| Period End | Type | Status | Affected | % Workforce | Announced | Expected Completion | Geography | Segment / Function | Charge | Source | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-08-01 | restructuring | in_progress | Manufacturing, engineering, and selling, marketing, general and administrative roles | USD 32 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Global Repositioning Actions transformation initiative to align enterprise strategy and organizational design; net special charges of $32.4 million in the nine months ended 2026-08-01. Severance liability roll-forward: $4.1M at 2025-11-01, $29.1M costs added, $7.0M balance at 2026-08-01. Employee headcount affected not disclosed. | |||||
| 2026-08-01 | acquisition_addition | completed | 2026-07-07 | Integrated voltage regulators and power management solutions | USD 1,500 (millions) | business_combinations_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Acquisition of Empower Semiconductor, Inc. for approximately $1.5 billion; headcount added not disclosed. | ||||
| 2026-08-01 | divestiture_reduction | completed | Penang, Malaysia | USD 24 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Completed sale of a subsidiary in Penang, Malaysia including facility and certain equipment previously held for sale; gain of approximately $24.2 million recorded in Special charges, net. Headcount removed not disclosed. | |||||
| 2026-08-01 | restructuring | in_progress | Global | Manufacturing, engineering, and SMG&A roles | USD 32 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Transformation initiative; net special charges of $32.4M recorded in nine months ended 2026-08-01, including $29.1M employee severance costs, net and a $15.6M San Jose sublease impairment. Severance accrual balance $7.0M at quarter-end after $26.2M of payments YTD. No employee count disclosed. | ||||
| 2026-08-01 | acquisition_addition | completed | 2026-07-07 | 2026-07-07 | United States | Power management / integrated voltage regulators | business_combinations_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Acquisition of Empower Semiconductor completed 2026-07-07 for approximately $1.5B; $1.0B goodwill recognized. No headcount added disclosed; $23.4M transaction-related costs expensed in SMG&A. | |||
| 2026-08-01 | divestiture_reduction | completed | Penang, Malaysia | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Sale of a subsidiary in Penang, Malaysia (facility and certain equipment) completed in Q3 FY2026; gain of approximately $24.2M recorded in Special charges, net. No headcount removed disclosed. | ||||||
| 2026-08-01 | restructuring | in_progress | Global | Manufacturing, Engineering, Selling, Marketing, General and Administrative | USD 29 (thousands) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Part of Global Repositioning Actions. Employee count not disclosed; severance costs net of payments recorded. | ||||
| 2026-08-01 | acquisition_addition | completed | 2026-07-07 | business_combinations_footnote f5-10q / Qwen3.6-27B-Q8_0 | Acquisition of Empower Semiconductor completed July 7, 2026. Headcount added not explicitly disclosed. | ||||||
| 2026-05-02 | restructuring | in_progress | Manufacturing, engineering, and selling, marketing, general and administrative roles | USD 32 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Global Repositioning Actions transformation initiative; severance costs for terminated employees in manufacturing, engineering and SMG&A roles. Accrued severance liability of $13.4 million remained at May 2, 2026. No employee count disclosed. | |||||
| 2026-05-02 | plant_closure | completed | San Jose, California | USD 16 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Sublease of leased San Jose property in Q1 fiscal 2026 resulted in an impairment charge representing excess carrying value of the asset group over estimated fair value. No workforce reduction count disclosed. | |||||
| 2026-05-02 | restructuring | in_progress | Manufacturing, engineering, and selling, marketing, general and administrative roles | USD 32 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Global Repositioning Actions transformation initiative; $32.4M net special charges recorded in six months ended May 2, 2026, including a $15.6M impairment on a San Jose, California leased property asset group from a sublease agreement. Severance accrual roll-forward: $4.1M at Nov 1, 2025, $31.2M at Jan 31, 2026, $13.4M at May 2, 2026. No employee count, announcement date, or completion date disclosed. | |||||
| 2026-05-02 | restructuring | in_progress | Global | Manufacturing, Engineering, Selling, Marketing, General and Administrative | USD 32 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Global Repositioning Actions; employee count not disclosed. | ||||
| 2026-05-02 | plant_closure | completed | San Jose, California | USD 16 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Sublease agreement for leased property; impairment charge recorded. Employee count not disclosed. | |||||
| 2026-01-31 | restructuring | in_progress | Manufacturing, engineering, and selling, marketing, general and administrative roles | USD 32 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Severance costs for terminated employees under Global Repositioning Actions, a transformation initiative aligning enterprise strategy and streamlining operations; accrued liability of $31.2 million at quarter-end; no employee count disclosed | |||||
| 2026-01-31 | plant_closure | completed | San Jose, California | Leased facilities | USD 16 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Impairment charge from sublease of leased San Jose property, representing excess carrying value of asset group over estimated fair value; no workforce reduction count disclosed | ||||
| 2026-01-31 | restructuring | in_progress | Manufacturing, engineering, and selling, marketing, general and administrative roles | USD 29 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Global Repositioning Actions transformation initiative; $29.085M employee severance costs net recorded in Q1 FY2026; total special charges of $47.982M include a $15.6M impairment on San Jose, CA leased property sublease; severance accrual balance $31.248M at quarter-end; no employee count disclosed | |||||
| 2026-01-31 | restructuring | in_progress | manufacturing, engineering and selling, marketing, general and administrative | USD 32 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Global Repositioning Actions; employee count not disclosed. | |||||
| 2026-01-31 | other | completed | San Jose, California | USD 16 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Impairment charge related to sublease of leased property; no headcount impact disclosed. | |||||
| 2025-11-01 | restructuring | in_progress | Global | Manufacturing, engineering, sales, marketing and administrative functions | USD 64 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | FY2025 employee severance and benefit costs of $63.968M; cumulative net special charges of $591.6M through 2025-11-01 since program inception (Maxim integration and footprint consolidation). Headcount affected not disclosed; balance remaining at year-end was $4.115M | ||||
| 2025-11-01 | plant_closure | announced | Malaysia | Penang manufacturing facility | other f5-10k / MiMo-V2.6-Flash-fp8-HTML | In Q4 FY2025 the Penang facility met held-for-sale criteria with no write-down; no closure, sale completion date, or associated workforce reduction disclosed | |||||
| 2025-11-01 | restructuring | in_progress | Global | Manufacturing, Engineering, Sales, Marketing, Administrative | USD 69,980 (thousands) | restructuring_footnote f5-10k / Qwen3.6-27B-Q8_0 | Fiscal 2025 special charges of $69.98 million related to Global Repositioning Actions. Cumulative charges through Nov 1, 2025 are $591.6 million. Employee count affected in FY2025 not explicitly disclosed in footnote, only financial accruals provided. | ||||
| 2025-11-01 | restructuring | completed | Global | Manufacturing, Engineering, Sales, Marketing, Administrative | USD 0 (thousands) | restructuring_footnote f5-10k / Qwen3.6-27B-Q8_0 | Q4 2023 Plan. Cumulative charges of $155.9 million through Nov 2, 2024. Balance at Nov 1, 2025 is $0, indicating completion. No new charges in FY2025. | ||||
| 2025-08-02 | restructuring | in_progress | Manufacturing, Engineering, and Selling, Marketing, General and Administrative roles | USD 70 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Global Repositioning Actions, a transformation initiative to align enterprise strategy, organizational design and streamline operations; net special charges of $70.0 million recorded in the nine months ended August 2, 2025, primarily severance costs. Accrued severance liability of $9.3 million remained at quarter-end. No employee headcount affected was disclosed. | |||||
| 2025-08-02 | restructuring | in_progress | Manufacturing, engineering, and selling, marketing, general and administrative roles | USD 70 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Global Repositioning Actions transformation initiative; net special charges of $70.0 million recorded in the nine months ended August 2, 2025. Severance accrual roll-forward shows employee severance costs, net of $56.3M (Q1), $5.2M (Q2), and $2.4M (Q3), with a remaining accrued balance of $9.292 million at August 2, 2025. No count of employees affected, announcement date, or completion date disclosed in this filing. | |||||
| 2025-08-02 | plant_closure | completed | Milpitas, CA, United States | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Sale of previously held-for-sale Milpitas, CA facility completed during the second quarter of fiscal 2025 for approximately $39.7 million net of selling costs, with an immaterial loss recorded in Special charges, net. No associated workforce reduction disclosed. | ||||||
| 2025-08-02 | restructuring | in_progress | Global | Manufacturing, Engineering, Selling, Marketing, General and Administrative | USD 2 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Part of Global Repositioning Actions. Q3 2025 severance costs net were $2.4 million. Total YTD 2025 special charges were $70.0 million. | ||||
| 2025-08-02 | plant_closure | completed | 2025-06-30 | Milpitas, CA | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Sale of facility completed in Q2 2025 for approx $39.7 million net. Resulted in immaterial loss recorded in Special charges, net. | |||||
| 2025-05-03 | restructuring | in_progress | Manufacturing, Engineering, and Selling, Marketing, General and Administrative roles | USD 66 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Net special charges of $65.6 million recorded in the six months ended May 3, 2025 for severance under Global Repositioning Actions, a transformation initiative aligning enterprise strategy and streamlining operations. No employee count disclosed. Accrued severance liability of $21.0 million remained at May 3, 2025; $51.4 million of severance paid during the second quarter. | |||||
| 2025-05-03 | restructuring | in_progress | Global | Manufacturing, engineering, and SMG&A roles | USD 66 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Severance accrual roll-forward: $13.9M balance at 2024-11-02, $56.3M severance costs net in Q1, $5.2M in Q2, $21.0M balance at 2025-05-03; no employee count or completion date disclosed. Transformation initiative aligning enterprise strategy and organizational design. | ||||
| 2025-05-03 | plant_closure | completed | Milpitas, CA, United States | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Sale of previously held-for-sale facility completed in Q2 FY2025 for approximately $39.7M net of selling costs, with an immaterial loss in Special charges, net; no headcount disclosed. | ||||||
| 2025-05-03 | restructuring | in_progress | Global | Manufacturing, Engineering, Selling, Marketing, General and Administrative | USD 66 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Part of Global Repositioning Actions. Charges include severance costs for terminated employees. Employee count not disclosed. | ||||
| 2025-02-01 | restructuring | in_progress | Manufacturing, Engineering, and Selling, Marketing, General and Administrative roles | USD 64 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Global Repositioning Actions transformation initiative; severance costs for terminated employees under ongoing benefit plans or statutory requirements at foreign locations. Accrued severance liability of $67.3 million at February 1, 2025, including $56.3 million of employee severance costs accrued in the quarter. | |||||
| 2025-02-01 | restructuring | in_progress | Global | Manufacturing, engineering, and selling, marketing, general and administrative roles | USD 64 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Global Repositioning Actions transformation initiative; $63.9M net special charges in Q1 FY2025; accrued special charges balance of $67.3M at quarter-end. Number of employees affected not disclosed. | ||||
| 2025-02-01 | restructuring | in_progress | Global | Manufacturing, Engineering, Selling, Marketing, General and Administrative | USD 64 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Part of Global Repositioning Actions; employee count not disclosed. | ||||
| 2024-11-02 | restructuring | in_progress | 2023 | Global | Manufacturing, engineering, and SMG&A functions | USD 42 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Program committed in fiscal 2023; FY2024 charge of $41.9M is current-year activity only. Cumulative charges of $155.9M through 2024-11-02; remaining accrual $0.7M at year-end. Employee headcount affected not disclosed. | |||
| 2024-11-02 | restructuring | in_progress | 2021 | Global | Manufacturing, engineering, sales, marketing and administrative functions | USD -5 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Multi-year program tied to Maxim integration and footprint consolidation; FY2024 activity was a net reversal of $5.1M of prior accruals. Cumulative net charges of $527.6M through 2024-11-02. Employee headcount affected not disclosed. | |||
| 2024-11-02 | restructuring | in_progress | 2023-10-29 | Global | Manufacturing, Engineering, Selling, Marketing, General and Administrative | USD 42 (millions) | restructuring_footnote f5-10k / Qwen3.6-27B-Q8_0 | Q4 2023 Plan: Employee severance and benefit costs incurred in fiscal 2024 were $41.9 million. Cumulative net special charges through Nov 2, 2024 were $155.9 million. Specific headcount affected not disclosed. | |||
| 2024-11-02 | restructuring | in_progress | Global | Manufacturing, Engineering, Sales, Marketing, Administrative | USD -5 (millions) | restructuring_footnote f5-10k / Qwen3.6-27B-Q8_0 | Global Repositioning Actions: Employee severance and benefit costs incurred in fiscal 2024 were -$5.1 million (likely reversals or adjustments). Cumulative net special charges through Nov 2, 2024 were $527.6 million. Specific headcount affected not disclosed. | ||||
| 2024-08-03 | restructuring | in_progress | USD 4,099 (thousands) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Employee severance and benefit costs of $4.1 million recorded in the three months ended August 3, 2024 under the Q4 2023 Plan; accrued severance liability of $7.5 million at quarter-end. No employee headcount figures disclosed. | ||||||
| 2024-08-03 | restructuring | in_progress | USD 21,235 (thousands) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | No new severance charges in the quarter; accrued severance liability of $21.2 million remained at August 3, 2024, of which $16.8 million in accrued liabilities and $4.4 million in other non-current liabilities. No employee headcount figures disclosed. | ||||||
| 2024-08-03 | restructuring | in_progress | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Global Repositioning Actions program continued in Q3 FY2024: severance and benefit payments of $5.767M during the quarter and a net credit of $5.106M to accruals; remaining accrual balance $21.235M at August 3, 2024 ($16.846M in accrued liabilities, $4.389M in other non-current liabilities). No employee count or announcement date disclosed. | |||||||
| 2024-08-03 | restructuring | in_progress | USD 4 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Q4 2023 Plan: employee severance and benefit costs of $4.099M and payments of $14.592M during the quarter; remaining accrual balance $7.530M at August 3, 2024, all in accrued liabilities. No employee count or announcement date disclosed. | ||||||
| 2024-08-03 | restructuring | in_progress | 2023-10-28 | USD 4,099 (thousands) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Q4 2023 Plan: Employee severance and benefit costs recorded in Q3 2024. No employee count disclosed. | |||||
| 2024-08-03 | restructuring | in_progress | USD -5,106 (thousands) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Global Repositioning Actions: Net adjustment to employee severance and benefit costs in Q3 2024. No employee count disclosed. | ||||||
| 2024-05-04 | restructuring | in_progress | USD 21,688 (thousands) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Accrued balance of $21.7M at May 4, 2024 (from $37.0M at Oct 28, 2023). Severance and benefit payments of $10.2M during first six months of fiscal 2024. No employee count disclosed. | ||||||
| 2024-05-04 | restructuring | in_progress | USD 18,023 (thousands) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Accrued balance of $18.0M at May 4, 2024 (from $110.4M at Oct 28, 2023). Employee severance and benefit costs of $35.2M and payments of $127.6M during first six months of fiscal 2024. No employee count disclosed. | ||||||
| 2024-05-04 | restructuring | in_progress | 2023-10-29 | USD 22,117 (thousands) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Q4 2023 Plan: YTD severance and benefit costs net $23.2M; payments $40.6M. Accrued liability $18.0M. | |||||
| 2024-05-04 | restructuring | in_progress | USD -5,106 (thousands) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Global Repositioning Actions: Q3 net benefit $5.1M; payments $5.8M. Accrued liability $21.7M. | ||||||
| 2024-02-03 | restructuring | in_progress | USD 11,977 (thousands) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q4 2023 Plan consists of voluntary and involuntary reductions-in-force and other cost-savings initiatives to align cost structure with weaker market demand. Employee severance and benefit costs of $11,977 thousand recorded in the quarter; severance and benefit payments of $87,013 thousand made; accrued liability of $35,410 thousand remained at quarter-end. No employee counts disclosed. | ||||||
| 2024-02-03 | restructuring | in_progress | 2023-10-28 | Global | Company-wide | USD 16 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Q4 2023 Plan: voluntary and involuntary reductions-in-force plus cost-savings initiatives to align with weaker demand. Severance accrual of $35.4M remaining at quarter-end; $87.0M paid during quarter. No employee count disclosed. | |||
| 2024-02-03 | restructuring | in_progress | Global | Company-wide | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Global Repositioning Actions: prior-period program with $32.6M accrual remaining at quarter-end ($23.1M non-current); $4.4M paid during quarter. No employee count or announcement date disclosed in this filing. | |||||
| 2024-02-03 | restructuring | in_progress | 2023-10-28 | Global | Global | USD 16,140 (thousands) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Charges recorded for the 'Q4 2023 Plan' to reorganize business, consisting of voluntary and involuntary reductions-in-force. Total accrued special charges balance at Feb 3, 2024 was $67.97 million ($35.41 million for Q4 2023 Plan). Employee count affected not disclosed. | |||
| 2023-10-28 | restructuring | in_progress | 2024-05-04 | Global | Manufacturing, engineering and selling, marketing, general and administrative functions | USD 114 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Committed to during the three months ended October 28, 2023; $114.0M recorded in fiscal 2023, with total expected charges of $120.0M–$140.0M; consists of voluntary and involuntary reductions-in-force plus other cost-savings initiatives; headcount not disclosed | |||
| 2023-10-28 | restructuring | in_progress | Global | Manufacturing, engineering, sales, marketing and administrative offices | USD 45 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Fiscal 2023 employee severance and benefit costs of $45.1M within a multi-year program; cumulative net special charges of $532.7M through October 28, 2023; $37.0M accrual balance remains at year-end; headcount not disclosed | ||||
| 2023-10-28 | plant_closure | completed | United States, Singapore | Wafer fabrication and test operations | USD 64 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Cumulative through fiscal year-end; no charges recorded during fiscal 2023 (accrued balance reached zero); includes Hillview/Milpitas, California and Singapore facility consolidations from the Linear acquisition; headcount not disclosed | ||||
| 2023-10-28 | plant_closure | completed | United States | Corporate campus — Milpitas, California | other f5-10k / MiMo-V2.6-Flash-fp8-HTML | Usage of the Milpitas campus ceased during fiscal 2023 and the facility met held-for-sale criteria; no write-down required and no workforce impact disclosed | |||||
| 2023-10-28 | restructuring | in_progress | 2023-10-28 | 2024-05-04 | Global | Manufacturing, Engineering, Selling, Marketing, General and Administrative | USD 114 (millions) | restructuring_footnote f5-10k / Qwen3.6-27B-Q8_0 | Q4 2023 Plan: voluntary and involuntary reductions-in-force. Total expected charges $120M-$140M. Majority of actions expected to be completed by Q2 FY2024. | ||
| 2023-10-28 | restructuring | in_progress | Global | Manufacturing, Engineering, Sales, Marketing, Administrative | USD 533 (millions) | restructuring_footnote f5-10k / Qwen3.6-27B-Q8_0 | Global Repositioning Actions: Cumulative charges through Oct 28, 2023 related to integration of Maxim acquisition and organizational initiatives. | ||||
| 2023-10-28 | plant_closure | completed | United States | Manufacturing | USD 64 (millions) | restructuring_footnote f5-10k / Qwen3.6-27B-Q8_0 | Closure of Manufacturing Facilities: Cumulative charges through Oct 28, 2023 for consolidation of wafer and test facility operations acquired from Linear. | ||||
| 2023-07-29 | restructuring | in_progress | Global | USD 22 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Ongoing global repositioning program; charge shown is employee severance and benefit costs recorded in the three months ended July 29, 2023 ($21,928 thousand). Accrued balance was $45,486 thousand at quarter end ($22,350 thousand in accrued liabilities, $23,136 thousand in other non-current liabilities). No employee count, announcement date, or completion date disclosed. | |||||
| 2023-07-29 | plant_closure | in_progress | United States (Cary, North Carolina and Milpitas, California) | other f5-10q / MiMo-V2.6-Flash-fp8-HTML | Filer states that during fiscal 2023 it ceased usage of an office facility in Cary, NC and a campus facility in Milpitas, CA and classified both as held for sale; no write-down was required. No specific date, employee count, or workforce impact disclosed. | ||||||
| 2023-07-29 | restructuring | in_progress | Global | Global Repositioning Actions | USD 23,539 (thousands) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Filing discloses $23.5M in employee severance and benefit costs for the quarter and $46.7M YTD under 'Global Repositioning Actions'. No specific employee headcount affected is disclosed in this 10-Q. | ||||
| 2023-04-29 | restructuring | in_progress | Global repositioning actions | USD 23,136 (thousands) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Employee severance and benefit costs of $23.1 million recorded in the quarter under global repositioning actions; accrued liability of $36.1 million at quarter-end. No employee count disclosed. | |||||
| 2023-04-29 | restructuring | in_progress | Global | USD 23 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Global Repositioning Actions; severance accrual roll-forward shows $23.1M employee severance and benefit costs recorded in Q2 FY2023 and $22.8M payments in the quarter. No employee count disclosed. | |||||
| 2023-04-29 | restructuring | in_progress | USD 23,136 (thousands) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Global Repositioning Actions: Employee severance and benefit costs incurred in the quarter. No employee count disclosed. | ||||||
| 2023-01-28 | restructuring | in_progress | Global | Global workforce | USD 16 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Global Repositioning Actions: $16.3M in severance and benefit payments made during Q1 FY2023; accrued balance declined from $52.1M to $35.8M. No employee count disclosed. MD&A attributes prior-period charges to Maxim integration and organizational alignment initiatives. | ||||
| 2023-01-28 | restructuring | in_progress | Global | USD 16,298 (thousands) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Severance and benefit payments of $16.3 million recorded during the quarter related to Global Repositioning Actions. No employee count disclosed. | |||||
| 2022-10-29 | restructuring | in_progress | Global | Manufacturing, engineering, sales, marketing and administrative | USD 180 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Fiscal 2022 activity within an ongoing multi-year program tied to Maxim integration and global footprint consolidation; $180.4M of severance and benefit costs plus accelerated equity awards, partly offset by an $8.3M gain on a business sale (net special charges of $174.8M). Employees affected not disclosed. | ||||
| 2022-10-29 | plant_closure | completed | 2022-07-31 | United States (Milpitas, California) | Wafer fabrication | USD 64 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Sale of the Hillview wafer fabrication facility completed in Q3 fiscal 2022 for ~$31.8M proceeds with a $4.4M gain; $63.8M charge is cumulative through fiscal year-end for the Linear-related facility consolidation program, not fiscal 2022-only. Employees affected not disclosed. | |||
| 2022-10-29 | other | completed | 2022-07-31 | United States (Santa Clara to San Jose, California) | Engineering, sales, marketing and administrative | USD 92 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Impairment recorded on transitioning activities from a leased Santa Clara property to an owned San Jose property; charge allocated $60.6M right-of-use assets, $28.1M leasehold improvements, $3.2M office equipment. No headcount reduction quantified. | |||
| 2022-10-29 | restructuring | completed | Global | Manufacturing, Engineering, SMG&A | USD 275 (thousands) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | Special charges of $274.5 million recorded in fiscal 2022, primarily for integration of Maxim and organizational initiatives. Includes $91.9 million impairment charge for Santa Clara sublease and severance/benefit costs. Employee count not explicitly disclosed in aggregate for the year. | ||||
| 2022-07-30 | restructuring | in_progress | Manufacturing, engineering, sales, marketing and administrative | USD 458 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Cumulative net special charges through 2022-07-30 for integration of the Maxim acquisition and organizational initiatives to consolidate footprint and align global workforce with long-term strategic plan; accrued liability of $58.5 million at quarter-end. No employee counts disclosed. | |||||
| 2022-07-30 | restructuring | in_progress | Manufacturing, engineering, sales, marketing and administrative | USD 50 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Employee severance and benefit costs recorded in the three months ended 2022-07-30 under the global repositioning program. | |||||
| 2022-07-30 | restructuring | in_progress | Manufacturing, engineering, sales, marketing and administrative | USD 154 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Nine-month fiscal 2022 special charges primarily consisting of severance and benefit costs plus charges from acceleration of equity awards upon termination of employees at sites assumed in the Maxim acquisition and other locations; partially offset by an $8.3 million gain on sale of a business. | |||||
| 2022-07-30 | restructuring | completed | 2022-07-30 | Santa Clara, California, United States | Engineering, sales, marketing and administrative | USD 92 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Transition of activities from leased Santa Clara property to owned San Jose property; impairment represents excess carrying value of asset group over estimated fair value from sublease cash flows, allocated $60.6M to right-of-use assets, $28.1M to leasehold improvements, $3.2M to office equipment. | |||
| 2022-07-30 | plant_closure | in_progress | Milpitas, California, United States | Wafer fabrication and test operations | USD 63 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Cumulative net special charges through 2022-07-30 from consolidating certain wafer and test facility operations acquired in the Linear Technology acquisition. In Q3 fiscal 2022 the Hillview wafer fabrication facility and certain Milpitas equipment were sold for approximately $31.8 million, generating a $4.4 million gain. No employee counts disclosed. | ||||
| 2022-07-30 | restructuring | in_progress | Global | Manufacturing, engineering, sales, marketing and administrative | USD 50 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Global Repositioning Actions tied to Maxim integration and organizational consolidation; charge shown is Q3 employee severance and benefit cost additions per the accrual roll-forward. Cumulative net special charges of $458.1M through July 30, 2022; includes a $91.9M Santa Clara, CA leased-property impairment recorded in Q3. No employee count disclosed. | ||||
| 2022-07-30 | plant_closure | completed | Milpitas, California, United States | Wafer fabrication (manufacturing) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Sale of Hillview wafer fabrication facility and certain Milpitas equipment completed in Q3 fiscal 2022 for ~$31.8M, generating a $4.4M gain; part of the Closure of Manufacturing Facilities program (cumulative net special charges of $63.4M through July 30, 2022) covering wafer and test operations acquired with Linear Technology. No employee count disclosed. | |||||
| 2022-07-30 | restructuring | in_progress | Global | Manufacturing, Engineering, Sales, Marketing, Administrative | USD 245 (thousands) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Includes $91.9M impairment charge for Santa Clara leased property sublease; $153.5M severance/benefit costs; acceleration of equity awards. Part of Maxim integration and global footprint consolidation. | ||||
| 2022-07-30 | plant_closure | completed | Milpitas, California | Manufacturing | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Sale of Hillview wafer fabrication facility and equipment for $31.8M, resulting in $4.4M gain. Previously classified as held for sale. | |||||
| 2022-04-30 | restructuring | in_progress | Global | Manufacturing, Engineering, and Selling, Marketing, General and Administrative (SMG&A) | USD 96 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Six-month fiscal 2022 charges of $95.5 million primarily severance and benefit costs ($103.8 million) plus accelerated equity awards for terminated employees, partially offset by an $8.3 million gain on a business sale; part of Maxim integration and global repositioning. Cumulative net special charges of $316.4 million through April 30, 2022. Accrued liability of $53.5 million at quarter-end. | ||||
| 2022-04-30 | plant_closure | in_progress | Milpitas, California, United States | Wafer fabrication (Hillview facility, acquired via Linear Technology) | USD 4 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Consolidation of wafer and test facility operations acquired with Linear Technology; cumulative net special charges of $66.9 million through April 30, 2022. Hillview fab ceased production in fiscal 2021 and is held for sale ($26.4 million net assets in Prepaid expenses and other current assets). Facility closure costs of $4.3 million recorded in the quarter; Singapore facility sale completed in fiscal 2021 with $13.6 million gain. | ||||
| 2022-04-30 | restructuring | in_progress | Global | Manufacturing, Engineering, SMG&A | USD 96 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Global Repositioning Actions tied to Maxim integration; includes $103.8M severance and benefit costs, offset by $8.3M gain on business sale. No employee count disclosed. | ||||
| 2022-04-30 | plant_closure | in_progress | United States (Milpitas, CA); Singapore | Wafer fabrication and test operations | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Closure of Linear Technology-acquired wafer/test facilities; Hillview facility held for sale. No employee count disclosed. | |||||
| 2022-04-30 | restructuring | in_progress | Global | Manufacturing, Engineering, SMG&A | USD 40 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Global Repositioning Actions: Employee severance and benefit costs incurred in Q3 FY22. Part of integration of Maxim acquisition. | ||||
| 2022-04-30 | plant_closure | in_progress | Global | Manufacturing | USD 4 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Closure of Manufacturing Facilities: Facility closure costs incurred in Q3 FY22. Consolidation of wafer and test facility operations acquired from Linear Technology. | ||||
| 2022-01-29 | restructuring | in_progress | Global workforce alignment | USD 53 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q1 FY2022 special charges of $53.1 million primarily severance and benefit costs ($61.4 million) plus accelerated equity awards for terminated employees tied to Maxim integration, offset by an $8.3 million gain on a business sale; cumulative charges $274.1 million; severance accrual balance $39.6 million at quarter-end. | |||||
| 2022-01-29 | plant_closure | in_progress | Milpitas, California; Singapore | Manufacturing | USD 7 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Consolidation of wafer and test facility operations acquired from Linear Technology; cumulative net special charges $62.6 million; Q1 included $6.5 million facility closure costs and $75 thousand severance; Hillview fab ceased production and is held for sale ($26.4 million net); Singapore facility sold for ~$35.7 million with $13.6 million gain. | ||||
| 2022-01-29 | restructuring | in_progress | Global | Global workforce repositioning | USD 53 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Q1 FY2022 special charges of $53.1M, primarily $61.4M severance and benefit costs plus equity award acceleration related to Maxim integration, offset by $8.3M gain on business sale. No employee count disclosed. | ||||
| 2022-01-29 | plant_closure | in_progress | United States | Manufacturing — wafer and test facility consolidation (Linear Technology legacy sites) | USD 7 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Q1 FY2022 accrual activity: $6.5M facility closure costs and $75K employee severance. Hillview wafer fab (Milpitas, CA) classified as held for sale. No employee count disclosed. | ||||
| 2022-01-29 | acquisition_addition | completed | 2021-08-26 | 2021-08-26 | Global | Analog and mixed-signal products | business_combinations_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Acquisition closed 2021-08-26; total consideration ~$28.0B. No headcount added disclosed in this filing. | |||
| 2022-01-29 | restructuring | in_progress | Global | Manufacturing, Engineering, SMG&A | USD 53 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Global Repositioning Actions: $53.1M charges in Q1 FY22, primarily $61.4M severance/benefits and equity acceleration for terminated employees during Maxim integration. Offset by $8.3M gain on business sale. | ||||
| 2022-01-29 | plant_closure | in_progress | Milpitas, California | Wafer Fabrication | USD 7 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Closure of Manufacturing Facilities: Consolidation of wafer/test operations acquired from Linear Technology. $6.6M facility closure costs recorded in Q1 FY22. Hillview facility previously classified as held for sale. | ||||
| 2021-10-30 | acquisition_addition | completed | 2021-08-26 | 2021-08-26 | Global | All functions | USD 27,949 (millions) | business_combinations_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Total purchase consideration of $27,949,098 thousand, all-stock at $164.00 per share. Headcount added not disclosed; Maxim contributed $558.8 million of revenue from the Acquisition Date. Includes $194.9 million fair value of replacement equity awards. | ||
| 2021-10-30 | restructuring | in_progress | Global | Acquisition integration | USD 83 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Fiscal 2021 charges of $83.4 million comprising $28.7 million severance and benefit costs plus $54.7 million accelerated equity awards, tied to termination of a limited number of employees during Maxim integration. Employee count not disclosed; $13.7 million remained accrued at year-end. | ||||
| 2021-10-30 | plant_closure | completed | United States | Wafer fabrication (Hillview facility, Milpitas, California) | USD 12 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Production ceased at Hillview during fiscal 2021; facility classified as held for sale with $26.4 million net PP&E reclassified to current assets. Part of consolidation of wafer/test operations acquired with Linear Technology; $55.9 million cumulative special charges through fiscal 2021 year-end, of which fiscal 2021 net activity was $1.1 million. Employee count not disclosed. | ||||
| 2021-10-30 | plant_closure | completed | 2022-10-30 | Singapore | Manufacturing facility and equipment sale | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Singapore facility sold during fiscal 2021 for approximately $35.7 million, generating a $13.6 million gain. Operations transitioning to Penang, Malaysia, the Philippines and outsourced assembly/test partners, expected to complete in fiscal 2022. Employee count not disclosed. | ||||
| 2021-10-30 | restructuring | completed | Global | Manufacturing | USD 12 (millions) | restructuring_footnote f5-10k / Qwen3.6-27B-Q8_0 | Closure of manufacturing facilities (Linear acquisition integration). Includes facility closure costs of $11.9M and gain on sale of facility. Employee count not explicitly disclosed for this specific action component. | ||||
| 2021-10-30 | restructuring | completed | Global | Other | USD 83 (millions) | restructuring_footnote f5-10k / Qwen3.6-27B-Q8_0 | Other special charges including severance and equity acceleration related to Maxim acquisition integration. Employee count not explicitly disclosed. | ||||
| 2021-07-31 | plant_closure | completed | Milpitas, California, United States | Manufacturing | USD 5 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Company ceased production at Hillview wafer fabrication facility in Q3 fiscal 2021; facility classified as held for sale with $29.0 million net carrying value reclassified to prepaid expenses and other current assets. No employee count disclosed. | ||||
| 2021-07-31 | plant_closure | completed | 2022-10-29 | Singapore | Manufacturing | USD 14 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Sold Singapore test facility and certain equipment for approximately $35.7 million, generating a $13.6 million gain; entered short-term leaseback while transitioning operations to Penang, Malaysia, the Philippines, and outsourced assembly and test partners, expected complete in fiscal 2022. No employee count disclosed. | |||
| 2021-07-31 | restructuring | in_progress | Manufacturing, Engineering, and Selling, Marketing, General and Administrative | USD 138 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Cumulative charges of $137.5 million through July 31, 2021 from organizational initiatives to align global workforce with long-term strategic plan; approximately $123.3 million for severance and fringe benefits, remainder from fiscal 2019 acquired IP write-off. No employee count disclosed. | |||||
