Texas Instruments (TXN)

Company ID: 59 | CIK: 0000097476
10-Q view:
No 10-K data
No 10-K data
No 10-Q YTD data
No 10-Q 3M data
No 10-K data
No 10-Q YTD data
No 10-Q 3M data
No 10-K data
No 10-K data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q YTD data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q YTD data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q YTD data
No 10-Q 3M data
No 10-Q YTD data
No 10-Q 3M data
No 10-Q 3M data
No 10-Q 3M data
Segments are charted by their disclosed metrics (revenue, segment profit, etc.). Each line is a single segment. Reconciliation/corporate items are excluded. Major customers are shown as a percentage of revenue. Operational KPIs are grouped by metric concept; sub-metrics appear as separate lines.

Geographic Segments

No 10-Q data
No 10-Q data

Business Unit / Product Segments

No 10-Q data
No 10-Q data

Major Customers (% of Revenue)

No 10-Q data

Operational KPIs

Backlog of firm orders (backlog)

Orders received (bookings)

No 10-Q data

Outsourced foundry capacity (capacity)

Stockholders of record (customers)

Customers served (customers_served)

No 10-K data

Employees in R&D, sales or manufacturing (headcount)

Inventory (inventory_units)

No 10-K data

Order backlog (order_book)

Orders received (orders_received)

150mm factories planned to close (other)

No 10-Q data

300mm Analog wafer share (other)

No 10-K data

300mm wafer production share (other)

No 10-Q data

Accounts receivable (other)

No 10-K data

Advanced logic foundry share (other)

No 10-Q data

Analog 300mm output (other)

No 10-Q data

Analog 300mm production (other)

No 10-Q data

Analog and Embedded Processing revenue mix (other)

No 10-K data

Analog and Embedded Processing share of revenue (other)

No 10-K data

Analog market share (other)

No 10-Q data

Analog on 300mm wafers (other)

No 10-Q data

Analog product portfolio (other)

No 10-Q data

Annual operating tax rate (other)

No 10-K data

Annual savings from restructuring (other)

No 10-K data

Annualized cost savings (other)

No 10-K data

Annualized dividend rate (other)

No 10-K data

Annualized savings from cost reduction (other)

No 10-K data

Assembly/test outsourced (other)

No 10-Q data

Assembly/test services outsourced (other)

No 10-Q data

Assembly/test subcontracted (other)

No 10-Q data

Assembly/test subcontracting (other)

No 10-Q data

Auction-rate securities (other)

No 10-K data

Authorized share repurchase capacity (other)

No 10-K data

Baseband revenue (other)

CHIPS Act cash benefit (other)

No 10-K data

CHIPS Act direct funding (other)

No 10-K data

CHIPS Act direct funding received (other)

No 10-K data

CHIPS Act incentives receivable (other)

No 10-K data

CHIPS Act investment tax credit received (other)

No 10-K data

CHIPS Act total cash benefit (other)

No 10-K data

Capital expenditure guidance (other)

No 10-K data

Capital expenditures (other)

No 10-K data

Capital expenditures guidance (other)

No 10-K data

Capital returned to shareholders (other)

No 10-K data

Capital spending (other)

No 10-K data

Capital spending plan (other)

No 10-K data

Cash and cash equivalents (other)

No 10-K data

Cash and cash equivalents plus short-term investments (other)

No 10-K data

Cash and short-term investments (other)

No 10-K data

Cash dividends declared per share (other)

No 10-K data

Cash flow from operating activities (other)

No 10-K data

Cash flow from operations (other)

No 10-K data

Cash flow from operations as a percent of revenue (other)

No 10-K data

Cash flow from operations as percentage of revenue (other)

No 10-K data

Cash flow from operations margin (other)

No 10-K data

Cash returned to owners (other)

No 10-K data

Cash returned to shareholders (other)

No 10-K data

Commercial paper outstanding (other)

No 10-K data

Common Stock Outstanding (other)

No 10-Q data

Common shares outstanding (other)

No 10-K data

Common shares repurchased (other)

Common stock outstanding (other)

Common stock repurchased (other)

No 10-K data

Consigned distributor revenue (other)

No 10-Q data

Consigned distributor revenue share (other)

No 10-Q data

Consigned inventory (other)

No 10-Q data

Consignment distributor revenue (other)

No 10-Q data

Consignment revenue share (other)

No 10-Q data

Contract assets (other)

No 10-K data

Countries of operation (other)

No 10-Q data

Countries of operations (other)

No 10-Q data

Countries with operations (other)

No 10-Q data

Countries with plants (other)

No 10-Q data

Country operations (other)

No 10-Q data

Credit facility availability (other)

No 10-K data

DSP market share (other)

No 10-K data

Days of inventory (other)

Days sales outstanding (other)

Debt to total capital (other)

No 10-K data

Debt-to-capital ratio (other)

No 10-K data

Debt-to-total capital ratio (other)

No 10-K data

Debt-to-total-capital (other)

No 10-K data

Debt-to-total-capital ratio (other)

No 10-K data

Depreciation (other)

No 10-K data

Depreciation expense (other)

No 10-K data

Digital cellular handsets market (other)

No 10-K data

Digital cellular phone production (other)

No 10-K data

Digital cellular phone production estimate (other)

No 10-K data

Digital cellular phones (other)

No 10-K data

Digital handsets market (other)

No 10-K data

Digital phone industry sales (other)

No 10-K data

Digital phone industry sales estimate (other)

No 10-K data

Diluted earnings per share (other)

No 10-K data

Direct revenue mix (other)

No 10-Q data

Direct revenue share (other)

No 10-Q data

Direct sales share of revenue (other)

No 10-Q data

Distribution channel sales (other)

No 10-Q data

Distribution channel share (other)

No 10-Q data

Distribution revenue share (other)

No 10-Q data

Distributor consignment share (other)

No 10-Q data

Distributor fulfilled sales (other)

No 10-Q data

Distributor revenue share (other)

No 10-Q data

Distributor sales share (other)

No 10-Q data

Distributor share of revenue (other)

No 10-Q data

Dividend increase (other)

No 10-K data

Dividend payout of free cash flow (other)

No 10-K data

Dividend per share (other)

No 10-K data

Dividend rate (other)

No 10-K data

Dividends as percent of free cash flow (other)

No 10-K data

Dividends declared per share (other)

No 10-K data

Dividends paid (other)

No 10-K data

Educator training workshops (other)

No 10-K data

Effective tax rate (other)

No 10-K data

Embedded Processing market share (other)

No 10-Q data

Embedded market share (other)

No 10-Q data

Embedded processing market share (other)

No 10-Q data

Embedded processor market share (other)

No 10-Q data

Employee turnover (other)

No 10-Q data

Employee turnover rate (other)

No 10-Q data

Employees terminated (other)

No 10-K data

Employees terminated - restructuring (other)

No 10-K data

End market revenue share (other)

No 10-Q data

End-market revenue (other)

No 10-Q data

End-market revenue mix (other)

No 10-Q data

Estimated annual effective tax rate (other)

No 10-K data

Estimated annual operating tax rate (other)

No 10-K data

Expected annualized cost savings (other)

No 10-K data

External foundry wafer share (other)

No 10-Q data

External foundry wafer sourcing (other)

No 10-Q data

External foundry wafers (other)

No 10-Q data

Facility countries (other)

No 10-Q data

Factory loading growth (other)

No 10-K data

Factory loadings growth (other)

No 10-Q data

Factory underutilization expense (other)

No 10-K data

Federal government revenue share (other)

No 10-Q data

Foundry wafer share (other)

No 10-K data

Foundry-sourced advanced logic wafers (other)

No 10-Q data

Free cash flow (other)

Free cash flow as a percent of revenue (other)

No 10-K data

Free cash flow as a percentage of revenue (other)

No 10-K data

Free cash flow as percentage of revenue (other)

No 10-K data

Free cash flow margin (other)

Gross margin (other)

Gross profit margin (other)

No 10-K data

High-performance analog products (other)

No 10-Q data

Hynix receivable balance (other)

No 10-K data

Inventory (other)

No 10-K data

Inventory balance (other)

