Ameren (AEE)

Company ID: 88 | CIK: 0001002910
10-Q view:
No 10-Q YTD data
No 10-Q 3M data
No 10-Q YTD data
No 10-Q 3M data
No 10-K data
No 10-Q YTD data
No 10-Q 3M data
No 10-K data
No 10-K data
No 10-K data
No 10-K data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-K data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-K data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q YTD data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
Segments are charted by their disclosed metrics (revenue, segment profit, etc.). Each line is a single segment. Reconciliation/corporate items are excluded. Major customers are shown as a percentage of revenue. Operational KPIs are grouped by metric concept; sub-metrics appear as separate lines.

Geographic Segments

Business Unit / Product Segments

Major Customers (% of Revenue)

No 10-K data

Operational KPIs

Residential electric bill (arpu)

No 10-Q data

Nuclear decommissioning trust fund (aum)

No 10-Q data

Contractual obligations (backlog)

No 10-K data

Net kilowatt capability (capacity)

MEEIA program spend (capital_expenditures)

No 10-K data

Asbestos lawsuits filed (claims_count)

No 10-K data

Retail customers on alternative supplier (customers)

No 10-Q data

Natural gas customers (customers_served)

Emissions reduction target (emissions_co2)

No 10-K data

Equivalent availability factor (fleet_utilization)

Hedged natural gas volume (gas_production)

No 10-K data

Electric Generating Capability (generation_capacity)

Electric Generation Volume (generation_volume)

Employees represented by unions (headcount)

Coal inventory (inventory_units)

No 10-Q data

Power sold forward (order_book)

No 10-K data

30-year Treasury yield (other)

No 10-K data

ARO for CCR (other)

No 10-K data

ATM available (other)

No 10-K data

ATM program availability (other)

No 10-K data

ATM program capacity (other)

No 10-K data

ATM program remaining capacity (other)

No 10-K data

ATXI remaining investment (other)

No 10-K data

Accounts receivable past due (other)

No 10-K data

Accounts receivable past due or deferred (other)

No 10-K data

Actual equity ratio (other)

No 10-K data

Additional collateral if below investment grade (other)

No 10-K data

Additional collateral if downgraded (other)

No 10-K data

Allowance for doubtful accounts (other)

No 10-K data

Allowed base ROE (other)

No 10-K data

Allowed return on common equity (other)

No 10-K data

Allowed return on equity (other)

No 10-K data

Allowed transmission ROE (other)

No 10-K data

Ameren Illinois power procurement share (other)

No 10-Q data

Ameren Illinois transmission investment (other)

No 10-K data

Ameren Missouri fuel cost (other)

No 10-Q data

Ancillary services market revenues (other)

No 10-K data

Ancillary services revenue (other)

No 10-K data

Annual revenue requirement reduction (other)

No 10-K data

Annualized dividend rate (other)

No 10-K data

Asbestos lawsuits (other)

No 10-K data

Asbestos lawsuits pending (other)

No 10-K data

Asbestos liability (other)

No 10-K data

Asset retirement obligations (other)

No 10-K data

Attrition rate (other)

No 10-Q data

Auction clearing price (other)

No 10-K data

Available AmerenUE credit line (other)

No 10-K data

Available bank credit lines (other)

No 10-K data

Available borrowing capacity (other)

No 10-K data

Available liquidity (other)

Average coal price (other)

No 10-Q data

Average common shares outstanding (other)

No 10-K data

Average employee tenure (other)

No 10-Q data

Average hedged generation price (other)

No 10-K data

Average hedged power price (other)

No 10-K data

Average power price (other)

No 10-K data

Average price of EEI power (other)

No 10-K data

Average price per ton of coal (other)

No 10-Q data

Average realized interchange price (other)

No 10-Q data

Average realized power price (other)

Bad debt expense (other)

No 10-K data

Bank lines of credit available (other)

No 10-K data

Book value per share (other)

No 10-K data

CCR capex (other)

No 10-K data

CCR compliance capex (other)

No 10-K data

CCR compliance capital expenditure estimate (other)

No 10-K data

CCR management capital expenditures (other)

No 10-K data

CCR storage facility ARO (other)

No 10-K data

CILCO former MGP sites (other)

No 10-K data

CIPS former MGP sites (other)

No 10-K data

CIPS power purchases from EEI (other)

No 10-K data

Callaway Nuclear Plant refueling duration (other)

No 10-K data

Callaway decommissioning cost (other)

No 10-K data

Callaway decommissioning costs (other)

No 10-K data

Callaway generator repair cost (other)

No 10-K data

Callaway insurance receivable (other)

No 10-K data

Callaway nuclear capacity share (other)

No 10-K data

Callaway operating license end year (other)

No 10-K data

Callaway operating license extension (other)

No 10-K data

Callaway outage expense (other)

No 10-K data

Callaway outage maintenance (other)

No 10-K data

Callaway outage maintenance cost (other)

No 10-K data

Callaway refueling outage (other)

No 10-K data

Callaway refueling outage duration (other)

No 10-K data

Capacity factor (other)

No 10-K data

Capacity revenue (other)

No 10-K data

Capacity revenue and cost decrease (other)

No 10-K data

Capacity revenue and cost increase (other)

No 10-K data

Capacity revenue decrease (other)

No 10-K data

Capacity revenue increase (other)

No 10-K data

Capacity revenues (other)

No 10-K data

Capacity-only revenue (other)

No 10-K data

Capacity-only revenue expectation (other)

No 10-K data

Capacity-only revenues (other)

No 10-K data

Capital allocated to FERC/Illinois infrastructure (other)

No 10-K data

Capital expenditure estimate (other)

No 10-K data

Capital expenditure guidance (other)

No 10-K data

Capital expenditure plan (other)

No 10-K data

Capital expenditures (other)

Capital expenditures forecast (other)

No 10-K data

Capital expenditures plan (other)

No 10-K data

Capital investment plan (other)

No 10-K data

Capital structure equity ratio (other)

No 10-K data

Capitalization ratio (other)

No 10-K data

Capitalized nuclear investments (other)

No 10-K data

Cash collateral posted (other)

No 10-K data

Circuit miles of electric distribution lines (other)

No 10-Q data

Coal and transportation prices (other)

No 10-K data

Coal burned (other)

No 10-Q data

Coal consumed (other)

No 10-Q data

Coal consumption (other)

No 10-Q data

Coal fuel costs hedged volume (other)

No 10-K data

Coal hedged (other)

Coal hedged percentage (other)

Coal hedged volume (other)

No 10-K data

Coal hedging percentage (other)

No 10-K data

Coal inventory days (other)

No 10-Q data

Coal inventory days of supply (other)

No 10-Q data

Coal inventory days supply (other)

No 10-Q data

Coal inventory vs target (other)

No 10-Q data

Coal plant availability (other)

No 10-Q data

Coal plant availability factor (other)

No 10-Q data

Coal price hedged (other)

Coal price increase (other)

No 10-K data

Coal price per ton (other)

No 10-Q data

Coal price sensitivity (other)

No 10-K data

Coal price-hedged (other)

Coal procurement commitments (other)

No 10-K data

Coal purchase commitments (other)

No 10-K data

Coal purchases by basin (other)

No 10-Q data

Coal requirements covered (other)

No 10-K data

Coal share of generation (other)

No 10-K data

Coal supply at fixed prices (other)

No 10-K data

Coal supply contracted (other)

No 10-K data

Coal supply coverage (other)

No 10-K data

Coal supply fixed price (other)

No 10-K data

Coal supply fixed price coverage (other)

No 10-K data

Coal supply fixed-price coverage (other)

No 10-K data

Coal supply hedged (other)

Coal transport hedged (other)

No 10-Q data

Coal transportation hedge coverage (other)

No 10-K data

Coal transportation hedged (other)

No 10-K data

Coal transportation hedged percentage (other)

No 10-K data

Coal transportation hedging percentage (other)

No 10-K data

Coal transportation price hedged (other)

No 10-K data

Coal transportation price sensitivity (other)

No 10-K data

Coal transportation price-hedged (other)

No 10-K data

Coal-fired capacity share (other)

No 10-K data

Coal-fired generation share (other)

No 10-K data

Collateral posted with external parties (other)

No 10-K data

Commercial electric sales growth (other)

No 10-K data

Commercial gas sales (other)

No 10-K data

Commercial gas volume sales (other)

No 10-K data

Commercial kWh sales growth (other)

No 10-K data

Commercial paper capacity available (other)

No 10-K data

Commercial paper interest rate (other)

No 10-K data

Commercial paper outstanding (other)

No 10-K data

Commercial paper rate (other)

No 10-K data

Commercial paper weighted-average rate (other)

No 10-K data

Commercial sales change (other)

No 10-K data

Commercial sales growth (other)

No 10-K data

Committed bank credit lines (other)

No 10-K data

Committed bank lines (other)

No 10-K data

Committed bank lines of credit (other)

No 10-K data

Committed credit facilities available (other)

No 10-K data

Committed infrastructure investment (other)

No 10-K data

Commodity price hedged (other)

No 10-K data

Common Shares Outstanding (other)

No 10-Q data

Common Stock Outstanding (other)

No 10-K data

Common dividend payout rate (other)

No 10-K data

Common shareholders of record (other)

No 10-Q data

Common shares outstanding (other)

No 10-K data

Common stock outstanding (other)

No 10-Q data

Consolidated indebtedness to total capitalization (other)

No 10-K data

Construction expenditures (other)

No 10-Q data

Contracted generation output (other)

No 10-K data

Cooling degree days (other)

No 10-K data

Cooling degree days change (other)

Cooling degree-days (other)

No 10-K data

Cooling degree-days change (other)

No 10-K data

Cooling degree-days increase (other)

No 10-K data

Counterparty exposure (other)

No 10-K data

Credit agreement capacity (other)

No 10-K data

Credit capacity available (other)

No 10-K data

Credit facility available (other)

No 10-K data

Customers without power (other)

No 10-K data

Data center agreements (other)

No 10-K data

Data center load agreements (other)

No 10-K data

Debt to capitalization (other)

No 10-K data

Debt to capitalization ratio (other)

No 10-K data

Debt to total capitalization (other)

No 10-K data

Degree days change (other)

Degree-days change (other)

No 10-K data

Delivered coal price (other)

No 10-Q data

Diesel fuel surcharge price cap coverage (other)

No 10-K data

Diesel surcharge price cap (other)

No 10-K data

Distribution circuit miles (other)

No 10-Q data

Distribution line miles (other)

No 10-Q data

Distribution lines underground (other)

No 10-Q data

Distribution miles (other)

No 10-Q data

Dividend coverage ratio (other)

No 10-K data

Dividend payout rate (other)

No 10-K data

Dividend payout ratio (other)

No 10-K data

Dividend payout ratio target (other)

No 10-K data

Dividends per common share (other)

No 10-K data

Dividends per share (other)

Dividends to operating cash flow (other)

No 10-K data

EEI sales growth (other)

No 10-K data

EV charging stations (other)

No 10-K data

Earnings per diluted share (other)

Earnings per share (other)

No 10-Q data

Effective income tax rate (other)

No 10-K data

Effective tax rate (other)

No 10-K data

Electric distribution circuit miles (other)

No 10-Q data

Electric distribution line miles (other)

No 10-Q data

Electric distribution lines (other)

No 10-Q data

Electric distribution miles (other)

No 10-Q data

Electric distribution rate base (other)

No 10-K data

Electric distribution rate increase (other)

No 10-K data

Electric energy sales (other)

No 10-Q data

Electric generation mix (other)

No 10-Q data

Electric kWh sales growth (other)

No 10-K data

Electric rate base (other)

No 10-K data

Electric rate increase (other)

No 10-K data

Electric rate increase approved (other)

No 10-K data

Electric rate increase request (other)

No 10-K data

Electric rate increase requested (other)

No 10-K data

Electric revenue by regulator (other)

No 10-Q data

Electric sales (other)

No 10-Q data

Electric sales growth (other)

No 10-K data

Electric sales volume (other)

No 10-Q data

Electric sales volume change (other)

No 10-K data

Electric sales volume growth (other)

No 10-K data

Electricity sales (other)

No 10-Q data

Emission credit sales (other)

No 10-K data

Emission credits sold (other)

No 10-K data

Employee attrition rate (other)

No 10-Q data

Employees aged 55+ (other)

No 10-Q data

Employees transferred (other)

No 10-K data

Energy Transition Fund (other)

No 10-K data

Energy efficiency goal achievement (other)

No 10-K data

Energy efficiency investment (other)

Energy efficiency investment plan (other)

No 10-K data

Energy efficiency investments (other)

No 10-K data

Energy efficiency net shared benefits (other)

No 10-K data

Energy efficiency program investment (other)

No 10-K data

Energy efficiency program spend (other)

No 10-K data

Energy efficiency rate increase (other)

No 10-K data

Energy efficiency target (other)

No 10-K data

Energy product agreement volume (other)

No 10-K data

Energy product procurement volume (other)

No 10-K data

Energy products procured (other)

No 10-K data

Energy products purchased (other)

No 10-K data

Energy supply fuel mix (other)

No 10-Q data

Energy supply mix (other)

No 10-Q data

Energy supply mix share (other)

No 10-Q data

Energy swaps contracted (other)

No 10-K data

Energy-efficiency investment (other)

No 10-K data

Energy-efficiency investment plan (other)

No 10-K data

Energy-efficiency plan investment (other)

No 10-K data

Energy-efficiency program investment (other)

No 10-K data

Environmental capex (other)

No 10-K data

Environmental capex estimate (other)

No 10-K data

Environmental capex plan (other)

No 10-K data

Environmental capital expenditure estimate (other)

No 10-K data

Environmental capital expenditures (other)

No 10-K data

Environmental compliance capex (other)

No 10-K data

Environmental compliance capital costs (other)

No 10-Q data

Environmental compliance capital expenditures (other)

No 10-K data

Environmental remediation liability (other)

No 10-K data

Equity capital structure (other)

No 10-K data

Equity capital structure ratio (other)

No 10-K data

Equity capitalization target (other)

No 10-K data

Equity financing plan (other)

No 10-K data

Equity in capital structure (other)

No 10-K data

Equity issuance plan (other)

No 10-K data

Equity to capitalization (other)

No 10-K data

Equity to capitalization target (other)

No 10-K data

Equity to total capitalization (other)

No 10-K data

Equivalent availability factor (other)

Estimated load growth (other)

No 10-K data

Excess deferred income tax regulatory liability (other)

No 10-K data

Excise taxes recorded (other)

No 10-K data

Expected generation volume (other)

No 10-K data

Expected load growth (other)

No 10-K data

Expected outage maintenance expense (other)

No 10-K data

Expected pension contributions (other)

No 10-K data

Expected residential rate increase (other)

No 10-K data

Expected tax refunds (other)

No 10-K data

FERC allowed base ROE (other)