| 2021-07-31 | restructuring | in_progress | Manufacturing | USD 47 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Cumulative net special charges of $46.8 million through July 31, 2021 from consolidating wafer and test facility operations acquired in the Linear Technology acquisition; includes severance, one-time termination benefits, and other exit costs. No employee count disclosed. | |||||
| 2021-07-31 | restructuring | in_progress | Global | Manufacturing, engineering, and SMG&A | USD 7,881 (thousands) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Accrual balance at 2021-07-31; cumulative special charges of $137.5M through 2021-07-31 for organizational initiatives aligning workforce with long-term strategy. No employee count disclosed. | ||||
| 2021-07-31 | plant_closure | in_progress | 2022-10-29 | United States (Milpitas, CA) and Singapore | Wafer fabrication and test operations | USD 26,875 (thousands) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Accrual balance at 2021-07-31; cumulative net charges of $46.8M for consolidating Linear-era wafer/test sites. Hillview (Milpitas) ceased production and was classified held-for-sale in Q3; Singapore facility sold for $35.7M with a $13.6M gain, operations transitioning to Penang and the Philippines by fiscal 2022. No employee counts disclosed. | |||
| 2021-07-31 | restructuring | in_progress | Global | Manufacturing, Engineering, SMG&A | USD 5 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Charges related to closure of manufacturing facilities (Hillview wafer fab ceased production; Singapore facility sold). Cumulative charges for Repositioning Action and Closure of Manufacturing Facilities are disclosed, but specific employee counts for the quarter are not provided. | ||||
| 2021-07-31 | plant_closure | completed | Singapore | Manufacturing | USD -14 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Sale of Singapore test facility resulted in a gain of $13.6 million. Operations transitioning to Penang, Malaysia, Philippines, and outsourced partners. | ||||
| 2021-05-01 | plant_closure | in_progress | 2021-10-30 | Milpitas, California, United States | Manufacturing (wafer fabrication) | USD 56 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Hillview wafer fabrication facility (acquired via Linear Technology) to close in fiscal 2021; production transferred to other internal facilities and external foundries. $55.7 million is the cumulative special charge through May 1, 2021 for the broader facility consolidation program, which also covers the Singapore test facility; no employee count disclosed. | |||
| 2021-05-01 | plant_closure | in_progress | 2022-10-29 | Singapore | Manufacturing (test operations) | USD 56 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Singapore test facility transition to be completed in fiscal year ending October 29, 2022; testing moves to Penang, Malaysia, the Philippines, and outsourced assembly and test partners. Facility met held-for-sale criteria; management agreed to sell it at end of May 2021. $55.7 million is the cumulative program-level charge shared with the Hillview closure; no employee count disclosed. | |||
| 2021-05-01 | restructuring | in_progress | Manufacturing, Engineering, and Selling, Marketing, General and Administrative | USD 138 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Organizational initiatives to align global workforce with long-term strategic plan; cumulative special charges of $137.5 million through May 1, 2021, of which approximately $123.3 million was severance and fringe benefit costs. No employee count disclosed. | |||||
| 2021-05-01 | restructuring | in_progress | Global | Manufacturing, engineering, and SMG&A employees | USD 138 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Cumulative special charges through May 1, 2021 from organizational initiatives to align workforce with long-term strategy; includes $123.3M severance and fringe benefits. No employee count disclosed. | ||||
| 2021-05-01 | plant_closure | in_progress | 2021-10-30 | Milpitas, California, United States | Wafer fabrication (Hillview facility) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Hillview wafer fab closure planned in fiscal 2021 as part of consolidating Linear-acquired facilities; production to transfer to internal and external foundries. Cumulative program charges of $55.7M through May 1, 2021 (shared with Singapore transition). No employee count disclosed. | ||||
| 2021-05-01 | plant_closure | in_progress | 2022-10-29 | Singapore | Test facility operations | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Transition of Singapore test operations to Penang (Malaysia), the Philippines, and outsourced partners expected complete by fiscal year ending October 29, 2022; facility held for sale with expected sale end of May 2021. Cumulative program charges of $55.7M through May 1, 2021 (shared with Hillview closure). No employee count disclosed. | ||||
| 2021-05-01 | restructuring | in_progress | Global | Manufacturing, Engineering, SMG&A | USD 311 (thousands) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Repositioning Action: $311k special charges in Q2 FY2021. Cumulative charges $137.5M through May 1, 2021. Affects manufacturing, engineering, and SMG&A employees. | ||||
| 2021-05-01 | plant_closure | in_progress | 2022-10-29 | Singapore, Milpitas CA | Manufacturing | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Closure of Manufacturing Facilities: Consolidating wafer/test operations from Linear acquisition. Hillview wafer fab closing in FY2021; Singapore test facility transition completing in FY2022. Cumulative charges $55.7M through May 1, 2021. | ||||
| 2021-05-01 | restructuring | in_progress | USD 311,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | |||||||
| 2021-05-01 | restructuring | in_progress | Facility Closing [Member] | USD 311,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2021-05-01 | restructuring | in_progress | Reposition Action [Member] | USD 0 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2021-05-01 | restructuring | in_progress | Other Actions [Member] | USD 0 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2021-01-30 | restructuring | in_progress | Manufacturing, Engineering, SMG&A | USD 138 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Cumulative charges through 2021-01-30 for organizational initiatives to align global workforce with long-term strategic plan; ~$123.3M severance and fringe benefits, ~$14.2M fiscal 2019 IP write-off. Accrued balance $12.9M at quarter-end. | |||||
| 2021-01-30 | plant_closure | in_progress | 2021-10-30 | Milpitas, California, United States | Wafer fabrication | USD 55 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Cumulative charges through 2021-01-30 for consolidating wafer and test operations acquired from Linear Technology; Hillview wafer fab closure planned in fiscal 2021. | |||
| 2021-01-30 | plant_closure | in_progress | 2022-10-29 | Singapore | Test operations | USD 55 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Singapore test facility closure planned for fiscal year ending 2022-10-29; testing to transition to Penang, Malaysia, the Philippines, and outsourced partners. Facility met held-for-sale criteria; net carrying value $22.2M reclassified to prepaid expenses and other current assets; sale agreement for May 2021. $55.4M charge is cumulative across both closure components. | |||
| 2021-01-30 | plant_closure | in_progress | 2021-10-30 | Milpitas, California, United States | Wafer fabrication (Hillview facility) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Closure of Hillview wafer fab planned for fiscal 2021; cumulative special charges of $55.4M for facility closures through Jan 30, 2021; no employee count disclosed. | ||||
| 2021-01-30 | plant_closure | in_progress | 2022-10-29 | Singapore | Test facility operations | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Singapore test facility closure planned for fiscal year ending Oct 29, 2022; facility designated held-for-sale with sale expected May 2021; no employee count disclosed. | ||||
| 2021-01-30 | restructuring | in_progress | Global | Manufacturing, Engineering, SMG&A | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Repositioning action: cumulative special charges of $137.5M through Jan 30, 2021 for organizational initiatives; $123.3M for severance/fringe; no employee count disclosed. | |||||
| 2021-01-30 | acquisition_addition | announced | 2020-07-12 | Global | Analog and mixed-signal products | business_combinations_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Pending acquisition of Maxim Integrated Products; estimated merger consideration ~$27.0B; no headcount addition disclosed. | ||||
| 2021-01-30 | restructuring | in_progress | Global | Manufacturing, Engineering, SMG&A | USD 0 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Part of 'Repositioning Action' and 'Closure of Manufacturing Facilities'. Cumulative charges of $137.5M and $55.4M respectively through Jan 30, 2021. Q1 special charges were $0.4M. Employee counts not disclosed for this period. | ||||
| 2021-01-30 | plant_closure | in_progress | 2021-10-30 | Milpitas, California | Wafer Fabrication | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Hillview wafer fabrication facility planned for closure in fiscal 2021. Production to be transferred to other internal facilities and external foundries. | ||||
| 2021-01-30 | plant_closure | in_progress | 2022-10-29 | Singapore | Test Facility | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Singapore test facility planned for closure in fiscal 2022. Operations to transition to Penang, Malaysia, Philippines, and outsourced partners. | ||||
| 2021-01-30 | restructuring | in_progress | USD 438,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | |||||||
| 2021-01-30 | restructuring | in_progress | Facility Closing [Member] | USD 438,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2021-01-30 | restructuring | in_progress | Reposition Action [Member] | USD 0 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2021-01-30 | restructuring | in_progress | Other Actions [Member] | USD 0 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2020-10-31 | restructuring | in_progress | Global | Manufacturing, engineering and SMG&A | USD 49 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Fiscal 2020 charges from organizational initiatives to align the global workforce with long-term strategy; filing states no future net annualized savings as reductions are redeployed. Headcount affected not disclosed. | ||||
| 2020-10-31 | plant_closure | in_progress | 2021-10-30 | United States (Milpitas, CA); Singapore | Wafer fabrication and test operations | USD 3 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Consolidation of wafer and test operations acquired with Linear Technology; plans to close the Hillview wafer fab and Singapore test facility in fiscal 2021. Singapore site classified held for sale with sale expected May 2021. Headcount affected not disclosed. | |||
| 2020-10-31 | acquisition_addition | announced | 2020-07-12 | Global | Analog and mixed-signal products | business_combinations_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | All-stock merger at 0.630 ADI shares per Maxim share, approximately $23.0 billion; pending non-U.S. regulatory approvals as of filing date. Acquired headcount not disclosed; $20.1 million of transaction costs recorded in fiscal 2020. | ||||
| 2020-10-31 | restructuring | in_progress | Global | Various | USD 49 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | Recorded special charges of $49.4 million for organizational initiatives to align global workforce. Employee count not disclosed. | ||||
| 2020-10-31 | plant_closure | in_progress | United States, Singapore | Manufacturing | USD 3 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | Recorded special charges of $2.9 million for consolidation of wafer and test facility operations. Employee count not disclosed. | ||||
| 2020-10-31 | restructuring | in_progress | USD 52,337,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | |||||||
| 2020-10-31 | restructuring | in_progress | Facility Closing [Member] | USD 2,918,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | ||||||
| 2020-10-31 | restructuring | in_progress | Repositioning Action [Member] | USD 49,419,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | ||||||
| 2020-10-31 | restructuring | in_progress | Other Restructuring [Member] | USD 0 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | ||||||
| 2020-10-31 | restructuring | in_progress | Facility Closing [Member] / Workforce Reduction Plan 2020 [Member] | USD 54,900,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | ||||||
| 2020-10-31 | restructuring | in_progress | Repositioning Action [Member] / Workforce Reduction Plan 2020 [Member] | USD 137,500,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | ||||||
| 2020-08-01 | restructuring | in_progress | Manufacturing, engineering, and selling, marketing, general and administrative | USD 33 (millions) | MD&A f5-10q / GLM-5.3-flash-fp4-HTML | Organizational initiatives to align global workforce with long-term strategic plan; Q3 charge $33.2M, nine-month charge $42.4M, cumulative $130.5M through 2020-08-01. Q3 action not expected to yield net annualized savings as reductions are redeployed. | |||||
| 2020-08-01 | restructuring | in_progress | Manufacturing, engineering, and selling, marketing, general and administrative | USD 42 (millions) | MD&A f5-10q / GLM-5.3-flash-fp4-HTML | Nine-month portion of repositioning charges; cumulative charges of approximately $130.5 million through August 1, 2020, of which ~$116.3M was severance and fringe benefit costs. | |||||
| 2020-08-01 | plant_closure | in_progress | 2021-10-30 | Milpitas, California, United States | Wafer fabrication (Linear Technology-acquired operations) | USD 54 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Hillview wafer fabrication facility to close in fiscal year ending October 30, 2021; production to transfer to other internal facilities and external foundries. Cumulative charges $53.9M; expected annual salary, variable compensation and benefit savings ~$60.0M. | |||
| 2020-08-01 | plant_closure | in_progress | 2021-10-30 | Singapore | Test operations (Linear Technology-acquired operations) | USD 54 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Singapore test facility to close in fiscal year ending October 30, 2021; testing to transition to Penang, Malaysia, the Philippines, and outsourced partners. Facility and certain equipment classified as held for sale (net carrying value $22.2M reclassified to current assets); sale agreement for May 2021. Cumulative program charges $53.9M shared with Hillview closure. | |||
| 2020-08-01 | acquisition_addition | announced | 2020-07-12 | 2021-07-12 | USD 9 (millions) | business_combinations_footnote f5-10q / GLM-5.3-flash-fp4-HTML | All-stock acquisition of Maxim Integrated Products; estimated consideration ~$20.0 billion. No headcount figures disclosed. $9.1M of transaction-related costs incurred in Q3 FY2020. Termination outside date July 12, 2021 (extendable). | ||||
| 2020-08-01 | restructuring | in_progress | Global | Manufacturing, engineering, and SMG&A employees | USD 33 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Organizational repositioning; $33.2M charge in Q3 FY2020 and $42.4M YTD; $130.5M cumulative through 2020-08-01. No employee count disclosed. Prior actions expected to yield ~$48.0M annualized savings; Q3 action expected to yield no net savings as reductions are redeployed. | ||||
| 2020-08-01 | plant_closure | in_progress | 2021-10-30 | Milpitas, California, United States | Wafer fabrication (Hillview facility) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Hillview wafer fab closure planned in fiscal year ending 2021-10-30; production to transfer to other internal and external foundry facilities. Part of $53.9M cumulative closure charges; no employee count disclosed. | ||||
| 2020-08-01 | plant_closure | in_progress | 2021-10-30 | Singapore | Test operations (Singapore test facility) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Singapore test facility closure planned in fiscal year ending 2021-10-30; testing to transition to Penang (Malaysia), the Philippines, and outsourced partners. Facility classified as held for sale with sale agreement for May 2021. No employee count disclosed. | ||||
| 2020-08-01 | acquisition_addition | announced | 2020-07-12 | Global | Analog and mixed-signal products | other f5-10q / MiMo-V2.6-Flash-fp8-HTML | All-stock merger announced 2020-07-12; estimated consideration ~$20.0B (based on 2020-08-14 closing price). Exchange ratio 0.630 ADI shares per Maxim share. No headcount added disclosed. $9.1M transaction costs incurred in Q3 FY2020. Termination fees: $725.0M mutual; $830.0M regulatory. | ||||
| 2020-08-01 | restructuring | in_progress | Global | Manufacturing, Engineering, SMG&A | USD 33 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Repositioning Action: Cumulative charges of $130.5M through Aug 1, 2020. Q3 charge of $33.2M. Aligns global workforce with long-term strategic plan. | ||||
| 2020-08-01 | plant_closure | in_progress | 2021-10-30 | Milpitas, California and Singapore | Manufacturing | USD -1 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Closure of Manufacturing Facilities: Consolidation of wafer/test operations from Linear acquisition. Q3 reversal of $1.4M. Cumulative charges $53.9M. Hillview wafer fab and Singapore test facility closing in FY2021. | |||
| 2020-08-01 | restructuring | in_progress | USD 31,830,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | |||||||
| 2020-08-01 | restructuring | in_progress | Facility Closing [Member] | USD -1,402,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2020-08-01 | restructuring | in_progress | Reposition Action [Member] | USD 33,232,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2020-08-01 | restructuring | in_progress | Other Actions [Member] | USD 0 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2020-05-02 | restructuring | in_progress | Global | Engineering and Selling, Marketing, General and Administrative | USD 97 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Cumulative charges of $97.2 million through May 2, 2020 to reposition the global workforce skill set toward the long-term strategic plan; $9.2 million recorded in Q1 fiscal 2020. Includes approximately $83.0 million of severance and fringe benefit costs and $14.2 million of acquired intellectual property write-offs recorded in fiscal 2019. Expected net annualized cash savings of approximately $48.0 million once fully implemented. Accrued balance of $23.3 million at May 2, 2020. Employee headcount affected not disclosed. | ||||
| 2020-05-02 | plant_closure | in_progress | 2021-10-30 | Milpitas, California; Singapore; Penang, Malaysia; Philippines | Manufacturing (wafer fabrication and test operations acquired from Linear Technology) | USD 55 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Cumulative special charges of $55.3 million through May 2, 2020 ($2.0 million in Q1 and $1.3 million in Q2 fiscal 2020) to consolidate wafer and test facility operations acquired with Linear Technology. Hillview wafer fabrication facility in Milpitas, California and Singapore test facility to close in fiscal year ending October 30, 2021; production to transfer to other internal facilities, external foundries, Penang, the Philippines and outsourced assembly/test partners. Expected annual salary, variable compensation and employee benefit savings of approximately $60.0 million. Accrued balance of $50.2 million at May 2, 2020. Employee headcount affected not disclosed. | |||
| 2020-05-02 | voluntary_separation | in_progress | USD 4 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Accrued liability roll-forward shows an Early Retirement Action accrual of $4.2 million at May 2, 2020 (all current), down from $4.6 million at November 2, 2019, with $0.2 million of severance and other payments made during the second quarter. Employee headcount affected not disclosed. | ||||||
| 2020-05-02 | restructuring | in_progress | USD 1 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Accrued liability roll-forward shows a Reduction of Operating Costs Action accrual of $0.5 million at May 2, 2020 (all current), down from $0.9 million at November 2, 2019. Employee headcount affected not disclosed. | ||||||
| 2020-05-02 | restructuring | in_progress | Global | Engineering, Selling, Marketing, General and Administrative | USD 9 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Repositioning action to realign global workforce skills with long-term strategy; $97.2M cumulative charge through May 2, 2020, of which $9.2M recorded in Q1 FY2020; expected net annualized cash savings of ~$48.0M once fully implemented; no employee count disclosed | ||||
| 2020-05-02 | plant_closure | in_progress | 2021-10-30 | Milpitas, California (Hillview wafer fab) and Singapore (test facility) | Manufacturing | USD 3 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Consolidation of wafer and test operations acquired with Linear Technology; $55.3M cumulative charge through May 2, 2020, of which $2.0M in Q1 FY2020 and $1.3M in Q2 FY2020 (six-month charge shown); closures planned in fiscal year ending October 30, 2021; severance and exit costs include one-time termination benefits earned over future service periods; no employee count disclosed | |||
| 2020-05-02 | restructuring | in_progress | Global | Engineering and SMG&A | USD 97,200 (thousands) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Repositioning Action: Cumulative charges of $97.2 million through May 2, 2020, to reposition global workforce skill set. Includes $83.0 million for severance/fringe benefits and $14.2 million for IP write-off. Expected annualized cash savings of $48.0 million. | ||||
| 2020-05-02 | plant_closure | in_progress | 2021-10-30 | Milpitas, California and Singapore | Manufacturing, Engineering and SMG&A | USD 55,300 (thousands) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Closure of Manufacturing Facilities: Cumulative charges of $55.3 million through May 2, 2020, to consolidate wafer and test operations acquired from Linear Technology. Plans to close Hillview wafer fab and Singapore test facility by fiscal year ending Oct 30, 2021. Expected annual salary/compensation savings of $60.0 million. | |||
| 2020-05-02 | restructuring | in_progress | USD 1,320,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | |||||||
| 2020-05-02 | restructuring | in_progress | Facility Closing [Member] | USD 1,982,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2020-05-02 | restructuring | in_progress | Other Restructuring [Member] | USD 0 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2020-05-02 | restructuring | in_progress | Special Termination Benefits [Member] | USD 0 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2020-05-02 | restructuring | in_progress | Reposition Action [Member] | USD 9,154,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2020-02-01 | restructuring | in_progress | 504 | Global | Engineering and Selling, Marketing, General and Administrative | USD 97 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Cumulative charges through 2020-02-01 to reposition global workforce skill set; approximately $83.0 million for severance and fringe benefits for 504 employees, of which 109 remained employed at quarter-end. Q1 fiscal 2020 charge was $9.2 million. Expected net annualized cash savings of approximately $48.0 million once fully implemented. | |||
| 2020-02-01 | plant_closure | in_progress | 1,100 | United States (Milpitas, CA), Singapore, Malaysia (Penang), Philippines | Manufacturing, Engineering and SMG&A | USD 54 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Cumulative charges through 2020-02-01 from consolidating wafer and test facility operations acquired with Linear Technology; Q1 fiscal 2020 charge was $2.0 million. Plans to close Hillview wafer fab (Milpitas, CA) and Singapore test facility over the next one to three years, transferring production to internal facilities, external foundries, Penang (Malaysia), the Philippines, and outsourced assembly and test partners. Expected annual salary, variable compensation and benefit savings of approximately $60.0 million. | |||
| 2020-02-01 | restructuring | in_progress | 504 | Global | Engineering and Selling, Marketing, General & Administrative | USD 97 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Cumulative charge through 2020-02-01; $9.2M recorded in Q1 FY2020. 109 of 504 employees still employed as of 2020-02-01. Expected net annualized cash savings of ~$48.0M once fully implemented. | |||
| 2020-02-01 | plant_closure | in_progress | 1,100 | United States (Milpitas, CA) and Singapore | Manufacturing, Engineering and Selling, Marketing, General & Administrative | USD 54 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Cumulative charge through 2020-02-01; $2.0M recorded in Q1 FY2020. Consolidation of wafer and test facilities acquired with Linear Technology. Hillview wafer fab (Milpitas, CA) and Singapore test facility to close over next one to three years. Expected annual savings of ~$60.0M once fully implemented. | |||
| 2020-02-01 | restructuring | in_progress | 504 | Global | Engineering and Selling, Marketing, General and Administrative | USD 97 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Repositioning Action: Cumulative charges of $97.2M through Feb 1, 2020. Includes severance for 504 employees; 109 still employed as of period end. | |||
| 2020-02-01 | plant_closure | in_progress | 1,100 | Milpitas, California and Singapore | Manufacturing, Engineering and Selling, Marketing, General and Administrative | USD 54 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Closure of Manufacturing Facilities: Cumulative charges of $54.0M through Feb 1, 2020. Consolidation of wafer and test facilities acquired from Linear Technology. | |||
| 2020-02-01 | restructuring | in_progress | USD 11,136,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | |||||||
| 2020-02-01 | restructuring | in_progress | Facility Closing [Member] | USD 1,982,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2020-02-01 | restructuring | in_progress | Other Restructuring [Member] | USD 0 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2020-02-01 | restructuring | in_progress | Special Termination Benefits [Member] | USD 0 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2020-02-01 | restructuring | in_progress | 504 | Reposition Action [Member] | USD 9,154,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | Expected positions to be eliminated | ||||
| 2019-11-02 | restructuring | in_progress | 464 | Global | Manufacturing, Engineering and SMG&A | USD 88 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | FY2019 charge of $88.1M comprises $73.9M severance/fringe benefits for 464 employees plus $14.2M write-off of acquired IP (IPR&D) from discontinued product strategies; 307 of the 464 remained employed at 2019-11-02 and must stay until involuntarily terminated to receive severance. Expected net annualized cash savings approximately $48.0M once fully implemented. | |||
| 2019-11-02 | plant_closure | in_progress | 1,100 | United States (Milpitas, California) and Singapore | Manufacturing, Engineering and SMG&A | USD 8 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Program to close the Hillview wafer fabrication facility (Milpitas, CA) and the Singapore test facility over the next one to three years, transferring work to internal sites, external foundries, Penang, the Philippines and outsourced partners. Charge shown is the $7.6M recorded in fiscal 2019; $52.0M is cumulative through 2019-11-02. The approximately 1,100 employees receiving one-time termination benefits is the cumulative program scope, not fiscal-2019-only. Expected annual savings approximately $60.0M once fully implemented. | |||
| 2019-11-02 | restructuring | in_progress | 464 | 2019-11-02 | Global | Manufacturing, Engineering, SMG&A | USD 88 (millions) | restructuring_footnote f5-10k / Qwen3.6-27B-Q8_0 | Repositioning action to align global workforce skill set. 307 of 464 employees still employed as of fiscal year-end. | ||
| 2019-11-02 | plant_closure | in_progress | 2018-11-03 | Milpitas, CA and Singapore | Manufacturing, Engineering, SMG&A | USD 8 (millions) | restructuring_footnote f5-10k / Qwen3.6-27B-Q8_0 | Consolidation of wafer and test facilities. Cumulative charge of $52.0 million through fiscal year-end. Approximately 1,100 employees affected cumulatively. | |||
| 2019-11-02 | restructuring | in_progress | USD 95,659,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | |||||||
| 2019-11-02 | restructuring | in_progress | Facility Closing [Member] | USD 7,556,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | ||||||
| 2019-11-02 | restructuring | in_progress | Reduction of Operating Costs [Member] | USD 0 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | ||||||
| 2019-11-02 | restructuring | in_progress | Special Termination Benefits [Member] | USD 0 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | ||||||
| 2019-11-02 | restructuring | in_progress | Repositioning Action [Member] | USD 88,103,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | ||||||
| 2019-11-02 | restructuring | in_progress | Facility Closing [Member] / Workforce Reduction Plan 2019 [Member] | USD 52,000,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | ||||||
| 2019-11-02 | restructuring | in_progress | Repositioning Action [Member] / Workforce Reduction Plan 2019 [Member] | USD 88,100,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | ||||||
| 2019-08-03 | restructuring | in_progress | 140 | Engineering and Selling, Marketing, General and Administrative | USD 24 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Charges of $20.7M in Q1 and $3.6M in Q2 fiscal 2019 to reposition global workforce skill set; ~$19.8M for severance and fringe benefits for 140 employees, remaining $4.4M was a write-off of acquired intellectual property. As of quarter-end, 18 of the 140 employees remained employed and must stay until involuntary termination to receive severance. | ||||
| 2019-08-03 | plant_closure | in_progress | 1,249 | United States (Milpitas, California) and Singapore | Manufacturing (wafer fabrication and test operations acquired from Linear Technology) | USD 51 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Cumulative special charges of $51.1M through August 3, 2019 for consolidation of wafer and test facility operations acquired with Linear Technology; includes severance, fringe benefits and one-time termination benefits for 1,249 manufacturing, engineering and SMG&A employees. Hillview wafer fab in Milpitas, CA and Singapore test facility to be closed over the next one to three years, with production transferred to other internal facilities, external foundries, Penang (Malaysia), the Philippines and outsourced assembly/test partners. | |||
| 2019-08-03 | voluntary_separation | in_progress | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Accrual of $9.9M at fiscal 2018 year-end declined to $4.9M at August 3, 2019 through severance and other payments; no employee count or new charges disclosed in this filing. | |||||||
| 2019-08-03 | restructuring | in_progress | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Accrual of $5.3M at fiscal 2018 year-end declined to $1.3M at August 3, 2019 through severance and other payments; no employee count or new charges disclosed in this filing. | |||||||
| 2019-08-03 | restructuring | in_progress | 140 | Global | Engineering and Selling, Marketing, General and Administrative (SMG&A) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Program originated in Q1 FY2019 (charges of $20.7M) with a further $3.6M in Q2 FY2019; no charge recorded in Q3. Severance and fringe benefit costs covered 140 employees; 18 remained employed at 2019-08-03 and must be involuntarily terminated to receive benefits. A separate $4.4M of Q1 charges wrote off acquired IP from discontinued product strategies. | ||||
| 2019-08-03 | plant_closure | in_progress | 1,249 | United States (Milpitas, California) and Singapore; work transferring to Penang, Malaysia and the Philippines | Manufacturing, engineering and SMG&A | USD 51 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Cumulative special charges of $51.1M through 2019-08-03 for consolidating wafer and test operations acquired with Linear Technology; $6.6M recorded in the first nine months of FY2019. One-time termination benefits recognized over the future service period; employees must remain employed until terminated by the Company. Filer states closures planned over the next one to three years (Hillview wafer fab and Singapore test facility). | |||
| 2019-08-03 | restructuring | in_progress | 140 | Global | Engineering and SMG&A | USD 24 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Repositioning Action: 140 engineering and SMG&A employees. $19.8M severance/fringe, $4.4M IP write-off. 18 employees still employed as of Aug 3, 2019. | |||
| 2019-08-03 | restructuring | in_progress | 1,249 | Global (Milpitas, CA; Singapore; Penang, Malaysia; Philippines) | Manufacturing, Engineering, and SMG&A | USD 51 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Closure of Manufacturing Facilities: Consolidation of wafer and test operations acquired from Linear. 1,249 employees. Cumulative charges of $51.1M through Aug 3, 2019. | |||
| 2019-08-03 | restructuring | in_progress | USD 927,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | |||||||
| 2019-08-03 | restructuring | in_progress | Facility Closing [Member] | USD 927,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2019-08-03 | restructuring | in_progress | Other Restructuring [Member] | USD 0 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2019-08-03 | restructuring | in_progress | Special Termination Benefits [Member] | USD 0 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2019-08-03 | restructuring | in_progress | 140 | Reposition Action [Member] | USD 0 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | Expected positions to be eliminated | ||||
| 2019-08-03 | restructuring | in_progress | Facility Closing [Member] / Workforce Reduction Plan 2018 [Member] | USD 51,100,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2019-05-04 | restructuring | in_progress | 140 | Global | Engineering and Selling, Marketing, General and Administrative | USD 20 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Charges of $20.7M in Q1 and $3.6M in Q2 FY2019 for workforce repositioning; ~$19.8M severance/fringe for 140 employees, of whom 68 remained employed at May 4, 2019. Additional $4.4M related to write-off of acquired intellectual property, not severance. | |||
| 2019-05-04 | plant_closure | in_progress | 1,249 | Milpitas, California; Singapore; Penang, Malaysia; Philippines | Manufacturing (wafer fabrication and test operations acquired from Linear Technology) | USD 49 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Cumulative special charges of $48.7M through May 4, 2019 for closure of Hillview wafer fab (Milpitas, CA) and Singapore test facility over two to four years; severance and one-time termination benefits for 1,249 manufacturing, engineering and SMG&A employees. | |||
| 2019-05-04 | voluntary_separation | in_progress | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Early retirement action accrual roll-forward disclosed; accrual balance of $5.5M at May 4, 2019 after $1.6M of severance and other payments in Q2 FY2019. No employee count disclosed in this filing. | |||||||
| 2019-05-04 | restructuring | in_progress | 140 | Global | Engineering and Selling, Marketing, General & Administrative | USD 4 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Special charges of $20.7M in Q1 FY2019 and $3.6M in Q2 FY2019; approximately $19.8M of combined charges was severance and fringe benefits for 140 employees, with 68 still employed at May 4, 2019. Remaining $4.4M was a write-off of acquired IP. No annual savings expected. | |||
| 2019-05-04 | plant_closure | in_progress | 1,249 | United States (Milpitas, California) and Singapore | Manufacturing, engineering and SMG&A | USD 6 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Consolidation of wafer and test operations acquired with Linear Technology: closure of Hillview wafer fab (Milpitas, CA) and Singapore test facility planned over the next two to four years, with production transferring to other internal facilities, external foundries, Penang (Malaysia), the Philippines and outsourced partners. Charge shown is the $5.7M recorded in the first six months of fiscal 2019; cumulative charges of $48.7M through May 4, 2019. One-time termination benefits for 1,249 employees, recognized over future service periods. | |||
| 2019-05-04 | restructuring | in_progress | 140 | 2019-01-01 | Global | Engineering and SMG&A | USD 24 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Repositioning Action: 140 engineering and SMG&A employees. $20.7M Q1 charge, $3.6M Q2 charge. Includes $4.4M IP write-off. 68 employees still employed as of May 4, 2019. | ||
| 2019-05-04 | plant_closure | in_progress | 1,249 | Milpitas, CA and Singapore | Manufacturing, Engineering and SMG&A | USD 49 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Closure of Manufacturing Facilities: Consolidation of wafer and test operations acquired from Linear. $48.7M cumulative charges through May 4, 2019. $5.7M recorded in first six months of fiscal 2019. | |||
| 2019-05-04 | restructuring | in_progress | Employee Severance [Member] | USD 19,800,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2019-05-04 | restructuring | in_progress | USD 8,162,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | |||||||
| 2019-05-04 | restructuring | in_progress | Facility Closing [Member] | USD 4,593,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2019-05-04 | restructuring | in_progress | Other Restructuring [Member] | USD 0 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2019-05-04 | restructuring | in_progress | Special Termination Benefits [Member] | USD 0 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2019-05-04 | restructuring | in_progress | 140 | Reposition Action [Member] | USD 3,569,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | Expected positions to be eliminated | ||||
| 2019-05-04 | restructuring | in_progress | Facility Closing [Member] / Workforce Reduction Plan 2018 [Member] | USD 48,700,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2019-02-02 | restructuring | in_progress | 114 | Engineering and Selling, Marketing, General and Administrative | USD 21 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q1 FY2019 charge to reposition global workforce skill set; ~$16.3M severance for 114 employees, remaining ~$4.4M write-off of acquired intellectual property. 100 of 114 employees still employed at quarter-end. | ||||
| 2019-02-02 | plant_closure | in_progress | 1,249 | Milpitas, California; Singapore; Penang, Malaysia; Philippines | Manufacturing (wafer fabrication and test operations acquired from Linear Technology) | USD 44 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Cumulative special charges of $44.1M through February 2, 2019 for closure of Hillview wafer fab and Singapore test facility over next two to four years; severance and one-time termination benefits for 1,249 manufacturing, engineering and SMG&A employees. | |||
| 2019-02-02 | restructuring | in_progress | 114 | Global | Engineering; Selling, Marketing, General and Administrative (SMG&A) | USD 21 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Charge recorded in Q1 FY2019: $16.3M severance/fringe for 114 employees plus $4.4M write-off of acquired IP from discontinued product strategies. 100 of the 114 employees still employed at 2019-02-02; severance payable only upon involuntary termination. Filer states no annual savings expected. | |||