No 10-K data

Inventory days (other)

No 10-K data

Investment in R&D and SG&A (other)

No 10-K data

Jobs eliminated (other)

Large-scale 300mm wafer fabs (other)

No 10-Q data

Manufacturing countries (other)

No 10-Q data

Manufacturing headcount reduction (other)

No 10-K data

Manufacturing sites (other)

No 10-K data

Market share (other)

No 10-Q data

Micron shares held (other)

No 10-K data

Number Of Reportable Segments (other)

Number of Reportable Segments (other)

Operating cash flow margin (other)

No 10-K data

Operating margin (other)

No 10-K data

Operating profit margin (other)

No 10-K data

Orderable parts (other)

Outside foundry wafer share (other)

No 10-K data

Outsourced assembly and test (other)

No 10-Q data

Outsourced assembly/test (other)

No 10-Q data

Outsourced capacity (other)

No 10-K data

Outsourced foundry capacity (other)

No 10-Q data

Outsourced wafer production (other)

No 10-Q data

Outsourced wafer share (other)

No 10-Q data

Planned job eliminations (other)

No 10-K data

Planned repatriation (other)

No 10-K data

Product portfolio (other)

No 10-Q data

Product portfolio count (other)

No 10-Q data

Product portfolio size (other)

No 10-Q data

Products designed at 90 nanometer (other)

No 10-K data

Products in portfolio (other)

No 10-Q data

Quarterly dividend per share (other)

No 10-K data

R&D Expense (other)

No 10-K data

R&D and SG&A investment (other)

No 10-K data

R&D expense ratio (other)

No 10-K data

Remaining repurchase authorization (other)

No 10-K data

Remaining share repurchase authorization (other)

No 10-K data

Research and Development Expense (other)

No 10-Q data

Research and development (other)

No 10-K data

Research and development expense (other)

No 10-K data

Research and development plus SG&A (other)

No 10-K data

Restructuring accrual balance (other)

No 10-K data

Restructuring charges (other)

No 10-K data

Restructuring charges recognized (other)

No 10-K data

Restructuring job reductions (other)

No 10-K data

Return on Common Equity (other)

No 10-K data

Return on Invested Capital (other)

No 10-K data

Return on Net Assets (other)

No 10-K data

Return on common equity (other)

No 10-K data

Return on invested capital (other)

Return on net assets (other)

No 10-K data

Revenue (other)

No 10-K data

Revenue by end market (other)

No 10-Q data

Revenue from China shipments (other)

No 10-K data

Revenue from consignment inventory (other)

No 10-Q data

Revenue from consignment programs (other)

No 10-Q data

Revenue from customers headquartered outside U.S. (other)

No 10-Q data

Revenue from distributors (other)

No 10-K data

Revenue from end customers headquartered in China (other)

No 10-Q data

Revenue from outside U.S. (other)

No 10-Q data

Revenue growth (other)

No 10-K data

Revenue mix by end market (other)

No 10-Q data

Revenue mix by market (other)

No 10-Q data

Revenue outside top 100 customers (other)

No 10-Q data

Revenue shipped into China (other)

No 10-Q data

Revenue shipped to China (other)

Revenue through distribution (other)

No 10-Q data

Revenue via distribution (other)

No 10-Q data

Revenue via distributors (other)

No 10-Q data

SG&A expense ratio (other)

No 10-K data

Sales and marketing offices (other)

No 10-Q data

Sales office countries (other)

No 10-Q data

Sales through distributors (other)

No 10-Q data

Sales via distributors (other)

No 10-Q data

Segment revenue change (other)

No 10-K data

Semiconductor product mix (other)

No 10-Q data

Semiconductor revenue by end market (other)

No 10-Q data

Semiconductor revenue mix (other)

Shares outstanding (other)

Shares repurchased (other)

No 10-K data

Shares returned to shareholders (other)

No 10-K data

Short-term investments (other)

No 10-K data

Speedpass deployment stations (other)

No 10-K data

Standard analog products (other)

No 10-Q data

Stock repurchase authorization remaining (other)

No 10-K data

Stock repurchases (other)

No 10-K data

Stock-based compensation (other)

No 10-K data

Stockholders of record (other)

No 10-Q data

Subcontracted assembly and test (other)

No 10-Q data

Subcontracted assembly/test share (other)

No 10-Q data

TI-funded R&D expense (other)

No 10-K data

TI.com revenue share (other)

No 10-Q data

Teacher workshop participants (other)

No 10-K data

Teachers in training workshops (other)

No 10-K data

Total assets (other)

No 10-K data

Total cash (other)

No 10-K data

Total cash and investments (other)

No 10-K data

Total cash and short-term investments (other)

No 10-K data

Total cash returned (other)

No 10-K data

Treasury shares (other)

No 10-K data

Turnover rate (other)

No 10-Q data

Underutilization expense (other)

No 10-K data

Venture fund investments (other)

No 10-K data

Wafer sourcing from foundries (other)

No 10-Q data

Wafers from external foundries (other)

No 10-Q data

Wafers outsourced (other)

No 10-Q data

Wafers sourced externally (other)

No 10-Q data

Wireless revenue (other)

No 10-Q data

Y2K costs incurred (other)

No 10-K data

Y2K costs spent (other)

No 10-K data

Y2K costs spent to date (other)

No 10-K data

Y2K estimated aggregate costs (other)

No 10-K data

Y2K program costs (other)

No 10-K data

Y2K program costs incurred (other)

No 10-K data

Y2K remediation spend (other)

No 10-K data

Digital cellular phone production (production_volume)

No 10-K data

Manufacturing sites (properties)

Remaining performance obligations (rpo)

No 10-K data

International Leased Facilities Square Footage (square_footage)

No 10-Q data

Chips shipped on 90-nm process (units_shipped)

Speedpass motorists (users)

No 10-K data

Facility space utilization (utilization_rate)

Human capital disclosures. Workforce totals and demographics are point-in-time. Flow metrics use the year-to-date period for 10-Q and full year for 10-K. Workforce actions (RIFs, restructurings, acquisition-related changes) are listed in the table at the bottom.

Workforce Totals

No 10-Q data

Demographics

No demographic data found.

Workforce Breakdowns

No 10-Q data

HCM Metrics — Point-in-Time

No point-in-time HCM metrics found.

HCM Metrics — Flow (Annual / YTD)