No 10-K data

FERC allowed return on equity (other)

No 10-K data

FERC base ROE (other)

No 10-K data

FERC transmission ROE (other)

No 10-K data

FERC transmission refund outstanding (other)

No 10-K data

Former MGP remediation sites (other)

No 10-K data

Former MGP sites (other)

No 10-K data

Former manufactured gas plant sites (other)

No 10-K data

Formula rate update increase (other)

No 10-K data

Forward power sales price (other)

No 10-K data

Forward power sales volume (other)

No 10-K data

Forward sale agreement shares (other)

No 10-K data

Forward sale agreements (other)

No 10-K data

Forward sale agreements outstanding (other)

No 10-K data

Forward sale agreements shares (other)

No 10-K data

Forward sale agreements value (other)

No 10-K data

Forward sale settlement (other)

No 10-K data

Forward sale shares (other)

No 10-K data

Fossil fuel share of rate base (other)

No 10-K data

Fuel cost (other)

No 10-Q data

Fuel cost hedged (other)

No 10-K data

Fuel cost per MMBtu (other)

No 10-Q data

Fuel cost per kWh (other)

No 10-Q data

Fuel cost per kWh generated (other)

No 10-Q data

Fuel cost per kilowatthour generated (other)

No 10-Q data

Fuel cost per mmbtu (other)

No 10-Q data

Fuel expense sensitivity to diesel (other)

No 10-K data

Fuel oil contract volume (other)

No 10-K data

Fuel supply mix (other)

No 10-Q data

Fuel surcharge price cap (other)

No 10-K data

Funds from operations to interest coverage (other)

No 10-K data

Gas Mains (other)

No 10-Q data

Gas distribution mains (other)

No 10-Q data

Gas heating degree-days change (other)

No 10-K data

Gas hedged for distribution (other)

No 10-K data

Gas hedged for generation (other)

No 10-K data

Gas main miles (other)

No 10-Q data

Gas mains (other)

No 10-Q data

Gas rate case request (other)

No 10-K data

Gas sales (other)

No 10-Q data

Gas sales change (other)

No 10-K data

Gas sales growth (other)

No 10-K data

Gas sales volume (other)

No 10-Q data

Gas sales volume change (other)

No 10-K data

Gas storage capacity (other)

No 10-Q data

Gas storage fields (other)

No 10-Q data

Gas storage working capacity (other)

No 10-Q data

Gas transmission & distribution mains (other)

No 10-Q data

Generation by fuel (other)

No 10-Q data

Generation fuel mix (other)

No 10-Q data

Generation hedged (other)

No 10-K data

Generation output hedged (other)

No 10-K data

Generation output sold forward (other)

No 10-K data

Generation sold forward (other)

No 10-K data

Generation volume sold forward (other)

No 10-K data

Grid modernization capital investment (other)

No 10-K data

Gross instantaneous peak demand (other)

No 10-Q data

Gross peak demand (other)

No 10-Q data

Guarantees outstanding (other)

No 10-K data

Heating degree days (other)

No 10-K data

Heating degree days change (other)

Heating degree days increase (other)

No 10-K data

Heating degree-days (other)

No 10-K data

Heating degree-days change (other)

No 10-K data

Hedge coverage (other)

No 10-K data

Hedged average price (other)

No 10-K data

Hedged coal fuel volume (other)

No 10-K data

Hedged fuel cost (other)

No 10-K data

Hedged fuel costs (other)

No 10-K data

Hedged fuel oil volume (other)

No 10-K data

Hedged generation (other)

No 10-K data

Hedged generation average price (other)

No 10-K data

Hedged generation price (other)

No 10-K data

Hedged generation sales (other)

No 10-K data

Hedged generation volume (other)

Hedged power volume (other)

No 10-K data

Hedged uranium volume (other)

No 10-K data

IEIMA capital investment (other)

No 10-Q data

IP former MGP sites (other)

No 10-K data

IP power purchases from EEI (other)

No 10-K data

Illinois auction sales (other)

No 10-K data

Illinois rate base (other)

No 10-K data

Illinois sales share (other)

No 10-K data

Income tax credit carryforwards (other)

No 10-K data

Indebtedness to total capitalization (other)

No 10-K data

Industrial electric sales change (other)

No 10-Q data

Industrial electric sales growth (other)

No 10-K data

Industrial kWh sales growth (other)

No 10-K data

Industrial sales change (other)

No 10-K data

Industrial sales growth (other)

No 10-K data

Infrastructure investment commitment (other)

No 10-K data

Insurance receivable (other)

No 10-K data

Interchange power price (other)

No 10-K data

Interchange revenues (other)

No 10-K data

Interchange sales change (other)

No 10-K data

Interchange sales growth (other)

No 10-K data

Intercompany energy sales (other)

No 10-K data

Intercompany power sale volume (other)

No 10-K data

Interest coverage ratio (other)

No 10-K data

Interest expense sensitivity (other)

No 10-K data

Interest rate sensitivity (other)

No 10-K data

Kilowatthour sales (other)

No 10-Q data

Kilowatthour sales growth (other)

No 10-K data

Large load demand (other)

No 10-K data

MEEIA 2019 plan investment (other)

No 10-K data

MEEIA energy efficiency investment (other)

No 10-K data

MEEIA incentive revenue (other)

No 10-K data

MEEIA net shared benefit revenues (other)

No 10-K data

MEEIA performance incentive (other)

No 10-K data

MEEIA performance incentive revenue (other)

No 10-K data

MEEIA plan investment (other)

No 10-K data

MEEIA plan investment cap (other)

No 10-K data

MEEIA plan net shared benefits target (other)

No 10-K data

MEEIA program investment (other)

No 10-K data

MGP remaining obligation (other)

No 10-K data

MGP remediation liability (other)

No 10-K data

MGP remediation obligation (other)

No 10-K data

MGP remediation sites (other)

No 10-K data

MISO capacity price (other)

No 10-K data

MISO credit exposure (other)

No 10-K data

MISO fall capacity price (other)

No 10-K data

MISO transmission investment (other)

No 10-K data

MISO transmission projects (other)

No 10-K data

MISO transmission projects assigned (other)

No 10-K data

MISO transmission projects awarded (other)

No 10-K data

MYRP forecasted rate base (other)

No 10-K data

MYRP requested ROE (other)

No 10-K data

MYRP requested equity ratio (other)

No 10-K data

MYRP revenue requirement (other)

No 10-K data

MYRP staff recommended ROE (other)

No 10-K data

MYRP staff recommended equity ratio (other)

No 10-K data

Merchant Generation Hedged Fuel Costs (other)

No 10-K data

Merchant Generation Hedged Transportation (other)

No 10-K data

Miles of natural gas transmission and distribution mains (other)

No 10-Q data

Mitigation relief liability (other)

No 10-K data

MoPSC rate order revenue increase (other)

No 10-K data

Money pool borrowing rate (other)

No 10-K data

Money pool interest rate (other)

No 10-K data

Money pool rate (other)

No 10-K data

Multi-value project investment (other)

No 10-K data

Multi-value transmission project investment (other)

No 10-K data

NOL carryforwards (other)

No 10-K data

NOx Annual allowances (other)

No 10-K data

NOx Emission Allowances (other)

No 10-Q data

NOx Ozone allowances (other)

No 10-K data

NOx allowances held (other)

No 10-K data

NOx compliance capex estimate (other)

No 10-K data

NOx emission allowances (other)

NOx emission allowances held (other)

Native electric sales growth (other)

No 10-K data

Native sales growth (other)

No 10-K data

Natural gas contract volume (other)

No 10-K data

Natural gas distribution price-hedged (other)

No 10-K data

Natural gas for distribution hedged (other)

No 10-K data

Natural gas for distribution hedged percentage (other)

No 10-K data

Natural gas for distribution price hedged (other)

No 10-K data

Natural gas for generation hedged (other)

Natural gas for generation hedged percentage (other)

No 10-K data

Natural gas for generation price hedged (other)

No 10-K data

Natural gas hedged (other)

No 10-K data

Natural gas hedged for distribution (other)

No 10-K data

Natural gas hedged for generation (other)

No 10-K data

Natural gas hedged percentage (other)

No 10-Q data

Natural gas hedged percentage for distribution (other)

No 10-K data

Natural gas hedged percentage for generation (other)

No 10-K data

Natural gas main miles (other)

No 10-Q data

Natural gas mains (other)

No 10-Q data

Natural gas mains miles (other)

No 10-Q data

Natural gas price hedged (other)

No 10-K data

Natural gas price hedged for distribution (other)

No 10-K data

Natural gas price hedged for generation (other)

No 10-K data

Natural gas price-hedged (other)

No 10-Q data

Natural gas purchase commitments (other)

No 10-K data

Natural gas rate base (other)

No 10-K data

Natural gas rate increase (other)

No 10-K data

Natural gas rate increase request (other)

No 10-K data

Natural gas rate increase requested (other)

No 10-K data

Natural gas rate request (other)

No 10-K data

Natural gas sales (other)

No 10-Q data

Natural gas sales volume (other)

No 10-Q data

Natural gas storage (other)

No 10-Q data

Natural gas supply hedged (other)

No 10-Q data

Natural gas transmission and distribution mains (other)

No 10-Q data

Net available liquidity (other)

No 10-K data

Net derivative fair value (other)

No 10-K data

Net income sensitivity to power prices (other)

No 10-K data

Net liquidity (other)

No 10-K data

Net liquidity available (other)

No 10-K data

Net operating loss carryforwards (other)

No 10-K data

Net periodic pension cost (other)

No 10-K data

Net shared benefits (other)

No 10-K data

Nonvested performance share units (other)

No 10-K data

Noranda annual power usage (other)

No 10-K data

Noranda annual sales volume (other)

No 10-K data

Noranda annual usage (other)

No 10-K data

Noranda power usage (other)

No 10-K data

Noranda rate-based sales volume (other)

No 10-K data

Noranda sales volume basis (other)

No 10-K data

Noranda sales volume change (other)

No 10-K data

Nuclear COL capitalized costs (other)

No 10-K data

Nuclear decommissioning trust fund (other)

No 10-K data

Nuclear fuel financing used (other)

No 10-K data

Nuclear fuel hedge coverage (other)

No 10-K data

Nuclear fuel hedged (other)

No 10-K data

Nuclear fuel hedged percentage (other)

Nuclear fuel lease financed (other)

No 10-K data

Nuclear fuel lease financing (other)

No 10-K data

Nuclear fuel price hedge coverage (other)

No 10-K data

Nuclear fuel price hedged (other)

Nuclear fuel price hedges (other)

No 10-K data

Nuclear fuel price-hedged (other)

Nuclear fuel refueling outage (other)

No 10-K data

Nuclear insurance coverage (other)

No 10-K data

Nuclear outage days (other)

No 10-K data

Nuclear plant repair cost (other)

No 10-K data

Nuclear refueling outage (other)

No 10-K data

Number Of Reportable Segments (other)

No 10-K data

Number of Reportable Segments (other)

Open coal positions (other)

No 10-K data

Open commodity contract volume (other)

No 10-K data

Open commodity contract volumes (other)

No 10-K data

Open natural gas positions (other)

No 10-K data

Open power positions (other)

No 10-K data

Operating revenue mix (other)

No 10-Q data

PRB coal share (other)

No 10-K data

Past due receivables (other)

No 10-K data

Past due receivables percentage (other)

No 10-K data

Past-due receivables (other)

No 10-K data

Peak Demand (other)

No 10-Q data

Peak day gas throughput (other)

No 10-Q data

Peak day throughput (other)

No 10-Q data

Peak demand (other)

No 10-Q data

Peak electric demand (other)

No 10-Q data

Peak supply capability (other)

No 10-Q data

Pending asbestos lawsuits (other)

No 10-K data

Pension contribution guidance (other)

No 10-K data

Pension contributions expected (other)

No 10-K data

Pension plan funded status (other)

No 10-Q data

Performance share units (other)

No 10-K data

Planned annual equity (other)

No 10-K data

Planned annual equity issuance (other)

No 10-K data

Planned capital expenditures (other)

No 10-K data

Planned capital investment (other)

No 10-K data

Planned data center load (other)

No 10-K data

Planned equity issuance (other)

No 10-K data

Planned load growth (other)

No 10-K data

Positions eliminated (other)

No 10-K data

Powder River Basin coal (other)

No 10-Q data

Powder River Basin share (other)

No 10-Q data

Power contract volume (other)

No 10-K data

Power generation hedged (other)

No 10-Q data

Power procured for customers (other)

No 10-Q data

Power sold forward (other)

No 10-K data

Power volume hedged (other)

No 10-K data

Price hedged percentage (other)

No 10-K data

Price per ton of delivered coal (other)

No 10-Q data

Price-hedged requirements (other)

No 10-K data

Price-hedged supply (other)

No 10-Q data

Price-hedged supply percentage (other)

No 10-K data

Procured power share (other)

No 10-Q data

Projected rate base (other)

No 10-K data

Propane-air plants (other)

No 10-Q data

Purchased power (other)

No 10-K data

Purchased power commitments (other)

No 10-K data

Purchased power cost decrease (other)

No 10-K data

Purchased power cost increase (other)

No 10-K data

Purchased power decrease (other)

No 10-K data

Purchased power hedged (other)

No 10-K data

Purchased power hedged percentage (other)

Purchased power price hedged (other)

No 10-K data

Purchased power price-hedged (other)

Purchased power share (other)

No 10-Q data

Q3 earnings increase (other)

No 10-K data

Quarterly common dividend (other)

No 10-K data

ROE sensitivity (other)

No 10-K data

RPS renewable share (other)

No 10-Q data

Rate base (other)

Rate base growth (other)

No 10-K data

Rate case ROE request (other)

No 10-K data

Rate case equity ratio (other)

No 10-K data

Rate case request (other)

No 10-K data

Rate case staff recommendation (other)

No 10-K data

Rate increase approved (other)

No 10-K data

Rate increase requested (other)

No 10-K data

Ratio of earnings to fixed charges (other)

Realized interchange power price (other)

No 10-K data

Receivables past due (other)

No 10-K data

Receivables past due or deferred (other)

No 10-K data

Recognized ROE (other)

No 10-K data

Recognized ROE basis (other)

No 10-K data

Reconciliation adjustment request (other)

No 10-K data

Refueling outage duration (other)

No 10-K data

Regulated revenue share (other)

Renewable energy credits (other)

No 10-K data

Renewable generation investments (other)

No 10-K data

Requested electric rate increase (other)

No 10-K data

Requested return on equity (other)

No 10-K data

Requirements hedged (other)

No 10-K data

Residential and commercial sales change (other)

No 10-Q data

Residential annual electric bill (other)

No 10-Q data

Residential electric bill (other)

No 10-Q data

Residential electric sales growth (other)

No 10-K data

Residential gas sales (other)