| 2019-02-02 | plant_closure | in_progress | 1,249 | Milpitas, California (Hillview wafer fabrication facility) and Singapore (test facility) | Manufacturing; Engineering; SMG&A | USD 44 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Cumulative charge and 1,249-employee count through 2019-02-02, not a current-quarter figure; program originated with the Linear Technology acquisition. Closure planned over the next two to four years; wafer production to transfer to internal facilities and external foundries, testing to Penang (Malaysia), the Philippines, and outsourced partners. Accrual balance $44.1M, substantially all non-current. | |||
| 2019-02-02 | voluntary_separation | in_progress | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Employee count not disclosed. Accrual roll-forward: $9.9M at 2018-11-03, less $2.8M severance/other payments, $7.1M balance at 2019-02-02 (all current). | |||||||
| 2019-02-02 | restructuring | in_progress | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Employee count not disclosed. Accrual roll-forward: $5.3M at 2018-11-03, less $2.5M severance/other payments, $2.8M balance at 2019-02-02 (all current). | |||||||
| 2019-02-02 | restructuring | in_progress | 114 | 2019-02-02 | Global | Engineering and Selling, Marketing, General and Administrative | USD 21 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Repositioning action to align global workforce skill set with long-term strategic plan. Includes $16.3M for severance/fringe benefits and $4.4M for write-off of acquired intellectual property. 100 of 114 employees still employed as of period end. | ||
| 2019-02-02 | plant_closure | in_progress | 1,249 | Milpitas, California and Singapore | Manufacturing, Engineering and Selling, Marketing, General and Administrative | USD 44 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Closure of Hillview wafer fabrication facility and Singapore test facility following Linear Technology acquisition. Cumulative charges of $44.1M through Feb 2, 2019. Expected completion over next two to four years. | |||
| 2019-02-02 | restructuring | in_progress | Employee Severance [Member] | USD 16,300,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2019-02-02 | restructuring | in_progress | USD 21,782,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | |||||||
| 2019-02-02 | restructuring | in_progress | 114 | Reposition Action [Member] | USD 20,655,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | Expected positions to be eliminated | ||||
| 2019-02-02 | restructuring | in_progress | Facility Closing [Member] | USD 1,127,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2019-02-02 | restructuring | in_progress | Other Restructuring [Member] | USD 0 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2019-02-02 | restructuring | in_progress | Special Termination Benefits [Member] | USD 0 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2018-11-03 | plant_closure | in_progress | 1,249 | United States (Milpitas, California) and Singapore | Manufacturing, engineering and SMG&A | USD 45 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Decision disclosed in Q1 FY2018 to consolidate wafer and test operations acquired with Linear; plans to close the Hillview wafer fab and Singapore test facility over the next two to four years. Charge comprises $41.2M in Q1 plus $3.3M of one-time termination benefits recognized in Q2-Q4 (Note 5 roll-forward: $44.452M); MD&A reports $44.5M. The 1,249 count covers the initial severance action only; headcount for the later $3.3M of benefits was not disclosed. | |||
| 2018-11-03 | restructuring | completed | 126 | Foreign locations (not specified) | Manufacturing, engineering and SMG&A | USD 17 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Fiscal 2018 action within a multi-year cost-reduction program; severance and fringe benefits for 126 employees. Employment of all employees in this action was terminated during the year. | |||
| 2018-11-03 | restructuring | in_progress | 1,249 | 2018-02-03 | 2022-11-03 | United States, Singapore | Manufacturing, Engineering, SMG&A | USD 45 (millions) | restructuring_footnote f5-10k / Qwen3.6-27B-Q8_0 | Consolidation of wafer and test facility operations acquired from Linear. Closure of Hillview wafer fabrication facility (Milpitas, CA) and Singapore test facility. Charge consists of severance and related benefit costs for 1,249 employees. Expected to complete over next two to four years. | |
| 2018-11-03 | restructuring | completed | 126 | 2018-01-01 | 2018-11-03 | Global | Manufacturing, Engineering, SMG&A | USD 17 (millions) | restructuring_footnote f5-10k / Qwen3.6-27B-Q8_0 | Reduction of operating costs action. Severance and fringe benefit costs for 126 employees. Employment of all associated employees terminated. | |
| 2018-11-03 | restructuring | in_progress | Facility Closing [Member] / Workforce Reduction Plan 2018 [Member] | USD 3,300,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | ||||||
| 2018-11-03 | restructuring | in_progress | USD 1,842,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | |||||||
| 2018-11-03 | restructuring | in_progress | Reduction of Operating Costs [Member] | USD 16,866,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | ||||||
| 2018-11-03 | restructuring | in_progress | Reduction of Operating Costs [Member] / Workforce Reduction Plan 2017 [Member] | USD 16,900,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | ||||||
| 2018-11-03 | restructuring | in_progress | Facility Closing [Member] | USD 44,452,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | ||||||
| 2018-11-03 | restructuring | in_progress | Special Termination Benefits [Member] | USD 0 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | ||||||
| 2018-08-04 | plant_closure | in_progress | 1,249 | 2018-02-03 | Milpitas, California and Singapore | Manufacturing, Engineering and SMG&A | USD 41 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q1 FY2018 charge of $41.2M for severance and fringe benefits; additional $2.2M of one-time termination benefits recorded in Q2 and Q3 FY2018. Company plans to close Hillview wafer fabrication facility and Singapore test facility over the next three to five years, transferring production to other internal facilities, external foundries, and facilities in Penang, Malaysia and the Philippines. Estimated annual savings of approximately $60.0 million once fully implemented. Accrual included in other non-current liabilities at August 4, 2018. | ||
| 2018-08-04 | restructuring | in_progress | 126 | 2018-02-03 | Manufacturing, Engineering and SMG&A | USD 16 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q1 FY2018 charge of approximately $16.1 million for severance and fringe benefit costs for 126 employees; 7 of the 126 employees still employed at August 4, 2018. Accrual included in accrued liabilities. | |||
| 2018-08-04 | voluntary_separation | in_progress | 225 | 2017-02-04 | Manufacturing, Engineering and SMG&A | USD 41 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Early retirement offer initiated in Q1 fiscal 2017 resulting in a special charge of approximately $41.3 million for 225 employees; 2 of the 225 employees still employed at August 4, 2018. Accrual included in accrued liabilities. Expected annual salary, variable compensation and benefit savings of approximately $28.4 million once fully implemented. | |||
| 2018-08-04 | restructuring | in_progress | 177 | 2017-02-04 | Manufacturing, Engineering and SMG&A | USD 8 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q1 fiscal 2017 charge of approximately $8.1 million for severance and fringe benefit costs for 177 employees; 2 of the 177 employees still employed at August 4, 2018. Accrual included in accrued liabilities. | |||
| 2018-08-04 | restructuring | in_progress | 123 | 2016-01-30 | Manufacturing, Engineering and SMG&A | USD 14 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q2 fiscal 2016 charge of approximately $13.7 million for severance and fringe benefit costs for 123 employees; 5 of the 123 employees still employed at August 4, 2018. Accrual included in accrued liabilities. | |||
| 2018-08-04 | plant_closure | in_progress | 1,249 | 2018-02-03 | 2023-02-03 | Milpitas, California and Singapore | Manufacturing, Engineering, and SMG&A | USD 41 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Consolidation of wafer and test facilities acquired with Linear Technology; closure planned over three to five years. Additional $2.2M in one-time termination benefits recorded in Q2 and Q3 FY2018 for employees already in the action. Accrual balance $43.4M at 2018-08-04. | |
| 2018-08-04 | restructuring | in_progress | 126 | 2018-02-03 | Foreign locations | Manufacturing, Engineering, and SMG&A | USD 16 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Recorded in Q1 FY2018. As of 2018-08-04, 7 of 126 employees remained; severance requires continued employment until involuntary termination. Accrual balance $6.8M at 2018-08-04. | ||
| 2018-08-04 | voluntary_separation | in_progress | 225 | 2017-01-28 | Not specified | Manufacturing, Engineering, and SMG&A | USD 41 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Initiated in Q1 FY2017; ongoing with severance payments in current period. As of 2018-08-04, 2 of 225 employees remained. Accrual balance $14.0M at 2018-08-04. Expected annual savings of approximately $28.4M once fully implemented. | ||
| 2018-08-04 | restructuring | in_progress | 1,249 | 2018-02-03 | Milpitas, California and Singapore | Manufacturing, Engineering, SMG&A | USD 43 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Closure of Manufacturing Facilities: Consolidation of wafer and test facility operations acquired from Linear. Includes Hillview wafer fab (Milpitas) and Singapore test facility. Charge recorded in Q1 2018 for 1,249 employees. Additional charges of $2.2M recorded in Q2/Q3 for one-time termination benefits. | ||
| 2018-08-04 | restructuring | in_progress | 126 | 2018-02-03 | Global | Manufacturing, Engineering, SMG&A | USD 16 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Reduction of Operating Costs Action: Q1 2018 charge for 126 employees. 7 employees still employed as of Aug 4, 2018. | ||
| 2018-08-04 | restructuring | in_progress | 177 | 2017-11-04 | Global | Manufacturing, Engineering, SMG&A | USD 8 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Reduction of Operating Costs Action: Q1 2017 charge for 177 employees. 2 employees still employed as of Aug 4, 2018. | ||
| 2018-08-04 | restructuring | in_progress | 123 | 2017-02-04 | Global | Manufacturing, Engineering, SMG&A | USD 14 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Reduction of Operating Costs Action: Q2 2016 charge for 123 employees. 5 employees still employed as of Aug 4, 2018. | ||
| 2018-08-04 | voluntary_separation | in_progress | 225 | 2017-11-04 | Global | Manufacturing, Engineering, SMG&A | USD 41 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Early Retirement Offer Action: Q1 2017 charge for 225 employees. 2 employees still employed as of Aug 4, 2018. | ||
| 2018-08-04 | restructuring | in_progress | Facility Closing [Member] / Workforce Reduction Plan 2018 [Member] | USD 2,200,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2018-08-04 | restructuring | in_progress | USD 1,069,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | |||||||
| 2018-08-04 | restructuring | in_progress | Facility Closing [Member] | USD 1,069,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2018-08-04 | restructuring | in_progress | Other Restructuring [Member] | USD 0 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2018-08-04 | restructuring | in_progress | Special Termination Benefits [Member] | USD 0 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2018-08-04 | restructuring | in_progress | Special Termination Benefits [Member] / Workforce Reduction Plan 2018 [Member] | USD 0 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2018-08-04 | restructuring | in_progress | Workforce Reduction Plan 2018 [Member] | USD 59,476,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2018-05-05 | plant_closure | in_progress | 1,249 | 2017-10-29 | Milpitas, California and Singapore | Manufacturing, engineering and SMG&A | USD 42 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Consolidation of wafer and test facility operations acquired in the Linear acquisition; Hillview wafer fab and Singapore test facility to close over three to five years, with production transferred to other internal facilities, external foundries, and Penang, Malaysia and the Philippines test sites. Charge comprises $41.2 million recorded in Q1 fiscal 2018 plus $1.1 million of one-time termination benefits in Q2 fiscal 2018. | ||
| 2018-05-05 | restructuring | in_progress | 126 | 2017-10-29 | Manufacturing, engineering and SMG&A | USD 16 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Fiscal 2018 reduction of operating costs action recorded in Q1 fiscal 2018 for severance and fringe benefit costs; 11 of the 126 employees remained employed as of May 5, 2018. | |||
| 2018-05-05 | voluntary_separation | in_progress | 225 | 2016-10-30 | Manufacturing, engineering and SMG&A | USD 41 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Early retirement offer initiated in Q1 fiscal 2017; expected annual salary, variable compensation and benefit savings of approximately $28.4 million once fully implemented. Two of the 225 employees remained employed as of May 5, 2018. | |||
| 2018-05-05 | plant_closure | in_progress | 1,249 | Milpitas, California (USA) and Singapore | Manufacturing, engineering, and SMG&A | USD 42 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Decision to consolidate wafer and test operations acquired with Linear, announced in Q1 FY2018 (quarter ended 2018-02-03); exact announcement date not stated. Charge comprises $41.2M in Q1 plus $1.1M of one-time termination benefits in Q2. Hillview wafer fab and Singapore test facility to close over the next three to five years; severance for 1,249 employees. Q2 charge recognized over future service period, so affected employees remain employed until termination. | |||
| 2018-05-05 | restructuring | in_progress | 126 | Foreign locations (multiple) | Manufacturing, engineering, and SMG&A | USD 16 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Fiscal 2018 Reduction of Operating Costs Action recorded in Q1 FY2018 (quarter ended 2018-02-03); exact announcement date not stated. Severance and fringe benefits for 126 employees; 11 of the 126 still employed as of 2018-05-05 and must remain employed to receive benefits. No completion date disclosed. | |||
| 2018-05-05 | restructuring | in_progress | 1,249 | 2018-02-04 | Milpitas, California and Singapore | Manufacturing, Engineering, SMG&A | USD 41 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Closure of Manufacturing Facilities: Consolidation of wafer and test operations acquired from Linear. Plans to close Hillview wafer fab and Singapore test facility over 3-5 years. Charge for severance and fringe benefits for 1,249 employees. | ||
| 2018-05-05 | restructuring | in_progress | 126 | 2018-02-04 | Global | Manufacturing, Engineering, SMG&A | USD 16 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Reduction of Operating Costs Action: Severance and fringe benefit costs for 126 employees. 11 employees still employed as of May 5, 2018. | ||
| 2018-05-05 | restructuring | in_progress | 2018-05-05 | Global | Manufacturing, Engineering, SMG&A | USD 1 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Closure of Manufacturing Facilities: One-time termination benefits for employees included in the facility closure action, recognized over future service period. | |||
| 2018-05-05 | restructuring | in_progress | USD 1,089,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | |||||||
| 2018-05-05 | restructuring | in_progress | Facility Closing [Member] / Workforce Reduction Plan 2018 [Member] | USD 1,089,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2018-05-05 | restructuring | in_progress | Other Restructuring [Member] / Workforce Reduction Plan 2018 [Member] | USD 0 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2018-05-05 | restructuring | in_progress | Special Termination Benefits [Member] | USD 0 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2018-05-05 | restructuring | in_progress | Special Termination Benefits [Member] / Workforce Reduction Plan 2018 [Member] | USD 0 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2018-05-05 | restructuring | in_progress | Workforce Reduction Plan 2018 [Member] | USD 58,407,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2018-02-03 | plant_closure | in_progress | 1,249 | 2017-10-29 | Milpitas, California and Singapore | Manufacturing, engineering and SMG&A | USD 41 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Plan to close Hillview wafer fabrication facility and Singapore test facility over three to five years; charge covers severance and fringe benefits; all affected employees still employed at quarter-end; accrual in other non-current liabilities. | ||
| 2018-02-03 | reduction_in_force | in_progress | 126 | 2017-10-29 | Manufacturing, engineering and SMG&A | USD 16 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q1 fiscal 2018 charge for severance and fringe benefits; 61 of 126 employees still employed at quarter-end; accrual in accrued liabilities. | |||
| 2018-02-03 | voluntary_separation | in_progress | 225 | 2016-10-30 | Manufacturing, engineering and SMG&A | USD 41 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Early retirement offer initiated in Q1 fiscal 2017; 5 of 225 employees still employed at quarter-end; accrual balance of $25.8 million at February 3, 2018; expected annual savings of approximately $28.4 million once fully implemented. | |||
| 2018-02-03 | plant_closure | in_progress | 1,249 | 2018-02-03 | 2023-02-03 | Milpitas, California and Singapore | Manufacturing, Engineering, SMG&A | USD 41 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Consolidation of wafer and test facilities acquired via Linear Technology. Hillview wafer fab (Milpitas, CA) and Singapore test facility to close over 3-5 years. All 1,249 employees still employed as of quarter-end; severance payable upon termination. | |
| 2018-02-03 | restructuring | in_progress | 126 | 2018-02-03 | Multiple (including foreign locations) | Manufacturing, Engineering, SMG&A | USD 16 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Fiscal 2018 workforce reduction under ongoing cost reduction program. 61 of 126 employees still employed as of quarter-end. | ||
| 2018-02-03 | restructuring | in_progress | 1,249 | 2018-02-03 | Milpitas, California and Singapore | Manufacturing, Engineering, SMG&A | USD 41 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Closure of Manufacturing Facilities: Consolidation of wafer and test operations acquired from Linear. Plan to close Hillview wafer fab and Singapore test facility over 3-5 years. Charge for severance and fringe benefits. | ||
| 2018-02-03 | restructuring | in_progress | 126 | 2018-02-03 | Global | Manufacturing, Engineering, SMG&A | USD 16 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Reduction of Operating Costs Action: Q1 FY2018 charges for severance and fringe benefits. | ||
| 2018-02-03 | restructuring | in_progress | USD 57,318,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | |||||||
| 2018-02-03 | restructuring | in_progress | Facility Closing [Member] / Workforce Reduction Plan 2018 [Member] | USD 41,201,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2018-02-03 | restructuring | in_progress | Other Restructuring [Member] / Workforce Reduction Plan 2018 [Member] | USD 16,117,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2018-02-03 | restructuring | in_progress | Special Termination Benefits [Member] | USD 0 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2018-02-03 | restructuring | in_progress | Special Termination Benefits [Member] / Workforce Reduction Plan 2018 [Member] | USD 0 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2018-02-03 | restructuring | in_progress | Workforce Reduction Plan 2018 [Member] | USD 57,318,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2017-10-28 | voluntary_separation | in_progress | 225 | Manufacturing, engineering and SMG&A | USD 41 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Early retirement offer initiated in Q1 fiscal 2017; 26 of the 225 employees still employed at year-end, with severance payable on termination. Expected annual savings of approximately $28.4 million once fully implemented. | ||||
| 2017-10-28 | restructuring | in_progress | 177 | Foreign locations | Manufacturing, engineering and SMG&A | USD 8 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Reduction of Operating Costs action initiated in Q1 fiscal 2017; 10 of the 177 employees still employed at year-end. Expected annual savings of approximately $5.0 million once fully implemented. | |||
| 2017-10-28 | acquisition_addition | completed | 2016-07-26 | 2017-03-10 | business_combinations_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Linear Technology acquisition closed 2017-03-10 for approximately $15.8 billion total consideration; headcount added through the acquisition was not disclosed. Linear contributed $913.2 million of revenue from the acquisition date. | |||||
| 2017-10-28 | voluntary_separation | in_progress | 225 | 2017-01-01 | Worldwide | Manufacturing, Engineering, SMG&A | USD 41 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | Initiated in Q1 FY2017. 26 employees remained employed as of Oct 28, 2017 to receive benefits. | ||
| 2017-10-28 | reduction_in_force | in_progress | 177 | 2017-01-01 | Foreign locations | Manufacturing, Engineering, SMG&A | USD 8 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | Initiated in Q1 FY2017. 10 employees remained employed as of Oct 28, 2017 to receive benefits. | ||
| 2017-10-28 | acquisition_addition | completed | 2017-03-10 | 2017-03-10 | Worldwide | All | Item_1_Business f5-10k / Qwen3.6-27B-Q8_0 | Acquisition of Linear Technology Corporation completed. Specific headcount added not disclosed, but total workforce is approx 15,300 as of year end. | |||
| 2017-10-28 | restructuring | in_progress | USD 0 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | |||||||
| 2017-10-28 | restructuring | in_progress | Reduction of Operating Costs [Member] | USD 8,126,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | ||||||
| 2017-10-28 | restructuring | in_progress | Reduction of Operating Costs [Member] / Workforce Reductions Plan 2017 [Member] | USD 8,100,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | ||||||
| 2017-10-28 | restructuring | in_progress | Special Termination Benefits [Member] | USD 41,337,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | ||||||
| 2017-10-28 | restructuring | in_progress | Special Termination Benefits [Member] / Workforce Reductions Plan 2017 [Member] | USD 41,300,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | ||||||
| 2017-07-29 | voluntary_separation | in_progress | 225 | 2017-01 | Manufacturing, engineering and selling, marketing, general and administrative | USD 41 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Early retirement offer initiated in Q1 fiscal 2017 covering 225 employees; 45 still employed as of 2017-07-29 and must remain until termination to receive severance. Expected annual savings of approximately $28.4 million once fully implemented. | |||
| 2017-07-29 | restructuring | in_progress | 177 | 2017-01 | Foreign locations | Manufacturing, engineering and selling, marketing, general and administrative | USD 8 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q1 fiscal 2017 workforce reduction under ongoing benefit plan or statutory requirements at foreign locations; 12 of 177 employees still employed as of 2017-07-29. Expected annual savings of approximately $5.0 million once fully implemented. | ||
| 2017-07-29 | restructuring | in_progress | 123 | 2016-01 | Manufacturing, engineering and selling, marketing, general and administrative | USD 14 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q2 fiscal 2016 workforce reduction; 24 of 123 employees still employed as of 2017-07-29 and must remain until involuntary termination to receive severance benefits. | |||
| 2017-07-29 | acquisition_addition | completed | 2017-03-10 | 2017-03-10 | Linear Technology Corporation | USD 15,757 (millions) | business_combinations_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Acquisition of Linear Technology completed March 10, 2017 for total consideration of approximately $15.8 billion; headcount added not disclosed. Replacement equity awards issued to certain Linear employees. | |||
| 2017-07-29 | voluntary_separation | in_progress | 225 | 2016-10-30 | Not specified | Manufacturing, Engineering, SMG&A | USD 41 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Initiated in Q1 FY2017; 45 of 225 employees still employed as of 2017-07-29, must remain employed until termination to receive severance. Charge covers severance, benefits, and other costs. | ||
| 2017-07-29 | reduction_in_force | in_progress | 177 | 2016-10-30 | Includes foreign locations | Manufacturing, Engineering, SMG&A | USD 8 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Initiated in Q1 FY2017; 12 of 177 employees still employed as of 2017-07-29. Severance under ongoing benefit plan or statutory requirements at foreign locations. | ||
| 2017-07-29 | reduction_in_force | in_progress | 123 | 2016-01-31 | Not specified | Manufacturing, Engineering, SMG&A | USD 14 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Initiated in Q2 FY2016; 24 of 123 employees still employed as of 2017-07-29. Accrual balance of $7.5M remains at quarter end. Announcement date approximate (Q2 FY2016 start). | ||
| 2017-07-29 | voluntary_separation | in_progress | 225 | 2017-01-01 | Global | Manufacturing, Engineering, SMG&A | USD 41 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Early retirement offer initiated in Q1 FY2017. 45 employees still employed as of July 29, 2017. | ||
| 2017-07-29 | restructuring | in_progress | 177 | 2017-01-01 | Foreign locations | Manufacturing, Engineering, SMG&A | USD 8 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Reduction of Operating Costs Action initiated in Q1 FY2017. 12 employees still employed as of July 29, 2017. | ||
| 2017-07-29 | acquisition_addition | completed | 2017-03-10 | Global | All functions | business_combinations_footnote f5-10q / Qwen3.6-27B-Q8_0 | Acquisition of Linear Technology Corporation completed. Headcount not explicitly disclosed. | ||||
| 2017-07-29 | restructuring | in_progress | USD 0 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | |||||||
| 2017-07-29 | restructuring | in_progress | Other Restructuring [Member] | USD 8,126,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2017-07-29 | restructuring | in_progress | Special Termination Benefits [Member] | USD 41,337,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2017-04-29 | voluntary_separation | in_progress | 225 | 2016-10-30 | Manufacturing, engineering and selling, marketing, general and administrative | USD 41 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Early retirement offer initiated in Q1 fiscal 2017 covering severance, related benefits and other costs; 196 of the 225 employees still employed at April 29, 2017 and must remain employed until termination to receive benefits. Accrued liability of $40.4 million remained at quarter-end. | |||
| 2017-04-29 | reduction_in_force | in_progress | 177 | 2016-10-30 | Manufacturing, engineering and selling, marketing, general and administrative | USD 8 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q1 fiscal 2017 charge for severance and fringe benefits under the ongoing benefit plan or statutory requirements at foreign locations; 163 of the 177 employees still employed at April 29, 2017. MD&A cites estimated annual savings of about $5.0 million once fully implemented. | |||
| 2017-04-29 | reduction_in_force | in_progress | 123 | 2015-10-31 | Manufacturing, engineering and selling, marketing, general and administrative | USD 14 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Prior-year (Q2 fiscal 2016) workforce reduction still active in the current restructuring accrual roll-forward; 24 of the 123 employees still employed at April 29, 2017. Included because the accrual remains open in the current-period footnote. | |||
| 2017-04-29 | acquisition_addition | completed | 2017-03-10 | 2017-03-10 | Linear Technology Corporation | USD 71 (millions) | business_combinations_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Acquisition of Linear Technology completed March 10, 2017; no employee headcount figure disclosed. Approximately 2.8 million shares of replacement restricted stock awards/units were issued to certain Linear employees at a weighted average grant-date fair value of $82.20 per share. | |||
| 2017-04-29 | voluntary_separation | in_progress | 225 | Global | Manufacturing, Engineering, SMG&A | USD 41 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Early retirement offer initiated in Q1 FY2017; 196 of 225 employees still employed as of 2017-04-29 and must remain employed until termination to receive severance. Expected annual savings of approximately $28.4 million once fully implemented. | |||
| 2017-04-29 | restructuring | in_progress | 177 | Global (includes foreign locations) | Manufacturing, Engineering, SMG&A | USD 8 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Workforce reduction recorded in Q1 FY2017 under ongoing benefit plan or statutory requirements at foreign locations; 163 of 177 employees still employed as of 2017-04-29. Expected annual savings of approximately $5.0 million once fully implemented. | |||
| 2017-04-29 | voluntary_separation | in_progress | 225 | 2017-01-01 | Global | Manufacturing, Engineering, SMG&A | USD 41 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Early retirement offer initiated in Q1 FY2017. 196 of 225 employees still employed as of April 29, 2017. | ||
| 2017-04-29 | restructuring | in_progress | 177 | 2017-01-01 | Foreign locations | Manufacturing, Engineering, SMG&A | USD 8 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Reduction of Operating Costs Action in Q1 FY2017. 163 of 177 employees still employed as of April 29, 2017. | ||
| 2017-04-29 | acquisition_addition | completed | 2017-03-10 | Global | All functions | business_combinations_footnote f5-10q / Qwen3.6-27B-Q8_0 | Acquisition of Linear Technology Corporation completed March 10, 2017. Specific headcount added not disclosed in this filing. | ||||
| 2017-04-29 | restructuring | in_progress | USD 0 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | |||||||
| 2017-04-29 | restructuring | in_progress | Other Restructuring [Member] | USD 8,126,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2017-04-29 | restructuring | in_progress | Special Termination Benefits [Member] | USD 41,337,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2017-01-28 | voluntary_separation | in_progress | 225 | Manufacturing, engineering and selling, marketing, general and administrative | USD 41 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Early retirement offer initiated in Q1 fiscal 2017 covering 225 employees; as of quarter-end all 225 still employed and must remain employed until termination to receive severance benefits. MD&A notes estimated annual savings of approximately $28.4 million once fully implemented. | ||||
| 2017-01-28 | reduction_in_force | in_progress | 177 | Foreign locations | Manufacturing, engineering and selling, marketing, general and administrative | USD 8 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q1 fiscal 2017 charge for severance and fringe benefit costs per ongoing benefit plan or statutory requirements at foreign locations; all 177 employees still employed at quarter-end. MD&A notes estimated annual savings of approximately $5.0 million once fully implemented. | |||
| 2017-01-28 | reduction_in_force | in_progress | 123 | Manufacturing, engineering and selling, marketing, general and administrative | USD 14 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Charge originally recorded in Q2 fiscal 2016; as of January 28, 2017, 31 of the 123 employees remained employed and must continue employment until involuntary termination to receive severance benefits. Included because the current-quarter footnote updates its status. | ||||
| 2017-01-28 | voluntary_separation | in_progress | 225 | 2016-10-30 | Not specified | Manufacturing, engineering, and SMG&A | USD 41 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Early retirement offer initiated in Q1 FY2017; all 225 employees still employed at quarter-end and must remain employed until termination to receive benefits. Expected annual savings of approximately $28.4 million once fully implemented. | ||
| 2017-01-28 | restructuring | in_progress | 177 | 2016-10-30 | Includes foreign locations | Manufacturing, engineering, and SMG&A | USD 8 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Q1 FY2017 workforce reduction under ongoing benefit plan or statutory requirements at foreign locations; all 177 employees still employed at quarter-end. Expected annual savings of approximately $5.0 million once fully implemented. | ||
| 2017-01-28 | voluntary_separation | in_progress | 225 | 2017-01-28 | Global | Manufacturing, Engineering, SMG&A | USD 41 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Early retirement offer initiated in Q1 FY2017. Employees must remain employed until termination to receive benefits. | ||
| 2017-01-28 | restructuring | in_progress | 177 | 2017-01-28 | Foreign locations | Manufacturing, Engineering, SMG&A | USD 8 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Reduction of Operating Costs Action. Charges for severance and fringe benefits per ongoing benefit plan or statutory requirements. | ||
| 2017-01-28 | restructuring | in_progress | USD 49,463,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | |||||||
| 2017-01-28 | restructuring | in_progress | Other Restructuring [Member] | USD 8,126,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2017-01-28 | restructuring | in_progress | Other Restructuring [Member] / Workforce Reductions Plan 2017 [Member] | USD 8,126,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2017-01-28 | restructuring | in_progress | Special Termination Benefits [Member] | USD 41,337,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2017-01-28 | restructuring | in_progress | Special Termination Benefits [Member] / Workforce Reductions Plan 2017 [Member] | USD 41,300,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2016-10-29 | restructuring | in_progress | 123 | Manufacturing, engineering and SMG&A | USD 14 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Fiscal 2016 charge of approximately $13.7 million ($13,684 thousand per footnote) for severance and fringe benefits; 44 of the 123 employees remained employed as of October 29, 2016 pending termination to receive severance. Expected annual cost savings of approximately $12.3 million once fully implemented. Announcement date not disclosed; charge recorded during fiscal 2016. | ||||
| 2016-10-29 | acquisition_addition | announced | 2016-07-26 | business_combinations_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Merger agreement signed July 26, 2016; total consideration estimated at approximately $14.8 billion, funded with approximately 58.0 million new shares and approximately $11.6 billion of new indebtedness. Expected to close by end of second quarter of fiscal 2017, subject to remaining regulatory clearances. Linear headcount not disclosed; no headcount added as of fiscal year-end. | ||||||
| 2016-10-29 | restructuring | in_progress | 123 | 2016-11-01 | Worldwide | Manufacturing, Engineering, SMG&A | USD 14 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | Severance and fringe benefit costs for 123 employees. 44 employees still employed as of fiscal year-end to receive benefits upon termination. | ||
| 2016-10-29 | restructuring | in_progress | USD 0 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | |||||||
| 2016-10-29 | restructuring | in_progress | Reduction of Operating Costs [Member] | USD 13,684,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | ||||||
| 2016-07-30 | restructuring | in_progress | 123 | Manufacturing, engineering, and selling, marketing, general and administrative | USD 14 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Second quarter fiscal 2016 charge for severance and fringe benefit costs for 123 employees under the Company's ongoing benefit plan. As of July 30, 2016, 90 of the 123 employees remained employed and must continue employment until involuntary termination to receive severance. Estimated annual cost savings of approximately $12.3 million once fully implemented. Severance accrual balance of $13.9 million at July 30, 2016. | ||||
| 2016-07-30 | acquisition_addition | announced | 2016-07-26 | USD 8 (millions) | business_combinations_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Definitive merger agreement to acquire Linear Technology announced July 26, 2016; total consideration estimated at approximately $14.8 billion. No headcount figures disclosed. Transaction-related costs of $8.3 million incurred through Q3 fiscal 2016 in SMG&A expenses. Subject to Linear stockholder approval and regulatory clearances. | |||||
| 2016-07-30 | restructuring | in_progress | 123 | 2016 | Manufacturing, engineering and SMG&A | USD 14 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Charge of $13.7M recorded in second quarter of fiscal 2016 for severance and fringe benefits; exact announcement date not disclosed. As of 2016-07-30, 90 of the 123 employees were still employed and must remain until involuntarily terminated to receive severance; accrued restructuring balance was $13.9M. Expected annual cost savings of approximately $12.3M once fully implemented. | |||
| 2016-07-30 | acquisition_addition | announced | 2016-07-26 | other f5-10q / MiMo-V2.6-Flash-fp8-HTML | Definitive merger agreement signed 2016-07-26 to acquire Linear Technology Corporation for approximately $14.8 billion, funded with approximately 58.0 million new shares plus approximately $11.6 billion of new loans and bonds. No headcount added through the transaction is disclosed; $8.3M of transaction-related costs recorded in SMG&A through Q3 fiscal 2016. Share repurchase program temporarily suspended as a result. | ||||||
| 2016-07-30 | restructuring | in_progress | 123 | 2016-04-30 | Global | Manufacturing, Engineering, SMG&A | USD 14 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Reduction of Operating Costs Action. 90 of 123 employees remained employed as of July 30, 2016, required to continue employment until involuntary termination to receive severance. | ||
| 2016-07-30 | restructuring | in_progress | USD 0 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | |||||||
| 2016-04-30 | restructuring | in_progress | 123 | Manufacturing, engineering and selling, marketing, general and administrative | USD 14 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Second quarter fiscal 2016 charge for severance and fringe benefit costs; as of April 30, 2016, 106 of the 123 employees remained employed and must remain until involuntary termination to receive severance. Company expects approximately $12.3 million in annual cost savings once fully implemented. Accrued restructuring balance of $15.4 million at April 30, 2016. | ||||
| 2016-04-30 | restructuring | in_progress | 123 | Manufacturing, engineering and SMG&A | USD 14 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Recorded during the second quarter of fiscal 2016; exact announcement date not disclosed. Severance and fringe benefit costs under the Company's ongoing benefit plan. As of 2016-04-30, 106 of the 123 employees remained employed and must stay until involuntary termination to receive severance. Expected annual cost savings of approximately $12.3 million once fully implemented (per MD&A). Accrued restructuring balance was $15,409 thousand at 2016-04-30. | ||||