No 10-Q data

Workforce Actions

Period EndTypeStatusAffected% WorkforceAnnouncedExpected CompletionGeographySegment / FunctionChargeSourceNote
2026-06-30acquisition_additionannounced2026-02-042027-06-30United StatesEmbedded ProcessingUSD 17 (millions)other
f5-10q / MiMo-V2.6-Flash-fp8-HTML
All-cash acquisition of Silicon Labs at $231.00 per share, ~$7.5B enterprise value; closing expected in the first half of 2027. Charge shown is Q2 2026 acquisition/transaction costs ($17M; $34M YTD), not severance. No headcount added or affected is disclosed in this filing.
2026-03-31acquisition_additionannounced2026-02-042027-06-30United StatesUSD 17 (millions)other
f5-10q / MiMo-V2.6-Flash-fp8-HTML
All-cash acquisition of Silicon Labs at $231.00 per share (~$7.5B enterprise value), expected to close in the first half of 2027 subject to regulatory and stockholder approvals; funded with cash on hand and debt. No employee headcount added or affected is disclosed. $17M of acquisition charges were incurred in Q1 2026 (transaction-related costs, recorded in the Other segment).
2025-12-31plant_closurein_progressManufacturing (150mm wafer fabrication)USD 85 (millions)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
2025 restructuring charges of $85 million cover severance, benefits and other exit costs for operational-efficiency efforts, including planned closures of the two remaining 150mm factories. Affected employee counts and completion dates are not disclosed. Total restructuring charges/other of $117 million also includes a $32 million non-cash goodwill impairment (custom ASIC products) that is not workforce-related.
2025-12-31acquisition_additionannounced2026-02-04subsequent_events
f5-10k / GLM-5.3-flash-HTML
Definitive agreement to acquire Silicon Labs for $231.00 per share in cash (approximately $7.5 billion enterprise value), announced February 4, 2026; closing expected in the first half of 2027 subject to regulatory and stockholder approvals. No headcount impact disclosed; expected completion date given only as 'first half of 2027'.
2025-12-31plant_closurein_progressUnited StatesManufacturing (150mm wafer fabs)USD 85 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
FY2025 restructuring charges of $85M cover severance, benefits and exit costs tied to operational-efficiency actions, including planned closures of the two remaining 150mm factories. No employee count or completion date disclosed.
2025-12-31acquisition_additionannounced2026-02-042027-06-30subsequent_events
f5-10k / MiMo-V2.6-Flash-fp8-HTML
All-cash acquisition at $231.00 per share, ~$7.5B enterprise value; expected to close in the first half of 2027, funded with cash on hand and debt. No headcount figure disclosed for the acquired workforce.
2025-12-31restructuringin_progressUSD 85 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Includes severance, benefits and other exit costs related to operational efficiencies, including planned closures of two remaining factories with 150mm production. Employee count not disclosed.
2025-12-31acquisition_additionannounced2026-02-042027-06-30USD 7,500 (millions)subsequent_events
f5-10k / Qwen3.6-27B-Q8_0
Definitive agreement to acquire Silicon Labs for $7.5 billion enterprise value. Expected to close in first half of 2027. Headcount impact not disclosed.
2025-09-30plant_closurein_progress2020Sherman and Dallas, TexasOtherUSD 85 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Multi-year plan announced in 2020 to close the two remaining 150mm factories, both over 50 years old; production transitioning to 300mm wafer fabs. Q3 2025 and first nine months 2025 each included $85 million of restructuring charges for severance and benefit costs tied to operational-efficiency efforts, including these planned closures. No employee count disclosed.
2025-09-30plant_closurein_progress2020Sherman, Texas and Dallas, Texas, United StatesManufacturing — 150mm wafer fabricationUSD 85 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Multi-year plan announced in 2020 to close the two remaining 150mm factories; $85M charge recognized in Q3 2025 for severance and benefit costs, classified in Other for segment reporting. No employee count or completion date disclosed.
2025-09-30restructuringin_progress2025-09-30OtherUSD 85 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Charges related to operational efficiencies, including planned closures of two remaining 150mm production factories. Charges attributable to severance and benefit costs.
2024-03-31restructuringcompletedUSD -124 (millions)MD&A
f5-10q / Qwen3.6-27B-Q8_0
Credit of $124 million primarily due to a gain on the sale of a property. No employee count disclosed.
2022-12-31restructuringcompleted2022-12-31United States (Lehi, Utah)ManufacturingUSD 257 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Integration charges for the Lehi, Utah 300-mm facility purchase, including preproduction costs; charges moved to cost of revenue when production began December 2022. No employee-affected count disclosed; no RIF or headcount reduction is explicitly described.
2022-09-30restructuringin_progressUnited StatesOther (Lehi, Utah manufacturing facility integration)USD 77 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Integration charges at the Lehi, Utah manufacturing facility; no employee headcount affected was disclosed. Charges are reported in the Other segment.
2022-09-30restructuringin_progressUnited States — Lehi, UtahOther (segment reporting); manufacturing facility integrationUSD 77 (millions)other
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Q3 2022 charge of $77M for integration charges at the Lehi, Utah manufacturing facility; YTD 2022 charge was $209M. No employee count, announcement date, or completion date disclosed.
2022-09-30restructuringin_progressLehi, UtahManufacturingUSD 77 (millions)MD&A
f5-10q / Qwen3.6-27B-Q8_0
Third quarter 2022 restructuring charges related to integration charges at Lehi, Utah manufacturing facility.
2022-09-30restructuringin_progressLehi, UtahManufacturingUSD 209 (millions)MD&A
f5-10q / Qwen3.6-27B-Q8_0
First nine months of 2022 restructuring charges related to integration charges at Lehi, Utah manufacturing facility.
2022-06-30restructuringin_progressUnited StatesOther (Lehi, Utah manufacturing facility integration)USD 132 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Integration charges at the Lehi, Utah manufacturing facility; $66 million recognized in Q2 2022 and $132 million in the first six months of 2022. No employee counts or severance detail disclosed.
2022-06-30restructuringin_progressUnited States (Lehi, Utah)Other (reported segment includes DLP, calculators, custom ASIC)USD 132 (millions)other
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Integration charges at the Lehi, Utah manufacturing facility; $66M in Q2 2022 and $132M YTD 2022. No employee count, severance detail, or completion date disclosed; may be facility integration rather than headcount reduction.
2022-06-30restructuringin_progressLehi, UtahManufacturingUSD 66 (millions)MD&A
f5-10q / Qwen3.6-27B-Q8_0
Integration charges at Lehi, Utah manufacturing facility for Q2 2022.
2022-06-30restructuringin_progressLehi, UtahManufacturingUSD 132 (millions)MD&A
f5-10q / Qwen3.6-27B-Q8_0
Integration charges at Lehi, Utah manufacturing facility for YTD 2022.
2022-03-31restructuringin_progressLehi, Utah, United StatesOther (Lehi manufacturing facility integration)USD 66 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
First quarter 2022 restructuring charges/other consisted of integration charges at the Lehi, Utah manufacturing facility; costs reported in Other for segment reporting. No employee counts disclosed.
2022-03-31restructuringin_progressUnited States (Lehi, Utah)Other (included in segment reporting as Other)USD 66 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Q1 2022 charge relates to integration charges at the Lehi, Utah manufacturing facility; no employee count, severance amount, or completion date disclosed.
2022-03-31restructuringcompletedLehi, UtahManufacturingUSD 66 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Integration charges at Lehi, Utah manufacturing facility. Employee count not disclosed.
2021-12-31plant_closurein_progress20202025Sherman and Dallas, Texas, United States150-millimeter wafer fabrication (manufacturing)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Multiyear plan announced in 2020 to close the two remaining 150mm factories; during 2021 the company decided not to close a portion of the Dallas factory. Completion expected no later than 2025; charges not yet reasonably estimable and no affected-headcount figure disclosed. Included because the plan remains open at fiscal year-end 2021.
2021-12-31acquisition_additioncompleted2021-10Lehi, Utah, United States300-millimeter semiconductor manufacturingUSD 104 (millions)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Purchase of an operating 300mm fab completed October 2021 for $893 million cash; headcount transferring with the facility was not disclosed. The $104 million shown is the 2021 integration charge for the facility (not severance), with ongoing costs expected until production begins in early 2023.
2021-12-31plant_closurein_progress20202025-12-31Sherman, Texas and Dallas, TexasManufacturing (150-millimeter wafer fabrication)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Multiyear plan announced in 2020 to close the two remaining 150-mm factories; in 2021 the company decided not to close a portion of the Dallas factory. No employees-affected count disclosed; charges for the closures cannot be reasonably estimated. No restructuring charges were recorded in 2021 (2021 restructuring charges line = $0).
2021-12-31restructuringin_progress2021-102023-01-31Lehi, Utah, United StatesManufacturing (300-millimeter semiconductor factory)USD 104 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Integration charges recorded in 2021 following the October 2021 cash purchase of the Lehi 300-mm factory ($893 million); covers purchase-related costs and ongoing costs until production begins in early 2023. No headcount impact disclosed; asset purchase rather than a business combination.