No 10-K data

Residential gas volume sales (other)

No 10-K data

Residential kWh sales growth (other)

No 10-K data

Residential kWh usage (other)

No 10-Q data

Residential revenue per kWh (other)

No 10-Q data

Residential revenue per kilowatthour (other)

No 10-Q data

Residential sales change (other)

No 10-K data

Residential sales growth (other)

No 10-K data

Residential usage (other)

No 10-Q data

Residential usage per customer (other)

No 10-Q data

Retail direct access phase-in (other)

No 10-K data

Retail sales volume change (other)

No 10-K data

Retail sales volume growth (other)

No 10-K data

Return on equity (other)

No 10-K data

Revenue mix by source (other)

No 10-Q data

Revenue per kWh (other)

No 10-Q data

Revenue per kilowatt-hour (other)

No 10-Q data

Revenue per kilowatthour (other)

No 10-Q data

Revenue requirement (other)

No 10-K data

Revenue requirement increase (other)

No 10-K data

Rush Island Energy Center net plant balance (other)

No 10-K data

Rush Island net plant (other)

No 10-K data

Rush Island net plant balance (other)

No 10-K data

Rush Island rate base (other)

No 10-K data

SO2 Emission Allowances (other)

No 10-Q data

SO2 allowances held (other)

No 10-K data

SO2 emission allowances (other)

SO2 emission allowances held (other)

Sales growth (other)

No 10-K data

Scheduled outage maintenance expense (other)

No 10-K data

Service area (other)

No 10-K data

Service population (other)

No 10-Q data

Service territory (other)

No 10-Q data

Service territory area (other)

Shares outstanding (other)

Short-term borrowing capacity (other)

No 10-K data

Short-term borrowings (other)

No 10-K data

Short-term borrowings outstanding (other)

No 10-K data

Short-term debt authorization (other)

No 10-K data

Short-term debt capacity (other)

No 10-K data

Smart Energy Plan (other)

No 10-K data

Smart Energy Plan investment (other)

No 10-K data

Smart Energy Plan investments (other)

No 10-K data

Smart grid capital cost (other)

No 10-K data

Smart meter penetration (other)

No 10-Q data

Source of energy supply (other)

No 10-Q data

Spent fuel storage capacity through (other)

No 10-K data

Storm restoration capex (other)

No 10-K data

Storm restoration workforce (other)

No 10-K data

Summer capacity price (other)

No 10-K data

Supply hedged for 2019 (other)

No 10-Q data

TCJA excess collections regulatory liability (other)

No 10-K data

TCJA operating cash flow impact (other)

No 10-K data

TCJA rate base increase (other)

No 10-K data

Taum Sauk insurance receivable (other)

No 10-K data

Taum Sauk rebuild cost (other)

No 10-K data

Tax credit carryforwards (other)

No 10-K data

Tax credit transfers (other)

No 10-K data

Tax credit transfers planned (other)

No 10-K data

Total contractual obligations (other)

No 10-K data

Total kWh sales growth (other)

No 10-K data

Total kilowatthour sales growth (other)

No 10-K data

Total liquidity (other)

No 10-K data

Total other obligations (other)

No 10-K data

Transmission capital expenditures (other)

No 10-K data

Transmission capital investment plan (other)

No 10-K data

Transmission investment guidance (other)

No 10-K data

Transmission rate base growth (other)

No 10-K data

Transmission revenue requirement (other)

No 10-K data

Transmission revenue requirements (other)

No 10-K data

Transportation hedged price (other)

No 10-K data

Transportation hedged volume (other)

No 10-K data

Treasury sensitivity (other)

No 10-K data

UE former MGP sites (other)

No 10-K data

UE power purchases from EEI (other)

No 10-K data

Underground distribution share (other)

No 10-Q data

Underground gas storage (other)

No 10-Q data

Underground gas storage capacity (other)

No 10-Q data

Underground gas storage fields (other)

No 10-Q data

Underground natural gas storage fields (other)

No 10-Q data

Union bargaining coverage (other)

No 10-Q data

Union representation (other)

No 10-Q data

Union represented employees (other)

No 10-Q data

Union workforce share (other)

No 10-K data

Union-represented employees (other)

No 10-Q data

Unrecognized tax benefits (other)

No 10-K data

Unused credit facility availability (other)

No 10-K data

Weather margin effect (other)

No 10-K data

Weather-normalized gas sales change (other)

No 10-Q data

Weather-normalized retail sales change (other)

No 10-Q data

Weather-sensitive residential electric sales growth (other)

No 10-K data

Weather-sensitive sales growth (other)

No 10-K data

Weighted average diluted shares (other)

No 10-K data

Weighted average fuel cost (other)

No 10-Q data

Weighted average shares (other)

No 10-K data

Weighted-average common shares outstanding (other)

No 10-K data

Weighted-average shares basic (other)

No 10-K data

Weighted-average shares diluted (other)

No 10-K data

Wholesale kWh sales growth (other)

No 10-K data

Wind capacity under agreement (other)

No 10-Q data

Wind generation capital expenditure (other)

No 10-K data

Workforce remote working (other)

No 10-K data

Working capital deficit (other)

No 10-K data

Year 2000 assessment phase completion (other)

No 10-K data

Year 2000 external costs (other)

No 10-K data

Year 2000 external costs incurred (other)

No 10-K data

Year 2000 implementation/testing completion (other)

No 10-K data

Year 2000 planning phase completion (other)

No 10-K data

Year 2000 remediation completion (other)

No 10-K data

Year 2000 remediation progress (other)

No 10-K data

Zero emission credit commitment (other)

No 10-K data

Natural Gas Sales (production_volume)

Underground natural gas storage fields (properties)

Coal-fired generation capacity (renewable_capacity)

Source of Energy Supply (renewable_energy_pct)

Service area (square_footage)

No 10-K data

Peak Day Throughput (throughput)

No 10-Q data

Gas Mains (transmission_miles)

MMBtu sales (units_shipped)

Equivalent availability (utilization_rate)

Human capital disclosures. Workforce totals and demographics are point-in-time. Flow metrics use the year-to-date period for 10-Q and full year for 10-K. Workforce actions (RIFs, restructurings, acquisition-related changes) are listed in the table at the bottom.

Workforce Totals

No 10-Q data

Demographics

No 10-Q data
No 10-Q data
No 10-Q data
No 10-Q data
No 10-Q data
No 10-Q data
No 10-Q data
No 10-Q data
No 10-Q data
No 10-Q data
No 10-Q data
No 10-Q data

Workforce Breakdowns

No 10-Q data
No 10-Q data
No 10-Q data
No 10-Q data
No 10-Q data
No 10-Q data

HCM Metrics — Point-in-Time

No 10-Q data

HCM Metrics — Flow (Annual / YTD)