| 2016-04-30 | restructuring | in_progress | 123 | 2016-04-30 | Global | Manufacturing, Engineering, SMG&A | USD 14 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | 106 of 123 employees remain employed until involuntary termination to receive severance benefit. | ||
| 2016-04-30 | restructuring | in_progress | USD 13,684,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | |||||||
| 2016-01-30 | restructuring | completed | 341 | Multiple foreign locations | Manufacturing, engineering, and selling, marketing, general and administrative | USD 38 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Fiscal 2014 program; all affected employees' employment terminated. Remaining severance accrual declined from $5.9M at Oct 31, 2015 to $3.9M at Jan 30, 2016 after $2.0M of severance payments during the quarter. | |||
| 2016-01-30 | restructuring | in_progress | 341 | Global | Manufacturing, Engineering, SMG&A | USD 37,322 (thousands) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Fiscal 2014 action. 341 employees terminated. Total charges $37.3M including severance, facility closure, and impairment. Accrual balance decreased from $5.9M to $3.9M during Q1 FY2016 due to severance payments. | |||
| 2015-10-31 | restructuring | completed | 341 | 2014-11-02 | 2015-10-31 | Foreign locations | Manufacturing, Engineering, SMG&A | USD 37 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | Fiscal 2014 action completed in FY2015. Charges included severance, lease obligations, and asset impairment. Terminated employment of all associated employees. | |
| 2015-10-31 | restructuring | in_progress | USD 0 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | |||||||
| 2015-08-01 | restructuring | in_progress | 341 | Global (multiple foreign locations) | Manufacturing, Engineering, and Selling, Marketing, General and Administrative | USD 38 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Fiscal 2014 workforce reduction program; severance and fringe benefit costs for 341 employees per ongoing benefit plan or statutory requirements at foreign locations. As of August 1, 2015, 4 of the 341 employees remained employed and must continue employment until involuntarily terminated to receive severance. Remaining accrued restructuring balance of $9.7 million at August 1, 2015. | |||
| 2015-08-01 | other | announced | 2015-08-18 | 2015-10-31 | Ireland | Irish defined benefit pension plan participants (active and deferred) | USD 210 (millions) | subsequent_events f5-10q / GLM-5.3-flash-fp4-HTML | Plan to convert Irish defined benefit pension plan to defined contribution plan; lump sum payments funded by existing DB Plan assets plus an additional Company contribution of approximately $210 million to settle all existing and future DB Plan liabilities. Retired participants' benefits to be bought out with individual annuities. No headcount reduction disclosed. | ||
| 2015-08-01 | restructuring | in_progress | 341 | Global (includes foreign locations) | Manufacturing, Engineering, and Selling, Marketing, General & Administrative | USD 38 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Program initiated in fiscal 2014; accrual roll-forward shows continued severance payments through the quarter ($5.5M in Q3 FY2015; $29.4M YTD), leaving a $9.7M balance at 2015-08-01. 4 of the 341 employees remained employed as of 2015-08-01 pending involuntary termination to receive severance. Charge shown is the fiscal 2014 workforce-reduction component; total fiscal 2014 charges were $37.3M including facility closure and impairment items. | |||
| 2015-08-01 | restructuring | in_progress | 341 | 2014-10-01 | Global | Manufacturing, Engineering, SMG&A | USD 37 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Fiscal 2014 reduction of operating costs. 341 employees affected. As of Aug 1, 2015, 4 employees remained employed pending involuntary termination to receive severance. Remaining accrual balance $9.7 million. | ||
| 2015-08-01 | restructuring | in_progress | USD 0 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | |||||||
| 2015-05-02 | restructuring | in_progress | 341 | Global (multiple foreign locations) | Manufacturing, Engineering, and Selling, Marketing, General and Administrative | USD 37 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Fiscal 2014 program of workforce reductions and facility closures; severance accrual balance of $15.2 million remained at May 2, 2015. As of May 2, 2015, 28 of the 341 affected employees were still employed and must remain until involuntarily terminated to receive severance. | |||
| 2015-05-02 | restructuring | in_progress | 341 | Global | Manufacturing, Engineering, and SMG&A | USD 37 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Program originated in fiscal 2014; no new charges in current period. Severance payments of $14.8M (Q2) and $9.2M (Q3-to-date) continued against accrual. 28 of 341 employees remained as of 2015-05-02; accrual balance $15.2M. | |||
| 2015-05-02 | restructuring | in_progress | 28 | Global | Manufacturing, Engineering, SMG&A | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | 28 of 341 employees from Fiscal 2014 reduction actions remain employed as of May 2, 2015, awaiting involuntary termination to receive severance. | ||||
| 2015-05-02 | restructuring | in_progress | USD 0 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | |||||||
| 2015-01-31 | restructuring | in_progress | 341 | Global (U.S. and foreign locations) | Manufacturing, Engineering, and Selling, Marketing, General and Administrative | USD 37 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Fiscal 2014 cost-reduction program covering 341 employees; severance and fringe benefit costs of $37.9 million plus facility closure and impairment charges, less a $1.4 million reversal. As of January 31, 2015, 61 of the 341 employees remained employed pending involuntary termination; accrued restructuring balance was $24.5 million after $14.8 million of severance payments during the quarter. | |||
| 2015-01-31 | restructuring | in_progress | 341 | Global | Manufacturing, Engineering, and SMG&A | USD 37 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Fiscal 2014 Reduction of Operating Costs program; 61 of 341 affected employees still employed as of 2015-01-31. Q1 FY2015 severance payments of $14.8M reduced accrual from $40.5M to $24.5M. No new charges in Q1 FY2015. | |||
| 2015-01-31 | acquisition_addition | completed | 2014-07-22 | 2014-07-22 | Global | RF, microwave and millimeter-wave (Hittite Microwave Corporation) | USD 2,400 (millions) | business_combinations_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Hittite acquisition closed 2014-07-22 for ~$2.4B; no headcount added disclosed. Acquisition accounting still in progress as of filing date. | ||
| 2015-01-31 | restructuring | in_progress | 341 | Global | Manufacturing, Engineering, SMG&A | USD 37 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Fiscal 2014 action. 341 employees affected. $37.9M severance, $0.5M facility closure, $0.4M impairment. 61 employees remained employed as of Jan 31, 2015. | |||
| 2015-01-31 | restructuring | in_progress | USD 0 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | |||||||
| 2014-11-01 | restructuring | in_progress | 341 | Foreign locations | Manufacturing, engineering and SMG&A | USD 38 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Fiscal 2014 cost reduction action; 311 of the 341 employees remained employed at year-end pending involuntary termination to receive severance. Net special charges of $37.3M include a $1.4M reversal of fiscal 2013 accrual; expected annual savings of $46.2M when fully implemented. | |||
| 2014-11-01 | acquisition_addition | completed | 2014-07-22 | 2014-07-22 | United States | Radio frequency, microwave and millimeterwave (new operating segment) | business_combinations_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Acquisition closed July 22, 2014 for approximately $2.4 billion; headcount added through the acquisition is not disclosed in the filing. | |||
| 2014-11-01 | acquisition_addition | completed | 5 | 2014-09-19 | 2014-09-19 | Edinburgh, United Kingdom | Energy-metering product development | business_combinations_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Developing-stage start-up with five employees acquired September 19, 2014 for $4.7 million total consideration. | ||
| 2014-11-01 | restructuring | in_progress | 341 | Foreign locations | Manufacturing, Engineering, SMG&A | USD 37 (millions) | restructuring_footnote f5-10k / Qwen3.6-27B-Q8_0 | Fiscal 2014 charges included $37.9M severance for 341 employees, $0.5M lease obligations, $0.4M impairment, and $1.4M reversal. 311 of 341 employees still employed as of Nov 1, 2014. | |||
| 2014-11-01 | acquisition_addition | completed | 5 | 2014-09-19 | Edinburgh, UK | business_combinations_footnote f5-10k / Qwen3.6-27B-Q8_0 | Acquisition of Metroic Limited, a start-up with five employees. | ||||
| 2014-11-01 | restructuring | in_progress | USD 37,322,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | |||||||
| 2014-11-01 | restructuring | in_progress | Reduction of Operating Costs [Member] | USD 37,322,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | ||||||
| 2014-08-02 | restructuring | completed | 30 | Foreign locations | Engineering and Selling, Marketing, General and Administrative | USD 3 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | First quarter fiscal 2014 charge for severance and fringe benefit costs; all affected employees terminated. | |||
| 2014-08-02 | restructuring | in_progress | 235 | Foreign locations | Engineering and Selling, Marketing, General and Administrative | USD 30 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Fiscal 2013 action; 11 of 235 employees still employed as of 2014-08-02 and must remain until involuntary termination to receive severance. Estimated annual savings approximately $32.6 million once fully implemented. | |||
| 2014-08-02 | restructuring | completed | 30 | 2014-02-01 | Foreign locations | Engineering and SMG&A | USD 2,685 (thousands) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Charge recorded in Q1 FY2014; all 30 employees terminated as of filing date. Severance accrual balance of $9,016K at Aug 2, 2014 reflects prior-year programs still winding down. | ||
| 2014-08-02 | restructuring | in_progress | 235 | 2013-11-02 | Foreign locations | Engineering and SMG&A | USD 29,848 (thousands) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | FY2013 program; 11 of 235 employees still employed at Aug 2, 2014 and must remain until involuntary termination to receive severance. Ongoing severance payments of $3,016K in Q3 FY2014. | ||
| 2014-08-02 | acquisition_addition | completed | 2014-07-22 | United States | RF, microwave and millimeter-wave ICs | business_combinations_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Acquisition closed July 22, 2014 for ~$2.4B. No employee headcount for Hittite disclosed in this filing. Replacement equity awards issued to certain Hittite employees (~0.7M RSUs). | ||||
| 2014-08-02 | restructuring | completed | 30 | 2014-02-01 | Foreign locations | Engineering and SMG&A | USD 3 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | First quarter fiscal 2014 action. Employment of all associated employees terminated. | ||
| 2014-08-02 | restructuring | in_progress | 235 | 2013-01-01 | Foreign locations | Engineering and SMG&A | USD 30 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Fiscal 2013 action. 11 of 235 employees remained employed as of Aug 2, 2014 pending involuntary termination. | ||
| 2014-08-02 | acquisition_addition | completed | 2014-07-22 | business_combinations_footnote f5-10q / Qwen3.6-27B-Q8_0 | Acquisition of Hittite Microwave Corporation. Headcount not explicitly disclosed. | ||||||
| 2014-08-02 | restructuring | in_progress | USD 0 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | |||||||
| 2014-08-02 | restructuring | in_progress | Reduction of Operating Costs [Member] | USD 2,685,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2014-05-03 | restructuring | in_progress | 30 | Foreign locations | Engineering and SMG&A | USD 3 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Charge recorded in Q1 fiscal 2014 for severance and fringe benefit costs; 4 of the 30 employees remained employed at May 3, 2014 and must remain until involuntary termination to receive severance. Estimated annual cost savings of approximately $4.5 million once fully implemented. | |||
| 2014-05-03 | restructuring | in_progress | 235 | Foreign locations | Engineering and SMG&A | USD 30 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Fiscal 2013 action for severance and fringe benefit costs; 19 of the 235 employees remained employed at May 3, 2014 and must remain until involuntary termination to receive severance. Estimated annual cost savings of approximately $32.6 million once fully implemented. | |||
| 2014-05-03 | restructuring | in_progress | 30 | 2014-02-01 | Foreign locations | Engineering and SMG&A | USD 3 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Severance and fringe benefit costs for 30 employees; 4 of 30 still employed as of 2014-05-03. Estimated annual cost savings of approximately $4.5 million once fully implemented. | ||
| 2014-05-03 | restructuring | in_progress | 30 | 2014-01-01 | Foreign locations | Engineering and SMG&A | USD 3 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Charge recorded in Q1 FY2014 for severance and fringe benefits. 4 of 30 employees remained employed as of May 3, 2014, required to continue employment until involuntary termination to receive benefit. | ||
| 2014-05-03 | restructuring | in_progress | USD 2,685,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | |||||||
| 2014-05-03 | restructuring | in_progress | Reduction of Operating Costs [Member] | USD 2,685,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2014-02-01 | restructuring | in_progress | 30 | Foreign locations | Engineering and Selling, Marketing, General and Administrative | USD 3 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Charge covers severance and fringe benefit costs for 30 employees; 12 of the 30 remained employed at February 1, 2014 and must remain employed until involuntary termination to receive severance. Estimated annual cost savings of approximately $4.5 million once fully implemented. | |||
| 2014-02-01 | restructuring | in_progress | 235 | Foreign locations | Engineering and Selling, Marketing, General and Administrative | USD 30 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Fiscal 2013 charge for severance and fringe benefits; 35 of the 235 employees remained employed at February 1, 2014. Estimated annual cost savings of approximately $32.6 million once fully implemented. Included here because the action remains in progress as of the current quarter-end. | |||
| 2014-02-01 | restructuring | in_progress | 30 | 2013-11-03 | Foreign locations | Engineering and Selling, Marketing, General & Administrative | USD 3 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Severance and fringe benefit costs for 30 employees; 12 of the 30 remained employed as of 2014-02-01 and must stay until involuntary termination to receive severance. Estimated annual cost savings of approximately $4.5 million once fully implemented. | ||
| 2014-02-01 | restructuring | in_progress | 235 | 2012-11-04 | Foreign locations | Engineering and Selling, Marketing, General & Administrative | USD 30 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Prior-year (fiscal 2013) cost reduction program still in progress; 35 of 235 employees remained employed as of 2014-02-01. Estimated annual cost savings of approximately $32.6 million once fully implemented. Included for context of ongoing accrual roll-forward; charge was not incurred in the current quarter. | ||
| 2014-02-01 | restructuring | in_progress | 30 | 2014-02-01 | Foreign locations | Engineering and SMG&A | USD 3 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Charge for severance and fringe benefits for 30 employees. 12 employees remained employed as of period end to receive severance upon involuntary termination. | ||
| 2014-02-01 | restructuring | in_progress | USD 2,685,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | |||||||
| 2014-02-01 | restructuring | in_progress | Reduction of Operating Costs 2014 [Member] [Member] [Member] | USD 2,685,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2014-02-01 | restructuring | in_progress | Reduction of Operating Costs [Member] | USD 2,685,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2013-11-02 | restructuring | in_progress | 235 | Foreign locations | Engineering and SMG&A | USD 30 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Fiscal 2013 charge of $29.8M for severance and fringe benefits for 235 engineering and SMG&A employees at foreign locations; 98 of the 235 remained employed at November 2, 2013 pending involuntary termination. Estimated annual cost savings of approximately $32.6M once fully implemented. Announcement date not disclosed. | |||
| 2013-11-02 | divestiture_reduction | completed | 2013-10-31 | Microphone product line | discontinued_operations_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Sale of microphone product line assets and IP to InvenSense completed October 31, 2013 for $100.0M cash plus up to $70.0M contingent milestone payments; no associated headcount disclosed. | |||||
| 2013-11-02 | restructuring | in_progress | 235 | Foreign locations | Engineering and SMG&A | USD 30 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | 98 of 235 employees remained employed as of Nov 2, 2013, required to stay until involuntary termination to receive severance. Estimated annual savings of $32.6 million. | |||
| 2013-11-02 | restructuring | in_progress | USD 29,848,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | |||||||
| 2013-11-02 | restructuring | in_progress | Reduction of Operating Costs [Member] | USD 29,848,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | ||||||
| 2013-08-03 | restructuring | in_progress | 137 | 2013-02-02 | Foreign locations | Manufacturing, engineering and SMG&A | USD 14 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | First quarter fiscal 2013 charge for severance and fringe benefits under ongoing benefit plan or statutory requirements; all affected employees terminated. Remaining severance accrual of $5.9 million at August 3, 2013; estimated annual cost savings of approximately $17.0 million. | ||
| 2013-08-03 | restructuring | completed | 137 | Foreign locations | Manufacturing, engineering and SMG&A | USD 14 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Charge recorded in first quarter of fiscal 2013 (quarter ended 2013-02-02); severance and fringe benefit costs under ongoing benefit plans or statutory requirements. Employment terminated for all employees associated with the action; estimated annual cost savings of approximately $17.0 million per MD&A. Exact announcement date not disclosed. | |||
| 2013-08-03 | restructuring | completed | 137 | 2013-01-01 | Foreign locations | Manufacturing, engineering and SMG&A | USD 14 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Recorded in Q1 FY2013 for severance and fringe benefits. Employment of all associated employees terminated. | ||
| 2013-08-03 | restructuring | in_progress | USD 14,071,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | |||||||
| 2013-08-03 | restructuring | in_progress | Reduction of Operating Costs [Member] | USD 14,071,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2013-05-04 | restructuring | in_progress | 137 | Foreign locations | Manufacturing, engineering, and selling, marketing, general and administrative | USD 14 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Charge recorded in Q1 fiscal 2013 for severance and fringe benefit costs per ongoing benefit plan or statutory requirements; as of May 4, 2013, 6 of the 137 employees remained employed and must continue employment until involuntary termination to receive severance. Company estimates approximately $17.0 million in annual cost savings once fully implemented. Accrued restructuring balance of $8.5 million at May 4, 2013. | |||
| 2013-05-04 | restructuring | in_progress | 137 | 2012-11-04 | Foreign locations | Manufacturing, engineering, and SMG&A | USD 14 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Recorded in Q1 FY2013; 6 of 137 employees remained as of 2013-05-04. Estimated annual cost savings of approximately $17.0 million once fully implemented. | ||
| 2013-05-04 | restructuring | in_progress | 137 | 2013-01-01 | Foreign locations | Manufacturing, engineering and SMG&A | USD 14 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Recorded in Q1 FY2013. 6 of 137 employees remained employed as of May 4, 2013, required to stay until involuntary termination to receive severance. | ||
| 2013-05-04 | restructuring | in_progress | USD 14,071,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | |||||||
| 2013-05-04 | restructuring | in_progress | Reduction of Operating Costs [Member] | USD 14,071,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2013-02-02 | restructuring | in_progress | 137 | Foreign locations | Manufacturing, engineering and selling, marketing, general and administrative | USD 14 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q1 fiscal 2013 special charge for severance and fringe benefit costs per ongoing benefit plan or statutory requirements; 19 of the 137 employees still employed at February 2, 2013 and must remain until involuntarily terminated to receive severance. Company estimates approximately $17.0 million in annual cost savings once fully implemented. | |||
| 2013-02-02 | restructuring | in_progress | 137 | Foreign locations | Manufacturing, engineering and SMG&A | USD 14 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Severance and fringe benefit costs for 137 employees; 19 remained employed as of 2013-02-02 and must stay until involuntary termination to receive severance. Expected annual cost savings of approximately $17.0 million once fully implemented. | |||
| 2013-02-02 | restructuring | in_progress | 137 | 2013-02-02 | Foreign locations | Manufacturing, engineering and SMG&A | USD 14 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | 19 of 137 employees remained employed as of Feb 2, 2013 to receive severance benefits. | ||
| 2013-02-02 | restructuring | in_progress | USD 14,071,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | |||||||
| 2013-02-02 | restructuring | in_progress | Reduction of Operating Costs [Member] | USD 14,071,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2013-02-02 | restructuring | in_progress | Reduction of Operating Costs 2013 [Member] [Member] | USD 14,100,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2012-11-03 | restructuring | in_progress | 95 | Foreign locations | Manufacturing, engineering and SMG&A | USD 8 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Fiscal 2012 charge of $8.4M includes $7.9M severance and fringe benefits for 95 employees, plus $0.1M contract termination, $0.2M lease and $0.2M asset write-off. Six of the 95 remained employed at year-end pending severance eligibility; estimated annual SMG&A savings of approximately $12.0M once fully implemented. Announcement date not disclosed. | |||
| 2012-11-03 | acquisition_addition | completed | 2012-03-30 | 2012-03-30 | United States | Clocking / high-speed signal processing | business_combinations_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Acquisition of Multigig, Inc. (San Jose, California) closed March 30, 2012 for $26.8M total consideration; acquired headcount not disclosed. | |||
| 2012-11-03 | restructuring | in_progress | 95 | 2012-01-01 | Foreign locations | Manufacturing, Engineering, SMG&A | USD 8 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | Special charges of approx $8.4M for severance/fringe for 95 employees. 6 employees remained employed as of Nov 3, 2012 to receive severance. | ||
| 2012-11-03 | acquisition_addition | completed | 2012-03-30 | San Jose, California | USD 27 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | Acquisition of Multigig, Inc. Consideration transferred totaled $26.8M. Headcount not explicitly disclosed. | ||||
| 2012-11-03 | restructuring | in_progress | USD 8,431,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | |||||||
| 2012-11-03 | restructuring | in_progress | Reduction of Operating Costs 2012 [Member] | USD 8,400,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | ||||||
| 2012-11-03 | restructuring | in_progress | Reduction of Operating Costs [Member] | USD 8,431,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | ||||||
| 2012-11-03 | restructuring | in_progress | Closure Of Facility One [Member] | USD 0 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | ||||||
| 2012-11-03 | restructuring | in_progress | Closure Of Facility Two [Member] | USD 0 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | ||||||
| 2012-08-04 | restructuring | in_progress | 25 | Foreign locations | Engineering and SMG&A | USD 2 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Fiscal 2011 severance action; as of 2012-08-04, 2 of the 25 employees remained employed and must be retained until involuntary termination to receive severance. Estimated annual SMG&A savings of approximately $4.0 million once fully implemented. | |||
| 2012-08-04 | restructuring | completed | 34 | Foreign locations | Manufacturing, engineering and SMG&A | USD 3 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q1 fiscal 2012 charge of ~$2.6M: $2.5M severance/fringe benefits for 34 employees plus $0.1M contract termination costs. All affected employees terminated; amounts paid as income continuance. Estimated annual SMG&A savings of approximately $4.0 million. | |||
| 2012-08-04 | restructuring | in_progress | 61 | Foreign locations | Manufacturing, engineering and SMG&A | USD 6 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q3 fiscal 2012 charge of ~$5.8M: $5.4M severance/fringe benefits for 61 employees, $0.2M lease obligation costs for ceased facilities, and $0.2M property write-off. As of 2012-08-04, 25 of the 61 employees remained employed pending involuntary termination. Estimated annual SMG&A savings of approximately $8.0 million once fully implemented. | |||
| 2012-08-04 | restructuring | completed | 34 | 2012-02-04 | Foreign locations (non-U.S.) | Manufacturing, engineering and SMG&A | USD 3 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | First quarter fiscal 2012 action: $2.5M severance/fringe benefits plus $0.1M contract termination costs. Employment of all 34 employees terminated; amounts paid as income continuance. Estimated annual SMG&A savings of approximately $4.0M. Announcement date not disclosed; charge recorded in quarter ended 2012-02-04. | ||
| 2012-08-04 | restructuring | in_progress | 61 | Foreign locations (non-U.S.) | Manufacturing, engineering and SMG&A | USD 6 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Third quarter fiscal 2012 action: $5.4M severance/fringe benefits for 61 employees, $0.2M lease obligation costs for facilities ceased during the quarter, $0.2M PP&E write-off. As of 2012-08-04, 25 of the 61 employees remained employed and must stay until involuntarily terminated to receive severance. Estimated annual SMG&A savings of approximately $8.0M once fully implemented. Announcement date not disclosed. | |||
| 2012-08-04 | restructuring | in_progress | 25 | Foreign locations (non-U.S.) | Engineering and SMG&A | USD 2 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Fiscal 2011 action carried forward: 25 engineering and SMG&A employees; as of 2012-08-04 the company still employed 2 of the 25, who must remain until involuntarily terminated to receive severance. Estimated annual SMG&A savings of approximately $4.0M once fully implemented. Charge recorded in fiscal 2011, not in the current reporting period. | |||
| 2012-08-04 | acquisition_addition | completed | 2012-03-30 | 2012-03-30 | San Jose, California, United States | Clocking / high-speed signal processing (technology) | business_combinations_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Acquisition of privately-held Multigig, Inc. closed 2012-03-30 for $26.8M total consideration ($24.2M cash at closing plus $2.6M indemnification holdback). Headcount added through the acquisition is not disclosed. Consideration is purchase price, not a workforce-related charge. | |||
| 2012-08-04 | restructuring | in_progress | 61 | 2012-05-06 | Foreign locations | Manufacturing, Engineering, SMG&A | USD 6 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Third quarter fiscal 2012 action. 25 of 61 employees remained employed as of period end to receive severance benefit. | ||
| 2012-08-04 | restructuring | completed | 34 | 2012-02-05 | Foreign locations | Manufacturing, Engineering, SMG&A | USD 3 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | First quarter fiscal 2012 action. All employees terminated; amounts paid as income continuance. | ||
| 2012-08-04 | restructuring | in_progress | USD 5,836,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | |||||||
| 2012-08-04 | restructuring | in_progress | Reduction of Operating Costs [Member] | USD 8,431,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2012-08-04 | restructuring | in_progress | Reduction of Operating Costs 2012 [Member] | USD 5,800,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2012-05-05 | restructuring | in_progress | 34 | Foreign locations | Manufacturing, engineering and SMG&A | USD 3 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | First quarter fiscal 2012 charge of approximately $2.6 million, including $2.5 million severance and fringe benefits for 34 employees and $0.1 million contract termination costs; all affected employees terminated and paid as income continuance. | |||
| 2012-05-05 | restructuring | in_progress | 25 | Foreign locations | Engineering and SMG&A | USD 2 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Fiscal 2011 charge for severance and fringe benefit costs for 25 engineering and SMG&A employees; as of May 5, 2012, 3 of the 25 employees remained employed and must be retained until involuntary termination to receive severance. | |||
| 2012-05-05 | restructuring | completed | 34 | Foreign locations | Manufacturing, engineering and SMG&A | USD 3 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Recorded in Q1 FY2012 (quarter ended 2012-02-04); $2.5M severance for 34 employees plus $0.1M contract termination costs. Employment terminated for all affected employees; severance paid as income continuance. Estimated annual SMG&A savings of approximately $4M. | |||
| 2012-05-05 | restructuring | in_progress | 25 | Foreign locations | Engineering and SMG&A | USD 2 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | FY2011 action; 3 of the 25 employees remained employed as of 2012-05-05 and must stay employed until involuntarily terminated to receive severance. Estimated annual SMG&A savings of approximately $4M once fully implemented. | |||
| 2012-05-05 | restructuring | completed | 34 | 2012-02-05 | Foreign locations | Manufacturing, Engineering, SMG&A | USD 3 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Special charge of approx $2.6M recorded in Q1 FY2012 for severance/fringe for 34 employees. Employment terminated, amounts paid as income continuance. | ||
| 2012-05-05 | restructuring | in_progress | USD 2,595,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | |||||||
| 2012-05-05 | restructuring | in_progress | Reduction of Operating Costs [Member] | USD 2,595,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2012-02-04 | restructuring | in_progress | 34 | Foreign locations | Manufacturing, engineering and SMG&A | USD 3 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | First-quarter fiscal 2012 special charge of approximately $2.6 million: $2.5 million severance and fringe benefits for 34 manufacturing, engineering and SMG&A employees at foreign locations, plus $0.1 million contract termination costs. As of February 4, 2012, 25 of the 34 employees remained employed and must stay until involuntarily terminated to receive severance. Company estimates approximately $4 million in annual SMG&A savings once fully implemented. | |||
| 2012-02-04 | restructuring | in_progress | 34 | Foreign locations (not specified) | Manufacturing, engineering and SMG&A | USD 3 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Fiscal 2012 first-quarter special charge of $2.6M: $2.5M severance/fringe benefits for 34 employees plus $0.1M contract termination costs. 25 of the 34 employees remained employed as of 2012-02-04; severance is payable only upon involuntary termination. Estimated annual SMG&A savings of approximately $4M once fully implemented. Announcement date not disclosed. | |||
| 2012-02-04 | restructuring | in_progress | 25 | Foreign locations (not specified) | Engineering and SMG&A | USD 2 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Fiscal 2011 cost-reduction action still in progress: 6 of the 25 employees remained employed as of 2012-02-04. Charge and headcount relate to fiscal 2011; included because the filing provides a current status update. Estimated annual SMG&A savings of approximately $4M once fully implemented. | |||
| 2012-02-04 | restructuring | in_progress | 34 | 2012-02-04 | Foreign locations | Manufacturing, Engineering, SMG&A | USD 3 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Charge includes $2.5M for severance/fringe benefits and $0.1M for contract termination. 25 of 34 employees remained employed as of Feb 4, 2012, required to remain employed until involuntary termination to receive severance. | ||
| 2012-02-04 | restructuring | in_progress | USD 2,595,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | |||||||
| 2012-02-04 | restructuring | in_progress | Reduction of Operating Costs [Member] | USD 2,595,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2011-10-29 | restructuring | in_progress | 25 | Foreign locations (not specified) | Engineering and Selling, Marketing, General & Administrative | USD 2 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | FY2011 charge of approximately $2.2M for severance and fringe benefits for 25 employees; 13 of the 25 remained employed at 2011-10-29 and must stay until involuntary termination to receive severance; estimated annual SMG&A savings of approximately $4M once fully implemented | |||
| 2011-10-29 | plant_closure | completed | 133 | 2011-07-31 | United States (Cambridge, Massachusetts) | Manufacturing (wafer fabrication) and SMG&A | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Cambridge wafer fab consolidated into Wilmington, MA facility; action completed in Q3 FY2011. Program total of $26.8M (severance for 124 manufacturing and 9 SMG&A employees, asset impairment, lease and closure costs) was recorded in fiscal 2009 and 2010; only $0.6M of facility closure payments occurred in FY2011. Headcount figure is cumulative program total, not FY2011-only activity | |||
| 2011-10-29 | acquisition_addition | completed | 2011-06-09 | 2011-06-09 | United States (Cambridge, Massachusetts) | Research and Development (mixed-signal processing technology) | business_combinations_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Acquisition of privately-held Lyric Semiconductor completed 2011-06-09 for $27.8M total consideration ($14.0M cash at closing plus contingent consideration); acquired headcount not disclosed | |||
| 2011-10-29 | restructuring | in_progress | 25 | 2011-11-01 | Foreign locations | Engineering and SMG&A | USD 2 (millions) | restructuring_footnote f5-10k / Qwen3.6-27B-Q8_0 | Reduction of operating costs. 13 of 25 employees still employed as of Oct 29, 2011, required to remain employed until involuntary termination to receive severance. | ||
| 2011-10-29 | restructuring | in_progress | USD 2,239,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | |||||||
| 2011-10-29 | restructuring | in_progress | Reduction of Operating Costs [Member] | USD 2,239,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | ||||||
| 2011-07-30 | plant_closure | completed | 2009-01 | 2011-07-30 | Cambridge, Massachusetts, United States | Wafer fabrication | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Consolidation of Cambridge wafer fabrication facility into Wilmington, Massachusetts facility; action completed during the third quarter of fiscal 2011. Original fiscal 2009 charge of $22.1 million included an approximately $12.9 million asset impairment and $9.2 million of severance and fringe benefit costs for 175 manufacturing and 9 SMG&A employees. Remaining severance accrual for this action was fully paid down to zero by July 30, 2011. | |||
| 2011-07-30 | restructuring | completed | 2008-11 | 2011-01-29 | Multiple foreign locations | Engineering, SMG&A, and manufacturing | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Reduction of operating costs action; per MD&A, cost reductions were fully implemented in the first quarter of fiscal 2011. Cumulative charges included $1.6 million (fiscal 2008, 19 employees), $30.3 million (fiscal 2009, 245 manufacturing and 302 engineering/SMG&A employees), and $11.4 million (fiscal 2010, 149 engineering/SMG&A employees). Remaining accrual of $2.5 million at July 30, 2011 relates to income continuance payments. | |||
| 2011-07-30 | plant_closure | completed | 175 | United States (Cambridge, Massachusetts) | Manufacturing | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Cambridge wafer fab consolidated into the Wilmington, MA facility; decision and $22.1M program charge recorded in Q1 fiscal 2009 (precise announcement date not stated). Action completed during Q3 fiscal 2011; $376K of Cambridge severance paid in the quarter and accrual reached zero. Count is the originally announced manufacturing headcount. | ||||
| 2011-07-30 | plant_closure | completed | 9 | United States (Cambridge, Massachusetts) | Selling, marketing, general and administrative | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | SMG&A component of the Cambridge wafer fab closure, same program and timing as the manufacturing component; count is as originally announced in fiscal 2009. | ||||
| 2011-07-30 | acquisition_addition | completed | 2011-06-09 | 2011-06-09 | United States (Cambridge, Massachusetts) | business_combinations_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Acquisition of Lyric Semiconductor, Inc. closed June 9, 2011; headcount added not disclosed. Total consideration $27.8M ($14.0M cash at closing plus $13.8M contingent consideration). | ||||
| 2011-07-30 | restructuring | completed | 2008-10-01 | 2011-07-30 | Global | Engineering, SMG&A, Manufacturing | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Reduction of Operating Costs program initiated in Q4 FY2008. Action completed during Q3 FY2011. Total historical charges include severance for 19, 245, 302, and 149 employees across various periods. Remaining accrual of $2.5M as of July 30, 2011. | |||
| 2011-07-30 | plant_closure | completed | 2009-01-01 | 2011-07-30 | Cambridge, Massachusetts | Manufacturing, SMG&A | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Closure of Wafer Fabrication Facility in Cambridge. Action completed during Q3 FY2011. Historical charges include severance for 175 manufacturing and 9 SMG&A employees. No remaining accrual as of July 30, 2011. | |||
| 2011-07-30 | acquisition_addition | completed | 2011-06-09 | 2011-06-09 | Cambridge, Massachusetts | Engineering | business_combinations_footnote f5-10q / Qwen3.6-27B-Q8_0 | Acquisition of Lyric Semiconductor, Inc. Goodwill recognized attributable to assembled workforce. Specific headcount not disclosed. | |||
| 2011-04-30 | restructuring | completed | 19 | 2008 | Foreign locations | Engineering; Selling, Marketing, General and Administrative | USD 2 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Fiscal 2008 charge for severance and fringe benefits under ongoing benefit plan or statutory requirements; action substantially completed in Q2 fiscal 2009. | ||
| 2011-04-30 | restructuring | in_progress | 245 | 2009 | Foreign locations | Manufacturing | USD 30 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Fiscal 2009 charge of $30.3 million covered 245 manufacturing and 302 engineering/SMG&A employees; severance accrual balance of $2,969 thousand remained at April 30, 2011. | ||