2021-12-31restructuringin_progress2020-01-012025-12-31United StatesManufacturingUSD 54 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Multi-year plan announced in 2020 to close 150mm factories in Sherman and Dallas, Texas. In 2021, decision made not to close portion of Dallas factory. Charges for closures cannot be reasonably estimated. 2021 charges of $54M include $104M integration charges for Lehi, Utah facility purchase and $50M gain on asset sales, offsetting prior year Embedded Processing action.
2021-12-31restructuringin_progressUSD 54,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2021-09-30restructuringin_progressUSD 0 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2021-06-30acquisition_additionannounced2021-06-302021-12-31United States (Lehi, Utah)Manufacturing (300-millimeter semiconductor factory)USD 900 (millions)other
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Agreement signed to acquire Micron Technology's Lehi, Utah 300mm fab for $900 million cash; no employee count or headcount transfer disclosed in the filing.
2021-06-30restructuringin_progressUSD 0 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2020-12-31restructuringin_progressEmbedded ProcessingUSD 25 (millions)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
2020 charge primarily severance and benefit costs for an Embedded Processing action; $8M paid during 2020, $18M accrual remained at year-end; headcount affected not disclosed
2020-12-31plant_closurein_progress2020-012024Sherman and Dallas, Texas, United Statesrestructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Multiyear plan announced January 2020 to close two remaining 150-millimeter factories; production transitioning to 300-millimeter facilities in North Texas; completion expected within two to four years; closure charges not yet reasonably estimable
2020-12-31restructuringin_progressEmbedded ProcessingUSD 25 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
2020 charges of $25M primarily for severance and benefit costs tied to an Embedded Processing action; $8M paid during 2020, $18M accrual remaining at year-end. Employees affected not disclosed.
2020-12-31plant_closurein_progressUnited States (Sherman and Dallas, Texas)Manufacturing (150-millimeter wafer production)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Multiyear plan announced January 2020 to close TI's two remaining 150-mm factories (over 50 years old) in Sherman and Dallas, Texas, with production transitioned to 300-mm North Texas facilities over two to four years. Filer states closure charges cannot be reasonably estimated until a later phase; no employee count disclosed.
2020-12-31restructuringin_progress2020-01United StatesEmbedded ProcessingUSD 25 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Announced in January 2020 to close two 150-millimeter factories in Sherman and Dallas, Texas. $25 million charge recognized in 2020 primarily for severance and benefits. Employee count not explicitly disclosed in footnote.
2020-12-31restructuringin_progressEmployee Severance [Member] / Embedded Processing [Member]USD 25,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2020-09-30restructuringin_progressEmbedded ProcessingUSD 24 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Charge covers severance and benefit costs for an Embedded Processing action in the first nine months of 2020; $1 million of payments made as of September 30, 2020. Employee count not disclosed.
2020-09-30restructuringin_progressEmbedded ProcessingUSD 24 (millions)other
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Severance and benefit costs for Embedded Processing action during first nine months of 2020; $1 million paid as of 2020-09-30. Employee count and announcement date not disclosed.
2020-09-30restructuringin_progressEmbedded ProcessingUSD 24 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Recognized $24 million of restructuring charges for severance and benefit costs associated with Embedded Processing business during the first nine months of 2020. As of September 30, 2020, $1 million of payments have been made. Employee count not disclosed.
2020-09-30restructuringin_progressUSD 0 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2020-09-30restructuringin_progressEmployee Severance [Member]USD 24,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2020-06-30restructuringcompletedEmbedded ProcessingUSD 24 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Second quarter 2020 charge of $24 million for severance and benefit costs tied to an Embedded Processing restructuring; no payments made as of June 30, 2020. Number of employees affected not disclosed.
2020-06-30restructuringin_progress2020-06-30Embedded ProcessingUSD 24 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Severance and benefit costs for an Embedded Processing action recognized in Q2 2020; no employee count, geography, or completion date disclosed. No payments made as of 2020-06-30.
2020-06-30restructuringin_progress2020-06-30Embedded ProcessingUSD 24 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Recognized $24 million of restructuring charges for severance and benefit costs. No payments made as of June 30, 2020. Employee count not disclosed.
2020-06-30restructuringin_progressEmployee Severance [Member]USD 24,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2019-12-31plant_closurecompleted2019-04Greenock, Scotland, United KingdomSemiconductor manufacturingUSD -36 (millions)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Manufacturing facility sold in April 2019, producing a net 36 million dollar credit to 2019 restructuring charges/other, composed of a 15 million dollar restructuring-charge credit and a 21 million dollar gain on asset sale. No employee headcount impact was quantified.
2019-12-31plant_closureannounced2020-01Sherman and Dallas, Texas, United States150-millimeter wafer fabricationsubsequent_events
f5-10k / GLM-5.3-flash-HTML
Multiyear plan announced January 2020 to close two 150-millimeter wafer fabs, each more than 50 years old, and transition production to 300-millimeter facilities in North Texas; completion expected within three to five years. Charges cannot be reasonably estimated until a later phase; no employee count disclosed.
2019-12-31plant_closurecompletedGreenock, ScotlandManufacturingrestructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Manufacturing facility sold in April 2019; restructuring charges of $15M and asset sale gains of $21M recorded in 2019, presented as a net credit of $36M. Employee count not disclosed.
2019-12-31plant_closureannounced2020-01Sherman and Dallas, Texas, United StatesManufacturing (150-millimeter wafer fabrication)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Announced January 2020 (after fiscal year-end): multiyear plan to close two remaining 150-mm factories over three to five years, transitioning production to 300-mm facilities. Charges not yet estimable; employee counts not disclosed.
2019-12-31plant_closurecompleted2019-04-012019-04-01ScotlandManufacturingUSD -36 (millions)MD&A
f5-10k / Qwen3.6-27B-Q8_0
Sale of manufacturing facility in Greenock, Scotland resulted in a credit of $36 million classified as restructuring charges/other. Employee count not disclosed.
2019-12-31plant_closureannounced2020-01-012025-01-01United StatesManufacturingsubsequent_events
f5-10k / Qwen3.6-27B-Q8_0
Announced in January 2020 plan to close two 150-millimeter factories in Sherman and Dallas, Texas. Production to transition to 300-millimeter facilities over three to five years. Charges cannot be reasonably estimated.
2019-09-30divestiture_reductioncompletedGreenock, ScotlandManufacturingUSD 36 (millions)other
f5-10q / GLM-5.3-flash-fp4-HTML
Company sold its Greenock, Scotland manufacturing facility in April 2019; year-to-date restructuring charges/other was a $36 million credit from the sale. No employee headcount affected was disclosed.
2019-09-30plant_closurecompleted2019-04Greenock, Scotlandrestructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Sale of the Greenock manufacturing facility in April 2019; produced a $36 million restructuring credit for the nine months ended 2019-09-30. No employee count, severance amount, or completion date disclosed.
2019-09-30plant_closurecompleted2019-04-30ScotlandManufacturingrestructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Sold manufacturing facility in Greenock, Scotland in April 2019. Employee count not disclosed.
2019-09-30restructuringin_progressUSD -15,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2019-06-30divestiture_reductioncompletedGreenock, ScotlandManufacturingUSD 36 (millions)MD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Company sold its Greenock, Scotland manufacturing facility in April 2019, producing a restructuring charges/other credit of $36 million in the quarter and year-to-date periods. No employee headcount affected was disclosed.
2019-06-30plant_closurecompletedGreenock, ScotlandManufacturingrestructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Sale of Greenock manufacturing facility in April 2019 produced a $36M restructuring credit in Q2 2019; no employee count disclosed. Restructuring accrual fell from $28M (2018-12-31) to $1M (2019-06-30) on $15M charges and $12M payments YTD.
2019-06-30plant_closurecompleted2019-04ScotlandManufacturingUSD -36 (millions)MD&A
f5-10q / Qwen3.6-27B-Q8_0
Sale of manufacturing facility in Greenock, Scotland resulted in a $36 million credit to restructuring charges/other. Employee count not disclosed.
2019-06-30restructuringin_progressUSD -15,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2019-03-31divestiture_reductioncompleted2019-02Greenock, ScotlandManufacturingrestructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Agreement to sell the Greenock, Scotland manufacturing facility entered in February 2019; sale closed in April 2019. No employee headcount affected was disclosed.