No 10-Q data

Workforce Actions

Period EndTypeStatusAffected% WorkforceAnnouncedExpected CompletionGeographySegment / FunctionChargeSourceNote
2024-12-31plant_closurecompleted2023-092024-10-15MissouriAmeren Missouri — Rush Island Energy Center (coal-fired generation)MD&A
f5-10k / GLM-5.3-flash-HTML
Coal-fired energy center retired October 15, 2024, following a September 2023 court modification of the NSR/Clean Air Act remedy order permitting early retirement in lieu of installing a flue gas desulfurization system. No workforce headcount impact quantified in the filing. Retirement costs (~$476 million, including unrecovered net plant balance) financed via securitized utility tariff bonds issued December 2024; a separate $59 million 2024 charge related to court-ordered mitigation programs (electric school buses and air purifiers), not to severance.
2024-06-30othercompleted12024-04-052024-03-22MissouriCorporate / ExecutiveUSD 1 (millions)other
f5-10q / Qwen3.6-27B-Q8_0
Separation of Bhavani Amirthalingam, Executive Vice President and Chief Customer and Technology Officer. Agreement signed April 5, 2024, effective separation date March 22, 2024. Includes lump sum severance of $1,112,875.
2023-12-31plant_closureannounced2023-092024-10-15Jefferson County, Missouri, United StatesAmeren Missouri — coal-fired generationUSD 519 (millions)other
f5-10k / GLM-5.3-flash-HTML
September 2023 court-modified remedy order set an October 15, 2024 retirement, accelerating the previously planned 2025 closure. Charge is a November 2023 MoPSC securitization petition covering retirement-related costs, not severance. Net plant balance of $530 million classified as plant to be abandoned. Plant operating as MISO system support resource until retirement. No workforce headcount impact quantified.
2022-12-31plant_closurecompleted2022-12MissouriAmeren Missouri — coal-fired electric generationItem_1_Business
f5-10k / GLM-5.3-flash-HTML
Coal-fired Meramec Energy Center retired at the end of its useful life in December 2022; December 2021 MoPSC rate order set a five-year recovery period for certain Meramec costs. Filing does not quantify any headcount impact.
2022-12-31plant_closureannounced2022-062025MissouriAmeren Missouri — coal-fired electric generationItem_1_Business
f5-10k / GLM-5.3-flash-HTML
Retirement of Rush Island Energy Center accelerated from 2039 to 2025, primarily due to NSR/Clean Air Act litigation; subject to district court ruling on modification of the 2019 remedy order. Ameren expects to seek MoPSC approval to securitize retirement costs; net plant balance ~$0.6 billion at Dec 31, 2022. No workforce impact quantified.
2014-12-31divestiture_reductioncompleted2013-12-022013-12-02IllinoisNew AER (Merchant Generation)discontinued_operations_footnote
f5-10k / Qwen3.6-27B-Q8_0
Divestiture of New AER to IPH completed in December 2013. Pension obligations for current/former employees retained by Ameren. Specific headcount reduction not explicitly quantified in the filing, but operations were discontinued.
2014-12-31divestiture_reductioncompleted2014-01-312014-01-31IllinoisMedina Valley (Elgin, Gibson City, Grand Tower energy centers)discontinued_operations_footnote
f5-10k / Qwen3.6-27B-Q8_0
Sale of Elgin, Gibson City, and Grand Tower gas-fired energy centers to Rockland Capital completed in January 2014. Specific headcount reduction not explicitly quantified.
2013-12-31divestiture_reductioncompleted2013-03-142013-12-02IllinoisMerchant Generation (New AER; reported as discontinued operations)discontinued_operations_footnote
f5-10k / GLM-5.3-flash-HTML
No headcount disclosed; the filing states a significant number of employees left Ameren coincident with the December 2, 2013 closing of the New AER divestiture to IPH. Pension and postretirement obligations were remeasured at closing, producing a $19 million pretax curtailment gain recorded in discontinued operations; union employees not eligible to retire transferred to IPH with assumed collective bargaining agreements. The separate $201 million pretax loss on disposal for New AER is a divestiture loss, not a severance charge. A 2011 voluntary separation program (approximately 340 employees, $28 million charge) discussed in the filing is prior-year activity and excluded per current-fiscal-year scoping.
2013-12-31divestiture_reductioncompleted2013-03-142013-12-02United StatesMerchant Generation (New AER)discontinued_operations_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Divestiture of New AER to IPH closed December 2, 2013; filing states a significant number of employees left Ameren coincident with closing but does not quantify headcount removed
2013-12-31divestiture_reductioncompleted2013-10-012014-01-31United StatesElgin, Gibson City and Grand Tower gas-fired energy centersdiscontinued_operations_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Sale to Rockland Capital completed January 31, 2014 (subsequent event); no headcount disclosed
2013-12-31voluntary_separationcompleted3402011-10-012011-12-31MissouriAmeren Missouri and Ameren ServicesUSD 28 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Voluntary separation offers extended in Q4 2011; 340 employees accepted and left by Dec 31, 2011. Pretax charge of $28 million recorded in 2011. Substantially all costs paid in Q1 2012.
2013-12-31divestiture_reductioncompleted2013-03-142013-12-02IllinoisNew AER (Merchant Generation)discontinued_operations_footnote
f5-10k / Qwen3.6-27B-Q8_0
Divestiture of New AER to IPH completed Dec 2, 2013. Significant number of employees left Ameren coincident with divestiture. Specific headcount not disclosed.
2013-09-30divestiture_reductionin_progress2013-03-142013-12-31United StatesMerchant Generation (New AER)MD&A
f5-10q / Qwen3.6-27B-Q8_0
Ameren entered into agreement to divest New AER. Filing anticipates reduction in employees and resulting curtailment gain in pension plans, but does not disclose specific headcount numbers for the divestiture.
2013-09-30othercompletedMissouriAmeren MissouriMD&A
f5-10q / Qwen3.6-27B-Q8_0
Filing mentions 'Ameren Illinois staff additions to comply with the requirements of the IEIMA' and 'Ameren Missouri... wage increases', but provides no specific headcount figures for these changes.
2013-06-30voluntary_separationcompletedMissouriAmeren MissouriUSD 25 (millions)MD&A
f5-10q / Qwen3.6-27B-Q8_0
Filing notes the absence of $25 million in severance payments made in 2012 as a result of voluntary separation offers extended to Ameren Missouri employees in Q4 2011. No new voluntary separation programs or headcount counts are disclosed for the current period.
2013-06-30otherin_progressIllinoisAmeren IllinoisMD&A
f5-10q / Qwen3.6-27B-Q8_0
Filing discloses 'Ameren Illinois staff additions to comply with the requirements of the IEIMA' contributing to increased labor costs. Specific headcount numbers are not provided.
2013-06-30divestiture_reductionin_progress2013-03-142013-12-31United StatesMerchant Generation (AER)MD&A
f5-10q / Qwen3.6-27B-Q8_0
Ameren entered into an agreement to divest New AER. The filing anticipates a reduction in employees and a curtailment gain in pension plans upon closing, but does not disclose the specific number of employees affected.
2013-03-31divestiture_reductionannounced2013-03-142013-12-31United StatesMerchant GenerationMD&A
f5-10q / Qwen3.6-27B-Q8_0
Ameren entered into agreement to divest New AER to IPH. Anticipates reduction in employees caused by divestiture will result in curtailment in pension and postretirement benefit plans.
2012-12-31othercompleted2012IllinoisMerchant Generation (Electric Energy, Inc. - EEI)USD 2 (millions)MD&A
f5-10k / GLM-5.3-flash-HTML
EEI reduced its workforce in 2012; the program resulted in a $2 million pension and management postretirement plan curtailment loss recognized in 2012, and is expected to reduce EEI's annual pretax other operations and maintenance expense by $2-3.5 million going forward. Filer does not state voluntary or involuntary character or affected headcount.
2012-12-31voluntary_separationcompleted2012IllinoisMerchant GenerationUSD 1 (millions)other
f5-10k / GLM-5.3-flash-HTML
Merchant Generation initiated separation programs consistent with Ameren's standard management separation program; $1 million pretax charge recorded in 2012 in other operations and maintenance expense (comparative charges of $4 million in each of 2011 and 2010). Affected headcount not disclosed. Only current-year (2012) charge extracted.
2012-12-31voluntary_separationcompletedUnited StatesMerchant GenerationUSD 1 (millions)other
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Filer states the segment initiated separation programs in each of 2012, 2011 and 2010 under its standard management separation program; pretax charges were $1 million in 2012, $4 million in 2011 and $4 million in 2010. Number of positions affected in 2012 is not disclosed. Only the 2012 charge is captured here.
2012-12-31voluntary_separationcompleted3402011-10-012011-12-31MissouriAmeren Missouri and Ameren ServicesUSD 28 (millions)Note 1 - Summary of Significant Accounting Policies
f5-10k / Qwen3.6-27B-Q8_0
Approximately 340 employees accepted offers and left by Dec 31, 2011. Pretax charge of $28 million recorded in 2011.
2012-12-31restructuringcompleted2012-01-012012-12-31IllinoisMerchant Generation (EEI)MD&A - Outlook
f5-10k / Qwen3.6-27B-Q8_0
EEI reduced its workforce in 2012. Specific headcount not disclosed.
2012-12-31restructuringcompleted2012-01-012012-12-31MissouriAmeren MissouriMD&A - Other Operations and Maintenance Expenses
f5-10k / Qwen3.6-27B-Q8_0
Staff reductions at Ameren Missouri contributed to decreased labor costs. Specific headcount not disclosed.
2012-09-30reduction_in_forcecompleted442012-06-012012-09-30IllinoisMerchant Generation (EEI); management and labor union represented employeesUSD 1 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
EEI announced in June 2012 a workforce reduction of 44 employees in response to lower demand and prices for electricity; substantially complete by end of September 2012. Ameren and Genco each recorded a $1 million pretax charge to Other operations and maintenance. The reduction also triggered a curtailment of EEI's pension and postretirement benefit plans.
2012-09-30voluntary_separationcompleted3402011-12-312011-12-31MissouriAmeren Missouri and Ameren ServicesMD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Approximately 340 employees of Ameren Missouri and Ameren Services accepted voluntary separation offers and left the company as of December 31, 2011; estimated annual $20 million reduction in labor-related operations and maintenance expense in 2012. Action occurred in prior fiscal year, disclosed as context in this 10-Q.
2012-09-30restructuringcompleted442012-06-012012-09-30United StatesMerchant Generation (EEI)USD 1 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
EEI reduced workforce by 44 employees (management and union-represented) in response to lower electricity demand and prices; substantially complete by end of September 2012. $1M pretax charge recorded in Other O&M for both Ameren and Genco. Also triggered a $2M curtailment loss on EEI's pension and postretirement plans.
2012-09-30restructuringcompleted442012-06-012012-09-30Merchant GenerationUSD 2 (millions)MD&A
f5-10q / Qwen3.6-27B-Q8_0
EEI announced workforce reduction of 44 employees (management and labor union). Substantially complete by end of September 2012. Ameren and Genco each recorded $1 million pretax charge.
2012-06-30reduction_in_forceannounced442012-062012-09-30IllinoisMerchant Generation (EEI)USD 1 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
EEI announced a workforce reduction of 44 management and union-represented employees in response to lower electricity demand and prices; affected employees to depart during Q3 2012; management employees receive standard severance benefits; charge recorded to Other Operations and Maintenance in Q2 2012; potential pension/postretirement plan curtailment gain or loss under evaluation for Q3 2012.
2012-06-30voluntary_separationcompleted3402011-10-012011-12-31MissouriAmeren Missouri and Ameren ServicesUSD 32 (millions)MD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Approximately 340 employees of Ameren Missouri and Ameren Services accepted voluntary separation offers and departed as of December 31, 2011; severance payments of $32 million were made during the first six months of 2012; estimated $20 million annual reduction in labor-related O&M expense in 2012.
2012-06-30layoffcompleted20112011-12-31IllinoisMerchant Generation (Genco)USD 2 (millions)MD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Genco made severance payments totaling $2 million in 2011 for an involuntary separation program; employee count not disclosed.
2012-06-30otherin_progress2012-06-30IllinoisAmeren IllinoisMD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Nine collective bargaining agreements between Ameren Illinois and IBEW expired June 30, 2012 and were extended while negotiations continue; Ameren Illinois seeking concessions on certain benefit provisions; work stoppage could materially affect results.
2012-06-30reduction_in_forceannounced442012-062012-09-30United StatesMerchant Generation (EEI)USD 1 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
EEI announced reduction of 44 employees (management and union-represented) in response to lower electricity demand and prices; departures during Q3 2012. A $1M pretax charge recorded in Q2 2012 to Other O&M. EEI evaluating pension/postretirement curtailment gain or loss for Q3 2012.
2012-06-30reduction_in_forceannounced2012United StatesMerchant Generation (Joppa energy center)MD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Ameren announced a workforce reduction at its Joppa energy center during 2012; no employee count or charge disclosed in this filing.
2012-06-30reduction_in_forceannounced442012-06-012012-09-30Merchant GenerationUSD 1 (millions)MD&A
f5-10q / Qwen3.6-27B-Q8_0
EEI announced reduction of 44 employees (management and labor union) in response to lower demand/prices. $1 million pretax charge recorded to Other Operations and Maintenance.
2012-03-31voluntary_separationcompleted3402011-10-012011-12-31MissouriAmeren Missouri and Ameren ServicesUSD 30 (millions)MD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Approximately 340 employees accepted voluntary separation offers and left as of December 31, 2011; severance payments of $30 million were made in Q1 2012 ($25 million at Ameren Missouri). Ameren estimates an annual $20 million reduction in operations and maintenance expense beginning in 2012.
2012-03-31plant_closurecompleted2011-12-312011-12-31IllinoisMerchant GenerationMD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Closure of the Meredosia and Hutsonville energy centers at the end of 2011; associated severance payments were made during Q1 2012. No affected-employee count disclosed.
2011-12-31voluntary_separationcompleted3402011-12-31MissouriAmeren Missouri and Ameren ServicesUSD 28 (millions)other
f5-10k / GLM-5.3-flash-HTML
Offers extended to eligible management and union-represented employees in the fourth quarter of 2011 under Ameren's standard management separation program; approximately 340 employees accepted and departed by December 31, 2011. Ameren recorded a pretax severance charge of $28 million, of which $27 million at Ameren Missouri (to be sought for recovery in its pending electric rate case). Estimated annual $20 million reduction in operations and maintenance expense beginning 2012; substantially all severance payable in Q1 2012 and accrued in accounts and wages payable at year-end.
2011-12-31plant_closurecompleted902011-12-31IllinoisMerchant Generation (Genco) — Meredosia and Hutsonville energy centersUSD 4 (millions)other
f5-10k / GLM-5.3-flash-HTML
Genco ceased operations of the four units at the Meredosia and Hutsonville coal-fired energy centers at the end of 2011, driven primarily by expected compliance costs under the CSAPR and MATS and the absence of a MISO multiyear capacity market. The closure eliminated 90 positions; Ameren and Genco each recorded a $4 million pretax charge for related severance and relocation costs. Separate noncash impairments of $26 million (remaining net plant investment) and $4 million (materials and supplies) were also recorded; severance substantially payable in Q1 2012.
2011-12-31voluntary_separationcompleted3402011-10-012011-12-31United StatesAmeren Missouri and Ameren ServicesUSD 28 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Approximately 340 employees accepted voluntary separation offers and left by December 31, 2011; Ameren recorded a $28 million pretax charge and Ameren Missouri $27 million; $27 million to be sought in Ameren Missouri's pending electric rate case
2011-12-31plant_closurecompleted902011-12-312011-12-31United StatesMerchant Generation (Genco) — Meredosia and Hutsonville energy centersUSD 4 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Closure of four units at end of 2011 eliminated 90 positions; Ameren and Genco each recorded a $4 million pretax charge for severance and relocation costs, substantially paid in Q1 2012; closure driven by expected CSAPR and MATS compliance costs
2011-12-31voluntary_separationcompleted3402011-Q42011-12-31MissouriAmeren Missouri and Ameren ServicesUSD 28 (millions)MD&A
f5-10k / Qwen3.6-27B-Q8_0
Approximately 340 employees accepted voluntary separation offers in Q4 2011. Pretax charge of $28 million recorded.
2011-12-31plant_closurecompleted9020112011-12-31IllinoisGencoUSD 4 (millions)MD&A
f5-10k / Qwen3.6-27B-Q8_0
Closure of Meredosia and Hutsonville energy centers resulted in elimination of 90 positions. Pretax charge of $4 million recorded.
2011-09-30voluntary_separationannounced7152011-10-212011-12-31MissouriAmeren Missouri and Ameren Services; management and labor union-represented employees aged 58 or oldersubsequent_events
f5-10q / GLM-5.3-flash-fp4-HTML