| 2011-04-30 | restructuring | in_progress | 302 | 2009 | Foreign locations | Engineering; Selling, Marketing, General and Administrative | USD 30 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Same fiscal 2009 cost-reduction action as the manufacturing component; employees owed amounts are being paid as income continuance. | ||
| 2011-04-30 | plant_closure | in_progress | 184 | 2009 | Cambridge, Massachusetts, United States | Wafer fabrication | USD 22 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Count is sum of disclosed 175 manufacturing and 9 SMG&A employees; charge includes ~$12.9M asset impairment and $9.2M severance; facility consolidated into Wilmington, MA; accrual balance of $376 thousand remained at April 30, 2011. | ||
| 2011-04-30 | restructuring | in_progress | 149 | 2010 | Foreign locations | Engineering; Selling, Marketing, General and Administrative | USD 11 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Fiscal 2010 additional charge; ~$10.9M for severance for 149 employees, ~$0.5M for impairment of power-management intellectual property; action fully implemented in Q1 fiscal 2011 with ~$16M annual savings. | ||
| 2011-04-30 | plant_closure | completed | 2006-11 | 2010-03 | Sunnyvale, California, United States | Wafer fabrication | USD 0 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Production ceased November 2006; one-time lease settlement charge of $0.4 million recorded in Q1 fiscal 2010; action completed during fiscal 2010. No employee count disclosed. | ||
| 2011-04-30 | restructuring | in_progress | 2008-10-01 | Foreign locations | Engineering, Selling, Marketing, General and Administrative | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Ongoing payment of severance and fringe benefits for employees terminated in prior fiscal years (2008-2010 actions). No new headcount reductions announced in this period. | ||||
| 2011-04-30 | plant_closure | completed | 2009-01-01 | 2010-03-31 | Sunnyvale, California | Wafer Fabrication | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Lease obligation costs expired in March 2010. Action completed during fiscal 2010. | |||
| 2011-04-30 | plant_closure | completed | 2009-01-01 | 2010-03-31 | Cambridge, Massachusetts | Wafer Fabrication | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Production ceased in Q4 2009. Clean-up activities ongoing. Severance accruals being paid out. | |||
| 2011-01-29 | restructuring | completed | 19 | 2008-10 | Foreign locations | Engineering and Selling, Marketing, General and Administrative | USD 2 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Severance and fringe benefit costs recorded in Q4 fiscal 2008 under ongoing benefit plan or statutory requirements at foreign locations. | ||
| 2011-01-29 | restructuring | completed | 547 | 2008-11 | Foreign locations | Manufacturing (245) and Engineering/SMG&A (302) | USD 30 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Fiscal 2009 charge; includes lease obligations, equipment write-off, contract termination and clean-up costs; severance portion $26.6 million for 245 manufacturing and 302 engineering/SMG&A employees. Substantially completed in Q2 fiscal 2009 with annual savings of approximately $36.4 million. | ||
| 2011-01-29 | restructuring | completed | 149 | 2009-11 | Foreign locations | Engineering and Selling, Marketing, General and Administrative | USD 11 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q1 fiscal 2010 charge; $10.9 million severance for 149 engineering/SMG&A employees plus $0.5 million impairment of power-management intellectual property. Fully implemented in Q1 fiscal 2011 with annual savings of approximately $16 million. | ||
| 2011-01-29 | plant_closure | completed | 184 | 2008-11 | Cambridge, Massachusetts, United States | Wafer fabrication (175 manufacturing, 9 SMG&A) | USD 22 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Consolidation into Wilmington, MA facility; includes $12.9 million asset impairment and $9.2 million severance. Additional charges of ~$1.8 million in Q4 fiscal 2009 and $4.7 million in Q1 fiscal 2010; estimated annual savings of approximately $41 million beginning Q3 fiscal 2010. | ||
| 2011-01-29 | plant_closure | completed | 2006-11 | 2010-03 | Sunnyvale, California, United States | Wafer fabrication | USD 0 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Production ceased November 2006; one-time lease termination settlement charge of $0.4 million recorded in Q1 fiscal 2010; action completed during fiscal 2010. No employee count disclosed in this filing. | ||
| 2011-01-29 | restructuring | completed | 19 | 2008-10-01 | Foreign locations | Engineering, Selling, Marketing, General and Administrative | USD 2 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Reduction of Operating Costs action initiated in Q4 FY2008. Terminated employment of all associated employees. | ||
| 2011-01-29 | restructuring | completed | 547 | 2009-01-01 | Foreign locations | Manufacturing, Engineering, Selling, Marketing, General and Administrative | USD 30 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Reduction of Operating Costs action continued in FY2009. Includes 245 manufacturing and 302 engineering/SMG&A employees. | ||
| 2011-01-29 | restructuring | completed | 149 | 2010-01-01 | Foreign locations | Engineering, Selling, Marketing, General and Administrative | USD 11 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Reduction of Operating Costs action continued in Q1 FY2010. Terminated employment of all associated employees. | ||
| 2011-01-29 | plant_closure | completed | 184 | 2009-01-01 | Cambridge, Massachusetts | Manufacturing, Selling, Marketing, General and Administrative | USD 22 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Closure of Wafer Fabrication Facility in Cambridge. Includes 175 manufacturing and 9 SMG&A employees. Terminated employment of all associated employees. | ||
| 2010-10-30 | restructuring | completed | 149 | 2009-11-01 | 2010-10-30 | Foreign locations | Engineering, Selling, Marketing, General and Administrative | USD 11 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | FY2010 portion of a multi-year operating cost reduction program; charge comprises ~$10.9M severance for 149 employees plus ~$0.5M impairment of power-management IP. Program fully implemented in Q1 FY2011 with estimated annual savings of ~$16M. Prior-year activity (FY2009: 245 manufacturing and 302 engineering/SMG&A employees) excluded. | |
| 2010-10-30 | plant_closure | completed | 2009-11-01 | 2010-10-30 | United States (Cambridge, Massachusetts) | Wafer fabrication | USD 5 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | FY2010 charges for lease obligations (~$3.4M) and clean-up/closure (~$1.3M) on the Cambridge wafer fab consolidation into Wilmington; facility ceased use in Q1 FY2010. Workforce reduction (175 manufacturing, 9 SMG&A) was recorded in FY2009 and is excluded here. Program expected to yield ~$41M annual savings beginning Q3 FY2010. | ||
| 2010-10-30 | plant_closure | completed | 2009-11-01 | 2010-03-31 | United States (Sunnyvale, California) | Wafer fabrication | USD 0 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | One-time lease settlement charge in Q1 FY2010; production had ceased in November 2006 and the action was completed during FY2010. No FY2010 employee separations disclosed. | ||
| 2010-10-30 | plant_closure | completed | 2009-11-01 | 2010-10-30 | Ireland (Limerick) | Wafer fabrication | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Six-inch production line consolidation to eight-inch line completed during FY2010 with no FY2010 charges; original 150-employee severance charge recorded in FY2007. Action yielded ~$25M annual savings beginning Q1 FY2010. | |||
| 2010-10-30 | restructuring | completed | 149 | 2010-01-01 | 2010-10-30 | Global | Engineering and SMG&A | USD 11 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | First quarter fiscal 2010 charge for severance and fringe benefits for 149 engineering and SMG&A employees. | |
| 2010-10-30 | plant_closure | completed | 2009-11-01 | 2010-10-30 | United States | Manufacturing | USD 5 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | First quarter fiscal 2010 charge of $4.7 million related to lease obligations and clean-up costs for Cambridge facility closed in prior year. | ||
| 2010-10-30 | plant_closure | completed | 2006-11-01 | 2010-10-30 | United States | Manufacturing | USD 0 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | First quarter fiscal 2010 one-time settlement charge of $0.4 million for termination of lease. | ||
| 2010-10-30 | restructuring | in_progress | USD 16,483,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | |||||||
| 2010-10-30 | restructuring | in_progress | Closure of Wafer Fabrication Facility in Sunnyvale [Member] | USD 375,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | ||||||
| 2010-10-30 | restructuring | in_progress | Reduction Of Operating Costs [Member] | USD 11,419,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | ||||||
| 2010-10-30 | restructuring | in_progress | Closure of Wafer Fabrication Facility in Cambridge [Member] | USD 4,689,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | ||||||
| 2010-07-31 | restructuring | in_progress | 149 | 2010-01 | 2011-01 | Foreign locations | Engineering and Selling, Marketing, General and Administrative | USD 11 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q1 FY2010 charge of $11.4M; ~$10.9M for severance and fringe benefits for 149 engineering and SMG&A employees; ~$0.5M for impairment of power-management intellectual property. As of July 31, 2010, 1 of the 149 employees remained employed. Company estimates ~$4 million in quarterly savings when fully implemented in Q1 FY2011. | |
| 2010-07-31 | plant_closure | in_progress | 184 | 2009-01 | Cambridge, Massachusetts, United States | Wafer fabrication (manufacturing and SMG&A) | USD 5 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Original Q1 FY2009 special charge of $22.1M included impairment of ~$12.9M and severance for 175 manufacturing and 9 SMG&A employees; ~$1.8M of severance accrual reversed in Q4 FY2009. Additional Q1 FY2010 charge of $4.7M: ~$3.4M lease obligation costs and ~$1.3M cleanup/closure costs. Facility consolidated into Wilmington, MA; 1 employee still employed at July 31, 2010. Estimated annual savings ~$41M beginning Q3 FY2010. | ||
| 2010-07-31 | plant_closure | completed | 2006-11 | 2010-03 | Sunnyvale, California, United States | Wafer fabrication | USD 0 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Production ceased November 2006; lease obligation paid monthly until lease expired March 2010. One-time settlement charge of $0.4M recorded in Q1 FY2010 on lease termination; no additional charges expected. | ||
| 2010-07-31 | restructuring | completed | 150 | 2007 | 2009-10 | Limerick, Ireland | Wafer fabrication (manufacturing) | USD 14 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Fiscal 2007 charge of $13.7M for severance and fringe benefits for 150 manufacturing employees as six-inch line transitioned to eight-inch technology and external foundries. Additional charges of $1.5M in FY2008 and $1.2M in FY2009. Six-inch production ceased in Q4 FY2009; all severance paid; no further charges expected. Annual cost savings ~$25M beginning Q1 FY2010. | |
| 2010-07-31 | restructuring | completed | 547 | 2008-10 | 2009-05 | Foreign locations | Manufacturing, Engineering, and Selling, Marketing, General and Administrative | USD 30 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | FY2009 charge of $30.3M: ~$2.1M lease obligations, ~$0.9M PP&E write-off, ~$0.8M contract termination/cleanup costs, and $26.5M severance for 245 manufacturing and 302 engineering and SMG&A employees. Action substantially completed in Q2 FY2009; annual savings ~$36.4M (~$31.6M SMG&A, ~$4.8M cost of sales). An initial $1.6M charge in Q4 FY2008 covered 19 engineering/SMG&A employees at foreign locations. | |
| 2010-07-31 | restructuring | in_progress | 149 | 2009-11-01 | Foreign locations | Engineering and SMG&A | USD 11 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Severance for 149 engineering and SMG&A employees recorded in Q1 FY2010; 1 employee still employed at July 31, 2010. Additional $0.5M charge for abandoned power management IP impairment. Expected quarterly savings of ~$4M when fully implemented in Q1 FY2011. | ||
| 2010-07-31 | plant_closure | in_progress | 2008-11-01 | Cambridge, Massachusetts, United States | Wafer fabrication (manufacturing) | USD 5 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Additional $4.7M charge in Q1 FY2010 ($3.4M lease obligation, $1.3M cleanup/closure). Facility ceased use in Q1 FY2010. Original FY2009 charge of $22.1M covered 175 manufacturing and 9 SMG&A employees; 1 employee still employed at July 31, 2010. Expected annual savings ~$41M. | |||
| 2010-07-31 | plant_closure | completed | 2006-11-01 | 2010-03-31 | Sunnyvale, California, United States | Wafer fabrication (manufacturing) | USD 0 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Production ceased November 2006; lease expired March 2010. One-time $0.4M settlement charge for lease termination recorded in Q1 FY2010. No additional charges expected. | ||
| 2010-07-31 | plant_closure | completed | 2006-11-01 | 2009-10-31 | Limerick, Ireland | Wafer fabrication (manufacturing) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Six-inch production line ceased Q4 FY2009; no further charges expected. Original FY2007 charge of $13.7M covered 150 manufacturing employees. Annual cost savings ~$25M began in Q1 FY2010. | |||
| 2010-07-31 | restructuring | in_progress | 149 | 2010-01-01 | 2011-01-01 | Foreign locations | Engineering and SMG&A | USD 11 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Recorded in Q1 FY2010. 1 employee remained employed as of July 31, 2010 to receive severance benefit upon involuntary termination. Estimated quarterly savings of $4 million when fully implemented in Q1 FY2011. | |
| 2010-07-31 | plant_closure | in_progress | 2009-01-01 | Cambridge, Massachusetts | Manufacturing and SMG&A | USD 5 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Original action in Q1 FY2009 affected 175 manufacturing and 9 SMG&A employees. Additional $4.7M charge in Q1 FY2010 for lease obligations and cleanup. 1 employee remained employed as of July 31, 2010. | |||
| 2010-07-31 | restructuring | in_progress | USD 16,483,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | |||||||
| 2010-07-31 | restructuring | in_progress | Closure of Wafer Fabrication Facility in Sunnyvale [Member] | USD 375,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2010-07-31 | restructuring | in_progress | Closure of Wafer Fabrication Facility in Cambridge [Member] | USD 4,689,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2010-07-31 | restructuring | in_progress | Reduction Of Operating Costs [Member] | USD 11,419,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2010-05-01 | restructuring | in_progress | 149 | 2011-01-30 | Foreign locations | Engineering and SMG&A | USD 11 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Severance and fringe benefit costs for 149 engineering and SMG&A employees; 45 of 149 still employed at May 1, 2010 and must remain until involuntarily terminated to receive severance. Estimated quarterly savings of approximately $4 million when fully implemented in Q1 fiscal 2011. | ||
| 2010-05-01 | other | completed | United States | Power management expertise development | USD 1 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Impairment of related intellectual property from decision to abandon efforts to develop a particular expertise in power management; part of the $11.4 million fiscal 2010 charge. | ||||
| 2010-05-01 | plant_closure | in_progress | 184 | Cambridge, Massachusetts, United States | Wafer fabrication | USD 5 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q1 fiscal 2010 charge: approximately $3.4 million lease obligation costs and $1.3 million cleanup/closure costs. Original fiscal 2009 charge of $22.1 million affected 175 manufacturing and 9 SMG&A employees; 2 employees still employed at May 1, 2010. Estimated annual savings of approximately $41 million starting Q3 fiscal 2010. | |||
| 2010-05-01 | plant_closure | completed | 2010-03-31 | Sunnyvale, California, United States | Wafer fabrication | USD 0 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | One-time settlement charge in Q1 fiscal 2010 related to termination of lease obligation; production ceased November 2006 and lease expired March 2010. No additional charges expected. | |||
| 2010-05-01 | restructuring | in_progress | 547 | Foreign locations | Manufacturing, engineering and SMG&A | USD 30 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Fiscal 2009 cost reduction action: 245 manufacturing and 302 engineering/SMG&A employees; 1 of 547 still employed at May 1, 2010. Annual savings of approximately $36.4 million. | |||
| 2010-05-01 | reduction_in_force | in_progress | 149 | 2010-01-30 | Foreign locations | Engineering and SMG&A | USD 11 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Charge recorded in Q1 FY2010; exact announcement date not disclosed. As of 2010-05-01, 45 of 149 employees remained, to be separated involuntarily. Approximately $0.5M of the total $11.4M charge relates to IP impairment, not severance. | ||
| 2010-05-01 | plant_closure | in_progress | 2010-01-30 | Cambridge, Massachusetts, United States | Wafer fabrication | USD 5 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Facility ceased use in Q1 FY2010; FY2010 charge covers $3.4M lease obligations and $1.3M cleanup. Workforce reduction of 175 manufacturing and 9 SMG&A employees occurred in FY2009, not current period. As of 2010-05-01, 2 employees from that prior action remained. | |||
| 2010-05-01 | plant_closure | completed | 2010-01-30 | 2010-03-31 | Sunnyvale, California, United States | Wafer fabrication | USD 0 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Lease term expired March 2010; one-time settlement charge recorded in Q1 FY2010. Production ceased in November 2006; no current-period workforce reduction. | ||
| 2010-05-01 | restructuring | in_progress | 149 | 2010-01-01 | 2011-01-01 | Foreign locations | Engineering and SMG&A | USD 11 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Reduction of operating costs. 45 employees remained employed as of May 1, 2010, pending involuntary termination to receive severance. Charge recorded in Q1 FY2010. | |
| 2010-05-01 | plant_closure | in_progress | 2009-01-01 | Cambridge, Massachusetts | Manufacturing and SMG&A | USD 5 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Closure of wafer fabrication facility. Charge recorded in Q1 FY2010 for lease obligations and cleanup. 2 employees remained employed as of May 1, 2010. | |||
| 2010-05-01 | restructuring | in_progress | USD 16,483,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | |||||||
| 2010-01-30 | plant_closure | in_progress | 150 | 2007-01-01 | Limerick, Ireland | Manufacturing | USD 14 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Fiscal 2007 decision to use only eight-inch technology at Limerick; severance for 150 manufacturing employees. As of 2010-01-30, 1 of the 150 employees remained. Six-inch production ceased in Q4 fiscal 2009; no further charges expected. | ||
| 2010-01-30 | restructuring | in_progress | 547 | 2008-11-01 | Foreign locations | Manufacturing, Engineering, SMG&A | USD 30 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Fiscal 2009 charge of $30.3 million covering 245 manufacturing and 302 engineering/SMG&A employees, plus lease, asset write-off and contract termination costs. As of 2010-01-30, 3 of the 547 employees remained. | ||
| 2010-01-30 | restructuring | in_progress | 149 | 2010-01-30 | Foreign locations | Engineering, SMG&A | USD 11 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q1 fiscal 2010 charge of $11.4 million: ~$10.9 million severance for 149 engineering and SMG&A employees, of whom 86 remained employed at quarter-end; ~$0.5 million impairment of power-management intellectual property. | ||
| 2010-01-30 | plant_closure | in_progress | 184 | 2009-01-01 | Cambridge, Massachusetts | Manufacturing, SMG&A | USD 22 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Fiscal 2009 charge of $22.1 million to consolidate Cambridge fab into Wilmington: ~$12.9 million asset impairment and ~$9.2 million severance for 175 manufacturing and 9 SMG&A employees. As of 2010-01-30, 9 employees remained. | ||
| 2010-01-30 | plant_closure | in_progress | 2010-01-30 | 2010-03-31 | Sunnyvale, California | Manufacturing | USD 0 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Production ceased November 2006; Q1 fiscal 2010 one-time settlement charge of $0.4 million to terminate the lease, which expires March 2010. No additional charges expected. | ||
| 2010-01-30 | restructuring | in_progress | 149 | 2009-11-01 | Foreign locations | Engineering and SMG&A | USD 11 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Q1 FY2010 additional charge under a program begun in Q4 FY2008. Severance for 149 employees ($10.9M) plus $0.5M IP impairment from abandoned power-management development. 86 of 149 still employed at 2010-01-30; announcement date is quarter start as no specific date disclosed. Program expected to yield ~$4M quarterly savings beginning Q1 FY2011. | ||
| 2010-01-30 | plant_closure | in_progress | 2008-11-01 | United States (Cambridge, Massachusetts) | Wafer fabrication (manufacturing) | USD 5 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Q1 FY2010 charge of $4.7M covers $3.4M lease obligations for the facility ceased in Q1 FY2010 and $1.3M cleanup/closure costs — no new employee separations this quarter. Original closure action (Q1 FY2009) affected 184 employees (175 manufacturing, 9 SMG&A); 9 remained employed at 2010-01-30. Facility consolidated into Wilmington, MA. Announcement date is original program start (approximate). | |||
| 2010-01-30 | plant_closure | in_progress | 2006-11-01 | 2010-03-31 | United States (Sunnyvale, California) | Wafer fabrication (manufacturing) | USD 0 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | One-time lease termination settlement charge of $0.4M recorded in Q1 FY2010; production ceased November 2006. Lease term expires March 2010. No additional charges expected. No employee separations in the current quarter. | ||
| 2010-01-30 | restructuring | in_progress | 149 | 2010-01-30 | Foreign locations | Engineering and SMG&A | USD 11 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Part of 'Reduction of Operating Costs'. 86 of 149 employees still employed as of Jan 30, 2010. | ||
| 2010-01-30 | plant_closure | in_progress | 2010-01-30 | Cambridge, Massachusetts | Wafer Fabrication | USD 5 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Closure of Wafer Fabrication Facility in Cambridge. Charge includes lease obligations and cleanup. 9 employees from prior action still employed. | |||
| 2010-01-30 | plant_closure | completed | 2010-01-30 | Sunnyvale, California | Wafer Fabrication | USD 0 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | One-time settlement charge for lease termination. Production ceased in Nov 2006. | |||
| 2010-01-30 | restructuring | in_progress | USD 16,483,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | |||||||
| 2009-10-31 | plant_closure | in_progress | 2010-01-30 | United States (Massachusetts) | Manufacturing — wafer fabrication | USD 22 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Decision disclosed as occurring in the first quarter of fiscal 2009 (announcement date not stated). Severance accruals covered 175 manufacturing and 9 SMG&A employees; total affected headcount not stated. Production finished and cleanup began in Q4 FY2009; 33 employees still employed at year-end, with lease termination and cleanup costs expected in Q1 fiscal 2010. Charge shown is the fiscal 2009 total special charge for this action. | |||
| 2009-10-31 | restructuring | completed | 547 | 2009-04-25 | Global (severance recorded at foreign locations) | Manufacturing, Engineering and SMG&A | USD 30 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Program originated in the fourth quarter of fiscal 2008; this record captures only the fiscal 2009 charge of $30.3 million (severance for 245 manufacturing and 302 engineering/SMG&A employees plus lease, asset write-off and contract termination costs). Substantially completed in Q2 fiscal 2009; 16 of the 547 employees still employed at year-end. Expected annual savings of approximately $36.4 million. | ||
| 2009-10-31 | plant_closure | completed | 2009-10-31 | Ireland | Manufacturing — six-inch wafer fabrication line | USD 1 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Six-inch line production ceased during the fourth quarter of fiscal 2009; fiscal 2009 charge covers clean-up and closure costs only. The associated workforce reduction (severance for 150 manufacturing employees) was recorded in fiscal 2007 and is not included here; 2 of those employees remained at year-end. Program announced in fiscal 2007. | |||
| 2009-10-31 | restructuring | in_progress | 547 | 2008-10-01 | Global | Manufacturing, Engineering, SMG&A | USD 30 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | Announced Q4 FY2008. FY2009 charge of $30.3M for 245 manufacturing and 302 engineering/SMG&A employees. 16 employees remained employed as of FY2009 end. | ||
| 2009-10-31 | plant_closure | in_progress | 184 | 2009-01-01 | Cambridge, Massachusetts | Manufacturing, SMG&A | USD 22 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | Announced Q1 FY2009. Charge of $22.1M for 175 manufacturing and 9 SMG&A employees. 33 employees remained employed as of FY2009 end. | ||
| 2009-10-31 | restructuring | in_progress | 150 | 2007-01-01 | Limerick, Ireland | Manufacturing | USD 1 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | Original action in FY2007. FY2009 charge of $1.2M for cleanup/closure. 2 employees remained employed as of FY2009 end. | ||
| 2009-10-31 | restructuring | in_progress | USD 53,656,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | |||||||
| 2009-08-01 | plant_closure | in_progress | 150 | 2007-10 | 2009-10-31 | Limerick, Ireland | Manufacturing | USD 14 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Six-inch line consolidation to eight-inch technology; severance under SFAS 88 for 150 manufacturing employees. Additional clean-up/closure charges of $0.6M in Q1 and $0.6M in Q2 fiscal 2009. 4 of 150 employees still employed at 2009-08-01; remaining production expected to cease in Q4 fiscal 2009. Estimated annual savings of ~$25 million starting Q1 fiscal 2010. | |
| 2009-08-01 | restructuring | in_progress | 370 | 2008-10 | Multiple foreign locations | Manufacturing (221) and Engineering/SMG&A (149) | USD 19 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q1 fiscal 2009 charge includes ~$2.1M lease obligations, ~$0.8M PP&E write-off, ~$0.6M contract termination/closure costs; remaining $15.6M severance for 221 manufacturing and 149 engineering/SMG&A employees. 3 of 370 still employed at 2009-08-01. Part of a program with estimated annual savings of ~$36.4 million once fully implemented. | ||
| 2009-08-01 | restructuring | in_progress | 177 | 2009-01 | Multiple foreign locations | Manufacturing (24) and Engineering/SMG&A (153) | USD 11 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q2 fiscal 2009 charge includes ~$0.1M PP&E write-off and ~$0.3M clean-up/closure costs; remaining $10.9M severance for 24 manufacturing and 153 engineering/SMG&A employees. 26 of 177 still employed at 2009-08-01. Same cost-reduction program as the Q1 fiscal 2009 action. | ||
| 2009-08-01 | plant_closure | in_progress | 184 | 2009-01 | 2009-10-31 | Cambridge, Massachusetts, United States | Manufacturing (175) and SMG&A (9) | USD 22 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Consolidation of Cambridge fab into Wilmington, Massachusetts facility. Charge comprises ~$12.9M non-cash impairment of manufacturing assets and $9.2M severance under SFAS 88 for 175 manufacturing and 9 SMG&A employees. All employees still employed at 2009-08-01; production expected to cease in Q4 fiscal 2009. Estimated annual savings of ~$41 million fully realized starting Q3 fiscal 2010. | |
| 2009-08-01 | plant_closure | completed | 2006-11 | 2010-12-31 | Sunnyvale, California, United States | Manufacturing | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Production ceased November 2006; clean-up completed in fiscal 2007. Company continues paying lease obligations monthly through lease expiry in 2010; no additional charges expected. | |||
| 2009-08-01 | restructuring | in_progress | 370 | 2009-01-31 | Global | Manufacturing, Engineering, and SMG&A | USD 19 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Q1 FY2009 action: 221 manufacturing and 149 engineering/SMG&A employees. Includes $2.1M lease obligations, $0.8M PP&E write-off, $0.6M contract termination/closure costs; remaining $15.6M severance. 3 of 370 still employed as of 2009-08-01. Announcement date is quarter-end proxy; exact date not disclosed. | ||
| 2009-08-01 | restructuring | in_progress | 177 | 2009-05-02 | Global | Manufacturing, Engineering, and SMG&A | USD 11 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Q2 FY2009 action: 24 manufacturing and 153 engineering/SMG&A employees. Includes $0.1M PP&E write-off, $0.3M closure costs; remaining $10.9M severance. 26 of 177 still employed as of 2009-08-01. Announcement date is quarter-end proxy; exact date not disclosed. | ||
| 2009-08-01 | plant_closure | in_progress | 184 | 2009-01-31 | 2009-10-31 | Cambridge, Massachusetts, United States | Wafer Fabrication (consolidated into Wilmington, MA facility) | USD 22 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Q1 FY2009 action: 175 manufacturing and 9 SMG&A employees. Includes $12.9M asset impairment and $9.2M severance. All employees still employed as of 2009-08-01; production expected to cease in Q4 FY2009. Announcement date is quarter-end proxy; exact date not disclosed. | |
| 2009-08-01 | plant_closure | in_progress | 150 | 2007-10-31 | 2009-10-31 | Limerick, Ireland | Wafer Fabrication (six-inch production line consolidation) | USD 1 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Original $13.7M charge recorded Q4 FY2007 for 150 manufacturing employees. Additional $0.6M charges in each of Q1 and Q2 FY2009 for clean-up/closure costs. 4 of 150 still employed as of 2009-08-01; remaining production expected to cease Q4 FY2009. Associated charge shown is FY2009 incremental charges only. | |
| 2009-08-01 | restructuring | in_progress | 150 | 2007-10-01 | 2009-10-31 | Limerick | Manufacturing | USD 14 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Consolidation of wafer fabrication facility to eight-inch technology. 4 employees remained employed as of Aug 1, 2009. | |
| 2009-08-01 | restructuring | in_progress | 370 | 2008-10-01 | Global | Manufacturing, Engineering, SMG&A | USD 19 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Reduction of operating costs. 3 employees remained employed as of Aug 1, 2009. | ||
| 2009-08-01 | restructuring | in_progress | 177 | 2009-04-01 | Global | Manufacturing, Engineering, SMG&A | USD 11 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Reduction of operating costs (Q2 2009 action). 26 employees remained employed as of Aug 1, 2009. | ||
| 2009-08-01 | plant_closure | in_progress | 184 | 2009-01-01 | 2009-10-31 | Cambridge, Massachusetts | Manufacturing, SMG&A | USD 22 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Closure of wafer fabrication facility. Includes $12.9M impairment and $9.2M severance. All 184 employees (175 manufacturing, 9 SMG&A) remained employed as of Aug 1, 2009. | |
| 2009-08-01 | restructuring | in_progress | USD 53,656,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | |||||||
| 2009-05-02 | plant_closure | in_progress | 150 | 2007-10 | 2009-10-31 | Limerick, Ireland | Manufacturing | USD 13,700 (thousands) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Six-inch line consolidation into eight-inch line; severance under SFAS 88 for 150 manufacturing employees. Additional charges of $1.5M in Q4 FY2008, $0.6M in Q1 FY2009 and $0.6M in Q2 FY2009 for clean-up/closure costs. 9 of 150 employees still employed at quarter end; remaining production to cease in H2 FY2009. Estimated annual savings ~$25M starting Q1 FY2010. | |
| 2009-05-02 | restructuring | in_progress | 370 | 2008-10 | Foreign locations | Manufacturing (221) and Engineering/SMG&A (149) | USD 19,100 (thousands) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q1 FY2009 charge of $19.1M: ~$2.1M lease obligations, ~$0.8M PP&E write-off, ~$0.6M contract termination/closure costs; remaining $15.6M severance under SFAS 88 for 221 manufacturing and 149 engineering/SMG&A employees. 6 of 370 employees still employed at quarter end. Estimated annual savings ~$36.4M once fully implemented. | ||
| 2009-05-02 | restructuring | in_progress | 177 | 2008-10 | Foreign locations | Manufacturing (24) and Engineering/SMG&A (153) | USD 11,300 (thousands) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q2 FY2009 additional charge of $11.3M: ~$0.1M PP&E write-off, ~$0.3M clean-up/closure costs; remaining $10.9M severance under SFAS 88 for 24 manufacturing and 153 engineering/SMG&A employees. 62 of 177 employees still employed at quarter end. | ||
| 2009-05-02 | plant_closure | in_progress | 184 | 2009-01 | 2009-10-31 | Cambridge, Massachusetts, United States | Manufacturing (175) and SMG&A (9) | USD 22,100 (thousands) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Consolidation of Cambridge fab into Wilmington, MA facility. $12.9M non-cash impairment of manufacturing assets; $9.2M severance under SFAS 88 for 175 manufacturing and 9 SMG&A employees. All affected employees still employed at quarter end; production to cease in Q4 FY2009. Estimated annual savings ~$41M fully realized starting Q3 FY2010. | |
| 2009-05-02 | restructuring | in_progress | 370 | Foreign locations (non-U.S.) | Manufacturing (221) and Engineering/SMG&A (149) | USD 19 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | First-quarter fiscal 2009 tranche; $15.6M of the $19.1M charge was severance and fringe benefits. 6 of the 370 employees still employed at May 2, 2009 pending involuntary termination. Announcement date not disclosed; charge recorded in quarter ended January 31, 2009. | |||
| 2009-05-02 | restructuring | in_progress | 177 | Foreign locations (non-U.S.) | Manufacturing (24) and Engineering/SMG&A (153) | USD 11 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Second-quarter fiscal 2009 additional charge; $10.9M of the $11.3M was severance and fringe benefits. 62 of the 177 employees still employed at May 2, 2009. Program described as substantially completed in the second quarter of fiscal 2009, with expected annual savings of about $36.4M. | |||
| 2009-05-02 | plant_closure | in_progress | 184 | 2009-10-31 | United States (Cambridge, Massachusetts) | Wafer fabrication (175 manufacturing) and SMG&A (9) | USD 22 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Cambridge fab consolidated into Wilmington, MA; charge recorded in quarter ended January 31, 2009 and comprises $12.9M asset impairment and $9.2M severance. All affected employees still employed at May 2, 2009; production to cease and terminations to occur in Q4 fiscal 2009 (fiscal year end October 31, 2009). Expected annual savings of about $41M. | ||
| 2009-05-02 | plant_closure | in_progress | 9 | 2009-10-31 | Ireland (Limerick) | Wafer fabrication (six-inch production line) | USD 1 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Count is the 9 of the original 150 affected employees still employed at May 2, 2009 (original program announced in fiscal 2007). FY2009 charges of $1.191M (Q1 $0.550M, Q2 $0.641M) were clean-up and closure costs, not severance. Remaining six-inch production expected to cease in the second half of fiscal 2009. | ||
| 2009-05-02 | restructuring | in_progress | 177 | 2008-10-01 | Global | Manufacturing, Engineering, SMG&A | USD 11 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Reduction of Operating Costs: 24 manufacturing, 153 engineering/SMG&A employees affected in Q2 2009. 62 employees still employed as of May 2, 2009. | ||
| 2009-05-02 | plant_closure | in_progress | 184 | 2009-01-01 | 2009-10-31 | Cambridge, Massachusetts | Manufacturing, SMG&A | USD 22 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Closure of Wafer Fabrication Facility in Cambridge: 175 manufacturing, 9 SMG&A employees affected. All employees still employed as of May 2, 2009. Production expected to cease in Q4 2009. | |
| 2009-05-02 | restructuring | in_progress | 150 | 2007-10-01 | 2009-10-31 | Limerick | Manufacturing | USD 1 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Consolidation of Wafer Fabrication Facility in Limerick: 150 manufacturing employees originally affected. 9 employees still employed as of May 2, 2009. Remaining production expected to cease in H2 2009. | |
| 2009-01-31 | restructuring | in_progress | 370 | 2008-11 | Multiple foreign locations | Manufacturing (221 employees) and Engineering/SMG&A (149 employees) | USD 19 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Initial $1.6M charge in Q4 FY2008 for 19 employees; additional $19.1M in Q1 FY2009 covering lease obligations ($2.1M), PP&E write-off ($0.8M), contract termination/closure costs ($0.6M), and severance for 370 employees. 19 of 370 still employed at quarter-end; action substantially completed in Q1 FY2009. Expected annual savings ~$21.2M. | ||
| 2009-01-31 | plant_closure | in_progress | 184 | 2008-11 | 2009-10 | Cambridge, Massachusetts, United States | Wafer fabrication (175 manufacturing employees, 9 SMG&A employees) | USD 22 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Consolidation of Cambridge fab into Wilmington, MA facility. Includes $12.9M non-cash asset impairment and $9.2M severance under SFAS 88. All affected employees still employed at quarter-end; production expected to cease in Q4 FY2009. Expected annual savings ~$41M starting Q3 FY2010. | |
| 2009-01-31 | plant_closure | in_progress | 150 | 2007-10 | 2009-04 | Limerick, Ireland | Six-inch wafer fabrication line | USD 1 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Original $13.7M charge in Q4 FY2007 (severance for 150 manufacturing employees); $1.5M additional in Q4 FY2008; $0.6M clean-up/closure costs in Q1 FY2009. 14 of 150 employees still employed at quarter-end; six-inch production to cease in Q2 FY2009. ~$0.9M additional closure costs expected over next two quarters. Expected annual savings ~$25M starting Q1 FY2010. | |
| 2009-01-31 | plant_closure | completed | 2006-11 | 2010-12-31 | Sunnyvale, California, United States | Wafer fabrication | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Production ceased November 2006; clean-up completed in fiscal 2007. Company continues paying lease obligations monthly through lease expiry in 2010; no additional charges expected. | |||
| 2009-01-31 | restructuring | in_progress | 370 | Manufacturing, engineering, and SMG&A | USD 19 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Action originated in Q4 fiscal 2008 with a $1.6M severance charge for 19 employees; an additional $19.1M charge was recorded in Q1 fiscal 2009, comprising ~$15.6M severance for 221 manufacturing and 149 engineering/SMG&A employees, ~$2.1M lease obligations for vacated facilities, ~$0.8M PP&E write-off, and ~$0.6M contract termination and clean-up costs. Filer states the action was substantially completed during the quarter; 19 of the 370 employees remained employed at 2009-01-31 and must stay until involuntary termination to receive severance. Expected annual savings ~$21.2M (~$18.8M SMG&A, ~$2.4M cost of sales), fully reflected by Q2 fiscal 2009. Filer does not state an announcement date or geography. | ||||