2019-03-31plant_closurecompleted2019-02-282019-04-30Greenock, ScotlandManufacturingrestructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Agreement entered in February 2019 to sell the Greenock manufacturing facility; sale closed April 2019. No employee count, severance charge, or workforce-reduction figure disclosed. Announcement date approximated to month (2019-02); completion date approximated to month (2019-04).
2019-03-31restructuringin_progressOther (restructuring charges/other)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Restructuring accrual roll-forward disclosed: $28M balance at 2018-12-31, $12M payments during Q1 2019, $16M balance at 2019-03-31. No employees-affected count, announcement date, or charge detail for the quarter disclosed.
2019-03-31plant_closurecompleted2019-022019-04ScotlandManufacturingrestructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Agreement entered in Feb 2019 to sell Greenock manufacturing facility; sale closed in April 2019. No specific headcount or charge disclosed.
2018-12-31divestiture_reductionannounced2019-022019-03-31Greenock, Scotland, United KingdomManufacturingsubsequent_events
f5-10k / GLM-5.3-flash-HTML
Subsequent event after fiscal year-end: agreement to sell the Greenock manufacturing facility, with closing expected in Q1 2019. No affected-employee count or transaction charge disclosed.
2018-12-31restructuringin_progressUSD 6 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
FY2018 restructuring charges of $6M include severance and benefits, accelerated depreciation, and other exit costs; no employee counts or dates disclosed. Net restructuring charges/other of $3M after $3M gains on asset sales.
2018-12-31plant_closureannounced2019-022019-03-31Greenock, ScotlandAnalog manufacturingsubsequent_events
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Agreement to sell the Greenock, Scotland manufacturing facility entered into February 2019, after fiscal year-end; sale expected to close in Q1 2019. Associated workforce reduction not quantified.
2018-12-31restructuringcompletedUSD 6 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Restructuring charges of $6 million recognized in 2018. Employee count not disclosed.
2018-12-31restructuringin_progressUSD 6,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2018-09-30plant_closurein_progress2019-12-31Greenock, ScotlandManufacturingUSD 37 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Cumulative charges through 2018-09-30 for severance, benefits and accelerated depreciation from phasing out a manufacturing facility; total charges estimated at about $40 million, remainder expected through 2019. No employee count disclosed.
2018-09-30restructuringin_progressProduct lines within the two reportable segmentsUSD 21 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Cumulative severance and benefit charges through 2018-09-30 for a previously reported reorganization of product lines; $18 million paid to terminated employees. Further charges not expected to be material. No employee count disclosed.
2018-09-30restructuringin_progressNot specifiedAnalog and Embedded Processing segments (product line reorganization)USD 21 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Cumulative severance and benefit charges through 2018-09-30 for a previously reported product-line reorganization; $18M paid to date; no employee count disclosed; further charges not expected to be material
2018-09-30plant_closurein_progress2019Greenock, ScotlandManufacturing facility phase-outUSD 37 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Cumulative charges through 2018-09-30 include severance, benefits and accelerated depreciation; total estimated at about $40M with remaining charges recognized through 2019; no employee count disclosed
2018-09-30restructuringin_progress2019-12-31GlobalProduct lines within Analog and Embedded Processing segmentsUSD 21 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Cumulative charges of $21 million recognized through Sept 30, 2018 for severance and benefits related to reorganization of product lines. $18 million paid to terminated employees.
2018-09-30plant_closurein_progress2019-12-31Greenock, ScotlandManufacturingUSD 37 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Cumulative charges of $37 million recognized through Sept 30, 2018 for phase out of manufacturing facility. Includes severance, benefits, and accelerated depreciation. Total estimated charges about $40 million.
2018-09-30restructuringin_progressUSD 5,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2018-06-30restructuringin_progress2019-12-31Greenock, ScotlandManufacturingUSD 36 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Cumulative charges through June 30, 2018 for severance, benefits and accelerated depreciation tied to phasing out a manufacturing facility; total estimated at about $40 million with remaining charges expected through 2019. Employee count not disclosed.
2018-06-30restructuringin_progressProduct lines within the two reportable segmentsUSD 21 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Cumulative severance and benefit charges through June 30, 2018 for a previously reported reorganization of product lines; $18 million paid to terminated employees. Further charges not expected to be material. Employee count not disclosed.
2018-06-30plant_closurein_progress2019-12-31Greenock, ScotlandManufacturingUSD 40 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Phase-out of a manufacturing facility; $36 million cumulative charges recognized through 2018-06-30 (severance, benefits and accelerated depreciation), with total estimated charges of about $40 million and the remainder expected to be recognized through 2019. No employee count disclosed.
2018-06-30restructuringin_progressProduct lines within the two reportable segmentsUSD 21 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Reorganization of product lines within the Analog and Embedded Processing segments; $21 million cumulative severance and benefit charges recognized through 2018-06-30, of which $18 million paid. No employee count disclosed; further charges not expected to be material.
2018-06-30restructuringin_progress2019-12-31GlobalProduct lines within Analog and Embedded Processing segmentsUSD 21 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Cumulative charges of $21 million recognized through June 30, 2018, for severance and benefit costs related to reorganization of product lines. $18 million paid to terminated employees. Further charges not expected to be material.
2018-06-30plant_closurein_progress2019-12-31Greenock, ScotlandManufacturingUSD 36 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Cumulative charges of $36 million recognized through June 30, 2018, for severance, benefits, and accelerated depreciation related to phase out of manufacturing facility. Total estimated charges are about $40 million. Remaining charges expected to be recognized through 2019.
2018-06-30restructuringin_progressUSD 4,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2018-03-31restructuringin_progressProduct lines within the two reportable segmentsUSD 21 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Cumulative charges for severance and benefit costs related to a previously reported reorganization of product lines; $18 million paid to terminated employees as of quarter-end. Further charges not expected to be material. No employee count disclosed.
2018-03-31plant_closurein_progress2019-12-31Greenock, ScotlandManufacturingUSD 33 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Phase out of a manufacturing facility; charges cover severance, benefits and accelerated depreciation. Total program charges estimated at about $40 million, with remaining charges expected through 2019. No employee count disclosed.
2018-03-31restructuringin_progressProduct lines within the two reportable segmentsUSD 21 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Cumulative $21M recognized for severance and benefits tied to reorganizing product lines; $18M paid to date. Number of employees affected not disclosed; further charges not expected to be material.
2018-03-31plant_closurein_progress2019-12-31Greenock, ScotlandManufacturingUSD 40 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Phase-out of manufacturing facility; $33M recognized to date (severance, benefits and accelerated depreciation) of an estimated ~$40M total, with remaining charges expected through 2019. Employee headcount affected not disclosed.
2018-03-31restructuringin_progressProduct lines within Analog and Embedded Processing segmentsUSD 21 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Recognized $21 million for severance and benefit costs related to reorganization of product lines. $18 million paid to terminated employees.
2018-03-31plant_closurein_progress2019-12-31Greenock, ScotlandManufacturingUSD 33 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Recognized $33 million for severance, benefits, and accelerated depreciation related to phase out of manufacturing facility. Total charges estimated at $40 million, expected to be recognized through 2019.
2018-03-31restructuringin_progressUSD 1,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2017-12-31plant_closurein_progress3502016-012019Greenock, Scotland, United KingdomSemiconductor manufacturing (wafer fabrication)USD 8 (millions)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Multi-year facility phase-out announced January 2016; ~350 jobs is the total expected program reduction, not a current-year count. Charges recognized: $17M (2015), $7M (2016), $8M (2017 — current-year figure shown); total program estimated ~$40M, comprising severance/benefits plus accelerated depreciation. Remaining charges expected through 2019; production moving to 200mm facilities in Germany, Japan and Maine.
2017-12-31restructuringcompleted2017-01Analog and Embedded Processing — product line reorganizationUSD 3 (millions)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Reorganization of product lines within the two reportable segments beginning January 2017. Current-year severance/benefit charge of $3M; a related $18M was recognized in 2016 (prior-year activity). Further charges not expected to be material; $16M cumulatively paid to terminated employees as of 2017-12-31. No employee count disclosed.