Voluntary separation offer extended to approximately 715 eligible employees; acceptance deadline December 22, 2011; benefits consistent with standard management severance benefits; part of efforts to reduce operations and maintenance expenses.
2011-09-30plant_closureannounced902011-10-042011-12-31IllinoisMerchant Generation - Genco Meredosia and Hutsonville energy centers (four operating units)USD 35 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Closure driven primarily by expected cost of complying with CSAPR and lack of a multi-year MISO capacity market. Charges comprise $26 million non-cash impairment of plant book value, $5 million non-cash impairment of materials and supplies, and $4 million estimate for future cash severance costs; severance substantially expected to be paid in Q1 2012. Previously recorded AROs for these centers were $38 million.
2011-09-30plant_closureannounced902011-10-042011-12-31IllinoisMerchant GenerationUSD 4 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Closure of four units at Meredosia and Hutsonville energy centers; includes $26M plant impairment and $5M materials impairment in addition to $4M severance estimate. Primarily driven by CSAPR compliance costs.
2011-09-30voluntary_separationannounced7152011-10-212011-12-31MissouriAmeren Missouri and Ameren Servicessubsequent_events
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Voluntary separation offer to approximately 715 management and union-represented employees aged 58 or older as of December 31, 2011; decision deadline December 22, 2011; benefits consistent with standard management severance.
2011-09-30voluntary_separationannounced7152011-10-212011-12-31MissouriManagement and labor union-represented employees at Ameren Missouri and Ameren Servicessubsequent_events
f5-10q / Qwen3.6-27B-Q8_0
Voluntary separation offer extended to approximately 715 management and labor union-represented employees who are 58 years of age or older as of December 31, 2011. Acceptances expected by December 22, 2011, with employment ending by December 31, 2011.
2011-06-30otherin_progress925United StatesMultiple (IBEW, IUOE, LIUNA, NCF&O, UA represented employees)MD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Collective bargaining agreements covering ~925 employees expire throughout 2011; contracts with multiple unions expired June 30, 2011 and are being extended while negotiations continue. Company notes potential work stoppage risk.
2010-12-31reduction_in_forcein_progress2010Illinois and MissouriMerchant GenerationUSD 4 (millions)other
f5-10k / GLM-5.3-flash-HTML
Filer terms this an involuntary separation program initiated in 2010 to reduce additional positions in the Merchant Generation segment. Pretax severance charge of $4 million recorded in 2010 (also cited in MD&A); roughly $2 million remained accrued in other current liabilities at December 31, 2010. Follows 2009 voluntary and involuntary separation programs that eliminated about 300 positions with a $17 million charge.
2010-12-31restructuringin_progress2010-01-01United StatesMerchant GenerationUSD 4 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
2010 involuntary separation programs at Ameren's Merchant Generation segment; approximately $2 million accrued at December 31, 2010. Number of positions eliminated not disclosed for 2010.
2010-12-31voluntary_separationcompleted2010Merchant GenerationUSD 4 (millions)MD&A
f5-10k / Qwen3.6-27B-Q8_0
Ameren's Merchant Generation segment initiated additional involuntary separation programs in 2010. Pretax charge of $4 million recorded for severance costs.
2010-12-31restructuringcompleted30020092009-12-31Management and Merchant GenerationUSD 17 (millions)MD&A
f5-10k / Qwen3.6-27B-Q8_0
Program initiated in 2009. Approximately 300 positions eliminated. Substantially entire amount paid prior to Dec 31, 2009. Included in 2010 filing for context of ongoing workforce changes.
2010-09-30reduction_in_forcecompleted752010-05-012010-06-30United StatesMerchant GenerationMD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Reduction of 75 full-time positions effective during the second quarter of 2010, coupled with other planned spending reductions, expected to reduce 2010 other operations and maintenance expenses to approximately $300 million, roughly 10% below 2009.
2010-09-30reduction_in_forcecompleted752010-05-012010-06-30United StatesMerchant GenerationMD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Announced in May 2010; reduction of 75 full-time positions effective during Q2 2010 as part of cost-reduction efforts in the Merchant Generation segment.
2010-09-30voluntary_separationcompleted2009-01-01MissouriAmeren Missouri (UE)USD 7 (millions)other
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Costs for voluntary and involuntary separation programs incurred in 2009; regulatory asset of $7 million recognized in Q2 2010, amortized over three years. Employee count not disclosed.
2010-09-30voluntary_separationcompleted2009-01-01IllinoisAmeren Illinois (CIPS, CILCO, IP)USD 3 (millions)other
f5-10q / MiMo-V2.6-Flash-fp8-HTML
ICC order created a $3 million aggregate regulatory asset for 2009 voluntary and involuntary separation program costs at CIPS, CILCO and IP; amortized over three years from May 2010. Employee count not disclosed.
2010-09-30restructuringcompleted752010-05-012010-06-30United StatesMerchant GenerationMD&A
f5-10q / Qwen3.6-27B-Q8_0
Ameren's Merchant Generation segment announced the reduction of 75 full-time positions effective during the second quarter of 2010.
2010-06-30reduction_in_forcecompleted752010-05-012010-06-30Merchant GenerationMD&A
f5-10q / GLM-5.3-flash-fp4-HTML
In May 2010, Ameren's Merchant Generation segment announced the reduction of 75 full-time positions effective during the second quarter of 2010, coupled with other planned spending reductions expected to lower 2010 other operations and maintenance expenses to approximately $300 million, about 10% lower than 2009.
2010-06-30voluntary_separationcompleted2009-10-01Company-wide (UE and Ameren Illinois Utilities)MD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Voluntary and involuntary employee separation programs initiated in the fourth quarter of 2009 reduced labor costs in 2010; UE recorded a $7 million regulatory asset for these costs, and the ICC created a $3 million regulatory asset for the Ameren Illinois Utilities' 2009 separation program costs, amortized over three years beginning May 2010.
2010-06-30reduction_in_forcecompleted752010-05-012010-06-30United StatesMerchant GenerationMD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Announced in May 2010; positions eliminated effective during Q2 2010. Part of broader cost-reduction plan expected to reduce 2010 O&M expenses to approximately $300 million, about 10% below 2009 levels.
2010-06-30restructuringin_progressIllinoisAmeren Illinois Utilities (CIPS, CILCO, IP)MD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
In response to the ICC April 2010 rate order, the Ameren Illinois Utilities instituted a hiring freeze, substantially reduced contractor use, delayed or canceled projects, and reduced reliability-enhancement capital spending. No headcount reduction count disclosed.
2010-06-30voluntary_separationcompletedMissouriUnion Electric Company (UE)USD 7 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
UE's 2009 voluntary and involuntary employee separation program costs were recognized as a $7 million regulatory asset in Q2 2010 per the MoPSC May 2010 rate order; to be amortized over three years beginning July 2010. Employee count not disclosed.
2010-06-30voluntary_separationcompletedIllinoisAmeren Illinois UtilitiesUSD 3 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
ICC April 2010 rate order created a $3 million aggregate regulatory asset for 2009 voluntary and involuntary separation program costs at the Ameren Illinois Utilities; to be amortized over three years beginning May 2010. Employee count not disclosed.
2010-06-30restructuringcompleted752010-05-012010-06-30United StatesMerchant GenerationMD&A
f5-10q / Qwen3.6-27B-Q8_0
Ameren's Merchant Generation segment announced the reduction of 75 full-time positions effective during the second quarter of 2010.
2010-03-31reduction_in_forceannounced752010-052010-06-30United StatesMerchant GenerationMD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Merchant Generation segment announced in May 2010 it will reduce staffing by approximately 75 positions, effective during the second quarter of 2010; combined with other planned spending reductions, expected to lower 2010 other operations and maintenance expenses to approximately $300 million, roughly 10% below 2009 levels.
2010-03-31reduction_in_forceannounced752010-052010-06-30United StatesMerchant GenerationMD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Announced May 2010, post-quarter. Approximately 75 full-time positions to be eliminated in Q2 2010 as part of cost reductions; expected to reduce 2010 O&M expenses to ~$300M, ~10% below 2009.
2010-03-31restructuringannounced752010-05-01Merchant GenerationMD&A
f5-10q / Qwen3.6-27B-Q8_0
Announced in May 2010; reduction of approximately 75 positions in Merchant Generation segment.
2009-12-31voluntary_separationcompleted2009United States (Missouri and Illinois)Management employees at UE, CIPS, Genco, CILCO and IPrestructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Initiated in the third quarter of 2009, offering eligible management employees severance consistent with the standard management program. Positions eliminated under this program were not separately disclosed; combined with the involuntary separation program and Genco staff reductions, approximately 300 positions were eliminated in 2009. Severance is part of a combined $17 million pretax charge broken out only by registrant (UE $8M, CIPS $1M, Genco $5M, CILCO $2M, IP $1M). Substantially all of the amount was paid before December 31, 2009.
2009-12-31layoffcompleted2009-11United States (Missouri and Illinois)Management positions across UE, CIPS, Genco, CILCO and IPrestructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Involuntary separation program initiated in November 2009 to reduce additional management positions under standard severance terms. Count and charge not separately disclosed; combined with the voluntary program and Genco staff reductions, approximately 300 positions were eliminated and a combined $17 million severance charge was recorded in 2009.
2009-12-31restructuringcompleted2009IllinoisMerchant Generation (Genco) – Meredosia, Grand Tower and Hutsonville generating plantsUSD 4 (millions)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Announced in the third quarter of 2009: operational changes and staff reductions at three generating facilities, retirement of two of four units at the Meredosia plant, and a shift of Grand Tower to seasonal May–September operation. The $4 million pretax charge relates to the Meredosia unit retirement and related obsolete inventory (not severance); Genco severance sits within the combined $17 million company-level charge. Approximately 300 positions were eliminated across all 2009 programs combined.
2009-12-31restructuringcompleted3002009-09-302009-12-31United States (Missouri and Illinois)Ameren parent and subsidiaries (UE, CIPS, Genco, CILCO, IP); includes Merchant Generation operational staff reductionsUSD 17 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Consolidated program bundling a Q3 2009 voluntary separation program, a November 2009 involuntary separation program, and Merchant Generation staff reductions; positions eliminated approximately 300. Severance charge split by entity: UE $8M, CIPS $1M, Genco $5M, CILCO $2M, IP $1M. Announcement date reflects quarter-level precision only (voluntary program initiated in Q3 2009). Substantially all of the charge was paid before December 31, 2009. Related operational changes at Genco: two of four Meredosia units retired and Grand Tower converted to seasonal (May–September) operation.
2009-12-31voluntary_separationcompleted2009-01-012009-12-31United StatesManagementItem_1_Business
f5-10k / Qwen3.6-27B-Q8_0
Ameren initiated a voluntary separation program for eligible management employees in 2009. Specific headcount for this component is not isolated from the total.
2009-12-31reduction_in_forcecompleted2009-01-012009-12-31United StatesManagementItem_1_Business
f5-10k / Qwen3.6-27B-Q8_0
Ameren initiated an involuntary separation program to reduce additional management positions in 2009. Specific headcount for this component is not isolated from the total.
2009-12-31restructuringcompleted3002009-01-012009-12-31United StatesMerchant GenerationUSD 17 (millions)Item_1_Business
f5-10k / Qwen3.6-27B-Q8_0
Approximately 300 positions eliminated as a result of voluntary/involuntary separation programs and operational changes at Genco (Meredosia, Grand Tower, Hutsonville plants). Pretax charge of $17 million recorded for severance and staff reductions.
2009-09-30voluntary_separationcompleted2009-09-302009-12-31United States (Missouri and Illinois)Management employees at UE, CIPS, Genco, CILCORP, CILCO, IPUSD 18 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Voluntary separation program initiated in Q3 2009 for eligible management employees; combined with involuntary program and Merchant Generation staff reductions, approximately 300 positions eliminated; charge recorded in other operations and maintenance expense; substantially all expected to be paid by December 31, 2009
2009-09-30layoffannounced2009-11-30United States (Missouri and Illinois)Management employees at Ameren subsidiariesrestructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Involuntary separation program initiated in November 2009 to reduce additional management positions under terms consistent with Ameren's standard management severance program; part of combined ~300 position reduction including voluntary program and Merchant Generation staff reductions
2009-09-30reduction_in_forceannounced2009-09-30United States (Illinois and Missouri)Merchant Generationrestructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Merchant Generation staff reductions announced in Q3 2009; included in the $17.5 million pretax severance charge and the combined ~300 position reduction
2009-09-30plant_closurecompleted2009-09-30United States (Illinois)Genco - Meredosia power plantUSD 4 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Genco recorded a $4 million pretax charge in Q3 2009 for retirement of two generating units at its Meredosia power plant and related obsolete inventory; part of operational changes and staff reductions at three plants (Meredosia, Grand Tower, Hutsonville), with Genco planning to reduce workforce by approximately 80 positions
2009-09-30voluntary_separationcompleted2009-07-012009-12-31United StatesManagement (Ameren subsidiaries including UE, CIPS, Genco, CILCORP, CILCO, IP)USD 18 (millions)other
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Voluntary separation program initiated in Q3 2009 for eligible management employees; charge covers both voluntary and involuntary programs plus Merchant Generation staff reductions. Approximately 300 positions total across all programs. Charge allocated: UE $9M, CIPS $1M, Genco $3M, CILCORP $3M, CILCO $3M, IP $1M.
2009-09-30reduction_in_forceannounced2009-11-012009-12-31United StatesManagement (Ameren subsidiaries)other
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Involuntary separation program initiated in November 2009 to reduce additional management positions; terms consistent with standard management severance program. Included within the $17.5M Q3 charge.
2009-09-30restructuringcompleted2009-07-012009-09-30United StatesMerchant Generation (Genco)USD 4 (millions)other
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Genco recorded a $4M pretax charge in Q3 2009 for retirement of two generating units at Meredosia power plant and related obsolete inventory; includes associated staff reductions.
2009-09-30restructuringin_progress2009-07-01United StatesMerchant Generation (Genco — Meredosia, Grand Tower, Hutsonville plants)MD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Genco announced operational changes and staff reductions at three plants; plans to reduce workforce by approximately 80 positions. Grand Tower to be operated seasonally May–September with limited staff.
2009-09-30voluntary_separationin_progress2009-09-302009-12-31United StatesManagementUSD 18 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Voluntary separation program for eligible management employees initiated in Q3 2009. Charge includes severance costs.
2009-09-30reduction_in_forceannounced2009-11-01United StatesManagementsubsequent_events
f5-10q / Qwen3.6-27B-Q8_0
Involuntary separation program initiated in November 2009 to reduce additional management positions.
2009-09-30restructuringcompleted3002009-09-302009-12-31United StatesVariousrestructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Total positions eliminated including voluntary/involuntary management separations and Merchant Generation staff reductions.
2009-09-30restructuringcompleted802009-09-30United StatesMerchant GenerationMD&A
f5-10q / Qwen3.6-27B-Q8_0
Genco plans to reduce workforce by approximately 80 positions due to staff reductions at Meredosia, Grand Tower, and Hutsonville plants.
2009-06-30reduction_in_forceannounced422009-07-012010-03-31Illinois and MissouriNon-rate-regulated GenerationUSD 2 (millions)MD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Announced July 2009; majority of the 42 eliminated positions effective early September 2009, with a smaller group effective March 2010; estimated severance and related costs of approximately $2 million during 2009.
2009-06-30reduction_in_forceannounced422009-072010-03United StatesNon-rate-regulated GenerationUSD 2 (millions)MD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Announced July 2009; majority of 42 positions effective early September 2009, remainder March 2010. Approximately $2M severance and related costs estimated for 2009.