| 2009-01-31 | plant_closure | in_progress | 175 | United States (Cambridge, Massachusetts) | Manufacturing | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Cambridge wafer fabrication facility being consolidated into the existing Wilmington, Massachusetts facility. Program charge of $22.1M (not allocated by function in the filing) comprises ~$12.9M manufacturing asset impairment and ~$9.2M severance covering 175 manufacturing and 9 SMG&A employees. All affected employees were still employed at 2009-01-31; production expected to cease during Q4 fiscal 2009. Estimated annual savings ~$41M beginning Q3 fiscal 2010. | ||||
| 2009-01-31 | plant_closure | in_progress | 9 | United States (Cambridge, Massachusetts) | Selling, marketing, general and administrative | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | SMG&A component of the Cambridge facility closure; see manufacturing component record for the consolidated $22.1M program charge (~$12.9M impairment, ~$9.2M severance across 175 manufacturing and 9 SMG&A employees). All affected employees still employed at 2009-01-31; production expected to cease during Q4 fiscal 2009. | ||||
| 2009-01-31 | plant_closure | in_progress | 14 | Ireland (Limerick) | Manufacturing | USD 1 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Consolidation of the six-inch production line at Limerick into the eight-inch line or external foundries. Original fiscal 2007 action covered 150 manufacturing employees; 14 remained employed at 2009-01-31 and will be terminated when six-inch production ceases during the second quarter of 2009. Q1 fiscal 2009 charge of $0.6M was clean-up and closure costs expensed as incurred (not severance); ~$0.9M further clean-up and closure costs expected over the next two quarters. Estimated annual savings ~$25M beginning Q1 fiscal 2010. | |||
| 2009-01-31 | restructuring | in_progress | 150 | 2007-10-01 | 2009-06-30 | Limerick | Manufacturing | USD 1 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Consolidation of wafer fabrication facility; 14 employees remained employed as of Jan 31, 2009. Production expected to cease Q2 2009. | |
| 2009-01-31 | restructuring | in_progress | 370 | 2008-10-01 | 2009-04-30 | Global | Manufacturing, Engineering, SMG&A | USD 19 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Reduction of operating costs; 19 employees remained employed as of Jan 31, 2009. Includes 221 manufacturing and 149 engineering/SMG&A employees. | |
| 2009-01-31 | plant_closure | in_progress | 184 | 2009-01-31 | 2009-10-31 | Cambridge, Massachusetts | Manufacturing, SMG&A | USD 22 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Closure of Cambridge fabrication facility; all 175 manufacturing and 9 SMG&A employees remained employed as of Jan 31, 2009. Production expected to cease Q4 2009. | |
| 2008-11-01 | restructuring | in_progress | 19 | 2009-01-31 | Non-U.S. locations | Engineering and SMG&A | USD 2 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Decision made during fourth quarter of fiscal 2008; exact announcement date not disclosed. Charge covers severance and fringe benefits for 19 employees; 14 of 19 still employed at 2008-11-01. Expected annual savings approximately $2.1 million. | ||
| 2008-11-01 | plant_closure | in_progress | 150 | 2009-06-30 | Limerick, Ireland | Manufacturing — six-inch wafer fabrication line | USD 2 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Cumulative program total announced in fourth quarter of fiscal 2007 (150 manufacturing employees); fiscal 2008 activity is an additional $1.5 million charge ($1.2M severance estimate adjustment, $0.3M clean-up). 126 of 150 employees still employed at 2008-11-01; six-inch production expected to cease in first half of 2009. Approximately $1.5 million of further clean-up costs expected over the following three quarters. | ||
| 2008-11-01 | restructuring | in_progress | 152 | Worldwide | Manufacturing, engineering, and SMG&A support infrastructure | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Program announced in fourth quarter of fiscal 2007 with a $12.3 million charge recorded in fiscal 2007; no new charge in fiscal 2008. Fiscal 2008 activity limited to severance payments of $8.1 million. Substantially completed in second quarter of fiscal 2008; 6 of 152 employees still employed at 2008-11-01. | ||||
| 2008-11-01 | divestiture_reduction | completed | 2007-09 | 2008-01-11 | Baseband Chipset Business | discontinued_operations_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Sale of the Baseband Chipset Business to MediaTek Inc. completed 2008-01-11; net cash proceeds of $269 million. Headcount removed through the disposition is not quantified in the filing; some employees transferred to the buyer with associated retention payments. | ||||
| 2008-11-01 | divestiture_reduction | completed | 2007-11 | CPU voltage regulation and PC thermal monitoring business | discontinued_operations_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Sale to subsidiaries of ON Semiconductor Corporation completed during the first quarter of fiscal 2008 (exact date not disclosed); net cash proceeds of $138 million. Headcount removed through the disposition is not quantified in the filing. | |||||
| 2008-11-01 | restructuring | in_progress | 150 | 2007-10-01 | 2009-06-30 | Ireland | Manufacturing | USD 14 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | Severance for 150 manufacturing employees associated with transition to eight-inch technology. Production expected to cease in first half of 2009. | |
| 2008-11-01 | restructuring | in_progress | 152 | 2007-10-01 | 2008-06-30 | Global | Manufacturing, Engineering, SMG&A | USD 12 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | 25 manufacturing, 127 engineering and SMG&A employees. Substantially completed in second quarter of fiscal 2008. | |
| 2008-11-01 | restructuring | in_progress | 19 | 2008-10-01 | 2009-03-31 | Global | Engineering, SMG&A | USD 2 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | 19 engineering and SMG&A employees. Expected to complete during first quarter of fiscal 2009. | |
| 2008-08-02 | plant_closure | completed | 367 | 2005-10-29 | 2007-05-05 | Sunnyvale, California, United States | Manufacturing | USD 20 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Closure of California wafer fabrication facility; severance for 339 manufacturing and 28 G&A employees; production ceased November 9, 2006; final cleanup completed in Q2 fiscal 2007; annual savings of approximately $50 million. | |
| 2008-08-02 | restructuring | completed | 260 | 2005-10-29 | 2007-10-27 | Multiple locations | Product Development and Support Programs | USD 11 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Reorganization affecting 60 manufacturing and 154 engineering/SMG&A employees; additional charges in fiscal 2006-2007; fully implemented in Q4 fiscal 2007 with annual savings of approximately $30 million. | |
| 2008-08-02 | plant_closure | in_progress | 150 | 2007-10-28 | 2009-05-02 | Limerick, Ireland | Manufacturing | USD 14 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Six-inch wafer production line to cease in first half of fiscal 2009; 146 of 150 affected employees still employed at August 2, 2008; approximately $3 million of additional closure expenses expected over next four quarters; estimated annual savings of approximately $25 million starting Q2 fiscal 2009. | |
| 2008-08-02 | restructuring | in_progress | 152 | 2007-10-28 | 2008-05-03 | Multiple locations | Manufacturing, Engineering and SMG&A | USD 12 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Severance for 25 manufacturing and 127 engineering/SMG&A employees plus $1.6 million contract termination costs; substantially completed in Q2 fiscal 2008; 10 of 152 employees still employed at August 2, 2008; expected annual savings of approximately $15 million. | |
| 2008-08-02 | divestiture_reduction | completed | 2007-09-01 | 2008-01-11 | Baseband Chipset Business | USD 278 (millions) | other f5-10q / GLM-5.3-flash-fp4-HTML | Sale to MediaTek Inc. completed January 11, 2008 for net cash proceeds of $269 million; pre-tax gain of $278 million; headcount transferred not quantified. | |||
| 2008-08-02 | divestiture_reduction | completed | 2007-11-08 | 2008-02-02 | CPU voltage regulation and PC thermal monitoring business | USD 78 (millions) | other f5-10q / GLM-5.3-flash-fp4-HTML | Sale to subsidiaries of ON Semiconductor Corporation completed in Q1 fiscal 2008 for net cash proceeds of $138 million; pre-tax gain of $78 million; headcount transferred not quantified. | |||
| 2008-08-02 | plant_closure | in_progress | 150 | Limerick, Ireland | Manufacturing | USD 14 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Charge recorded in Q4 FY2007 to consolidate Limerick onto eight-inch technology; 146 of 150 employees still employed at 2008-08-02. Six-inch line production expected to cease in first half of fiscal 2009; additional closure expense of about $3M expected over the next four quarters, expensed as incurred. | |||
| 2008-08-02 | restructuring | completed | 152 | Global | Manufacturing, Engineering, and SMG&A | USD 12 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Overhead infrastructure reduction announced Q4 FY2007 (25 manufacturing and 127 engineering/SMG&A employees plus $1.6M contract termination); substantially completed in Q2 FY2008, with 10 of 152 employees still employed at 2008-08-02. Expected annual savings about $15M. | |||
| 2008-08-02 | divestiture_reduction | completed | 2008-01-11 | Baseband Chipset Business | other f5-10q / MiMo-V2.6-Flash-fp8-HTML | Definitive agreement to sell Baseband Chipset Business to MediaTek Inc. entered in September 2007; sale completed 2008-01-11 for net cash proceeds of $269M. No employee count disclosed; some employees transferred to MediaTek with retention payments. | |||||
| 2008-08-02 | divestiture_reduction | completed | 2007-11-08 | CPU voltage regulation and PC thermal monitoring business | other f5-10q / MiMo-V2.6-Flash-fp8-HTML | Purchase and sale agreement with subsidiaries of ON Semiconductor Corporation signed 2007-11-08; sale completed during Q1 FY2008 for net cash proceeds of $138M. No employee count disclosed. | |||||
| 2008-08-02 | restructuring | in_progress | 150 | 2007-10-01 | 2009-04-01 | Limerick | Manufacturing | USD 14 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Consolidation of wafer fabrication facility to eight-inch technology. 146 of 150 employees still employed as of Aug 2, 2008. Production expected to cease in first half of fiscal 2009. | |
| 2008-08-02 | restructuring | in_progress | 152 | 2007-10-01 | Global | Manufacturing, Engineering, SMG&A | USD 12 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Reduction of overhead infrastructure costs. 10 of 152 employees still employed as of Aug 2, 2008. Actions substantially completed in Q2 FY2008. | ||
| 2008-08-02 | divestiture_reduction | completed | 2007-09-01 | 2008-01-11 | Global | Baseband Chipset Business | discontinued_operations_footnote f5-10q / Qwen3.6-27B-Q8_0 | Sale of Baseband Chipset Business to MediaTek Inc. completed Jan 11, 2008. Employee count not explicitly disclosed, but retention payments of $3M made in Q3 FY2008 to employees transferring to MediaTek. | |||
| 2008-08-02 | divestiture_reduction | completed | 2007-11-08 | 2008-02-02 | Global | CPU voltage regulation and PC thermal monitoring business | discontinued_operations_footnote f5-10q / Qwen3.6-27B-Q8_0 | Sale of CPU voltage regulation and PC thermal monitoring business to ON Semiconductor subsidiaries completed in Q1 FY2008. Employee count not explicitly disclosed. | |||
| 2008-05-03 | plant_closure | completed | 367 | 2005-10-30 | 2007-05-05 | Sunnyvale, California, United States | Manufacturing (339) and general and administrative (28) | USD 20 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Wafer fab closed; production ceased November 9, 2006; final cleanup completed in Q2 fiscal 2007. Charge was for severance and fringe benefits under SFAS 88. | |
| 2008-05-03 | restructuring | completed | 214 | 2005-10-30 | 2007-11-03 | Product development and support programs (60 manufacturing; 154 engineering and SMG&A) | USD 11 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Reorganization to focus on analog and DSP product programs; fully implemented in Q4 fiscal 2007 with additional charges in fiscal 2006 and 2007. | ||
| 2008-05-03 | plant_closure | in_progress | 150 | 2007-11-04 | 2009-06-30 | Limerick, Ireland | Manufacturing | USD 14 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Six-inch line to be consolidated into eight-inch technology; 147 of 150 employees still employed as of May 3, 2008. Additional closure costs of approximately $6 million expected in fiscal 2009. | |
| 2008-05-03 | restructuring | completed | 152 | 2007-11-04 | 2008-05-03 | Manufacturing (25) and engineering and SMG&A (127) | USD 12 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Includes $10.7 million severance and $1.6 million contract termination costs tied to exiting the Baseband Chipset Business; substantially completed in Q2 fiscal 2008 with 20 employees still employed at quarter-end. | ||
| 2008-05-03 | divestiture_reduction | completed | 2007-09-01 | 2008-01-11 | Baseband Chipset Business | other f5-10q / GLM-5.3-flash-fp4-HTML | Sold to MediaTek Inc. on January 11, 2008 for net cash proceeds of $269 million; pre-tax gain of $278 million. Headcount transferred not disclosed. | ||||
| 2008-05-03 | divestiture_reduction | completed | 2007-11-08 | 2008-02-02 | CPU voltage regulation and PC thermal monitoring business | other f5-10q / GLM-5.3-flash-fp4-HTML | Sold to subsidiaries of ON Semiconductor Corporation in Q1 fiscal 2008 for net cash proceeds of $138 million; pre-tax gain of $78 million. Headcount transferred not disclosed. | ||||
| 2008-05-03 | plant_closure | in_progress | 150 | 2007 | 2009-05-31 | Limerick, Ireland | Manufacturing | USD 14 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Six-inch production line to cease in first half of fiscal 2009; 147 of 150 employees still employed at May 3, 2008. Additional closure costs of ~$6M expected in fiscal 2009. | |
| 2008-05-03 | restructuring | in_progress | 152 | 2007 | 2008-05-03 | Global | Manufacturing, Engineering, Selling/Marketing/G&A | USD 12 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Actions substantially completed in Q2 FY2008; 20 of 152 employees still employed at May 3, 2008. Includes 25 manufacturing and 127 engineering/SMG&A positions plus $1.6M contract termination costs. | |
| 2008-05-03 | divestiture_reduction | completed | 2007-09 | 2008-01-11 | Global | Baseband Chipset Business | other f5-10q / MiMo-V2.6-Flash-fp8-HTML | Baseband Chipset Business sold to MediaTek Inc.; net cash proceeds $269M. Employee headcount transferred not disclosed. | |||
| 2008-05-03 | divestiture_reduction | completed | 2007-11-08 | 2008-02-02 | Global | CPU voltage regulation and PC thermal monitoring business | other f5-10q / MiMo-V2.6-Flash-fp8-HTML | Business sold to subsidiaries of ON Semiconductor Corporation; net cash proceeds $138M. Employee headcount transferred not disclosed. | |||
| 2008-05-03 | restructuring | in_progress | 150 | 2007-10-01 | 2009-04-01 | Limerick | Manufacturing | USD 14 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Consolidation of wafer fabrication facility to solely use eight-inch technology. 147 of 150 employees still employed as of May 3, 2008. Production expected to cease in first half of fiscal 2009. | |
| 2008-05-03 | restructuring | in_progress | 152 | 2007-10-01 | Global | Manufacturing, Engineering, SMG&A | USD 12 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Reduction of overhead infrastructure costs. 20 of 152 employees still employed as of May 3, 2008. Actions substantially completed in second quarter of fiscal 2008. | ||
| 2008-05-03 | restructuring | in_progress | 2005-10-01 | Sunnyvale | Manufacturing, G&A | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Closure of wafer fabrication facility. Original charge in FY2005 for 367 employees. Final cleanup completed in Q2 FY2007. Lease obligations remain through 2010. | ||||
| 2008-05-03 | restructuring | completed | 2005-10-01 | Global | Manufacturing, Engineering, SMG&A | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Reorganization of product development and support programs. Employment of all employees included in this action has been terminated. | ||||
| 2008-02-02 | plant_closure | completed | 367 | 2005-10 | 2007-04 | Sunnyvale, California, United States | Manufacturing (339) and general and administrative (28) | USD 20 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q4 fiscal 2005 charge for severance and fringe benefits; production ceased November 9, 2006 and final cleanup/closure completed in Q2 fiscal 2007. Estimated annual cost savings of approximately $50 million beginning fiscal 2007. | |
| 2008-02-02 | restructuring | completed | 214 | 2005-10 | 2007-10 | Manufacturing (60) and engineering/SMG&A (154) | USD 11 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q4 fiscal 2005 charge to refocus product development on analog and digital signal processing programs; additional charges in fiscal 2006 and 2007; fully implemented in Q4 fiscal 2007 with annual savings of approximately $30 million. | ||
| 2008-02-02 | plant_closure | in_progress | 150 | 2007-11 | 2009-06 | Limerick, Ireland | Manufacturing | USD 14 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q4 fiscal 2007 charge to consolidate six-inch production line into eight-inch technology at Limerick; 147 of 150 employees still employed as of February 2, 2008; production expected to cease in first half of fiscal 2009; approximately $6 million of additional cleanup/closure costs expected in fiscal 2009; estimated annual savings of approximately $25 million starting Q2 fiscal 2009. | |
| 2008-02-02 | restructuring | in_progress | 152 | 2007-11 | 2008-03 | Manufacturing (25) and engineering/SMG&A (127) | USD 12 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q4 fiscal 2007 charge comprising $10.7 million severance for 152 employees and $1.6 million contract termination costs tied to a license agreement; 25 of 152 employees still employed as of February 2, 2008; expected annual savings of approximately $15 million once substantially completed in Q2 fiscal 2008. | ||
| 2008-02-02 | divestiture_reduction | completed | 2007-09 | 2008-01-11 | Baseband Chipset Business | USD 278 (millions) | other f5-10q / GLM-5.3-flash-fp4-HTML | Sale of Baseband Chipset Business to MediaTek Inc. completed January 11, 2008 for net cash proceeds of $269 million; pre-tax gain of $278 million ($204 million net of tax); headcount removed not disclosed. | |||
| 2008-02-02 | divestiture_reduction | completed | 2007-11-08 | 2007-12-31 | CPU voltage regulation and PC thermal monitoring business | USD 78 (millions) | other f5-10q / GLM-5.3-flash-fp4-HTML | Sale to subsidiaries of ON Semiconductor Corporation completed December 31, 2007 for net cash proceeds of $138 million; pre-tax gain of $78 million ($43 million net of tax); headcount removed not disclosed. | |||
| 2008-02-02 | restructuring | in_progress | 150 | Limerick, Ireland | Manufacturing (six-inch wafer fabrication line) | USD 14 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Charge recorded in Q4 FY2007 for severance of 150 manufacturing employees; 147 still employed at 2008-02-02. Six-inch line production expected to cease in first half of fiscal 2009; additional cleanup/closure costs of about $6 million expected in fiscal 2009. Announcement date not stated in filing. | |||
| 2008-02-02 | restructuring | in_progress | 152 | Global | Manufacturing, Engineering, and SMG&A overhead support | USD 12 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Charge recorded in Q4 FY2007: $10.7M severance for 25 manufacturing and 127 engineering/SMG&A employees, plus $1.6M contract termination. 25 of 152 still employed at 2008-02-02; actions expected substantially complete in Q2 fiscal 2008. Announcement date not stated in filing. | |||
| 2008-02-02 | divestiture_reduction | completed | 2007-09-30 | 2008-01-11 | Global | Baseband Chipset Business (sold to MediaTek Inc.) | other f5-10q / MiMo-V2.6-Flash-fp8-HTML | Sale completed 2008-01-11 for net cash proceeds of $269 million; pre-tax gain of $278 million. Headcount transferred not disclosed; announcement month stated as September 2007 (exact date not given). | |||
| 2008-02-02 | divestiture_reduction | completed | 2007-11-08 | 2007-12-31 | Global | CPU voltage regulation and PC thermal monitoring business (sold to ON Semiconductor Corporation subsidiaries) | other f5-10q / MiMo-V2.6-Flash-fp8-HTML | Sale completed 2007-12-31 for net cash proceeds of $138 million; pre-tax gain of $78 million. Headcount transferred not disclosed. | |||
| 2008-02-02 | restructuring | in_progress | 150 | 2007-10-01 | 2009-06-30 | Limerick | Manufacturing | USD 14 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Consolidation of wafer fabrication facility to eight-inch technology; 147 of 150 employees still employed as of Feb 2, 2008. | |
| 2008-02-02 | restructuring | in_progress | 152 | 2007-10-01 | 2008-06-30 | Global | Manufacturing, Engineering, SMG&A | USD 12 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Reduction of overhead infrastructure costs; 25 of 152 employees still employed as of Feb 2, 2008. | |
| 2008-02-02 | divestiture_reduction | completed | 2007-09-01 | 2008-01-11 | Global | Baseband Chipset Business | discontinued_operations_footnote f5-10q / Qwen3.6-27B-Q8_0 | Sale of Baseband Chipset Business to MediaTek Inc. completed Jan 11, 2008. Employee count not explicitly disclosed. | |||
| 2008-02-02 | divestiture_reduction | completed | 2007-11-08 | 2007-12-31 | Global | CPU voltage regulation and PC thermal monitoring business | discontinued_operations_footnote f5-10q / Qwen3.6-27B-Q8_0 | Sale of CPU voltage regulation and PC thermal monitoring business to ON Semiconductor completed Dec 31, 2007. Employee count not explicitly disclosed. | |||
| 2007-11-03 | plant_closure | completed | 2005 | United States — Sunnyvale, California | Wafer fabrication (manufacturing) | USD 10 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Program announced in Q4 FY2005 (original charge $20.3M covering 339 manufacturing and 28 G&A employees). FY2007 activity shown is $10.288M of facility closure costs; production ceased 2006-11-09 and clean-up completed in Q2 FY2007. No new workforce reductions in FY2007. | |||
| 2007-11-03 | restructuring | completed | 2005 | Global | Product development and support programs (engineering, selling, marketing, G&A) | USD 4 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Multi-year program announced Q4 FY2005; FY2007 activity only (net of a $0.913M accrual reversal). Filer discloses sub-components rather than a FY2007 total: 6 engineering employees in Q1 and 20 engineering/SMG&A employees in Q2. Fully implemented in Q4 FY2007; expected savings ~$30M per year. | |||
| 2007-11-03 | plant_closure | in_progress | 150 | Ireland — Limerick | Wafer fabrication — six-inch production line (manufacturing) | USD 14 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Recorded in Q4 FY2007; announcement date not stated (fiscal Q4 2007 = 2007-08-05 to 2007-11-03). Severance for 150 manufacturing employees; production expected to cease in the six-inch facility during the first half of 2009, with ~$6M additional clean-up/closure costs expected in FY2009. Estimated annual savings ~$25M beginning Q2 FY2009. | |||
| 2007-11-03 | restructuring | in_progress | 152 | Global | Manufacturing, engineering, and SMG&A overhead support | USD 12 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Recorded in Q4 FY2007 following the decision to divest the Baseband Chipset Business; announcement date not stated. Charge comprises $10.711M severance for 25 manufacturing and 127 engineering/SMG&A employees plus $1.637M contract termination costs. 77 of the 152 employees still employed at 2007-11-03. Expected substantially complete in Q2 FY2008; savings ~$15M per year. | |||
| 2007-11-03 | divestiture_reduction | announced | 2007-09-09 | Global | Baseband Chipset Business | discontinued_operations_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Definitive agreement to sell the Baseband Chipset Business to MediaTek Inc. for approximately $350M cash; expected to close in Q1 FY2008. Headcount associated with the business not disclosed. Business presented as a discontinued operation for all periods. | ||||
| 2007-11-03 | divestiture_reduction | announced | 2007-11-08 | Global | CPU voltage regulation and PC thermal monitoring business | subsequent_events f5-10k / MiMo-V2.6-Flash-fp8-HTML | Purchase and sale agreement with subsidiaries of ON Semiconductor Corporation for total consideration of approximately $185M; met held-for-sale criteria on 2007-11-08 (after fiscal year-end) and will be reclassified to discontinued operations in Q1 FY2008. Headcount not disclosed. Business generated approximately $25M of sales in Q4 FY2007. | ||||
| 2007-11-03 | restructuring | completed | 367 | 2005-10-30 | 2007-05-05 | United States | Manufacturing and General & Administrative | USD 20 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | 339 manufacturing and 28 G&A employees. Final cleanup completed Q2 FY2007. | |
| 2007-11-03 | restructuring | completed | 214 | 2005-10-30 | 2007-11-03 | Global | Manufacturing, Engineering, and SMG&A | USD 11 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | 60 manufacturing, 154 engineering/SMG&A employees in FY2005. Additional 46 employees in FY2006, 6 in FY2007 Q1, 20 in FY2007 Q2. Fully implemented Q4 FY2007. | |
| 2007-11-03 | restructuring | in_progress | 150 | 2007-11-03 | 2009-05-03 | Ireland | Manufacturing | USD 14 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | Production expected to cease in first half of FY2009. | |
| 2007-11-03 | restructuring | in_progress | 152 | 2007-11-03 | 2008-05-03 | Global | Manufacturing, Engineering, and SMG&A | USD 12 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | 25 manufacturing, 127 engineering/SMG&A employees. 77 still employed as of FY2007 end. | |
| 2007-08-04 | plant_closure | completed | 367 | 2005-10-29 | 2007-05-05 | California, United States | Manufacturing (wafer fabrication); 339 manufacturing and 28 general and administrative employees | USD 20 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Initial Q4 FY2005 charge of $20.3M for severance and fringe benefits under SFAS 88; production ceased November 9, 2006; remaining cleanup and closure completed in Q2 FY2007 with additional FY2007 charges including $10.3M facility closure costs; all affected employees terminated; annual cost savings of approximately $50 million beginning fiscal 2007. | |
| 2007-08-04 | restructuring | in_progress | 286 | 2005-10-29 | 2007-11-03 | Multiple (US and foreign locations) | Product development and support programs; 60 manufacturing and 226 engineering and selling, marketing, general and administrative employees | USD 11 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Initial Q4 FY2005 charge of $11.2M for severance and fringe benefits under SFAS 88; additional charges of $3.8M in FY2006, $1.6M in Q1 FY2007 and $3.4M in Q2 FY2007; as of August 4, 2007, eight of the 286 employees remained employed and must continue employment until involuntarily terminated to receive severance; expected savings of approximately $30 million per year once fully completed in Q4 FY2007. | |
| 2007-08-04 | plant_closure | completed | 367 | 2005-10-01 | 2007-05-05 | California, United States | Wafer Fabrication (339 manufacturing and 28 G&A employees) | USD 10 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Announcement date approximate (Q4 FY2005). Initial $20.3M severance charge in Q4 FY2005; fiscal 2007 charges of $10.288M were facility closure costs incurred in Q1–Q2 FY2007. Production ceased 2006-11-09; cleanup completed Q2 FY2007. All employees terminated. No new charges in Q3 FY2007. | |
| 2007-08-04 | restructuring | in_progress | 286 | 2005-10-01 | 2007-11-03 | Global (including foreign locations) | Product Development and Support Programs (manufacturing, engineering, and SMG&A) | USD 4 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Announcement date approximate (Q4 FY2005). Fiscal 2007 workforce reduction charges of $4.165M (plus $0.859M other items, $5.024M total FY2007). 8 of 286 employees still employed as of 2007-08-04. Expected full completion in Q4 FY2007. No new charges in Q3 FY2007; only severance payments of $1.346M against existing accrual. | |
| 2007-08-04 | restructuring | in_progress | 2005-10-29 | California | Manufacturing | USD 10,288 (thousands) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Closure of wafer fabrication facility. Charge includes facility closure costs. Employment of all employees included in this action has been terminated. | |||
| 2007-08-04 | restructuring | in_progress | 2005-10-29 | 2007-11-03 | Global | Engineering, Sales, Marketing, G&A | USD 5,024 (thousands) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Reorganization of product development and support programs. 8 of 286 employees still employed as of Aug 4, 2007. Savings expected to be fully realized in Q4 FY2007. | ||
| 2007-05-05 | plant_closure | completed | 367 | 2005-10 | 2007-05-05 | California, United States | Manufacturing (339 employees) and general and administrative (28 employees) | USD 10 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Closure of California wafer fabrication operations announced Q4 fiscal 2005 with initial $20.3 million severance charge; production ceased November 9, 2006; remaining cleanup and closure activities completed during Q2 fiscal 2007 with no further expenses expected. Fiscal 2007 charges to date of $10.3 million include facility closure costs; Q2 fiscal 2007 charge included $1.7 million cleanup/closure costs and $5.0 million future lease obligation costs. Expected annual cost savings of approximately $50 million beginning fiscal 2007. | |
| 2007-05-05 | restructuring | in_progress | 286 | 2005-10 | Multiple (US and foreign locations) | Product development and support programs (60 manufacturing; 154 engineering and SMG&A; 46 engineering and SMG&A added fiscal 2006; 6 engineering added Q1 fiscal 2007; 20 engineering and SMG&A added Q2 fiscal 2007) | USD 5 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Reorganization announced Q4 fiscal 2005 with initial $11.2 million charge to refocus on analog and DSP product programs; cumulative fiscal 2007 charges of $5.0 million (Q1 $1.6 million, Q2 $3.4 million). As of May 5, 2007, 21 of the 286 employees remained employed and must stay until involuntarily terminated to receive severance. Expected savings of approximately $30 million per year once fully completed. | ||
| 2007-05-05 | plant_closure | completed | 367 | 2005-10-29 | 2007-05-05 | California, United States | Wafer Fabrication (Manufacturing) | USD 7 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Original program: 339 manufacturing + 28 G&A employees (367 total). Q2 FY2007 charge of $6.68M was for facility closure costs ($1.7M cleanup, $5.0M lease obligations), not severance. All employees terminated by May 5, 2007; cleanup completed. Announcement date approximate — filing states decision made during Q4 FY2005 without exact date. | |
| 2007-05-05 | restructuring | in_progress | 286 | 2005-10-29 | Global | Product Development and Support Programs | USD 3 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Full program scope: 286 employees (214 in Q4 FY2005, 46 in FY2006, 6 in Q1 FY2007, 20 in Q2 FY2007). Q2 FY2007 charge of $3.436M: $3.2M severance/fringe for 20 engineering and SMG&A employees, $0.2M lease. 21 of 286 still employed as of May 5, 2007. Announcement date approximate — filing states decision made during Q4 FY2005 without exact date. | ||
| 2007-05-05 | plant_closure | completed | 2005-10-01 | 2007-05-05 | California | Manufacturing | USD 10 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Closure of wafer fabrication facility. Initial charge in FY2005 for 367 employees (339 manufacturing, 28 G&A). Q2 FY2007 charge of $10.3M includes $1.7M clean-up and $5.0M lease obligations. All employees terminated by May 5, 2007. | ||
| 2007-05-05 | restructuring | in_progress | 20 | 2005-10-01 | Global | Engineering, Sales, Marketing, G&A | USD 3 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Reorganization of Product Development and Support Programs. Q2 FY2007 charge of $3.4M for 20 employees. 21 of 286 total employees in this action remain employed as of May 5, 2007. | ||
| 2007-02-03 | plant_closure | in_progress | 339 | 2005-10-29 | 2007-04-30 | California, United States | Manufacturing | USD 20 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q4 fiscal 2005 decision to close California wafer fabrication operations and transfer production to Wilmington, Massachusetts; severance for 339 manufacturing employees under ongoing benefit plan per SFAS 88. Eight employees remained as of 2007-02-03; remaining cleanup and closure expected complete by end of April 2007. Additional Q1 fiscal 2007 charges of $3.6 million for facility closure costs; approximately $7 million of remaining expenses expected in Q2 fiscal 2007. | |
| 2007-02-03 | plant_closure | in_progress | 28 | 2005-10-29 | 2007-04-30 | California, United States | General and administrative | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Severance and fringe benefit costs for 28 general and administrative employees at the California wafer fabrication site, part of the same Q4 fiscal 2005 closure action. | ||
| 2007-02-03 | restructuring | in_progress | 60 | 2005-10-29 | 2007-04-01 | Manufacturing | USD 11 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q4 fiscal 2005 charge of $11.2 million for severance and fringe benefit costs for 60 manufacturing employees under ongoing benefit plan or statutory requirements at foreign locations. Two employees still employed as of 2007-02-03. Reorganization expected fully completed by end of Q2 fiscal 2007. | ||
| 2007-02-03 | restructuring | in_progress | 154 | 2005-10-29 | 2007-04-01 | Engineering and Selling, Marketing, General and Administrative | USD 11 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q4 fiscal 2005 charge of $11.2 million covering severance for 154 engineering and SMG&A employees; ten of these employees still employed as of 2007-02-03. Part of the same reorganization action. | ||
| 2007-02-03 | restructuring | in_progress | 46 | 2006-10-28 | 2007-04-01 | Engineering and Selling, Marketing, General and Administrative | USD 2 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q4 fiscal 2006 additional special charge of $3.8 million, of which $2.3 million related to severance and fringe benefit costs for 46 engineering and SMG&A employees; ten still employed as of 2007-02-03. | ||
| 2007-02-03 | restructuring | in_progress | 6 | 2006-10-29 | Engineering | USD 1 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q1 fiscal 2007 additional special charge of $1.6 million, of which $1.0 million related to severance and fringe benefit costs for six engineering employees under the ongoing benefit plan; two still employed as of 2007-02-03. No further material charges expected for this action. | |||
| 2007-02-03 | plant_closure | in_progress | 367 | 2007-04-30 | California, United States | Wafer fabrication (manufacturing); production transferred to Wilmington, Massachusetts | USD 4 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Decision recorded in Q4 fiscal 2005 with a $20.3M severance charge covering 339 manufacturing and 28 G&A employees (count shown is the sum of those two disclosed groups). Production ceased 2006-11-09; eight of these employees remained as of 2007-02-03 for cleanup. Q1 fiscal 2007 charge of $3.6M comprised $3.2M clean-up/closure costs expensed as incurred plus $0.4M lease obligation for a warehouse. About $7M further expense expected in Q2 fiscal 2007; closure expected to yield roughly $50M annual savings beginning fiscal 2007. | ||
| 2007-02-03 | restructuring | in_progress | 266 | Multiple locations including foreign locations | Product development and support programs (manufacturing, engineering, and selling/marketing/general/administrative functions) | USD 2 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Reorganization decided in Q4 fiscal 2005 ($11.2M charge; 60 manufacturing and 154 engineering/SMG&A employees), extended by 46 employees in fiscal 2006 ($3.8M) and six engineering employees in Q1 fiscal 2007 ($1.6M, of which $1.0M severance and $0.6M contract termination). Affected count is the sum of the three disclosed tranches. Two, ten and two employees from the respective tranches remained employed at 2007-02-03. Program expected to complete by end of Q2 fiscal 2007 (exact date not stated); expected savings about $27M annually once fully completed. | |||
| 2007-02-03 | plant_closure | in_progress | 2005-10-29 | 2007-04-30 | California | Manufacturing | USD 4 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Closure of wafer fabrication facility. Initial charge recorded in Q4 FY2005 for 367 employees (339 manufacturing, 28 G&A). Q1 FY2007 charge of $3.6M relates to clean-up, closure, and lease obligations. 8 employees remained employed as of Feb 3, 2007, assisting with cleanup. | ||
| 2007-02-03 | restructuring | in_progress | 2005-10-29 | 2007-06-30 | Global | Engineering, Sales, Marketing, G&A, Manufacturing | USD 2 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Reorganization of product development and support programs. Initial charge in Q4 FY2005 for 214 employees. Q1 FY2007 charge of $1.6M includes $0.6M contract termination and $1.0M severance for 6 engineering employees. 12 employees remained employed as of Feb 3, 2007. | ||
| 2006-10-28 | plant_closure | completed | 367 | 2006-11-09 | United States — Sunnyvale, California | Wafer fabrication (339 manufacturing employees and 28 general and administrative employees) | USD 18 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Program decision and $20.3M severance charge were recorded in fiscal 2005; fiscal 2006 activity comprises $18.3M accelerated depreciation in cost of sales, $2.0M stay-on bonuses, and a $2.0M severance accrual reversal. Cumulative program headcount shown; 72 employees remained at fiscal year-end, 42 terminated 2006-11-09, 30 retained for cleanup through early fiscal 2007. Additional $11M lease/cleanup costs expected in first half of fiscal 2007; estimated annual savings of ~$50M. | ||
| 2006-10-28 | restructuring | in_progress | 46 | Worldwide (including foreign locations under statutory severance requirements) | Engineering, selling, marketing, general and administrative — product development and support reorganization | USD 4 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Fiscal 2006 incremental charge only; original program announced in fiscal 2005 with $11.2M charge covering 214 employees (60 manufacturing, 154 engineering/SMG&A). Of the $3.8M fiscal 2006 charge, $2.3M relates to severance for the 46 employees and $1.5M to lease obligations and asset write-offs. 35 of these employees still employed at fiscal year-end; no further material charges expected. | |||
| 2006-10-28 | divestiture_reduction | completed | 2006-02-21 | 2006-02-21 | Not disclosed | DSP-based DSL ASIC and network processor product line | other f5-10k / MiMo-V2.6-Flash-fp8-HTML | Sale to Ikanos Communications, Inc. for ~$23.1M cash with a ~$13.0M net gain recorded in nonoperating income. No employee count transferred or retained is disclosed. | |||
| 2006-10-28 | acquisition_addition | completed | Not disclosed | Wireless modem software and applications platform (TTPCom Limited transaction) | USD 6 (millions) | business_combinations_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Third-quarter fiscal 2006 transaction transferring IP, engineering resources and related assets; $11.9M initial cash plus up to $12M contingent. Charge shown is purchased in-process R&D written off. No headcount added is disclosed. | ||||