2017-12-31plant_closurein_progress3502016-012019Greenock, ScotlandManufacturingUSD 8 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Manufacturing phase-out announced January 2016 with production moving to sites in Germany, Japan and Maine; estimated reduction of about 350 jobs and total program charges of about $40 million. Charge shown is the amount recognized in fiscal 2017 ($8 million); remaining charges expected through 2019. Multi-year program — only current-year activity extracted.
2017-12-31restructuringin_progress2017-01Analog and Embedded Processing segmentsUSD 3 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Product line reorganization within the two reportable segments beginning January 2017; $3 million of severance and benefit charges recognized in fiscal 2017 (an additional $18 million was recognized in 2016). Further charges not expected to be material; $16 million paid to terminated employees through fiscal year-end. Employees affected not disclosed.
2017-12-31restructuringin_progress2016-012019-12-31Greenock, ScotlandManufacturingUSD 8 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Phase out of manufacturing facility in Greenock, Scotland. Total estimated charges $40 million. $8 million recognized in 2017 for severance, benefits, and accelerated depreciation. Remaining charges expected through 2019.
2017-12-31restructuringcompleted2017-012017-12-31GlobalAnalog and Embedded ProcessingUSD 3 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Reorganization of product lines within reportable segments. $3 million recognized in 2017 for severance and benefit costs. $18 million recognized in 2016. Any further charges not expected to be material.
2017-12-31restructuringin_progressUSD 11,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2017-12-31restructuringin_progressProduct Line Reorganization [Member]USD 3,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2017-12-31restructuringin_progress350Manufacturing Facility In Greenock Scotland [Member]USD 8,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
Expected positions to be eliminated
2017-09-30plant_closurein_progress2019-12-31Greenock, ScotlandOtherUSD 40 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Phase-out of a manufacturing facility; charges primarily severance and benefits plus accelerated depreciation. Total estimated charges about $40 million, of which $29 million recognized through September 30, 2017; remaining charges expected through 2019. Q3 2017 charge $1 million; nine-month charge $5 million. No employee count disclosed.
2017-09-30restructuringin_progress2017-01-01USD 21 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Product-line reorganization announced January 2017; $18 million of severance and benefit charges recognized in Q4 2016 plus $3 million in first half of 2017. $10 million paid to terminated employees as of September 30, 2017. No employee count disclosed.
2017-09-30plant_closurein_progress2019-12-31Greenock, ScotlandManufacturingUSD 5 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Phase-out of the Greenock, Scotland manufacturing facility; $1M charged in Q3 2017 and $5M YTD, primarily severance, benefits and accelerated depreciation. No employee count disclosed; remaining charges expected through 2019.
2017-09-30restructuringin_progress2017-01-01Analog and Embedded Processing segments (product line reorganization)USD 3 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Product-line reorganization announced January 2017; $18M severance charge in Q4 2016 plus $3M in first half 2017. $10M paid to terminated employees as of 2017-09-30. No employee count disclosed; further charges not expected to be material.
2017-09-30restructuringin_progress2019-12-31Greenock, ScotlandManufacturingUSD 1 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Phase-out of manufacturing facility. $1M incurred in Q3 2017. Total estimated charges ~$40M, of which $29M recognized through Sept 30, 2017. Remaining charges expected through 2019.
2017-09-30restructuringcompletedGlobalAnalog and Embedded ProcessingUSD 3 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Reorganization of product lines within Analog and Embedded Processing segments announced Jan 2017. $3M incurred in first half of 2017. Any further charges not expected to be material.
2017-09-30restructuringin_progressManufacturing Facility In Greenock Scotland [Member]USD 1,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2017-09-30restructuringin_progressUSD 8,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2017-06-30plant_closurein_progress2018-12-31Greenock, ScotlandOtherUSD 4 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Phase-out of a manufacturing facility; charges primarily severance and benefits plus accelerated depreciation. YTD charge $4 million; Q2 charge $2 million. Total program estimated at about $40 million, of which $28 million recognized through June 30, 2017; remaining charges expected through end of 2018.
2017-06-30restructuringin_progress2016-10-01Analog and Embedded Processing product line reorganizationUSD 3 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Severance and benefit costs from January 2017 reorganization of product lines within the two reportable segments; $18 million recognized in Q4 2016 plus $3 million in first half of 2017. No employee count disclosed. Accrued restructuring balance was $36 million at June 30, 2017.
2017-06-30plant_closurein_progress2018-12-31Greenock, ScotlandManufacturingUSD 4 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Phase-out of manufacturing facility; $4M charged in H1 2017 ($2M in Q2), primarily severance, benefits, and accelerated depreciation. No employee count disclosed.
2017-06-30restructuringin_progress2016-10-012018-12-31Analog and Embedded Processing product linesUSD 3 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Product-line reorganization within two reportable segments; $18M recognized in Q4 2016 and additional $3M in H1 2017. Total program estimated at ~$40M, of which $28M recognized through 2017-06-30. No employee count disclosed.
2017-06-30restructuringin_progress2018-12-31Greenock, ScotlandManufacturingUSD 2 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Phase-out of manufacturing facility. $2M incurred in Q2 2017 (severance, benefits, accelerated depreciation). Total estimated charges ~$40M; $28M recognized through June 30, 2017. Remaining charges expected through end of 2018.
2017-06-30restructuringcompletedGlobalAnalog and Embedded ProcessingUSD 3 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Reorganization of product lines within Analog and Embedded Processing segments. $3M incurred in H1 2017 (severance and benefits). $18M incurred in Q4 2016. Further charges not expected to be material.
2017-06-30restructuringin_progressProduct Line Reorganization [Member]USD 3,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2017-06-30restructuringin_progressManufacturing Facility In Greenock Scotland [Member]USD 2,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2017-06-30restructuringin_progressUSD 7,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2017-03-31plant_closurein_progress2018-12-31Greenock, ScotlandOtherUSD 2 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Phase-out of a manufacturing facility in Greenock, Scotland; Q1 2017 charges comprised severance and benefits costs plus accelerated depreciation. Total program charges estimated at about $40 million, of which $26 million recognized through March 31, 2017; remaining charges expected through end of 2018.
2017-03-31restructuringin_progressAnalog and Embedded Processing product linesUSD 2 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Severance and benefit costs for reorganization of product lines within the two reportable segments beginning January 2017; $18 million recognized in Q4 2016 and an additional $2 million in Q1 2017. Further charges not expected to be material. $2 million paid to terminated employees as of March 31, 2017.
2017-03-31plant_closurein_progress2016-10-012018-12-31Greenock, ScotlandManufacturingUSD 40 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Phase-out of Greenock manufacturing facility; $2M charged in Q1 2017 (severance, benefits, accelerated depreciation), $18M in Q4 2016; ~$40M total estimated, $26M recognized through 2017-03-31, remainder expected through end of 2018. Employee headcount affected not disclosed.
2017-03-31restructuringin_progress2016-10-012018-12-31Not specifiedProduct line reorganization across Analog and Embedded Processing segmentsrestructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Product-line reorganization effective January 2017; $4M charged in Q1 2017 per accrual roll-forward (vs. $2M described as Greenock-related), $18M in Q4 2016. Severance accrual balance $39M at 2017-03-31. Employee counts not disclosed.
2017-03-31restructuringin_progress2018-12-31Greenock, ScotlandManufacturingUSD 2 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Phase-out of manufacturing facility. $2M incurred in Q1 2017 (severance, benefits, accelerated depreciation). Total estimated charges ~$40M; $26M recognized through March 31, 2017. Remaining charges expected through end of 2018.
2017-03-31restructuringin_progressGlobalAnalog and Embedded ProcessingUSD 2 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Reorganization of product lines within Analog and Embedded Processing segments. $2M incurred in Q1 2017 for severance and benefit costs. $18M recognized in Q4 2016. $2M paid to terminated employees as of March 31, 2017. Further charges not expected to be material.