2009-06-30restructuringcompleted5702009-01-012009-01-01IllinoisSupport ServicesMD&A
f5-10q / Qwen3.6-27B-Q8_0
Approximately 570 Ameren Services employees providing support services to Ameren Illinois Utilities were transferred to CILCO (Illinois Regulated).
2009-03-31othercompleted5702009-01-012009-01-01IllinoisSupport services (Ameren Services to CILCO)MD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Internal transfer of approximately 570 Ameren Services employees providing support services to the Ameren Illinois Utilities to CILCO effective January 1, 2009; no net headcount reduction, employees continue serving CIPS, IP and CILCO. Increased CILCO (Illinois Regulated) other operations and maintenance expense by approximately $16 million in the quarter.
2009-03-31othercompleted5702009-01-012009-01-01IllinoisSupport ServicesMD&A
f5-10q / Qwen3.6-27B-Q8_0
Transfer of approximately 570 Ameren Services employees to CILCO to provide support services to Ameren Illinois Utilities.
2008-12-31othercompletedMissouri and IllinoisItem_1_Business
f5-10k / GLM-5.3-flash-HTML
Labor-relations event: all collective bargaining agreements that expired during 2008 were renegotiated and ratified during the fiscal year. Most renewed agreements carry four- or five-year terms expiring in 2011 and 2012. Unions involved: IBEW, IUOE, NCF&O, and the Laborers and Gas Fitters. No headcount change or associated charge was disclosed; the UE–IUOE Local 148 agreement covering approximately 1,100 employees was not among the expired agreements and remains in effect until June 30, 2009.
2008-12-31othercompleted2008-12-31United StatesAll segmentsItem_1_Business
f5-10k / MiMo-V2.6-Flash-fp8-HTML
All CBAs that expired in 2008 were renegotiated and ratified; most have four- or five-year terms expiring in 2011 and 2012. Affected-employee counts not disclosed.
2008-12-31otherannounced1,1002009-06-30United StatesUE (Union Electric Company)Item_1_Business
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Agreement expires June 30, 2009; disclosed as a forthcoming labor-relations event, not a workforce reduction.
2007-12-31restructuringcompleted2007Corporate-wide (Missouri and Illinois operations)Inactive and ancillary holding-company subsidiaries, including Ameren Energy, Inc. (power marketing and risk management agent for UE)Item_1_Business
f5-10k / GLM-5.3-flash-HTML
Organizational streamlining during late 2007: inactive or ancillary subsidiaries were dissolved, merged or consolidated, including Ameren Energy, Inc., whose power marketing and risk management functions were absorbed by UE. Legal-entity action; no employee headcount impact or associated charge disclosed.
2007-12-31restructuringcompleted2008-022008-02-29Corporate-wide (Missouri and Illinois operations)Development Company; Ameren Energy Resources Company; EEI ownership interestsItem_1_Business
f5-10k / GLM-5.3-flash-HTML
Subsequent to fiscal year-end but completed before the 2008-02-29 filing: Development Company was eliminated through merger and Ameren Energy Resources Company was merged into the newly created Resources Company; UE's and Development Company's 40% EEI ownership interests were transferred to Resources Company on 2008-02-29. Legal-entity reorganization; no employee headcount impact or associated charge disclosed.
2007-12-31otherin_progress2007Missouri and IllinoisUnionized workforce (IBEW, IUOE, NCF&O, Laborers and Gas Fitters)Item_1_Business
f5-10k / GLM-5.3-flash-HTML
2007 collective bargaining cycle: all agreements that expired in 2007 were renegotiated and ratified, except the benefits provisions in IP agreements with IBEW locals 51, 309, 702 and 1306, which remained under negotiation at the filing date with existing provisions in effect. The majority of renewed agreements have four- or five-year terms expiring in 2011 and 2012. Four IP agreements with the Laborers and Gas Fitters unions covering approximately 127 employees expire 2008-06-30.
2005-12-31voluntary_separationcompleted2302004-122005-12-31Illinois, United StatesIP (AmerenIP) — integration-related administrative functionsUSD 26 (millions)business_combinations_footnote
f5-10k / GLM-5.3-flash-HTML
230 IP employees accepted an enhanced voluntary separation opportunity in December 2004; departures occurred throughout 2005 as business needs warranted. Separation costs of $26 million were deferred as a regulatory asset at December 31, 2005 for future recovery from customers, consistent with the ICC order approving Ameren's acquisition of IP. Costs are integration-related, tied to realizing administrative synergies from the acquisition.
2005-12-31voluntary_separationcompleted2302004-12-312005-12-31Illinois, United StatesIllinois Power Company (IP)USD 26 (millions)business_combinations_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
230 IP employees accepted a voluntary separation opportunity in December 2004 with enhanced separation benefits; departures occurred throughout 2005. Separation costs of $26 million deferred as a regulatory asset for future recovery from customers as of 2005-12-31. Consistent with ICC conditions on Ameren's acquisition of IP.
2005-12-31voluntary_separationcompleted2302004-122005-12-31IllinoisIllinois Power Company (IP)USD 26 (millions)Note 2 - Acquisitions
f5-10k / Qwen3.6-27B-Q8_0
230 IP employees accepted a voluntary separation opportunity in December 2004. Separation costs of $26 million were deferred as a regulatory asset. Employees departed throughout 2005.
2005-09-30voluntary_separationin_progress2302004-12IllinoisIllinois Power Company (AmerenIP)USD 25 (millions)MD&A
f5-10q / GLM-5.3-flash-fp4-HTML
December 2004 voluntary separation opportunity at IP with enhanced benefits; employees leaving throughout 2005 as business needs warrant. As of September 30, 2005, $25 million of separation costs deferred as a regulatory asset for future customer recovery, consistent with the ICC order approving the IP acquisition.
2005-09-30voluntary_separationin_progress2302004-12-31United States (Illinois)Illinois Power Company (IP)USD 25 (millions)business_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
230 IP employees accepted a voluntary separation opportunity in December 2004 with enhanced benefits; separations continuing through 2005. $25M separation costs deferred as regulatory asset as of 2005-09-30. Announcement predates this quarter; disclosed as ongoing.
2005-09-30voluntary_separationin_progress2302004-12-01IllinoisIllinois Power Company (IP)USD 25 (millions)business_combinations_footnote
f5-10q / Qwen3.6-27B-Q8_0
230 IP employees accepted voluntary separation opportunity in Dec 2004; leaving throughout 2005. $25M deferred as regulatory asset.
2005-06-30voluntary_separationin_progress2302004-12-01IllinoisIllinois Power Company (AmerenIP)USD 25 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Employees accepted a voluntary separation opportunity in December 2004 with enhanced separation and extended medical/dental benefits; they leave IP throughout 2005 as business needs warrant. Estimated separation costs of $25 million were deferred as a regulatory asset for future customer recovery, consistent with the ICC order approving the IP acquisition.
2005-06-30voluntary_separationin_progress2302004-12-012005-12-31IllinoisIllinois Power Company (IP)USD 25 (millions)business_combinations_footnote
f5-10q / Qwen3.6-27B-Q8_0
230 IP employees accepted voluntary separation opportunity in Dec 2004; estimated separation costs of $25 million deferred as regulatory asset.
2005-03-31voluntary_separationin_progress2302004-12-012005-12-31IllinoisIllinois Power Company (AmerenIP)USD 26 (millions)MD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Employees accepted a voluntary separation opportunity with enhanced separation and extended medical/dental benefits; departures occur throughout 2005 as business needs warrant. Estimated separation costs of $26 million deferred as a regulatory asset for future customer recovery, consistent with the ICC acquisition order.
2005-03-31othercompleted1002005-05-022005-05-02IllinoisUE Illinois electric and natural gas utility businesses transferred to CIPSother
f5-10q / GLM-5.3-flash-fp4-HTML
Intercompany transfer of UE's Illinois-based utility businesses to CIPS included approximately 100 employees; internal reorganization within Ameren, not a headcount reduction.
2005-03-31divestiture_reductioncompleted1002005-05-022005-05-02Illinois, United StatesElectric and natural gas utility businesses (distribution, certain transmission)subsequent_events
f5-10q / MiMo-V2.6-Flash-fp8-HTML
UE transferred approximately 100 employees to CIPS as part of the May 2, 2005 Illinois service territory transfer; accounted for at book value with no gain or loss.
2005-03-31acquisition_additioncompleted2004-09-302004-09-30Illinois, United StatesIllinois Power Company (rate-regulated electric and natural gas T&D)business_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
IP acquisition closed September 30, 2004; no headcount added figure disclosed. IP served 600,000 electric and 415,000 gas customers. Included for context as the acquisition driving current-period workforce composition.
2005-03-31voluntary_separationcompleted2302004-12-012005-12-31Illinois, United StatesIllinois Power CompanyUSD 26 (millions)MD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
230 IP employees accepted a voluntary separation opportunity announced December 2004; employees depart throughout 2005. Estimated separation costs of $26 million deferred as a regulatory asset for future recovery from customers.
2005-03-31voluntary_separationin_progress2302004-12-012005-12-31IllinoisIllinois Power Company (IP)USD 26 (millions)MD&A
f5-10q / Qwen3.6-27B-Q8_0
230 IP employees accepted a voluntary separation opportunity in December 2004; employees will leave throughout 2005. Estimated separation costs of $26 million deferred as regulatory asset.
2004-12-31voluntary_separationin_progress2302004-122005IllinoisIllinois Power Company (AmerenIP)USD 26 (millions)MD&A
f5-10k / GLM-5.3-flash-HTML
230 IP employees accepted an enhanced voluntary separation opportunity (enhanced separation benefit plus extended medical and dental benefits) in December 2004; departures occur throughout 2005 as business needs warrant, consistent with the IP integration plan and ICC acquisition-order conditions on administrative synergies. The estimated $26 million of separation costs was deferred as a regulatory asset for future recovery from customers, per the ICC order.
2004-12-31restructuringcompletedIllinoisCentral Illinois Light Company (CILCO)USD 2 (millions)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
CILCO recorded $2 million of acquisition-integration costs in 2004, primarily severance and relocation; no employee count was disclosed. Amounts were offset against CILCORP goodwill through purchase accounting, so there was no impact on Ameren's consolidated statement of income.
2004-12-31voluntary_separationcompleted2302004-12-012005-12-31IllinoisIllinois Power Company (IP)USD 26 (millions)MD&A
f5-10k / MiMo-V2.6-Flash-fp8-HTML
230 IP employees accepted a voluntary separation opportunity providing enhanced separation benefits and extended medical/dental benefits. Estimated separation costs of $26 million deferred as a regulatory asset for future recovery from customers. Employees depart throughout 2005 as business needs warrant. Consistent with ICC order approving the IP acquisition.
2004-12-31acquisition_additioncompleted1,7222004-09-302004-09-30IllinoisIllinois Power Company (IP)business_combinations_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Ameren completed acquisition of IP from Dynegy on September 30, 2004. IP headcount of 1,722 as of December 31, 2004. IP serves approximately 600,000 electric and 415,000 gas customers.
2004-12-31acquisition_additioncompleted7732003-01-312003-01-31IllinoisCILCORP / CILCObusiness_combinations_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Ameren completed acquisition of CILCORP on January 31, 2003. CILCORP headcount of 4 (parent) plus CILCO headcount of 769 as of December 31, 2004. Included here for context of workforce additions during the reporting period; acquisition completed prior to FY2004.
2004-12-31voluntary_separationin_progress2302004-12-012005-12-31IllinoisIllinois Power Company (IP)USD 26 (millions)MD&A
f5-10k / Qwen3.6-27B-Q8_0
230 IP employees accepted a voluntary separation opportunity in December 2004. Employees will leave throughout 2005 as business needs warrant. Estimated separation costs of $26 million deferred as regulatory asset.
2004-09-30voluntary_separationannounced9502004-112005-12-31IllinoisIP (AmerenIP) employees — certain employee groupsMD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Voluntary separation opportunity for certain IP employee groups, roughly 950 of Ameren's ~9,300 employees; enhanced separation and extended medical/dental benefits; employees must decide by December 20, 2004 and will depart throughout 2005 based on business needs; costs expected to be deferred as a regulatory asset consistent with the ICC acquisition order
2004-09-30acquisition_additioncompleted2004-09-30IllinoisUtility Operations — IP (AmerenIP)business_combinations_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Ameren completed acquisition of Illinois Power Company on September 30, 2004; IP employees transferred into Ameren defined benefit and postretirement plans; specific headcount added not quantified
2004-09-30otherin_progress2004-10-06IllinoisCILCO — IBEW-represented employeesother
f5-10q / GLM-5.3-flash-fp4-HTML
CILCO labor agreement with IBEW-represented employees (about 4% of Ameren's workforce) expired June 30, 2004; final offer rejected September 29, 2004; company implemented offer terms effective October 11, 2004; employees participated in a one-day work stoppage on October 18, 2004 over a work rule grievance
2004-09-30voluntary_separationannounced9502004-11-092005-12-31United States (Illinois)Illinois Power Company (AmerenIP)MD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Voluntary separation opportunity offered to approximately 950 IP employees (of Ameren's total 9,300). Decisions due by 2004-12-20; departures throughout 2005. Costs expected to be deferred as regulatory asset per ICC order.
2004-09-30acquisition_additioncompleted2004-09-302004-09-30United States (Illinois)Illinois Power Company (AmerenIP)business_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Acquisition of Illinois Power Company completed 2004-09-30; IP serves ~600,000 electric and ~415,000 gas customers. No specific employee headcount added disclosed in the filing.
2004-09-30voluntary_separationannounced9502004-11-012005-12-31IllinoisIP Operationssubsequent_events
f5-10q / Qwen3.6-27B-Q8_0
Voluntary separation opportunity for certain IP employee groups; decisions due Dec 20, 2004; departures throughout 2005.
2004-06-30otherin_progress2004-08-29IllinoisCILCOother
f5-10q / GLM-5.3-flash-fp4-HTML
Labor agreements covering IBEW-represented CILCO employees expire August 29, 2004; company presented best and final offer and outcome of negotiations is uncertain
2004-06-30otherin_progress2004-08-29Illinois, United StatesCILCO — IBEW-represented employeesother
f5-10q / MiMo-V2.6-Flash-fp8-HTML
CILCO IBEW labor agreements covering ~4% of Ameren workforce expire 2004-08-29; best and final offer presented, outcome uncertain.
2003-12-31voluntary_separationcompleted5502002Missouri and Illinois, United StatesAmeren consolidated (UE, CIPS, Genco and other subsidiaries)USD 75 (millions)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Voluntary retirement program initiated in fiscal 2002 with a $75M charge (within $92M total 2002 restructuring charges; charge split UE $51M, CIPS $14M, Genco $8M, other $2M), primarily special termination benefits under pension/postretirement plans. Approximately 550 employees accepted retirement in 2002 and departed in early 2003; FY2003 MD&A credits the program with reduced staffing of over 500 and lower 2003 labor costs (~11 cents per share). Percent-of-workforce not computed because the relevant 2002 base headcount is not disclosed.
2003-12-31acquisition_additioncompleted8622003-01-312003-01-31Illinois, United StatesCILCORP Inc. / CILCO (AmerenCILCO)business_combinations_footnote
f5-10k / GLM-5.3-flash-HTML
Ameren completed the acquisition of CILCORP (parent of CILCO) from AES on January 31, 2003; total cost ~$1.4B including $895M assumed debt/preferred stock and $479M cash. The 862 figure is CILCORP's employment (855 at CILCO) as of December 31, 2003 per Item 1; headcount at the acquisition date is not separately disclosed. A related small acquisition of Medina Valley (40 MW gas-fired plant) closed February 4, 2003 with no workforce data disclosed.
2003-12-31restructuringcompleted2003Illinois, United StatesCILCO (AmerenCILCO)USD 21 (millions)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
2003 CILCO acquisition integration costs of $21M comprising $13M software write-offs, $5M severance and relocation costs, and a $3M bad debt reserve increase. Total was offset against CILCORP goodwill through purchase accounting, so no impact on Ameren's consolidated income statement. No affected-employee count disclosed.
2003-12-31othercompleted2003Missouri and Illinois, United StatesUE, CIPS and Genco — eleven IBEW and IUOE bargaining unitsItem_1_Business
f5-10k / GLM-5.3-flash-HTML
New four-year labor agreements entered with the IBEW and IUOE during Q2–Q3 2003 covering eleven bargaining units, approximately 70% of the affected workforces. Terms include no year-one wage increase, 3.5% increases in years two and three, 3.25% in year four, a pension supplement, more flexible work rules and employees bearing a greater share of future medical benefit cost increases. CILCO's separate IBEW agreement expires July 1, 2004.
2003-12-31acquisition_additionannounced2004-02-022004-12-31Illinois, United StatesIllinois Power Company (to operate as AmerenIP)business_combinations_footnote