| 2006-10-28 | acquisition_addition | completed | South Korea — Seoul | Mobile TV / reconfigurable RF signal processing (Integrant Technologies, Inc.) | USD 11 (millions) | business_combinations_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Fourth-quarter fiscal 2006 acquisition of substantially all outstanding stock for $127.2M initial cash plus up to $33M contingent. Charge shown is purchased in-process R&D written off. No headcount added is disclosed. | ||||
| 2006-10-28 | acquisition_addition | completed | Denmark — Roskilde | Low-power microphone and audio signal conditioning (AudioAsics A/S) | USD 5 (millions) | business_combinations_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Fourth-quarter fiscal 2006 acquisition of all outstanding stock for $19.3M initial cash plus up to $8M contingent. Charge shown is purchased in-process R&D written off. No headcount added is disclosed. | ||||
| 2006-10-28 | plant_closure | completed | 367 | 2005-10-30 | 2006-11-09 | California, United States | Manufacturing | USD 20 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | Charge recorded in Q4 FY2005 for 339 manufacturing and 28 G&A employees. Production ceased Nov 9, 2006. | |
| 2006-10-28 | restructuring | in_progress | 214 | 2005-10-30 | 2007-03-31 | Global | Engineering, Sales, Marketing, G&A, Manufacturing | USD 11 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | Initial charge in Q4 FY2005 for 60 manufacturing and 154 engineering/S&M/G&A employees. Additional 46 employees affected in Q4 FY2006. | |
| 2006-10-28 | restructuring | in_progress | 46 | 2006-10-28 | 2007-03-31 | Global | Engineering, Sales, Marketing, G&A | USD 2 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | Additional charge recorded in Q4 FY2006 related to the reorganization program initiated in FY2005. | |
| 2006-07-29 | plant_closure | in_progress | 367 | 2005-10-29 | 2006-10-28 | California, United States | Manufacturing (339 manufacturing employees; 28 general and administrative employees) | USD 20 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Charge recorded in Q4 fiscal 2005 for severance and fringe benefits under SFAS 88; production transferring to Massachusetts, Ireland and third-party fabs. As of July 29, 2006 all affected employees remained employed; termination expected upon facility closure planned for October 2006. Additional fiscal 2006 expenses include quarterly non-cash depreciation of $5.4M (Q1/Q2) and $5.2M (Q3), $0.5M per quarter stay-on bonuses, and approximately $13.5M expected in Q4 fiscal 2006. Estimated annual cost savings of approximately $44 million beginning fiscal 2007. | |
| 2006-07-29 | restructuring | in_progress | 214 | 2005-10-29 | 2006-10-28 | Product development and support programs (60 manufacturing; 154 engineering and selling, marketing, general and administrative) | USD 11 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q4 fiscal 2005 charge for severance and fringe benefits under SFAS 88 or statutory requirements at foreign locations. As of July 29, 2006, 172 of the affected employees had been terminated. An additional $1.0 million special charge was recorded in Q1 fiscal 2006 for lease obligation costs and property write-off. Expected annual savings of approximately $19 million once fully completed by end of fiscal 2006. | ||
| 2006-07-29 | plant_closure | in_progress | 339 | 2006-10-31 | California, United States | Manufacturing | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Program total severance charge was $20M (not split by sub-component). All 339 manufacturing employees still employed as of 2006-07-29; termination expected upon facility closure planned October 2006. Charge recorded in Q4 FY2005. | |||
| 2006-07-29 | plant_closure | in_progress | 28 | 2006-10-31 | California, United States | General & Administrative | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Program total severance charge was $20M (not split by sub-component). All 28 G&A employees still employed as of 2006-07-29; termination expected upon facility closure planned October 2006. Charge recorded in Q4 FY2005. | |||
| 2006-07-29 | restructuring | in_progress | 60 | 2006-10-28 | Global | Manufacturing | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Program total severance charge was $11M (not split by sub-component). Part of 214 total affected employees across both sub-components; 172 of 214 had been terminated as of 2006-07-29. Charge recorded in Q4 FY2005. | |||
| 2006-07-29 | restructuring | in_progress | 154 | 2006-10-28 | Global | Engineering, Sales, Marketing, General & Administrative | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Program total severance charge was $11M (not split by sub-component). Part of 214 total affected employees across both sub-components; 172 of 214 had been terminated as of 2006-07-29. Charge recorded in Q4 FY2005. | |||
| 2006-07-29 | plant_closure | in_progress | 367 | 2005-10-29 | 2006-10-28 | California | Manufacturing | USD 20 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Closure of wafer fabrication facility. 339 manufacturing and 28 G&A employees affected. Severance recorded in Q4 FY2005. Employees must remain employed until involuntary termination in Oct 2006 to receive benefits. | |
| 2006-07-29 | restructuring | in_progress | 214 | 2005-10-29 | 2006-10-28 | Global | Product Development and Support | USD 12 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Reorganization of product development and support programs. 60 manufacturing, 154 engineering, and selling/marketing/G&A employees affected. 172 terminated as of July 29, 2006. | |
| 2006-07-29 | acquisition_addition | completed | 2006-07-29 | 2006-07-29 | Global | Engineering | USD 12 (millions) | business_combinations_footnote f5-10q / Qwen3.6-27B-Q8_0 | Acquired intellectual property and engineering resources from TTPCom Limited. Specific headcount not disclosed. | ||
| 2006-07-29 | acquisition_addition | announced | 2006-07-31 | 2006-07-31 | Seoul, Korea | Engineering | USD 127 (millions) | subsequent_events f5-10q / Qwen3.6-27B-Q8_0 | Acquired Integrant Technologies, Inc. Specific headcount not disclosed. | ||
| 2006-04-29 | plant_closure | in_progress | 367 | 2005-10-29 | 2006-10-28 | California, United States | Manufacturing (339 manufacturing employees; 28 general and administrative employees) | USD 20,315 (thousands) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Charge recorded in Q4 fiscal 2005 for severance and fringe benefits under the ongoing benefit plan; production transferring to Massachusetts and Ireland facilities and third-party wafer fabricators. As of April 29, 2006 all affected employees remained employed, with terminations expected upon facility closure planned for October 2006. Additional fiscal 2006 expenses of approximately $18.4 million expected (depreciation, stay-on bonuses, lease termination/closure costs); estimated annual cost savings of approximately $44 million beginning fiscal 2007. | |
| 2006-04-29 | restructuring | in_progress | 214 | 2005-10-29 | 2006-10-28 | Product development and support programs (60 manufacturing; 154 engineering and selling, marketing, general and administrative) | USD 11,165 (thousands) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q4 fiscal 2005 charge for severance and fringe benefits under the ongoing benefit plan or statutory requirements at foreign locations. As of April 29, 2006, 165 of the affected employees had been terminated. An additional $1.0 million special charge was recorded in Q1 fiscal 2006 for lease obligation costs and write-off of property, plant and equipment at a ceased facility. Expected annual savings of approximately $19 million once fully completed by end of fiscal 2006. | ||
| 2006-04-29 | plant_closure | in_progress | 339 | 2006-10 | California, United States | Manufacturing | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Wafer fab closure program announced in Q4 fiscal 2005; program-level severance charge of $20.3 million covers 339 manufacturing and 28 G&A employees (charge not split by function). All affected employees still employed at quarter-end; production moving to Massachusetts, Ireland and third-party fabricators. | |||
| 2006-04-29 | plant_closure | in_progress | 28 | 2006-10 | California, United States | General & Administrative | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Sub-component of the California wafer fabrication closure; program-level severance charge of $20.3 million recorded in Q4 fiscal 2005 (not allocated by function). Closure planned for October 2006. | |||
| 2006-04-29 | restructuring | in_progress | 60 | 2006-10-28 | Manufacturing | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Reorganization of product development and support programs announced in Q4 fiscal 2005; program-level severance charge of $11.2 million covers 60 manufacturing and 154 engineering/SMG&A employees (charge not split by function). Expected complete by end of fiscal 2006. | ||||
| 2006-04-29 | restructuring | in_progress | 154 | 2006-10-28 | Engineering; Sales, Marketing, General & Administrative | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Sub-component of the product development/support reorganization; 165 of 214 total affected employees had been terminated by 2006-04-29. Program severance charge $11.2 million (Q4 FY2005) plus $1.0 million FY2006 charge for lease and equipment write-off. | ||||
| 2006-04-29 | acquisition_addition | announced | 2006-05-03 | Engineering | USD 23 (millions) | subsequent_events f5-10q / MiMo-V2.6-Flash-fp8-HTML | Agreement with TTPCom Limited to transfer intellectual property, engineering resources and related assets to the Company; $11 million payable at closing, balance on technical milestones; no headcount figure disclosed. Expected to close in Q3 fiscal 2006. | ||||
| 2006-04-29 | plant_closure | in_progress | 367 | 2005-10-29 | 2006-10-31 | California | Manufacturing and General & Administrative | USD 20 (thousands) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Closure of wafer fabrication facility. 339 manufacturing and 28 G&A employees affected. Severance recorded in Q4 FY2005. Employees remain employed until closure. | |
| 2006-04-29 | restructuring | in_progress | 214 | 2005-10-29 | 2006-10-28 | Global | Manufacturing, Engineering, Sales, Marketing, and G&A | USD 12 (thousands) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Reorganization of product development and support programs. 60 manufacturing and 154 engineering/S&M/G&A employees affected. 165 terminated as of period end. | |
| 2006-01-28 | plant_closure | in_progress | 367 | 2006-10-31 | California, USA | Manufacturing (339 manufacturing employees; 28 general and administrative employees) | USD 20 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q4 FY2005 charge for severance and fringe benefits; production transferring to Massachusetts, Ireland and third-party fabricators. As of quarter-end all affected employees remained employed; termination expected at facility closure planned for October 2006. Additional Q1 FY2006 expense of $5.4M non-cash depreciation and $0.5M stay-on bonuses; approximately $23.6M further expenses expected in FY2006. Estimated annual cost savings of approximately $44 million beginning fiscal 2007. | ||
| 2006-01-28 | restructuring | in_progress | 214 | 2006-10-29 | Product development and support programs (60 manufacturing; 154 engineering and SMG&A employees) | USD 11 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q4 FY2005 charge for severance and fringe benefits to refocus on analog and DSP product programs. As of January 28, 2006, 98 of the 214 affected employees had been terminated. Additional Q1 FY2006 special charge of $1 million for lease obligation costs and property write-off; no further charges planned. Expected annual savings of approximately $19 million once fully completed by end of fiscal 2006. | |||
| 2006-01-28 | plant_closure | in_progress | 367 | 2005-07-01 | 2006-10-31 | California, United States | Wafer Fabrication (339 manufacturing; 28 general and administrative) | USD 20 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Severance accrual of $20.3M recorded in Q4 FY2005; all affected employees still employed at quarter-end. Additional FY2006 expenses of ~$23.6M expected, including $16.2M non-cash depreciation, $1.4M stay-on bonuses, $6M lease/cleanup. Production transferring to Massachusetts, Ireland, and third-party fabricators. | |
| 2006-01-28 | restructuring | in_progress | 214 | 2005-07-01 | 2006-10-31 | Global | Product Development and Support (60 manufacturing; 154 engineering and SMG&A) | USD 12 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Original $11.2M severance charge in Q4 FY2005; additional $1.0M charge in Q1 FY2006 for lease obligation and equipment write-off. 98 of 214 employees terminated as of 2006-01-28. No further charges expected. Expected annual savings ~$19M once fully completed by end of FY2006. | |
| 2006-01-28 | plant_closure | in_progress | 367 | 2005-10-29 | 2006-10-31 | California | Manufacturing and General & Administrative | USD 20 (thousands) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Closure of wafer fabrication facility. Charge recorded in Q4 FY2005 for 339 manufacturing and 28 G&A employees. Employment expected to terminate upon closure in Oct 2006. | |
| 2006-01-28 | restructuring | in_progress | 214 | 2005-10-29 | 2006-10-28 | Global | Manufacturing, Engineering, and Selling, Marketing & G&A | USD 11 (thousands) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Reorganization of product development and support programs. Charge recorded in Q4 FY2005 for 60 manufacturing and 154 engineering/SMG&A employees. 98 terminated as of Jan 28, 2006. | |
| 2005-10-29 | plant_closure | in_progress | 367 | 2006-10-28 | California, United States | Wafer fabrication (manufacturing and general & administrative) | USD 20 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Decision recorded in Q4 FY2005 to close Sunnyvale, CA wafer fab and transfer production to Massachusetts, Ireland and third-party foundries. Charge covers severance/fringe for 339 manufacturing and 28 G&A employees; none terminated as of 2005-10-29. Additional FY2006 costs expected: ~$22M non-cash depreciation, ~$2.4M stay-on bonuses, ~$6M lease/cleanup. Announcement date not specified beyond 'fourth quarter of fiscal 2005'. | ||
| 2005-10-29 | restructuring | in_progress | 214 | 2006-10-28 | Global | Product development and support programs (engineering, manufacturing, sales/marketing/G&A) | USD 11 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Decision recorded in Q4 FY2005 to reorganize product development and support programs for greater focus on analog and DSP. Charge covers severance/fringe for 60 manufacturing and 154 engineering/SMG&A employees; 49 terminated as of 2005-10-29. Most of action expected complete by end of Q1 FY2006, fully complete by end of FY2006, with ~$2M additional FY2006 costs. Announcement date not specified beyond 'fourth quarter of fiscal 2005'. | ||
| 2005-10-29 | restructuring | in_progress | 367 | 2005-10-29 | 2006-10-28 | California | Manufacturing and General/Administrative | USD 20 (millions) | restructuring_footnote f5-10k / Qwen3.6-27B-Q8_0 | Closure of California wafer fabrication facility. 339 manufacturing and 28 G&A employees affected. None terminated as of fiscal year-end. | |
| 2005-10-29 | restructuring | in_progress | 214 | 2005-10-29 | 2006-10-28 | Global | Product Development and Support | USD 11 (millions) | restructuring_footnote f5-10k / Qwen3.6-27B-Q8_0 | Reorganization of product development and support programs. 60 manufacturing and 154 engineering/SMG&A employees affected. 49 terminated as of fiscal year-end. | |
| 2004-10-30 | plant_closure | completed | 71 | 2003-10-31 | 2004-05-01 | Belfast, Northern Ireland | Foundry substrate services for optical applications | USD 9 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Charge recorded in fiscal 2003 Q4; closure completed in fiscal 2004 Q2. Severance covered about 57 manufacturing and 14 engineering/administrative employees, paid by end of fiscal 2004 Q2. | |
| 2004-10-30 | restructuring | completed | 439 | 2001-11-04 | 2004-05-01 | United States and Ireland | Manufacturing (transfer from four-inch to six-/eight-inch wafer fabs) | USD 15 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Multi-year program; charge recorded in fiscal 2002 Q2. Headcount reduced from 509 originally projected to 439; all terminations completed May 1, 2004, within fiscal 2004. Severance paid as income continuance at some sites extends beyond termination date. | |
| 2004-10-30 | restructuring | completed | 1,200 | 2000-11-05 | 2004-01-31 | United States, Europe, Asia and the Philippines | Manufacturing, selling, marketing and administrative | USD 30 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Multi-year program; charge recorded in fiscal 2001. All approximately 1,200 employees terminated as of January 31, 2004, within fiscal 2004. | |
| 2004-10-30 | plant_closure | completed | 71 | 2003-10-01 | 2004-05-01 | Northern Ireland | Manufacturing | USD 9 (millions) | restructuring_footnote f5-10k / Qwen3.6-27B-Q8_0 | Closure of Belfast facility. Charge included $2.0M severance for 57 manufacturing and 14 engineering/admin employees. Completed in Q2 FY2004. | |
| 2004-10-30 | restructuring | completed | 439 | 2002-04-01 | 2004-05-01 | United States, Ireland | Manufacturing | USD 15 (millions) | restructuring_footnote f5-10k / Qwen3.6-27B-Q8_0 | Transfer of production from four-inch to six/eight-inch wafer facilities. Originally projected 509 terminations, adjusted down to 439. All terminated by May 1, 2004. | |
| 2004-10-30 | restructuring | completed | 100 | 2002-07-01 | 2004-05-01 | United States, Europe, Canada | Engineering, Manufacturing | USD 4 (millions) | restructuring_footnote f5-10k / Qwen3.6-27B-Q8_0 | Cost reduction actions. ~70 engineering and ~30 manufacturing employees. All terminated by end of Q2 FY2004. | |
| 2004-10-30 | restructuring | completed | 65 | 2002-10-01 | 2003-11-01 | United States, Europe | Sales, Manufacturing Test | USD 3 (millions) | restructuring_footnote f5-10k / Qwen3.6-27B-Q8_0 | Cost reduction in sales and manufacturing test operations. All terminated by Nov 1, 2003. | |
| 2004-10-30 | restructuring | completed | 1,200 | 2001-11-01 | 2004-01-31 | United States, Europe, Asia, Philippines | Manufacturing, Sales, Marketing, Admin | USD 30 (millions) | restructuring_footnote f5-10k / Qwen3.6-27B-Q8_0 | FY2001 cost reduction actions. All 1,200 employees terminated by Jan 31, 2004. | |
| 2004-07-31 | restructuring | completed | 57 | 2003-10-01 | 2004-05-01 | Belfast, Northern Ireland | Manufacturing | USD 2 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Closure of small manufacturing facility supplying foundry substrate services for optical applications. Charge included $2.0M severance for 57 manufacturing employees. Closure completed in Q2 FY2004. | |
| 2004-07-31 | restructuring | completed | 14 | 2003-10-01 | 2004-05-01 | Belfast, Northern Ireland | Engineering and Administrative | USD 2 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Part of Belfast facility closure. Charge included $2.0M severance for 14 engineering and administrative employees. | |
| 2004-07-31 | restructuring | completed | 439 | 2002-04-01 | 2004-05-01 | United States and Ireland | Manufacturing | USD 15 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Transfer of production from four-inch to six- and eight-inch wafer facilities. Original projection of 509 employees adjusted down to 439. All terminated as of May 1, 2004. | |
| 2004-07-31 | restructuring | completed | 70 | 2002-07-01 | 2004-05-01 | United States, Europe, and Canada | Engineering | USD 4 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Cost reduction actions in product groups and manufacturing. All terminated as of May 1, 2004. | |
| 2004-07-31 | restructuring | completed | 30 | 2002-07-01 | 2004-05-01 | United States | Manufacturing | USD 4 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Cost reduction actions in product groups and manufacturing. All terminated as of May 1, 2004. | |
| 2004-07-31 | restructuring | completed | 65 | 2002-10-01 | 2003-11-01 | United States and Europe | Sales, Product Groups, and Manufacturing Test | USD 3 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Cost reduction actions in sales, product groups, and manufacturing test operations. All terminated as of November 1, 2003. | |
| 2004-07-31 | restructuring | completed | 1,200 | 2001-01-01 | 2004-01-31 | United States, Europe, Asia, and Philippines | Manufacturing, Selling, Marketing, and Administrative | USD 30 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Workforce reductions in response to economic climate and consolidation of worldwide manufacturing operations. All terminated as of January 31, 2004. | |
| 2004-05-01 | plant_closure | completed | 71 | 2003-11-01 | 2004-05-01 | Belfast, Northern Ireland | Manufacturing (foundry substrate services for optical applications) | USD 9 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Charge included $2.0M severance for approximately 57 manufacturing and 14 engineering/administrative employees, $6M PP&E write-down, and $1.2M other asset write-downs. Closure completed during Q2 fiscal 2004. | |
| 2004-05-01 | restructuring | completed | 439 | 2002-02-02 | 2004-05-01 | United States and Ireland | Manufacturing (transfer from four-inch to six-inch and eight-inch wafer fabrication facilities) | USD 26 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Severance and fringe benefit costs of $15.3M originally for 509 manufacturing employees, later reduced to 439 as employees transferred to six-inch fabs; all terminated as of May 1, 2004. Charge also included $2.3M equipment write-down and $8.1M other charges. | |
| 2004-05-01 | restructuring | completed | 100 | 2002-08-03 | 2004-05-01 | United States, Europe and Canada | Engineering and Manufacturing | USD 13 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Severance of $3.7M for approximately 70 engineering employees and approximately 30 manufacturing employees; all terminated as of May 1, 2004. Charge also included investment impairment, goodwill impairment for an Austrian design center closure, and equipment/lease abandonment. | |
| 2004-05-01 | restructuring | completed | 65 | 2002-11-02 | 2003-11-01 | United States and Europe | Sales, product groups and manufacturing test operations | USD 8 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Severance of $2.5M for approximately 65 employees; all terminated as of November 1, 2003. Charge also included investment impairments and equipment/lease abandonment. | |
| 2004-05-01 | restructuring | completed | 1,200 | 2001 | 2004-01-31 | United States, Europe, Asia and the Philippines | Manufacturing, selling, marketing and administrative | USD 47 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Cost reduction actions including $29.6M severance for approximately 1,200 employees, all terminated as of January 31, 2004; $11.6M equipment abandonment from worldwide manufacturing consolidation; $5.8M other charges. $0.2M remained accrued at May 1, 2004 for income-continance severance payments. | |
| 2004-05-01 | plant_closure | completed | 71 | 2003-11-01 | 2004-05-01 | Belfast, Northern Ireland | Manufacturing — foundry substrate services for optical applications | USD 9 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Closure of small manufacturing facility announced in Q4 FY2003; charge included $2.0M severance for 57 manufacturing and 14 engineering/admin employees, $6M PP&E write-down, $1.2M other asset write-downs. Closure completed during Q2 FY2004. | |
| 2004-05-01 | restructuring | in_progress | 2003-11-01 | United States, Ireland, Europe, Asia, Philippines | Manufacturing, Engineering, Sales, Marketing, Administrative | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Ongoing execution of prior-year restructuring programs (FY2001–FY2003). Severance accrual declined from $11.3M at Nov 1, 2003 to $1.2M at May 1, 2004 through $7.7M of severance and other cash payments during the six months. No new restructuring program announced during the quarter. | ||||
| 2004-05-01 | plant_closure | completed | 71 | 2003-10-01 | 2004-05-01 | Belfast, Northern Ireland | Manufacturing, Engineering, Administrative | USD 9 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Closure of small manufacturing facility supplying foundry substrate services for optical applications. Charge included $2.0M severance for 57 manufacturing and 14 engineering/admin employees, plus asset write-downs. Closure completed in Q2 FY2004. | |
| 2004-05-01 | restructuring | completed | 439 | 2002-04-01 | 2004-05-01 | United States, Ireland | Manufacturing | USD 26 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Transfer of production from four-inch to six/eight-inch wafer facilities. Original charge for 509 employees adjusted down to 439. All employees terminated as of May 1, 2004. | |
| 2004-05-01 | restructuring | completed | 100 | 2002-07-01 | 2004-05-01 | United States, Europe, Canada | Engineering, Manufacturing | USD 13 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Cost reduction actions in product groups and manufacturing. Included ~70 engineering and ~30 manufacturing employees. All terminated as of May 1, 2004. | |
| 2004-05-01 | restructuring | completed | 65 | 2002-10-01 | 2003-11-01 | United States, Europe | Sales, Product Groups, Manufacturing Test | USD 8 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Cost reduction actions in sales, product groups, and manufacturing test operations. All terminated as of November 1, 2003. | |
| 2004-05-01 | restructuring | completed | 1,200 | 2001-01-01 | 2004-01-31 | United States, Europe, Asia, Philippines | Manufacturing, Selling, Marketing, Administrative | USD 47 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Workforce reductions and consolidation of worldwide manufacturing operations. All 1,200 employees terminated as of January 31, 2004. | |
| 2004-01-31 | plant_closure | in_progress | 71 | 2003-09 | 2004-04 | Belfast, Northern Ireland | Manufacturing (foundry substrate services for optical applications) | USD 9 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Closure of small manufacturing facility; charge includes $2.0M severance for approximately 57 manufacturing and 14 engineering/administrative employees, plus asset write-downs. 43 employees terminated as of January 31, 2004; closure anticipated to complete in Q2 fiscal 2004. | |
| 2004-01-31 | restructuring | completed | 439 | 2002-04 | United States and Ireland | Manufacturing (transfer of production from four-inch to six-inch and eight-inch wafer fabs) | USD 26 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Severance and fringe benefit costs of $15.3M; original estimate of 509 employees reduced to 439 after transfers to six-inch fabs; substantially all terminated as of January 31, 2004. All closure actions related to four-inch fabs complete. | ||
| 2004-01-31 | restructuring | completed | 100 | 2002-07 | United States, Europe, Canada | Engineering and manufacturing (cost reduction actions) | USD 4 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Approximately 70 engineering employees in the US, Europe and Canada and approximately 30 manufacturing employees in the US; all terminated as of January 31, 2004. | ||
| 2004-01-31 | restructuring | completed | 65 | 2002-10 | United States and Europe | Sales, product groups and manufacturing test operations | USD 3 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | All terminated as of November 1, 2003. | ||
| 2004-01-31 | restructuring | completed | 1,200 | 2001 | United States, Europe, Asia, Philippines | Manufacturing, selling, marketing and administrative (consolidation of worldwide manufacturing operations) | USD 30 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Workforce reductions of approximately 1,200 employees; substantially all terminated as of January 31, 2004. Total fiscal 2001 special charges approximately $47 million including equipment abandonment and other charges. | ||
| 2004-01-31 | plant_closure | in_progress | 57 | 2003-11-01 | 2004-05-01 | Northern Ireland, United Kingdom | Manufacturing | USD 2 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Announcement date approximated to fiscal Q4 2003 quarter-end; charge covers severance and fringe benefits for manufacturing employees at the Belfast substrate facility. | |
| 2004-01-31 | plant_closure | in_progress | 14 | 2003-11-01 | 2004-05-01 | Northern Ireland, United Kingdom | Engineering and Administrative | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | 43 of the 71 total affected employees (57 manufacturing + 14 engineering/administrative) had been terminated as of 2004-01-31; closure anticipated to complete in fiscal Q2 2004. Severance charge disclosed only at the combined program level. | ||
| 2004-01-31 | restructuring | completed | 439 | 2002-05-04 | 2004-01-31 | United States and Ireland | Manufacturing | USD 15 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Original estimate of 509 employees was revised down to 439; announcement date approximated to fiscal Q2 2002 quarter-end. Substantially all terminated as of 2004-01-31; relates to transfer of production from four-inch to six-/eight-inch wafer fabs. | |
| 2004-01-31 | reduction_in_force | completed | 70 | 2002-08-03 | 2004-01-31 | United States, Europe and Canada | Engineering | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Announcement date approximated to fiscal Q3 2002 quarter-end; all affected employees terminated as of 2004-01-31. Severance charge disclosed only at the combined program level ($3.7M covering engineering and manufacturing). | ||
| 2004-01-31 | reduction_in_force | completed | 30 | 2002-08-03 | 2004-01-31 | United States | Manufacturing | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Announcement date approximated to fiscal Q3 2002 quarter-end; all affected employees terminated as of 2004-01-31. Severance charge disclosed only at the combined program level. | ||
| 2004-01-31 | reduction_in_force | completed | 65 | 2002-11-01 | 2002-11-01 | United States and Europe | Sales, Product Groups and Manufacturing Test | USD 3 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | All affected employees terminated as of 2002-11-01 (fiscal year-end 2002). | |
| 2004-01-31 | restructuring | completed | 1,200 | 2001-11-03 | 2004-01-31 | United States, Europe, Asia and the Philippines | Manufacturing, Selling, Marketing and Administrative | USD 30 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Fiscal 2001 program; announcement date approximated to fiscal year-end. Substantially all terminated as of 2004-01-31; $0.6M remains accrued for severance paid as income continuance through fiscal 2004. | |
| 2004-01-31 | plant_closure | in_progress | 71 | 2003-10-04 | 2004-04-30 | Belfast, Northern Ireland | Manufacturing, Engineering, Administrative | USD 9 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Closure of small manufacturing facility supplying foundry substrate services for optical applications. Charge includes $2.0M severance for 57 manufacturing and 14 engineering/admin employees. 43 terminated as of Jan 31, 2004. | |
| 2004-01-31 | restructuring | in_progress | 509 | 2002-04-06 | 2004-04-30 | United States, Ireland | Manufacturing | USD 26 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Transfer of production from four-inch to six/eight-inch wafer facilities. Original charge $25.7M including $15.3M severance for 509 employees. Adjusted down to 439 employees due to transfers. Substantially all terminated as of Jan 31, 2004. | |
| 2004-01-31 | restructuring | completed | 100 | 2002-07-06 | 2004-01-31 | United States, Europe, Canada | Engineering, Manufacturing | USD 13 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Cost reduction actions in product groups and manufacturing. Includes $3.7M severance for ~70 engineering and ~30 manufacturing employees. All terminated as of Jan 31, 2004. | |
| 2004-01-31 | restructuring | completed | 65 | 2002-10-05 | 2003-11-01 | United States, Europe | Sales, Product Groups, Manufacturing Test | USD 8 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Cost reduction actions in sales, product groups, and manufacturing test. Includes $2.5M severance for ~65 employees. All terminated as of Nov 1, 2003. | |
| 2004-01-31 | restructuring | in_progress | 1,200 | 2001-01-01 | 2004-10-30 | United States, Europe, Asia, Philippines | Manufacturing, Selling, Marketing, Administrative | USD 47 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Workforce reductions and consolidation of worldwide manufacturing operations. Includes $29.6M severance for ~1,200 employees. Substantially all terminated as of Jan 31, 2004. Remaining accrual primarily for income continuance. | |
| 2003-11-01 | plant_closure | in_progress | 71 | 2003-11-01 | 2004-05-01 | Belfast, Northern Ireland | Manufacturing — foundry substrate services for optical applications | USD 9 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Charge included $2M severance for 57 manufacturing and 14 engineering/admin employees; none terminated as of fiscal year-end. Closure expected complete in first half of fiscal 2004. | |
| 2003-11-01 | restructuring | completed | 2003-05-01 | 2003-08-02 | Philippines | Manufacturing — plastic package assembly | USD 2 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Decision to outsource plastic package assembly previously done internally at Philippines facility; $2.0M equipment write-down to fair value. Employee count not disclosed. | ||
| 2003-11-01 | restructuring | completed | 2003-05-01 | 2003-08-02 | United States | Optical communications product development | USD 3 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Decision to abandon optical communications expertise development; $2.7M equipment write-down. Employee count not disclosed. | ||
| 2003-11-01 | restructuring | in_progress | 71 | 2003-10-01 | 2004-06-30 | Northern Ireland | Manufacturing | USD 9 (millions) | restructuring_footnote f5-10k / Qwen3.6-27B-Q8_0 | Closure of Belfast facility; 57 manufacturing and 14 engineering/admin employees. Severance costs $2 million. | |
| 2003-11-01 | restructuring | completed | 397 | 2002-04-01 | 2003-11-01 | United States and Ireland | Manufacturing | USD 15 (millions) | restructuring_footnote f5-10k / Qwen3.6-27B-Q8_0 | Transfer from four-inch to six/eight-inch wafer facilities. Originally 509 projected, adjusted to 439, with 397 terminated as of Nov 1, 2003. | |
| 2003-08-02 | restructuring | in_progress | 439 | 2002-02-02 | United States and Ireland | Manufacturing | USD 26 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Transfer of production from three four-inch wafer fabs to six-inch and eight-inch facilities. Original estimate of 509 employees revised down to 439; 296 terminated as of 2003-08-02. Includes $15.3M severance, $2.3M equipment write-down, $8.1M lease termination/cleanup. $2.9M accrual reversed in Q3 FY2003 due to lower severance costs. Expected annual savings ~$60M, first full year in fiscal 2004. | ||
| 2003-08-02 | reduction_in_force | completed | 100 | 2002-08-03 | United States, Europe, Canada | Engineering and Manufacturing | USD 4 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q3 FY2002 special charge of $12.8M included $3.7M severance for approximately 70 engineering and 30 manufacturing employees; all manufacturing and substantially all engineering employees terminated as of 2003-08-02. Expected annual savings ~$10M. | ||
| 2003-08-02 | reduction_in_force | in_progress | 65 | 2002-11-02 | 2003-11-01 | United States and Europe | Sales, product groups, manufacturing test operations | USD 3 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q4 FY2002 special charge of $8.4M included $2.5M severance for approximately 65 employees; 56 terminated as of 2003-08-02. Expected annual savings ~$4M. | |
| 2003-08-02 | reduction_in_force | completed | 1,200 | 2001 | United States, Europe, Asia, Philippines | Manufacturing and selling, marketing, administrative | USD 30 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Fiscal 2001 special charges of ~$47M included $29.6M severance for approximately 1,200 employees; substantially all terminated as of 2003-08-02. $1.8M remained accrued at 2003-08-02 for income-continuance payments. Expected annual salary savings ~$40M. | ||
| 2003-08-02 | plant_closure | in_progress | 2001 | Manufacturing | USD 12 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Fiscal 2001 consolidation of worldwide manufacturing operations included $11.6M equipment abandonment; production transfer from four-inch fabs ongoing, two of three four-inch facilities transitioned as of 2003-08-02. | ||||
| 2003-08-02 | restructuring | completed | 2003-08-02 | Philippines | Manufacturing — plastic package assembly | USD 0 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q3 FY2003 special charge of $0.3M (net of $4.4M accrual reversals) included $2.0M equipment write-down from decision to outsource plastic package assembly previously done internally in the Philippines, and $2.7M write-down from abandoning optical communications development. | |||
| 2003-08-02 | restructuring | in_progress | 439 | United States and Ireland | Manufacturing | USD 15 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Wafer fab transfer program charged in the second quarter of fiscal 2002; headcount adjusted down from 509 originally projected, with 296 terminated as of 2003-08-02. Remaining four-inch facility transition planned to finish within four to five months of quarter end. Announcement date not disclosed. | |||
| 2003-08-02 | restructuring | in_progress | 70 | United States, Europe and Canada | Engineering / product groups | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Cost-reduction action charged in the third quarter of fiscal 2002; substantially all engineering employees terminated as of 2003-08-02. Severance charge of $3.7 million covers both the engineering and manufacturing sub-components combined. Announcement date not disclosed. | ||||
| 2003-08-02 | restructuring | in_progress | 30 | United States | Manufacturing | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Manufacturing sub-component of the third-quarter fiscal 2002 cost-reduction action; all manufacturing employees terminated as of 2003-08-02. Severance charge of $3.7 million covers both sub-components combined. Announcement date not disclosed. | ||||
| 2003-08-02 | restructuring | in_progress | 65 | 2003-11-01 | United States and Europe | Sales, product groups and manufacturing test operations | USD 3 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Action charged in the fourth quarter of fiscal 2002; 56 of approximately 65 employees terminated as of 2003-08-02, with substantial completion expected by the end of fiscal 2003. Announcement date not disclosed. | ||
| 2003-08-02 | restructuring | in_progress | 1,200 | United States, Europe, Asia and the Philippines | Manufacturing, selling, marketing and administrative | USD 30 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Fiscal 2001 cost-reduction program; substantially all of approximately 1,200 employees terminated as of 2003-08-02, with $1.8 million still accrued for severance paid as income continuance. Announcement date not disclosed. | |||
| 2003-08-02 | restructuring | in_progress | 509 | 2002-05-04 | United States and Ireland | Manufacturing | USD 26 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Transfer of production from four-inch to six/eight-inch wafer facilities. 296 employees terminated as of Aug 2, 2003. Projected terminations adjusted down to 439. | ||
| 2003-08-02 | restructuring | completed | 100 | 2002-08-03 | United States, Europe, and Canada | Engineering and Manufacturing | USD 4 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Cost reduction actions. ~70 engineering and ~30 manufacturing employees. Substantially all terminated as of Aug 2, 2003. | ||
| 2003-08-02 | restructuring | in_progress | 65 | 2002-11-02 | 2003-11-01 | United States and Europe | Sales, Product Groups, and Manufacturing Test | USD 3 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Cost reduction actions. 56 terminated as of Aug 2, 2003. Expected to substantially complete by end of Q4 FY2003. | |