2017-03-31restructuringin_progressProduct Line Reorganization [Member]USD 2,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2017-03-31restructuringin_progressManufacturing Facility In Greenock Scotland [Member]USD 2,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2017-03-31restructuringin_progressUSD 4,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2016-12-31plant_closurein_progress3502016-012018-12-31Greenock, Scotland (United Kingdom)Analog (manufacturing)USD 40 (millions)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Multi-year phase-out of the Greenock, Scotland manufacturing facility announced January 2016, with production moving to 200mm TI facilities in Germany, Japan and Maine. Figures are program totals for the phase-out through end of 2018: expected reduction of about 350 jobs and about $40M estimated charges, primarily severance and related benefits; $7M recognized in 2016 and $17M in 2015, remainder expected through 2018. Greenock facility is listed under the Analog segment in the Item 2 Properties table.
2016-12-31restructuringannounced2017-01USD 18 (millions)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
$18M of Q4 2016 restructuring charges for severance and benefit costs related to a reorganization of product lines announced in January 2017 (after fiscal year-end, before the February 2017 filing); no payments had been made as of December 31, 2016. Number of employees affected and affected segment not disclosed.
2016-12-31plant_closurein_progress3502016-012018-12-31Greenock, ScotlandAnalog (manufacturing)USD 40 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Multi-year program announced January 2016 to phase out the Greenock facility by end of 2018, moving production to 200mm sites in Germany, Japan and Maine. Charge of about $40M total (severance, benefits, accelerated depreciation); $7M recognized in FY2016 and $17M in FY2015, remainder through 2018. Count of about 350 jobs is the expected total reduction for the program, not FY2016-only. Accrued restructuring balance was $40M at 2016-12-31.
2016-12-31restructuringannounced2017-01Not specifiedProduct lines (reorganization)USD 18 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Severance and benefit costs for a product-line reorganization recognized in Q4 2016; the reorganization itself was announced in January 2017, after fiscal year-end. No payments had been made as of 2016-12-31 and no employee count was disclosed. Included within the $25M of total FY2016 restructuring charges.
2016-12-31restructuringin_progress3502016-01-012018-12-31Greenock, ScotlandManufacturingUSD 40 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Announced in January 2016 to phase out manufacturing facility through end of 2018. Total estimated charges $40 million, primarily severance and related benefit costs associated with expected reduction of about 350 jobs. $7 million recognized in 2016.
2016-12-31restructuringcompleted2017-01-01GlobalProduct LinesUSD 18 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Recognized $18 million of restructuring charges in Q4 2016 for severance and benefit costs related to reorganization of product lines announced in January 2017. No payments made as of Dec 31, 2016.
2016-12-31restructuringin_progressUSD 25,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2016-12-31restructuringin_progressTwo Thousand Sixteen Product Line Reorganization [Member]USD 18,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2016-12-31restructuringin_progress350Manufacturing Facility In Greenock Scotland [Member]USD 7,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
Expected positions to be eliminated
2016-09-30plant_closurein_progress2018-12-31Greenock, ScotlandManufacturingUSD 1 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Plan to phase out the Greenock manufacturing facility through end of 2018; Q3 charge of $1 million ($5 million YTD) for severance, benefits and accelerated depreciation. Total estimated charges about $40 million, of which $22 million recognized through September 30, 2016. No employee count disclosed.
2016-09-30plant_closurein_progress2018-12-31Greenock, Scotland, United KingdomManufacturingUSD 5 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Phase-out of Greenock manufacturing facility through end of 2018; $5M charges in nine months 2016 ($1M in Q3), severance/benefits and accelerated depreciation; total estimated ~$40M, $22M recognized through 2016-09-30; no employee count disclosed; restructuring accrual balance $23M at 2016-09-30
2016-09-30restructuringin_progress2018-12-31Greenock, ScotlandManufacturingUSD 5 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Phase out of manufacturing facility. Total estimated charges ~$40 million; $22 million recognized through Sept 30, 2016. Charges include severance, benefits, and accelerated depreciation.
2016-09-30restructuringin_progressSemiconductor Manufacturing Facilities In Greenock Scotland [Member]USD 1,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2016-09-30restructuringin_progressUSD 5,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2016-06-30plant_closurein_progress2018-12-31Greenock, ScotlandManufacturingUSD 40 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Phase-out of a manufacturing facility; charges comprise severance, benefits and accelerated depreciation. No employee count disclosed. $21 million of the estimated ~$40 million recognized through June 30, 2016; no payments made as of quarter-end.
2016-06-30plant_closurein_progress2018-12-31Greenock, ScotlandManufacturingUSD 4 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Six-month 2016 charge of $4M (Q2 charge $2M) for phasing out the Greenock facility through end of 2018; severance, benefits and accelerated depreciation. Total program estimated at about $40M, of which $21M recognized through 2016-06-30; no payments made to date. Number of employees affected not disclosed.
2016-06-30plant_closurein_progress2018-12-31Greenock, ScotlandManufacturingUSD 4 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Phase out of manufacturing facility through end of 2018. Charges include severance, benefits, and accelerated depreciation. Total estimated charges are about $40 million.
2016-06-30restructuringin_progressUSD 2,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2016-03-31plant_closurein_progress2018-12-31Greenock, ScotlandManufacturingUSD 2 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Phase-out of a manufacturing facility in Greenock, Scotland. Q1 2016 charges of $2 million comprised severance and benefits costs plus accelerated depreciation. Total estimated charges about $40 million, of which $19 million recognized through March 31, 2016; no payments made as of quarter-end. Employee count not disclosed.
2016-03-31plant_closurein_progress2018-12-31Greenock, ScotlandManufacturingUSD 40 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Phase-out of Greenock manufacturing facility through end of 2018; $2M charged in Q1 2016 (severance, benefits, accelerated depreciation); $19M of ~$40M total recognized through 2016-03-31; no employee count disclosed. Restructuring accrual balance $29M at 2016-03-31 ($17M Scotland, $12M prior actions).
2016-03-31restructuringin_progress2018-12-31Greenock, ScotlandManufacturingUSD 2 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Phase out of manufacturing facility. Charges comprised of severance, benefits, and accelerated depreciation. Total estimated charges ~$40 million.
2016-03-31restructuringin_progressUSD 2,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2015-12-31plant_closureannounced3502016-01Greenock, ScotlandManufacturingUSD 40 (millions)subsequent_events
f5-10k / GLM-5.3-flash-HTML
Approximately 350 jobs affected. Decision made in Q4 2015; publicly announced January 2016. Facility to be phased out over the next three years, with production moved to 200mm facilities in Germany, Japan and Maine; ~$35 million annualized savings expected. Estimated total charges of ~$40 million, primarily severance and related benefits; $17 million recognized in Q4 2015, remainder expected over the following three years; no payments made as of 2015-12-31.
2015-12-31plant_closureannounced3502016-012019-12-31Greenock, ScotlandManufacturingUSD 40 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Decision made in Q4 2015; announced January 2016 as a subsequent event. Phase-out of an older manufacturing facility over three years, moving production to 200-mm sites in Germany, Japan and Maine, with expected annualized savings of about $35 million. Estimated total charges of about $40 million, primarily severance and benefits; $17 million recognized in Q4 2015 (within full-year 2015 restructuring charges of $14 million, net of changes in estimates on prior actions). No payments made as of 2015-12-31.
2015-12-31restructuringin_progress3502016-01-012018-12-31Greenock, ScotlandManufacturingUSD 40 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Announced in January 2016 to phase out Greenock facility over three years. Expected reduction of about 350 jobs with total charges of about $40 million. $17 million recognized in Q4 2015.
2015-12-31restructuringin_progress350USD 14,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
Expected positions to be eliminated
2015-09-30restructuringcompleted2014-01-01JapanEmbedded ProcessingUSD -1 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Cost-saving actions announced January 2014 in Embedded Processing and Japan to reduce expenses and refocus investments; now complete. Nine-month 2015 charge reflects a change in estimates; remaining severance accrual of $10 million (severance and benefits) and $5 million (other charges) as of September 30, 2015.
2015-09-30plant_closurecompleted2013-12-31Houston, Texas and Hiji, JapanFormer Wireless businessrestructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Pre-2013 restructuring of former Wireless business and closures of manufacturing facilities in Houston, Texas, and Hiji, Japan; completed in 2013. Remaining severance accrual of $8 million as of September 30, 2015.
2015-09-30restructuringcompleted2014-012015-09-30JapanEmbedded ProcessingUSD -1 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Cost-saving actions announced January 2014 covering Embedded Processing and Japan; filing states actions are now complete. Charge shown is the nine-months 2015 amount, a credit from change in estimate. No employee count disclosed; program presented as a consolidated total.