f5-10k / GLM-5.3-flash-HTML
Definitive agreement with Dynegy signed February 2, 2004 (subsequent event) to acquire Illinois Power and Dynegy's 20% interest in EEI; total transaction value ~$2.3B including ~$1.8B assumed debt and preferred stock. Completion expected by end of 2004, subject to ICC, SEC, FERC, FCC and Hart-Scott-Rodino approvals. No Illinois Power employee count is disclosed in this filing; ~590,000 electric and 415,000 gas customers would be added.
2003-12-31voluntary_separationcompleted5502002-01-012003-06-30United StatesUE, CIPS, Genco, and other Ameren companiesUSD 75 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Charge recorded in 2002; approximately 550 employees voluntarily retired and left in early 2003. MD&A frames the program as a 2003 cost-reduction initiative reducing staffing by over 500 people. Charge breakdown: UE $51M, CIPS $14M, Genco $8M, other $2M.
2003-12-31acquisition_additioncompleted8622003-01-312003-01-31Illinois, United StatesCILCORP / CILCO — electric and natural gas utility operationsbusiness_combinations_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
CILCORP acquired from AES on 2003-01-31 for ~$1.4B total; CILCORP employed 862 (CILCO 855) at year-end 2003. Employees included in Ameren consolidated headcount from acquisition date.
2003-12-31acquisition_additionannounced2004-02-022004-12-31Illinois, United StatesIllinois Power — electric and natural gas transmission and distributionsubsequent_events
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Agreement with Dynegy to purchase Illinois Power stock and 20% of EEI for ~$2.3B total transaction value; employee headcount for Illinois Power not disclosed; expected close by end of 2004 subject to regulatory approvals
2003-12-31voluntary_separationcompleted5002003-01-012003-12-31United StatesCorporate and Operating CompaniesUSD 75 (millions)MD&A
f5-10k / Qwen3.6-27B-Q8_0
Voluntary retirement program initiated in early 2003 reduced staffing levels by over 500 people. Pre-tax charge of $75 million recorded in 2002 for special termination benefits.
2003-09-30voluntary_separationcompletedMissouri and IllinoisAmeren consolidatedMD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Voluntary employee retirement program implemented in early 2003; cited as a driver of lower labor costs in 2003 results. No headcount or charge amount quantified.
2003-09-30othercompleted23%2003-10-012003-10-01IllinoisCILCO generation operations transferred to AERGother
f5-10q / GLM-5.3-flash-fp4-HTML
In October 2003, CILCO transferred approximately 1,100 MW of generating facilities to wholly-owned subsidiary AERG; approximately 23% of CILCO's employees were transferred to AERG as part of the transaction. Internal transfer between entities under common control; no gain or loss recognized.
2003-09-30othercompleted70%2003-09-30Missouri and IllinoisUE (six units), CIPS (one unit), Genco (two units)MD&A
f5-10q / GLM-5.3-flash-fp4-HTML
New four-year labor agreements entered with IBEW and IUOE during second and third quarters of 2003 covering eleven bargaining units and approximately 70% of Ameren's workforce; terms include no year-one wage increase, 3.5% increases in years two and three, 3.25% in year four, a pension supplement, more flexible work rules, and employees paying a greater share of future benefit cost increases.
2003-09-30othercompleted23%2003-10-032003-10-03Illinois, United StatesElectric generation operations (CILCO)MD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Approximately 23% of CILCO's employees transferred to AERG upon transfer of Duck Creek, E.D. Edwards, and Sterling Avenue generating facilities (~1,100 MW). Net book value of transferred assets ~$378 million; no gain or loss recognized as transfer between entities under common control.
2003-09-30othercompletedUnited StatesUE, CIPS, Genco (eleven bargaining units)MD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
New four-year labor agreements entered during Q2 and Q3 2003 covering ~70% of Ameren's workforce. Terms: no wage increase year one; 3.5% increases years two and three; 3.25% year four. Includes pension supplement, flexible work rules, and increased employee share of medical benefit cost increases.
2003-09-30voluntary_separationcompletedUnited StatesAmeren (enterprise-wide)MD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Referenced as a driver of lower labor costs in Q3 2003 and lower O&M expenses. No employee count or charge disclosed in this filing.
2003-09-30voluntary_separationcompleted2003-01-01United StatesCorporate / OperationsMD&A
f5-10q / Qwen3.6-27B-Q8_0
Voluntary retirement program implemented in early 2003 resulted in lower labor costs. Specific headcount not disclosed.
2003-09-30acquisition_additioncompleted2003-01-31IllinoisUtility Operationsbusiness_combinations_footnote
f5-10q / Qwen3.6-27B-Q8_0
Acquisition of CILCORP completed January 31, 2003. Specific headcount added not disclosed.
2003-09-30restructuringcompleted23%2003-10-03IllinoisGenerationother
f5-10q / Qwen3.6-27B-Q8_0
CILCO transferred generation assets to AERG. Approximately 23% of CILCO's employees were transferred to AERG.
2003-06-30voluntary_separationcompleted5502002-12-31United StatesCompany-wideMD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Voluntary retirement program announced in late 2002 was accepted by approximately 550 employees; lower labor costs from the program reduced operations and maintenance expense in 2003
2003-06-30plant_closurecompleted2002-12-31United StatesGenerationMD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Operations suspended at a 1940s-era generating plant to reduce operating costs; no employee count disclosed
2003-06-30otherin_progress52%2003-04-01United StatesIBEW and IUOE bargaining units (11 units)MD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Labor agreements for eleven bargaining units covering 52% of the workforce expired between April 1 and July 1, 2003; tentative agreements reached in July 2003 with seven units expiring in 2006, with ratification pending for some units
2003-06-30otherin_progress29%2003-04-01United StatesThree remaining IBEW/IUOE bargaining unitsMD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Wages and work rules still under negotiation with three bargaining units representing approximately 29% of the workforce
2003-06-30acquisition_additioncompleted2003-01-31IllinoisCILCORP / AmerenCILCOUSD 1,400 (millions)business_combinations_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Acquisition of CILCORP completed January 31, 2003 added utility businesses serving approximately 200,000 electric and 205,000 gas customers; no employee headcount disclosed
2003-06-30voluntary_separationcompleted5502002-12-31United StatesEnterprise-wideMD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Program announced in late 2002 as a cost-mitigation action; accepted by approximately 550 employees.
2003-06-30acquisition_additioncompleted2003-01-312003-01-31Illinois, United StatesUtility Operations (AmerenCILCO)business_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Acquisition of CILCORP (parent of Central Illinois Light Company) completed January 31, 2003; no employee headcount added disclosed.
2003-06-30acquisition_additioncompleted2003-02-042003-02-04United StatesNon-regulated generation (AmerenEnergy Medina Valley Cogen)business_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Acquisition of AES Medina Valley Cogen (No. 4), LLC completed February 4, 2003; no employee headcount added disclosed.
2003-06-30otherin_progress52%2003-04-01United StatesEnterprise-wide (IBEW and IUOE bargaining units)MD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Agreements expired between April 1 and July 1, 2003. Tentative agreements reached with seven units in July 2003; three units (~29% of workforce) still negotiating wages and work rules.
2003-06-30voluntary_separationcompleted5502002-12-312003-06-30United StatesAll segmentsMD&A
f5-10q / Qwen3.6-27B-Q8_0
Voluntary retirement program accepted by approximately 550 employees, announced late 2002.
2003-06-30otherin_progress29%2003-07-01United StatesUnion-represented workforceMD&A
f5-10q / Qwen3.6-27B-Q8_0
Negotiations ongoing with three bargaining units representing approximately 29% of workforce.
2003-03-31voluntary_separationin_progress5502002-12-31United States (Missouri and Illinois service territory)Company-wideMD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Voluntary retirement program announced in late 2002; approximately 550 employees accepted. No completion date or associated charge disclosed.
2003-03-31voluntary_separationin_progress5502002-12-31United StatesAllMD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Voluntary retirement program accepted by approximately 550 employees; announced in late 2002 as part of cost-mitigation measures. No severance charge or completion date disclosed.
2003-03-31acquisition_additioncompleted2003-01-312003-01-31United States (Illinois)Utility Operationsbusiness_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Acquisition of CILCORP (parent of Central Illinois Light Company) completed January 31, 2003; no employee headcount added disclosed.
2003-03-31acquisition_additioncompleted2003-02-042003-02-04United States (Texas)Non-rate-regulated generationbusiness_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Acquisition of AES Medina Valley Cogen (No. 4), LLC (40 MW gas-fired plant) completed February 4, 2003; no employee headcount added disclosed.
2003-03-31voluntary_separationcompleted5502002-12-31MD&A
f5-10q / Qwen3.6-27B-Q8_0
Voluntary retirement program accepted by approximately 550 employees, announced in late 2002.
2002-12-31voluntary_separationcompleted2002-12Item_1_Business
f5-10k / GLM-5.3-flash-HTML
Voluntary retirement program offered in December 2002. The December 10, 2002 Form 8-K reported the program's results and a related fourth-quarter after-tax earnings charge. Participant count and charge amount are contained in incorporated-by-reference financial statement notes (Note 9) and are not stated in this filing.
2002-12-31plant_closurecompleted2002-12IllinoisAmerenEnergy Generating Company — Meredosia coal-fired unitsother
f5-10k / GLM-5.3-flash-HTML
Two coal-fired generating units totaling approximately 126 MW at the Meredosia facility were mothballed in December 2002. The December 10, 2002 Form 8-K also reported generating plant closure information with a related fourth-quarter after-tax charge; the filing does not state an employee impact or charge amount, and it is not confirmed whether the 8-K closure item and the Meredosia mothballing are the same event.
2002-12-31acquisition_additioncompleted2003-01-31IllinoisCILCORP Inc. / Central Illinois Light Company (AmerenCILCO)Item_1_Business
f5-10k / GLM-5.3-flash-HTML
Acquisition of CILCORP from The AES Corporation completed January 31, 2003 (stock purchase agreement dated April 28, 2002), adding the AmerenCILCO rate-regulated electric and gas utility businesses. The acquired entity's employee headcount is not disclosed in this filing; the transaction closed after the December 31, 2002 fiscal year-end and will first affect consolidated headcount in 2003.
2002-12-31acquisition_additioncompleted2003-02-04IllinoisAES Medina Valley Cogen (No. 4), LLC — 40 MW gas-fired cogeneration plant (renamed AmerenEnergy Medina Valley Cogen (No. 4), LLC)Item_1_Business
f5-10k / GLM-5.3-flash-HTML
Acquisition from The AES Corporation completed February 4, 2003, adding a 40 MW gas-fired cogeneration plant to AmerenEnergy Resources Company. The acquired entity's employee headcount is not disclosed; the transaction closed after the December 31, 2002 fiscal year-end.
2002-12-31voluntary_separationcompleted2002-12-012002-12-31United StatesNot specifiedItem_1_Business
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Voluntary retirement program offered in December 2002; results and related Q4 after-tax charge referenced in Form 8-K dated December 10, 2002. Specific employee count and charge amount are in Note 9 of the 2002 Annual Report, incorporated by reference but not reproduced in this filing.
2002-12-31acquisition_additioncompleted2002-04-282003-01-31United States (Illinois)AmerenCILCO — electric and gas utility operationssubsequent_events
f5-10k / MiMo-V2.6-Flash-fp8-HTML
CILCORP Inc. acquisition completed January 31, 2003 (subsequent to fiscal year-end). Total purchase price approximately $1.4 billion. No employee headcount for CILCORP/CILCO disclosed in this filing.
2002-12-31acquisition_additioncompleted2002-04-282003-02-04United States (Illinois)AmerenEnergy Resources Company — gas-fired generationsubsequent_events
f5-10k / MiMo-V2.6-Flash-fp8-HTML
AES Medina Valley Cogen (No. 4) LLC acquisition completed February 4, 2003 (subsequent to fiscal year-end). 40 MW gas-fired plant. No employee headcount disclosed.
2002-12-31voluntary_separationcompleted2002-12Item_1_Business
f5-10k / Qwen3.6-27B-Q8_0
Voluntary retirement program offered in December 2002. Specific headcount and charge details referenced in Notes 9 and 14 of the Consolidated Financial Statements.
2002-12-31voluntary_separationcompleted5502002-12-312003-03-31United StatesAmeren consolidatedUSD 75 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Voluntary retirement program offered to approximately 1,000 of 7,400 employees; 550 accepted. Charge primarily special termination benefits under pension and post-retirement plans. Most employees to depart by March 2003. Pretax charge $75M ($47M net of taxes).
2002-12-31plant_closurecompleted2002-12-31Venice, Illinois, United StatesAmerenUE — rate-regulated electric generationUSD 17 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Retirement of 343 MW rate-regulated capacity at Venice, IL plant combined with temporary suspension of two coal-fired units (126 MW) at Meredosia, IL; combined charge $17M pretax ($11M net of taxes). Employee headcount not separately disclosed.
2002-12-31acquisition_additioncompleted2003-01-312003-01-31Illinois, United StatesAmerenCILCO (Central Illinois Light Company)subsequent_events
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Acquisition of CILCORP Inc. from AES completed January 31, 2003. Purchase price ~$1.4B. Employee headcount added not disclosed. CILCO serves ~200,000 electric and ~205,000 gas customers.
2002-12-31acquisition_additioncompleted2003-02-042003-02-04United StatesAmerenEnergy Resources Companysubsequent_events
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Acquisition of AES Medina Valley Cogen (No. 4), LLC (40 MW gas-fired plant) completed February 4, 2003. Employee headcount not disclosed.
2002-12-31voluntary_separationcompleted5502002-12-012003-03-31United StatesAll segmentsUSD 75 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Voluntary retirement program offered to approx. 1,000 employees; 550 accepted. Charge includes special termination benefits.
2002-12-31plant_closurecompleted2002-12-01IllinoisAmerenUEUSD 17 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Retirement of 343 MW Venice plant and suspension of two units at Meredosia plant. Charge includes capacity reductions and related severance.
2002-09-30voluntary_separationannounced2002-11-04United States (Missouri/Illinois service territories)Company-wide; management employees subject to 2003 wage freezesubsequent_events
f5-10q / GLM-5.3-flash-fp4-HTML
Voluntary retirement program offered to ~1,000 of 7,400 employees; expected 300-500 voluntary retirements with a one-time after-tax Q4 2002 charge estimated between $30 million and $50 million. Also announced limits on contributions and increased retiree contributions for certain retiree medical plans and a wage-increase freeze for management employees beginning 2003; possible involuntary severance program under consideration.
2002-09-30voluntary_separationannounced1,0002002-11-04United StatesAll functionssubsequent_events
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Program offered to approximately 1,000 of 7,400 employees. Expected one-time after-tax charge of $30M-$50M in Q4 2002, based on 300-500 expected voluntary retirements. Also announced limits on retiree medical contributions and a 2003 wage-increase freeze for management employees.
2002-09-30acquisition_additionin_progress2002-04-282003-03-31United States (Illinois)Regulated electric and natural gas distribution (CILCO)business_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Pending acquisition of CILCORP Inc. (parent of Central Illinois Light Company) for approximately $1.4 billion; no headcount figure disclosed for the acquired workforce.
2002-09-30voluntary_separationannounced2002-11-042002-12-31United StatesAll segmentsUSD 40 (millions)subsequent_events
f5-10q / Qwen3.6-27B-Q8_0
Voluntary retirement program offered to approx. 1,000 of 7,400 employees. Expected after-tax charge $30M-$50M based on 300-500 retirements. Charge expected in Q4 2002.
2000-12-31restructuringcompleted2000-05-012000-05-01IllinoisAmerenCIPS electric generation operationsItem_1_Business
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Approximately 45% of AmerenCIPS employees transferred to Generating Company as part of the May 1, 2000 asset transfer under the Illinois Law; internal reorganization with no change to consolidated headcount
2000-12-31voluntary_separationcompleted4001998-07-011999-06-30United StatesAll segmentsUSD 25 (millions)MD&A
f5-10k / Qwen3.6-27B-Q8_0
Targeted Separation Plan (TSP) announced in July 1998 to eliminate approximately 400 positions by mid-1999. Pretax charge of $25 million recorded in 1998.
2000-12-31acquisition_additioncompleted45%2000-05-012000-05-01IllinoisGenerating CompanyItem_1_Business
f5-10k / Qwen3.6-27B-Q8_0
Approximately 45% of AmerenCIPS' employees transferred to Generating Company on May 1, 2000.
2000-09-30voluntary_separationcompletedMD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Non-recurring charge for a targeted employee separation plan cited among items affecting earnings; no employee count or charge amount disclosed.