| 2003-08-02 | restructuring | completed | 1,200 | 2001-11-03 | United States, Europe, Asia, and Philippines | Manufacturing, Selling, Marketing, and Administrative | USD 30 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Workforce reductions and consolidation of worldwide manufacturing operations. Substantially all terminated as of Aug 2, 2003. | ||
| 2003-05-03 | restructuring | in_progress | 509 | 2002-02-01 | 2003-10-31 | United States and Ireland | Manufacturing | USD 26 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Severance and fringe benefit costs of $15.3 million for 509 manufacturing employees tied to transfer of production from four-inch to six- and eight-inch wafer fabs; 216 employees terminated as of May 3, 2003. Transitions from remaining two four-inch facilities planned complete in second half of fiscal 2003. | |
| 2003-05-03 | restructuring | completed | 100 | 2002-08-01 | United States, Europe and Canada | Engineering and Manufacturing | USD 4 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Approximately 70 engineering employees in the US, Europe and Canada and approximately 30 manufacturing employees in the US; all manufacturing and substantially all engineering employees terminated as of May 3, 2003. Expected annual savings of approximately $10 million. | ||
| 2003-05-03 | restructuring | in_progress | 65 | 2002-11-02 | 2003-08-31 | United States and Europe | Sales, product groups and manufacturing test operations | USD 3 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | 56 of 65 employees terminated as of May 3, 2003; company expects to substantially complete the action by end of third quarter of fiscal 2003. Expected annual savings of approximately $4 million. | |
| 2003-05-03 | restructuring | in_progress | 1,200 | 2001-10-31 | United States, Europe, Asia and the Philippines | Manufacturing, selling, marketing and administrative | USD 30 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Fiscal 2001 cost reduction actions; substantially all of approximately 1,200 employees terminated as of May 3, 2003. $26.6 million of $29.6 million severance obligations paid as of May 3, 2003; $3.5 million accrued, largely income-continuance payments. Expected annual salary savings of approximately $40 million. | ||
| 2003-05-03 | restructuring | in_progress | 509 | 2002-05-04 | 2004-10-31 | United States and Ireland | Manufacturing | USD 15 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Severance and fringe benefit costs within a $25.7M charge for transferring production from three four-inch wafer fabs to six-inch and eight-inch fabs; 216 of the 509 employees terminated as of May 3, 2003. Remaining two four-inch facility transitions planned for completion in the second half of fiscal 2003. Charge also included $2.3M equipment write-down and $8.1M lease termination/cleanup costs. | |
| 2003-05-03 | restructuring | in_progress | 100 | 2002-08-03 | 2003-10-31 | United States, Europe and Canada | Engineering and Manufacturing | USD 4 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Approximately 70 engineering and 30 manufacturing employees affected by cost reduction actions; all manufacturing and substantially all engineering employees terminated as of May 3, 2003. Part of a $12.8M third-quarter fiscal 2002 special charge that also included investment and goodwill impairments. $2.1M of these charges remained accrued at May 3, 2003, primarily income-continuance payments. | |
| 2003-05-03 | restructuring | in_progress | 65 | 2002-11-02 | 2003-08-02 | United States and Europe | Sales, Product Groups and Manufacturing Test | USD 3 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Severance and fringe benefit costs for approximately 65 employees, of which 56 had been terminated as of May 3, 2003. Part of an $8.4M fourth-quarter fiscal 2002 special charge; $1.6M remained accrued at May 3, 2003. Company expects to substantially complete these actions by the end of the third quarter of fiscal 2003. | |
| 2003-05-03 | restructuring | in_progress | 1,200 | 2001-11-03 | United States, Europe, Asia and the Philippines | Manufacturing, Selling, Marketing and Administrative | USD 30 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Fiscal 2001 worldwide cost reduction actions; substantially all of the approximately 1,200 employees terminated as of May 3, 2003, with $26.6M of the $29.6M severance obligations paid. $3.5M of the $47M total fiscal 2001 special charge remained accrued, primarily income-continuance termination payments. | ||
| 2003-05-03 | restructuring | in_progress | 509 | 2002-05-04 | 2003-11-01 | United States and Ireland | Manufacturing | USD 26 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Transfer of production from four-inch to six- and eight-inch wafer facilities. 216 of 509 employees terminated as of May 3, 2003. Completion planned for second half of fiscal 2003. | |
| 2003-05-03 | restructuring | completed | 100 | 2002-08-03 | 2003-05-03 | United States, Europe, and Canada | Engineering and Manufacturing | USD 13 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Cost reduction actions in product groups and manufacturing. ~70 engineering and ~30 manufacturing employees. All manufacturing and substantially all engineering employees terminated as of May 3, 2003. | |
| 2003-05-03 | restructuring | in_progress | 65 | 2003-02-01 | 2003-08-02 | United States and Europe | Sales, Product Groups, and Manufacturing Test | USD 8 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Cost reduction actions. 56 of 65 employees terminated as of May 3, 2003. Substantial completion expected by end of third quarter fiscal 2003. | |
| 2003-05-03 | restructuring | completed | 1,200 | 2001-05-05 | 2003-05-03 | United States, Europe, Asia, and Philippines | Manufacturing, Selling, Marketing, and Administrative | USD 47 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Fiscal 2001 worldwide cost reduction actions. Substantially all of 1,200 employees terminated as of May 3, 2003. $3.5 million accrued remains for income continuance payments. | |
| 2003-02-01 | restructuring | in_progress | 509 | 2002-05 | 2003-05 | United States and Ireland | Manufacturing | USD 26 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Transfer of production from three four-inch wafer fabs to six-inch and eight-inch fabs; includes $15.3M severance for 509 manufacturing employees, $2.3M equipment write-down, $8.1M lease termination and cleanup costs. 190 employees terminated as of 2003-02-01; $23M remaining accrued. Expected annual savings ~$60M. | |
| 2003-02-01 | restructuring | in_progress | 100 | 2002-08 | 2003-05 | United States, Europe, Canada | Engineering and Manufacturing | USD 13 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q3 FY2002 charges include $3.7M severance for ~70 engineering employees (US, Europe, Canada) and ~30 manufacturing employees (US); also $3.8M investment impairment, $3.4M goodwill impairment (Austrian design center closure), $1.9M equipment abandonment and lease cancellation. All manufacturing employees and 51 engineering employees terminated as of 2003-02-01; $3.2M remaining accrued. Expected annual savings ~$10M. | |
| 2003-02-01 | restructuring | in_progress | 65 | 2002-11 | 2003-08 | United States and Europe | Sales, product groups, and manufacturing testing | USD 8 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q4 FY2002 charges include $2.5M severance for ~65 employees (45 terminated as of 2003-02-01), $2.1M investment impairments, $1.8M equipment abandonment and lease cancellation fees, and $2.0M change in estimate for cleanup costs. $2.0M remaining accrued. Expected annual savings ~$4M. | |
| 2003-02-01 | restructuring | in_progress | 1,200 | 2001 | United States, Europe, Asia, Philippines | Manufacturing and selling, marketing and administrative | USD 47 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Fiscal 2001 cost reduction actions: $29.6M severance for ~1,200 employees (substantially all terminated as of 2003-02-01; $25.3M of severance paid), $11.6M equipment abandonment from worldwide manufacturing consolidation, $5.8M other charges. $4.9M remained accrued as of 2003-02-01, mostly income continuance payments. Expected annual salary savings ~$40M. | ||
| 2003-02-01 | restructuring | in_progress | 509 | 2003-05 | United States and Ireland | Manufacturing | USD 15 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Recorded in fiscal Q2 2002 as part of a $25.7M charge to move production from three four-inch wafer fabs to six- and eight-inch fabs; includes $2.3M equipment write-down and $8.1M lease/cleanup costs. 190 of the 509 employees had been terminated as of 2003-02-01; approximately $23M of the charges remained to be paid. Program expected substantially complete by end of fiscal Q2 2003. | ||
| 2003-02-01 | restructuring | in_progress | 70 | 2003-05 | United States, Europe and Canada | Engineering / product groups | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Recorded in fiscal Q3 2002; severance and fringe benefit costs for approximately 70 engineering employees, part of a combined $3.7M severance charge shared with the manufacturing component. 51 of the 70 had been terminated as of 2003-02-01; approximately $3.2M of the fiscal Q3 2002 charges remained to be paid. | |||
| 2003-02-01 | restructuring | in_progress | 30 | 2003-05 | United States | Manufacturing | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Recorded in fiscal Q3 2002; severance and fringe benefit costs for approximately 30 manufacturing employees, part of a combined $3.7M severance charge shared with the engineering component. All manufacturing employees had been terminated as of 2003-02-01. | |||
| 2003-02-01 | restructuring | in_progress | 65 | 2003-08 | United States and Europe | Sales, product groups and manufacturing testing | USD 3 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Recorded in fiscal Q4 2002 as part of an $8.4M special charge that also included $2.1M investment impairments, $1.8M equipment/lease cancellations and a $2.0M change in cleanup cost estimate. 45 of the 65 employees had been terminated as of 2003-02-01; approximately $2.0M of the charges remained to be paid. Expected substantially complete by end of fiscal Q3 2003. | ||
| 2003-02-01 | restructuring | completed | 1,200 | United States, Europe, Asia and the Philippines | Manufacturing, selling, marketing and administrative | USD 30 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Recorded during fiscal 2001 within a $47M special charge (which also included $11.6M equipment abandonment and $5.8M other charges). Substantially all of the approximately 1,200 employees had been terminated as of 2003-02-01; $25.3M of the $29.6M severance had been paid and $4.9M of the $47M remained accrued, primarily for income-continuance payments to terminated employees. | |||
| 2003-02-01 | restructuring | in_progress | 509 | 2002-04-01 | 2003-06-30 | United States, Ireland | Manufacturing | USD 26 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Transfer of production from four-inch to six/eight-inch wafer facilities. 190 terminated as of Feb 1, 2003. Expected completion end of Q2 FY2003. | |
| 2003-02-01 | restructuring | in_progress | 100 | 2002-07-01 | 2003-06-30 | United States, Europe, Canada | Engineering, Manufacturing | USD 13 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Cost reduction actions. 70 engineering and 30 manufacturing employees. All manufacturing and 51 engineering terminated as of Feb 1, 2003. | |
| 2003-02-01 | restructuring | in_progress | 65 | 2002-10-01 | 2003-09-30 | United States, Europe | Sales, Product Groups, Manufacturing Testing | USD 8 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Cost reduction actions. 45 terminated as of Feb 1, 2003. Expected completion end of Q3 FY2003. | |
| 2003-02-01 | restructuring | in_progress | 1,200 | 2001-01-01 | United States, Europe, Asia, Philippines | Manufacturing, Selling, Marketing, Administrative | USD 47 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Fiscal 2001 worldwide cost reduction actions. Substantially all terminated as of Feb 1, 2003. $4.9M accrued remaining. | ||
| 2002-11-02 | restructuring | in_progress | 509 | 2002-06-01 | 2003-05-31 | United States and Ireland | Manufacturing | USD 15 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Severance and fringe benefits within a $25.7M charge for transferring production from three older four-inch wafer fabs to six-inch and eight-inch fabs; 182 of the 509 had been terminated as of 2002-11-02. Announcement date is the fiscal second quarter end; MD&A states completion expected by mid-fiscal 2003. | |
| 2002-11-02 | restructuring | in_progress | 100 | 2002-08-31 | 2003-03-01 | United States, Europe and Canada | Engineering and Manufacturing | USD 4 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Approximately 70 engineering employees plus approximately 30 manufacturing employees; all manufacturing and about 32 engineering employees terminated as of 2002-11-02. Announcement date is the fiscal third quarter end. | |
| 2002-11-02 | restructuring | in_progress | 65 | 2002-11-02 | 2003-08-31 | United States and Europe | Sales, product groups and manufacturing | USD 3 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Approximately 65 employees, of which 40 had been terminated as of 2002-11-02. Announcement date is the fiscal fourth quarter end; MD&A states completion expected by the third quarter of fiscal 2003. | |
| 2002-11-02 | plant_closure | completed | 2002-08-31 | Austria | Design center | USD 3 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Goodwill impairment recorded on closure of a design center acquired in fiscal 2001; no employee count disclosed. Announcement date is the fiscal third quarter end. | |||
| 2002-11-02 | restructuring | in_progress | 509 | 2002-04-01 | 2003-05-01 | United States and Ireland | Manufacturing | USD 26 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | Second quarter fiscal 2002 charge related to transfer of production from four-inch to six- and eight-inch wafer fabrication facilities. Includes severance and fringe benefits for 509 manufacturing employees. 182 terminated as of Nov 2, 2002. | |
| 2002-11-02 | restructuring | in_progress | 100 | 2002-07-01 | 2003-02-01 | United States, Europe, and Canada | Engineering and Manufacturing | USD 4 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | Third quarter fiscal 2002 charge. Severance for approx 70 engineering and 30 manufacturing employees. All manufacturing and approx 32 engineering terminated as of Nov 2, 2002. | |
| 2002-11-02 | restructuring | in_progress | 65 | 2002-10-01 | 2003-08-01 | United States and Europe | Sales, Product Groups, and Manufacturing | USD 3 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | Fourth quarter fiscal 2002 charge. Severance for approx 65 employees. 40 terminated as of Nov 2, 2002. | |
| 2002-08-03 | restructuring | in_progress | 1,200 | 2001 | 2003-01 | U.S., Europe, Asia and the Philippines | Manufacturing; selling, marketing and administrative | USD 30 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Fiscal 2001 worldwide cost reduction program; approximately 1,000 of 1,200 employees terminated as of 2002-08-03, remaining 200 expected to be terminated by Q1 fiscal 2003. Approximately $22.4 million of the $29.6 million severance obligation paid as of 2002-08-03. Program also included $11.6 million equipment abandonment and $5.8 million other charges (not workforce-related). | |
| 2002-08-03 | restructuring | in_progress | 509 | 2003-01 | U.S. and Ireland | Manufacturing | USD 15 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Second quarter fiscal 2002 charge tied to transfer of production from three older four-inch wafer fabs to six-inch and eight-inch fabs; only 27 of 509 employees terminated as of 2002-08-03. Company expects annual savings of approximately $24 million from these workforce reductions. Related non-workforce components: $2.3 million equipment write-down and $8.1 million lease termination/cleanup costs; majority of actions expected complete by Q2 fiscal 2003. | ||
| 2002-08-03 | reduction_in_force | in_progress | 70 | 2003-01 | U.S., Europe and Canada | Engineering | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Part of $3.7 million Q3 severance charge shared with ~30 manufacturing employees; per-component split of the severance amount not disclosed. Company expects to substantially complete actions by Q1 fiscal 2003; combined annual savings from Q3 actions estimated at approximately $10 million. | |||
| 2002-08-03 | reduction_in_force | completed | 30 | 2002-08-03 | U.S. | Manufacturing | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | All manufacturing employees terminated as of 2002-08-03. Severance shares a $3.7 million charge with ~70 engineering employees; per-component split not disclosed. | |||
| 2002-08-03 | restructuring | in_progress | 1,200 | 2003-02-01 | United States, Europe, Asia, the Philippines | Manufacturing and, to a lesser extent, selling, marketing and administrative | USD 30 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Fiscal 2001 worldwide cost-reduction program; approximately 1,000 of 1,200 employees terminated as of 2002-08-03, remaining 200 expected terminated by first quarter of fiscal 2003; about $22.4M of the $29.6M severance obligation paid to date. Announcement date not disclosed in this filing. | ||
| 2002-08-03 | restructuring | in_progress | 509 | 2003-05-01 | United States and Ireland | Manufacturing | USD 15 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Second quarter of fiscal 2002 charge tied to transferring production from three older four-inch wafer fabs to six-inch and eight-inch fabs; 27 of 509 employees terminated as of 2002-08-03. Severance is part of a $25.7M charge that also includes $2.3M equipment write-down and $8.1M lease termination/cleanup. Company expects to complete a majority of actions by second quarter of fiscal 2003. Announcement date not disclosed in this filing. | ||
| 2002-08-03 | restructuring | in_progress | 70 | 2003-02-01 | United States, Europe, Canada | Engineering (product groups) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Third quarter of fiscal 2002 cost-reduction actions; severance and fringe benefit costs for these employees are part of a combined $3.7M severance component within the $12.8M third-quarter special charge (charge not split between the engineering and manufacturing sub-components). Expected to be substantially complete by first quarter of fiscal 2003. Announcement date not disclosed in this filing. | |||
| 2002-08-03 | restructuring | in_progress | 30 | 2003-02-01 | United States | Manufacturing | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Third quarter of fiscal 2002 cost-reduction actions; all manufacturing employees in this group had been terminated as of 2002-08-03. Severance part of the combined $3.7M severance component within the $12.8M third-quarter special charge. Announcement date not disclosed in this filing. | |||
| 2002-08-03 | restructuring | in_progress | 100 | 2001-01-01 | 2003-02-01 | U.S., Europe, Asia, Philippines | Manufacturing, Selling, Marketing, Administrative | USD 30 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Fiscal 2001 cost reduction actions. 1,200 employees total affected; 1,000 terminated as of Aug 3, 2002. Remaining 200 expected to be terminated by Q1 FY2003. | |
| 2002-08-03 | restructuring | in_progress | 509 | 2002-02-03 | 2003-05-04 | U.S., Ireland | Manufacturing | USD 15 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Q2 FY2002 charge for transfer of production from four-inch to six/eight-inch wafer facilities. 27 employees terminated as of Aug 3, 2002. Majority of actions expected complete by Q2 FY2003. | |
| 2002-08-03 | restructuring | in_progress | 100 | 2002-05-05 | 2003-02-01 | U.S., Europe, Canada | Engineering, Manufacturing | USD 4 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Q3 FY2002 cost reduction actions. 70 engineering and 30 manufacturing employees affected. All manufacturing employees terminated as of Aug 3, 2002. Actions expected substantially complete by Q1 FY2003. | |
| 2002-05-04 | restructuring | in_progress | 509 | 2003-05-03 | U.S. and Ireland | Manufacturing | USD 26 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q2 FY2002 charge for transfer of production from three older four-inch wafer fabs to six- and eight-inch fabs; includes $15.3M severance for 509 manufacturing employees, $2.3M equipment write-down, $8.1M lease termination/cleanup. Expected annual savings ~$24M from workforce reductions; ~$60M total when complete. Additional depreciation of ~$7M per quarter for two quarters. | ||
| 2002-05-04 | restructuring | in_progress | 2002-11-02 | Other | USD 3 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Q2 FY2002 charge primarily related to impairment of an investment. | ||||
| 2002-05-04 | restructuring | in_progress | 1,200 | 2002-11-02 | U.S., Europe, Asia and the Philippines | Manufacturing; selling, marketing and administrative | USD 30 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Fiscal 2001 cost-reduction program; severance and fringe benefit costs for approximately 1,200 employees, of which approximately 930 terminated as of May 4, 2002. Also included $11.6M equipment abandonment from manufacturing consolidation and $5.8M other charges (equipment and lease cancellation fees); total FY2001 special charges ~$47M. Company expects to complete within next six months. | ||
| 2002-05-04 | restructuring | in_progress | 509 | 2003-05-02 | United States and Ireland | Manufacturing | USD 15 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Severance and fringe benefits for 509 manufacturing employees tied to transfer of production from three older four-inch wafer fabs to six- and eight-inch fabs; part of $25.7M charge that also included $2.3M equipment write-down and $8.1M lease termination/cleanup. Company expects substantial completion by second quarter of fiscal 2003 (expected_completion_date approximate). | ||
| 2002-05-04 | restructuring | in_progress | 1,200 | 2002-11-01 | United States, Europe, Asia and the Philippines | Manufacturing, and to a lesser extent selling, marketing and administrative | USD 47 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Fiscal 2001 cost-reduction program including workforce reductions of approximately 1,200 employees (severance component $29.6M); approximately 930 employees terminated as of May 4, 2002. Company expects completion within the next six months (expected_completion_date approximate). | ||
| 2002-05-04 | restructuring | in_progress | 509 | 2002-05-04 | 2003-05-04 | United States, Ireland | Manufacturing | USD 26 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Transfer of production from older four-inch wafer facilities to six- and eight-inch facilities. Includes severance, equipment write-down, and lease termination costs. | |
| 2002-05-04 | restructuring | in_progress | 1,200 | 2001-10-01 | 2002-11-04 | United States, Europe, Asia, Philippines | Manufacturing, Selling, Marketing, Administrative | USD 47 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Cost reduction actions from fiscal 2001. Approximately 930 employees terminated as of May 4, 2002. Includes severance, equipment abandonment, and cancellation fees. | |
| 2002-02-02 | restructuring | in_progress | 1,200 | U.S., Europe, Asia and the Philippines | Manufacturing; to a lesser extent selling, marketing and administrative | USD 30 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Severance and fringe benefit costs for approximately 1,200 employees under fiscal 2001 cost reduction actions; approximately 880 employees terminated as of February 2, 2002. Company expects to complete actions within the next nine months. | |||
| 2002-02-02 | plant_closure | in_progress | Worldwide | Manufacturing operations consolidation | USD 12 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Charge related to abandonment of equipment resulting from consolidation of worldwide manufacturing operations; part of fiscal 2001 special charges of approximately $47 million. | ||||
| 2002-02-02 | restructuring | in_progress | Other | USD 6 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Other charges primarily related to equipment and lease cancellation fees as part of fiscal 2001 cost reduction actions. | |||||
| 2002-02-02 | restructuring | in_progress | 1,200 | U.S., Europe, Asia and the Philippines | Manufacturing, and to a lesser extent selling, marketing and administrative | USD 30 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Cost reductions of $29.6M in severance and fringe benefits for about 1,200 employees; roughly 880 had been terminated as of 2002-02-02. Total special charge was $47.0M, including $11.6M equipment abandonment and $5.8M other charges. Announced during fiscal 2001 (exact date not disclosed); company expects completion within nine months of filing. | |||
| 2002-02-02 | plant_closure | in_progress | Worldwide | Manufacturing operations | USD 12 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Non-cash charge for abandonment of equipment resulting from consolidation of worldwide manufacturing operations; no separate employee count disclosed for this component. Part of the same $47.0M fiscal 2001 special charge program. | ||||
| 2002-02-02 | restructuring | in_progress | 1,200 | 2002-11-02 | U.S., Europe, Asia, Philippines | Manufacturing, Selling, Marketing, Administrative | USD 47 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Approximately 880 employees terminated as of Feb 2, 2002. Actions include workforce reductions and consolidation of worldwide manufacturing operations. | ||
| 2001-11-03 | restructuring | in_progress | 1,200 | 2001-06-30 | 2002-11-03 | United States, Europe, Asia, Philippines | Manufacturing, Selling, Marketing, Administrative | USD 47 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Cost reduction program; $29.6M severance for ~1,200 employees, $11.6M equipment abandonment, $5.8M other. Approximately half terminated by year-end; balance expected within 9-12 months. Annual salary savings expected ~$40M ($27M COGS, $13M opex). | |
| 2001-11-03 | restructuring | in_progress | 1,200 | 2001-11-03 | U.S., Europe, Asia, Philippines | Manufacturing, Selling, Marketing, Administrative | USD 47 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | Special charge of approx $47M related to cost reduction actions. Includes severance/fringe benefits of approx $30M for approx 1,200 employees. Approx half terminated as of Nov 3, 2001. Also includes $12M for equipment abandonment. Expected annual salary savings of approx $40M. | ||
| 2001-08-04 | restructuring | in_progress | 500 | 2002-08-04 | U.S., Europe and Southeast Asia | Manufacturing; to a lesser extent selling, marketing and administrative | USD 14 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Workforce reductions in response to economic climate; approximately half of the ~500 employees terminated as of 2001-08-04; expected annual salary savings of approximately $18 million; $2.3 million of severance paid through quarter-end. | ||
| 2001-08-04 | plant_closure | in_progress | 2002-08-04 | Worldwide | Test operations | USD 12 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Consolidation of worldwide test operations; non-cash write-down of test equipment to be abandoned; no headcount figure disclosed for this component. | |||
| 2001-08-04 | restructuring | in_progress | 500 | 2002-08-04 | United States, Europe, Southeast Asia | Manufacturing and, to a lesser extent, selling, marketing and administrative | USD 14 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Severance and fringe benefit costs for approximately 500 employees; about half terminated as of 2001-08-04. Expected annual salary savings of approximately $18 million. Company expects actions completed within twelve months; exact announcement date not disclosed (recorded during Q3 fiscal 2001). | ||
| 2001-08-04 | restructuring | in_progress | 2002-08-04 | Worldwide | Test operations | USD 12 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Non-cash write-down of test equipment to be abandoned from consolidation of worldwide test operations; no employee count disclosed for this component. Total special charge was $26.1 million. | |||
| 2001-08-04 | restructuring | announced | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | Company anticipates further special charges in Q4 fiscal 2001 as it continues cost reductions; no counts or amounts quantified. | |||||||
| 2001-08-04 | acquisition_addition | completed | 2000-10-31 | Austria | DSL broadband access integrated circuits (Thomas Neuroth AG) | business_combinations_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Acquired for approximately $4 million cash plus up to $4 million contingent; headcount added not disclosed. | ||||
| 2001-08-04 | acquisition_addition | completed | 2000-11-10 | Australia | Voice processing and fax/data relay software (Signal Processing Associates) | business_combinations_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Acquired for approximately $3 million cash plus up to $1.5 million contingent; headcount added not disclosed. | ||||
| 2001-08-04 | acquisition_addition | completed | 2000-12-18 | United States (Berkeley, California) | MEMS process designs (Integrated Micro Instruments) | business_combinations_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Acquired for approximately $1 million cash plus 13,750 shares; headcount added not disclosed. | ||||
| 2001-08-04 | acquisition_addition | completed | 2001-01-04 | United States (Santa Clara, California) | Voice, broadband access and network protocol processing ICs and software (ChipLogic) | USD 10 (millions) | business_combinations_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Acquired for approximately $4 million cash and approximately 1 million shares (~$60 million); $9.5 million in-process R&D write-off. Headcount added not disclosed. | |||
| 2001-08-04 | acquisition_addition | completed | 2001-01-16 | United States (Mountain View, California) | Audio synthesis technology (Staccato Systems) | business_combinations_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Acquired for approximately $23 million cash plus up to $7 million contingent (about $2 million paid); headcount added not disclosed. | ||||
| 2001-08-04 | restructuring | in_progress | 500 | 2001-08-04 | 2002-08-04 | U.S., Europe and Southeast Asia | Manufacturing, selling, marketing and administrative | USD 14 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Severance and fringe benefit costs for approx. 500 employees; approx. half terminated as of Aug 4, 2001. Completion expected within next twelve months. | |
| 2001-08-04 | restructuring | completed | 2001-08-04 | 2001-08-04 | Worldwide | Test operations | USD 12 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Write-down of test equipment to be abandoned as a result of the consolidation of worldwide test operations. | ||
| 2001-02-03 | acquisition_addition | completed | 2000-10-31 | Austria | Integrated circuits (DSL broadband access) | business_combinations_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Acquired Thomas Neuroth AG for ~$4M cash plus up to $4M contingent consideration; headcount added not disclosed. | ||||
| 2001-02-03 | acquisition_addition | completed | 2000-11-10 | Australia | Voice processing and fax/data relay software | business_combinations_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Acquired Signal Processing Associates Pty. Ltd. for ~$3M cash plus up to $1.5M contingent consideration; headcount added not disclosed. | ||||
| 2001-02-03 | acquisition_addition | completed | 2000-12-18 | United States | MEMS process designs | business_combinations_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Acquired Integrated Micro Instruments, Inc. for ~$1M cash plus 13,750 shares (with 50,000 additional shares issuable over five years); headcount added not disclosed. | ||||
| 2001-02-03 | acquisition_addition | completed | 2001-01-04 | United States | Voice, broadband access and network protocol processing ICs and software | USD 10 (millions) | business_combinations_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Acquired ChipLogic, Inc. for ~$4M cash and ~1M shares (~$60M), plus 489,375 contingent shares; $9.5M charge was write-off of in-process R&D, not severance. Headcount added not disclosed. | |||
| 2001-02-03 | acquisition_addition | completed | 2001-01-16 | United States | Audio synthesis technology | business_combinations_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Acquired Staccato Systems, Inc. for ~$23M cash plus up to $7M contingent consideration; headcount added not disclosed. | ||||
| 2000-10-28 | acquisition_addition | completed | Northern Ireland | Wafer manufacturing (silicon-on-insulator wafers) | USD 163 (millions) | business_combinations_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Cash-for-stock acquisition completed in Q3 FY2000; headcount added not disclosed. | ||||
| 2000-10-28 | acquisition_addition | announced | 2001-01-04 | 2001-01-04 | United States (Santa Clara, California) | Voice, broadband access and network protocol processing ICs and software | USD 86 (millions) | subsequent_events f5-10k / MiMo-V2.6-Flash-fp8-HTML | Completed 2001-01-04 after fiscal year-end; approximately 1.65 million ChipLogic shares issued; headcount added not disclosed. | ||
| 2000-10-28 | acquisition_addition | announced | 2001-01-17 | Not specified | Not specified | USD 50 (millions) | subsequent_events f5-10k / MiMo-V2.6-Flash-fp8-HTML | Four smaller acquisitions completed through 2001-01-17, total value approximately $50 million including contingent consideration; headcount added not disclosed. | |||
| 2000-10-28 | restructuring | completed | 350 | 2000-01-01 | 2000-10-28 | Worldwide | Manufacturing, Selling, General and Administrative | USD 7 (millions) | restructuring_footnote f5-10k / Qwen3.6-27B-Q8_0 | Workforce reduction completed during the fourth quarter of fiscal 1998. Charge recorded in fiscal 1998. | |
| 2000-10-28 | acquisition_addition | completed | 2000-07-01 | 2000-07-01 | Northern Ireland | Other | business_combinations_footnote f5-10k / Qwen3.6-27B-Q8_0 | Acquisition of BCO Technologies plc in the third quarter of fiscal 2000. Headcount not explicitly disclosed. | |||
| 1999-10-30 | acquisition_addition | completed | 1999-01-01 | United States; United Kingdom | R&D — DSP tools | USD 5 (millions) | business_combinations_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Acquisition of White Mountain DSP and Edinburgh Portable Compilers in Q2 FY1999; $5.1M in-process R&D write-off. Headcount added not disclosed. | |||
| 1999-10-30 | acquisition_addition | completed | 1999-04-01 | United States, United Kingdom | Research and Development | USD 23 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | Acquired White Mountain DSP, Inc. and Edinburgh Portable Compilers Limited in Q2 FY99. Total cost approx $23 million plus up to $10 million contingent. Headcount not disclosed. | |||
| 1999-07-31 | acquisition_addition | completed | 1999-04-01 | United States, United Kingdom | DSP tools | USD 21 (millions) | business_combinations_footnote f5-10q / Qwen3.6-27B-Q8_0 | Acquired White Mountain DSP, Inc. and Edinburgh Portable Compilers Limited. Total cost approx $21M cash and $2M stock. Employee count not disclosed. | |||
| 1999-05-01 | acquisition_addition | completed | 1999-02-28 | United States; United Kingdom | DSP tools (research and development) | USD 5 (millions) | business_combinations_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Acquisition of White Mountain DSP, Inc. and Edinburgh Portable Compilers Limited in February 1999; purchase accounted, with a $5.1 million in-process R&D write-off. No employee headcount added disclosed. | |||
| 1999-05-01 | divestiture_reduction | completed | 1999-01-31 | Taiwan | WaferTech, LLC joint venture | other f5-10q / MiMo-V2.6-Flash-fp8-HTML | Sale of about 78% of the WaferTech equity stake in Q1 FY1999, cutting ownership from 18% to 4%; $105 million cash received. No workforce impact disclosed. | ||||
| 1999-05-01 | acquisition_addition | completed | 1999-02-01 | United States, United Kingdom | Research and Development | USD 21 (millions) | business_combinations_footnote f5-10q / Qwen3.6-27B-Q8_0 | Acquired White Mountain DSP, Inc. and Edinburgh Portable Compilers Limited. Total cost approx $21M cash and $2M stock. Headcount not disclosed. | |||
| 1998-10-31 | restructuring | completed | 350 | 1998-05-01 | 1998-10-31 | Worldwide | Manufacturing, Selling, General and Administrative | USD 7 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Part of $17M total restructuring charge; $7M for workforce reduction of ~350 employees completed in Q4 FY1998; expected annual savings ~$10M. Remaining $10M charge was asset write-off for scaled-back DSP product areas. | |
| 1998-10-31 | divestiture_reduction | completed | 1998-10-31 | Disk Drive IC business | discontinued_operations_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Disk drive IC business sold to Adaptec, Inc. during fiscal 1998; $27M cash received, $13M net gain recorded. Headcount associated with the divested business not disclosed. | |||||
| 1998-10-31 | restructuring | completed | 350 | 1998-07-01 | 1998-10-31 | Worldwide | Manufacturing, Selling, General and Administrative | USD 7 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | Workforce reduction completed in Q4 1998. Total restructuring charge was $17 million, including $10 million asset write-off. | |
| 1998-08-01 | restructuring | in_progress | 350 | Worldwide | Manufacturing, selling and G&A areas | USD 7 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Worldwide workforce reduction of approximately 350 employees; expected annual savings of approximately $10 million commencing in the fourth quarter of fiscal 1998. Part of a total $17 million restructuring charge that also includes a $10 million non-cash asset write-off. | |||
| 1998-08-01 | restructuring | completed | Certain business areas (DSP strategy scale-back) | USD 10 (millions) | restructuring_footnote f5-10q / GLM-5.3-flash-fp4-HTML | Non-cash write-off of $10 million representing the carrying value of specific assets associated with business areas being scaled back following a strategy review; no headcount figure disclosed for this component. | |||||
| 1998-08-01 | divestiture_reduction | completed | Disk drive IC business | USD 13 (millions) | other f5-10q / GLM-5.3-flash-fp4-HTML | Sale of disk drive IC business to Adaptec, Inc. completed in Q2 fiscal 1998 for approximately $27 million cash; net gain of approximately $13 million after write-offs. Headcount transferred not disclosed. | |||||
| 1998-08-01 | restructuring | in_progress | 350 | Worldwide | Manufacturing, selling and G&A | USD 7 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Part of a $17M total restructuring charge recorded in Q3 FY1998; the remaining $10M was an asset write-off for scaled-back business areas. Annual savings of about $10M were expected to begin in Q4 FY1998. No announcement date or completion date stated. | |||
| 1998-08-01 | restructuring | completed | 350 | 1998-08-01 | 1998-11-01 | Worldwide | Manufacturing, Selling, and G&A | USD 7 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Workforce reduction of approx. 350 employees; annual savings of approx. $10 million expected to commence in Q4 fiscal 1998. | |
| 1998-05-02 | divestiture_reduction | completed | United States | Disk drive IC business | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Sale of disk drive IC business to Adaptec completed in Q2 FY1998; no employee count disclosed. Filing predates Reg S-K Item 101(c) human capital requirements. | |||||
| 1998-05-02 | restructuring | completed | North America | Third-party distribution channel / cost structure | USD 6 (millions) | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | Q2 charge for consolidating the North American third-party distribution channel and streamlining cost structure; no employee count disclosed. |