2000-09-30divestiture_reductioncompleted2000-05-012000-05-01IllinoisAmerenCIPS electric generationother
f5-10q / GLM-5.3-flash-fp4-HTML
Approximately 45% of AmerenCIPS employees transferred to nonregulated AmerenEnergy Generating Company along with generating assets; internal restructuring under Illinois law, no headcount figure disclosed.
2000-09-30othercompleted2000-08-01Collective bargainingother
f5-10q / GLM-5.3-flash-fp4-HTML
Remaining collective bargaining units representing approximately 19% of union employees ratified the Company's last, best and final offer in August 2000; contract term expires 2003.
2000-09-30othercompleted2000-01-01Collective bargainingother
f5-10q / GLM-5.3-flash-fp4-HTML
Contracts with bargaining units representing approximately 21% of union employees ratified in 2000 with terms expiring in 2003.
2000-09-30othercompleted2000-08United StatesOperations (union workforce)other
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Remaining collective bargaining units, representing approximately 19% of the Registrant's union employees, ratified the Company's last, best and final offer for a new contract with a term expiring in 2003.
2000-09-30othercompleted2000United StatesOperations (union workforce)other
f5-10q / MiMo-V2.6-Flash-fp8-HTML
New contracts with bargaining units representing approximately 21% of union employees ratified during 2000, terms expiring in 2003; exact ratification month not disclosed.
2000-09-30othercompleted2000-05-012000-05-01IllinoisAmerenCIPS electric generation operationsother
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Approximately 45% of AmerenCIPS employees transferred to the newly created nonregulated Generating Company as part of the Illinois restructuring transaction; no absolute headcount disclosed and no change to consolidated headcount.
2000-09-30voluntary_separationin_progressUnited StatesCompany-wideMD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
MD&A cites non-recurring charges for a targeted employee separation plan among factors affecting earnings; no employee count, charge amount, or timing disclosed. Related narrative describes employee separation packages among cost-reduction alternatives.
2000-09-30othercompleted45%2000-05-012000-05-01IllinoisGenerating Company (Nonregulated)MD&A
f5-10q / Qwen3.6-27B-Q8_0
Approximately 45% of AmerenCIPS' employees were transferred to Generating Company as part of the transfer of electric generating assets.
2000-09-30othercompleted2000-08-012000-08-01United StatesUnion Employeesrestructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Remaining collective bargaining units representing approx 19% of union employees ratified new contract expiring in 2003.
2000-06-30voluntary_separationcompletedMD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Non-recurring charges were recorded for a targeted employee separation plan; the filing does not disclose the number of employees affected or the charge amount.
2000-06-30othercompleted2000-05-012000-05-01IllinoisAmerenCIPS electric generationother
f5-10q / GLM-5.3-flash-fp4-HTML
Approximately 45% of AmerenCIPS employees were transferred to the new nonregulated affiliate AmerenEnergy Generating Company as part of the transfer of generating assets; an internal reorganization with no net headcount change at the registrant level.
2000-06-30otherannounced2000-07-272000-08-25Union-represented employeesother
f5-10q / GLM-5.3-flash-fp4-HTML
Subsequent event: after bargaining, the registrant submitted a last, best and final contract offer to the bargaining unit representing roughly 19% of union employees; the unit had until August 25, 2000 to ratify. Outcome and impact not predictable per the filing.
2000-06-30othercompleted2000-01-01Union-represented employeesother
f5-10q / GLM-5.3-flash-fp4-HTML
New collective bargaining contracts covering approximately 21% of bargaining unit employees were ratified in 2000 with terms expiring in 2003.
2000-06-30othercompleted2000-05-012000-05-01IllinoisElectric generation (AmerenCIPS)other
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Internal reorganization under Illinois restructuring law: approximately 45% of AmerenCIPS' employees transferred to the new nonregulated Generating Company. Percentage is of AmerenCIPS workforce, not total company; absolute count not disclosed. Also described in MD&A; sourced here to avoid duplication.
2000-06-30otherannounced2000-07-272000-08-25United StatesUnion-represented workforce (approximately 19% of union employees)other
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Post-quarter labor event: last, best and final contract offer submitted to the bargaining unit representing most of ~19% of union employees; unit has until 2000-08-25 to notify of ratification. Filer unable to predict outcome or financial impact.
2000-06-30otherin_progressUnited StatesEnterpriseMD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
MD&A cites a non-recurring charge for a targeted employee separation plan as an earnings driver; no employee count, charge amount, or timing disclosed. Related narrative also references employee separation packages among cost-reduction alternatives.
2000-06-30otherin_progress45%2000-05-01IllinoisElectric GenerationMD&A
f5-10q / Qwen3.6-27B-Q8_0
Approximately 45% of AmerenCIPS' employees were transferred to Generating Company as part of the transfer of electric generating assets.
2000-06-30otherin_progress2000-07-272000-08-25restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Registrant submitted last, best and final offer to bargaining unit representing approx 19% of union employees. Ratification decision due by Aug 25, 2000.
2000-03-31voluntary_separationcompletedMD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Non-recurring charge recorded for a targeted employee separation plan; no affected-employee count or charge amount disclosed in this filing.
2000-03-31divestiture_reductionannounced2000-05-012000-05-01IllinoisAmerenCIPS electric generationsubsequent_events
f5-10q / GLM-5.3-flash-fp4-HTML
On May 1, 2000 AmerenCIPS transferred its generating assets (~2,900 MW) to nonregulated AmerenEnergy Generating Company; approximately 45% of AmerenCIPS employees were transferred as part of the transaction. No absolute headcount disclosed.
2000-03-31otherannounced45%2000-05-012000-05-01Illinois, United StatesAmerenCIPS electric generating operationsother
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Approximately 45% of AmerenCIPS' employees transferred to AmerenEnergy Generating Company as part of the May 1, 2000 asset transfer under Illinois restructuring law. Absolute headcount not disclosed.
2000-03-31voluntary_separationcompletedMD&A
f5-10q / Qwen3.6-27B-Q8_0
Filing mentions 'non-recurring charges for a targeted employee separation plan' affecting earnings, but does not disclose the number of employees affected or the specific charge amount in this section.
2000-03-31restructuringannounced45%2000-05-01IllinoisGenerating Operationssubsequent_events
f5-10q / Qwen3.6-27B-Q8_0
On May 1, 2000, AmerenCIPS transferred generating assets to a new nonregulated subsidiary. Approximately 45% of AmerenCIPS' employees were transferred as part of this transaction. This is a subsequent event relative to the March 31, 2000 quarter-end.
1999-12-31voluntary_separationcompleted4001998-07USD 25 (millions)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Targeted Separation Plan (TSP): separation packages offered July 1998 to employees whose positions were eliminated; approximately 400 positions eliminated by mid-1999 via the TSP plus a hiring freeze. Multi-year program — charge of $25 million pretax ($15 million after tax) recorded in Q3 1998; position eliminations completed during fiscal 1999 and reduced 1999 operating expenses by approximately $22 million.
1999-12-31otherin_progress2,0001999-07Item_1_Business
f5-10k / GLM-5.3-flash-HTML
Labor dispute following July 1999 expiration of agreements with IBEW Locals 1439, 309, 649 and 1455, collectively representing approximately 2,000 employees, not renewed. Last, best and final offer to Locals 1439, 309 and 649 submitted February 2, 2000 and rejected; Company implemented the noneconomic portion of the offer effective March 6, 2000 (after fiscal year-end). Negotiations with Local 1455 still ongoing at filing; economic terms unresolved. Employee count is approximate.
1999-12-31othercompleted1999Item_1_Business
f5-10k / GLM-5.3-flash-HTML
New collective bargaining agreements covering approximately 60% of union-represented employees (union-represented share is ~70% of workforce) ratified in 1999, with terms expiring in 2002. Absolute headcount not disclosed; percentage is of the union-represented subgroup, not of total workforce.
1999-12-31restructuringcompleted4001998-07-011999-06-30United StatesCompany-wideUSD 25 (millions)MD&A
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Targeted Separation Plan announced July 1998; $25M pretax charge recorded Q3 1998 (prior year). Approximately 400 positions eliminated by mid-1999 via hiring freeze and TSP; ongoing cost savings of ~$22M realized in FY1999.
1999-12-31otherin_progress2,0002000-02-02United StatesIBEW Locals 1439, 309, 649 (representing approximately 2,000 employees)Item_1_Business
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Expired 1999 labor agreements not renewed with IBEW Locals 1439, 309, 649 and 1455 (~2,000 employees). Last best and final offer rejected Feb 2, 2000; noneconomic terms implemented Mar 6, 2000. Negotiations with Local 1455 ongoing. Subsequent-event labor dispute.
1999-12-31voluntary_separationcompleted4001998-07-011999-06-30United StatesCorporateUSD 25 (millions)MD&A
f5-10k / Qwen3.6-27B-Q8_0
In 1998, the Company announced plans to eliminate approximately 400 employee positions by mid-1999 through a hiring freeze and a targeted separation plan (TSP). A nonrecurring, pretax charge of $25 million was recorded in the third quarter of 1998 representing costs incurred to implement the TSP.
1999-09-30otherin_progressMissouri and IllinoisMD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Registrant is negotiating with many of its major collective bargaining units to manage labor costs and practices; no employee counts or charges disclosed.
1999-06-30voluntary_separationcompletedMD&A
f5-10q / GLM-5.3-flash-fp4-HTML
MD&A cites a charge for a targeted employee separation plan as a factor in 12-month results ended June 30, 1999; no headcount or charge amount disclosed in this filing.
1999-06-30voluntary_separationin_progressMissouri and IllinoisRegistrant-wideMD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
MD&A cites a charge for a targeted employee separation plan as a driver of the $44 million increase in other operations expenses for the 12 months ended June 30, 1999; no employee count, charge amount, or timing disclosed.
1999-06-30otherin_progressMissouri and IllinoisOperations (IBEW and IUOE bargaining units)other
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Active labor negotiations with IBEW and IUOE; collective bargaining agreements extended to facilitate negotiations. Impact on financial condition, results of operations or cash flows stated as unpredictable.
1999-06-30otherin_progress1999-04-01IllinoisAmerenCIPS labor relationsother
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Unions petitioned the D.C. Circuit in April 1999 for review of the NLRB's August 1998 decision upholding the lawfulness of AmerenCIPS's 1993 lockout; litigation matter, no current-period headcount impact disclosed.
1999-06-30voluntary_separationcompletedMD&A
f5-10q / Qwen3.6-27B-Q8_0
Charge for targeted employee separation plan included in other operating expenses for the 12-month period ended June 30, 1999.
1999-03-31voluntary_separationin_progressUnited StatesOperationsMD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Targeted employee separation plan cited as a driver of higher other operations expenses in the 12 months ended 1999-03-31; no employee count, charge amount, or timing disclosed in this filing.
1999-03-31voluntary_separationcompletedMD&A
f5-10q / Qwen3.6-27B-Q8_0
Filing mentions a 'charge for a targeted employee separation plan' affecting 12-month operating expenses, but does not disclose the number of employees affected or the specific charge amount.
1998-12-31voluntary_separationin_progress4001998-031999-06-30Company-wide (Missouri and Illinois)USD 25 (millions)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Targeted Separation Plan (TSP): in March 1998 the Company announced plans to eliminate approximately 400 positions by mid-1999 through a hiring freeze combined with the TSP; separation packages were offered in July 1998. Pre-tax charge of $25 million recorded in Q3 1998 ($15 million after tax, $0.11 per share); remaining TSP liability of $14 million at December 31, 1998. Position eliminations (excluding the charge) lowered operating expenses roughly $15 million in 1998, with $20-25 million in annual savings expected thereafter. Completion date approximated from 'by mid-1999' disclosure.
1998-12-31voluntary_separationin_progress4001998-03-011999-06-30United StatesCompany-wideUSD 25 (millions)MD&A
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Announced March 1998 to eliminate ~400 positions by mid-1999 via hiring freeze and voluntary separation packages offered July 1998. Pre-tax charge of $25M recorded in Q3 1998 ($15M after tax, $0.11/share). Remaining liability at 12/31/98 was $14M. Expected annual expense savings of $20-25M thereafter.
1998-12-31voluntary_separationcompleted4001998-031999-06-30United StatesCorporate and AdministrativeUSD 25 (millions)MD&A
f5-10k / Qwen3.6-27B-Q8_0
Company announced plans to eliminate approximately 400 employee positions by mid-1999 through a hiring freeze and targeted separation plan (TSP). Separation packages offered in July 1998. Pre-tax charge of $25 million recorded in Q3 1998.
1998-09-30voluntary_separationin_progress4001998-03-011999-06-30Missouri and IllinoisCompany-wideUSD 25 (millions)MD&A
f5-10q / GLM-5.3-flash-fp4-HTML
One-time pretax charge of $25 million recorded in Q3 1998, reducing earnings $15 million (11 cents per share); positions to be eliminated via hiring freeze and targeted separation plan, expected to cut operating expenses $10-15 million in 1998 and $20-25 million annually thereafter.
1998-09-30othercompletedIllinoisAmerenCIPSother
f5-10q / GLM-5.3-flash-fp4-HTML
NLRB three-member panel issued a decision on 1998-08-27 favorable to AmerenCIPS regarding unfair labor practice charges by two unions related to the company's 1993 lockout; unions expected to seek reconsideration.
1998-09-30restructuringin_progress4001998-031999-06-30United StatesEnterprise-wideUSD 25 (millions)MD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
One-time pretax charge recorded in Q3 1998; reduced earnings $15M (11 cents/share). Positions to be eliminated via hiring freeze and separation packages offered July 1998; expected annual expense savings of $20-25M. Corroborated in Note 7. Filer states approximately 400 positions; completion stated as mid-1999.
1998-09-30restructuringin_progress4001998-03-011999-06-30USD 25 (millions)MD&A
f5-10q / Qwen3.6-27B-Q8_0
Announced March 1998 plan to eliminate approx 400 positions by mid-1999 via hiring freeze and targeted separation plan. $25M pretax charge recorded in Q3 1998.
1998-06-30voluntary_separationannounced4001998-03-011999-06-30Missouri and IllinoisOther operating expenses reduction programMD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Registrant plans to eliminate approximately 400 positions by mid-1999 via hiring freeze and targeted voluntary separation plan; separation packages offered July 1998; charge expected in Q3 1998 but not yet estimable. Announcement date given only as March 1998.
1998-06-30voluntary_separationin_progress4001998-03-011999-06-30United StatesOther operating expenses / corporate functionsMD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Announced March 1998: plans to eliminate approximately 400 positions by mid-1999 via hiring freeze and targeted voluntary separation plan; separation packages offered July 1998. Charge to earnings expected in Q3 1998 but not yet estimable. Announcement date approximate to month.
1998-06-30voluntary_separationannounced4001998-03-011999-06-30MD&A
f5-10q / Qwen3.6-27B-Q8_0
Plan to eliminate approximately 400 positions by mid-1999 through hiring freeze and voluntary separation plan. Separation packages offered in July 1998. Charge expected in Q3 1998 once acceptances are known.
1998-03-31voluntary_separationannounced4001998-03-011999-06-30Missouri and IllinoisOther operating expenses reduction programMD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Registrant announced plans in March 1998 to cut other operating expenses, eliminating roughly 400 positions by mid-1999 via a hiring freeze and a targeted voluntary separation plan; charge expected in Q3 1998 once acceptances are known, but amount not yet estimable.
1998-03-31voluntary_separationin_progress4001998-031999-06United States (Missouri and Illinois operations)Company-wide; part of broader other operating expense reduction programMD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Program combines a hiring freeze with a targeted voluntary separation plan to eliminate roughly 400 positions by mid-1999. Filer expects a charge in Q3 1998 once participation is known but states it cannot yet estimate the amount.
1998-03-31voluntary_separationannounced4001998-03-011999-06-30MD&A
f5-10q / Qwen3.6-27B-Q8_0
Plans to eliminate approximately 400 employee positions by mid-1999 through hiring freeze and targeted voluntary separation plan. Charge expected in Q3 1998.
1997-12-31voluntary_separationcompletedMD&A
f5-10k / Qwen3.6-27B-Q8_0
1995 other operations expenses increased due to costs related to a voluntary separation program.