2015-09-30restructuringcompleted2013-12-31United States and JapanWireless business; manufacturing operationsrestructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Restructuring of the former Wireless business plus closures of the Houston, Texas and Hiji, Japan facilities, completed in 2013; announcement date not disclosed. Residual severance payments of $18 million in the first nine months of 2015 with $8 million accrual remaining at quarter end. No employee count disclosed.
2015-09-30restructuringcompleted2014-01Embedded Processing and JapanEmbedded ProcessingUSD -1 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
2013 actions announced in Jan 2014 to reduce expenses in Embedded Processing and Japan. Actions are now complete. YTD 2015 charge was $(1) million.
2015-09-30restructuringcompleted2013Houston, Texas and Hiji, JapanWirelessrestructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Prior actions involving restructuring of former Wireless business and closure of manufacturing facilities. Completed in 2013. No charges recorded in current period.
2015-09-30restructuringin_progressUSD 0 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2015-06-30restructuringcompleted2014-01-01Japan and Embedded Processing operationsEmbedded ProcessingUSD -1 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Cost-saving actions announced January 2014 in Embedded Processing and Japan; now complete. Six-month 2015 charge of $(1) million reflects a change in estimate; severance accrual of $13 million remained at June 30, 2015.
2015-06-30plant_closurecompleted2013-12-31Houston, Texas and Hiji, JapanFormer Wireless businessrestructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Pre-2013 restructuring of former Wireless business and closures of Houston, Texas and Hiji, Japan manufacturing facilities; completed in 2013. $13 million severance accrual remained at June 30, 2015.
2015-06-30restructuringcompleted2014-01JapanEmbedded Processingrestructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Cost-saving actions announced January 2014 in Embedded Processing and Japan; filing states actions are now complete. No employee count disclosed; six-month 2015 restructuring charge was a $(1)M credit and remaining accrual was $19M at 2015-06-30.
2015-06-30restructuringcompletedUnited States; JapanWireless; Manufacturing (Houston, Texas and Hiji, Japan facility closures)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Prior-actions program announced before 2013 and completed in 2013; disclosed here only via severance accrual roll-forward. No employee count disclosed; $13M of severance payments in six-month 2015 and $13M remaining accrual at 2015-06-30.
2015-06-30restructuringcompleted2014-01JapanEmbedded ProcessingUSD -1 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
2013 actions announced in Jan 2014 to reduce expenses in Embedded Processing and Japan. Actions are now complete. YTD 2015 charge was $(1) million.
2015-06-30restructuringcompleted2013Houston, Texas; Hiji, JapanWireless; Manufacturingrestructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Prior actions involving restructuring of former Wireless business and closures of manufacturing facilities in Houston and Hiji. Completed in 2013.
2015-06-30restructuringin_progressUSD 0 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2015-03-31restructuringin_progress1,1002014-012015-06Worldwide, including JapanEmbedded Processing and Japan operationsUSD 74 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Cost-saving actions announced January 2014 to reduce expenses and focus investments; elimination of about 1,100 jobs worldwide. Cumulative charges of $74 million recognized through March 31, 2015, with no further material charges expected; $48 million paid to terminated employees for severance and benefits as of March 31, 2015. Actions expected to be completed by mid-2015.
2015-03-31restructuringin_progress1,1002014-01-012015-06-30Worldwide (including Japan)Embedded Processing; Japan operationsUSD 74 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Cumulative $74M restructuring charges recognized through 2015-03-31, with $48M paid for severance and benefits; no further material charges expected. Filer states elimination of about 1,100 jobs worldwide; actions announced January 2014 and expected complete by mid-2015.
2015-03-31plant_closurecompleted2013-12-31Houston, Texas, United States; Hiji, JapanManufacturing (former Wireless business restructuring and facility closures)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Prior restructuring actions completed in 2013; $356M paid to terminated employees for severance and benefits as of 2015-03-31. Remaining severance accrual of $20M for prior actions at quarter-end. No employee-affected count disclosed for these closures.
2015-03-31restructuringin_progress1,1002014-012015-06-30WorldwideEmbedded Processing; JapanUSD -1 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Announced Jan 2014. Cost reductions include elimination of about 1,100 jobs. Cumulative charges recognized through Mar 31, 2015 were $74 million. No further material charges expected. $48 million paid to terminated employees for severance and benefits as of Mar 31, 2015.
2015-03-31restructuringin_progress1,100USD -1,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
Expected positions to be eliminated
2014-12-31restructuringin_progress1,1002014-012015-06Worldwide (Japan component)Embedded Processing segment and Japan operationsUSD 75 (millions)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Cost-saving actions announced January 2014 targeting Embedded Processing and Japan; roughly 1,100 job eliminations worldwide; expected completion stated as mid-2015. Charge is cumulative through fiscal year-end 2014, of which $26M (severance $16M plus other exit costs $10M) was recognized in 2014; $43M paid to terminated employees for severance and benefits as of 2014-12-31; no further material charges expected. Prior-year programs (2012 Wireless restructuring and Houston/Hiji plant closures, both completed in 2013) excluded as current-year activity was limited to reversals/payments.
2014-12-31restructuringin_progress1,1002014-012015-06WorldwideEmbedded Processing; Japan operationsUSD 75 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Cost-saving actions announced January 2014 to reduce expenses and refocus investment; about 1,100 jobs eliminated worldwide. Charge of $75M is cumulative through fiscal year-end (FY2014 charges for this program were $26M: $16M severance/benefits and $10M other exit costs); $43M paid to terminated employees through 2014-12-31. Filer expects no further material charges.
2014-12-31restructuringin_progress1,1002014-012015-06-30WorldwideEmbedded Processing and JapanUSD 75 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Announced January 2014 cost-saving actions in Embedded Processing and Japan. Cumulative charges recognized through Dec 31, 2014 were $75 million. No further material charges expected.
2014-12-31restructuringcompleted20122013-12-31WorldwideWirelessUSD 383 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
2012 restructuring of Wireless business completed in 2013. Cumulative charges $383 million including $90 million goodwill impairment.
2014-12-31plant_closurecompleted20122013-12-31Houston, Texas and Hiji, JapanManufacturingUSD 200 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Closure of two older semiconductor manufacturing facilities announced in 2012, completed by end of 2013. Cumulative charges $200 million.
2014-12-31restructuringin_progress1,1002013 Action [Member]USD 75,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
Expected positions to be eliminated
2014-12-31restructuringin_progressPrior Actions [Member] / Former Reporting Segment Wireless [Member]USD 383,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2014-12-31restructuringin_progressUSD 20,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2014-12-31restructuringin_progressBusiness Restructuring Impairments And Other Charges Reserves Member / 2013 Action [Member]USD 10,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2014-12-31restructuringin_progressBusiness Restructuring Impairments And Other Charges Reserves Member / Prior Actions [Member]USD 0 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2014-12-31restructuringin_progressEmployee Severance And Benefits Charges Reserves Member / 2013 Action [Member]USD 16,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2014-12-31restructuringin_progressEmployee Severance And Benefits Charges Reserves Member / Prior Actions [Member]USD -6,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2014-12-31restructuringin_progressPrior Actions [Member]USD -6,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2014-09-30restructuringin_progress1,1002014-01-012015-06-30Worldwide, including JapanEmbedded Processing and Japan operationsUSD 74 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Cost-saving actions announced January 2014 to reduce expenses and focus investments; elimination of about 1,100 jobs worldwide. Cumulative charges of $74 million recognized through September 30, 2014, with no further material charges expected; $36 million paid to terminated employees for severance and benefits as of September 30, 2014. Remaining severance accrual of $31 million plus $7 million other charges.
2014-09-30restructuringcompleted2012-01-01Wireless businessUSD 383 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Restructuring of the Wireless business to reduce expenses and focus investments; action now complete. Cumulative charges of $383 million, including a $90 million goodwill impairment. $241 million paid to terminated employees for severance and benefits as of September 30, 2014. Included sale of Nice, France site (completed Q1 2014, $30 million gain).
2014-09-30plant_closurecompleted2012-01-012013-12-31Houston, Texas and Hiji, JapanSemiconductor manufacturingUSD 200 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Closure of two older semiconductor wafer fabrication facilities announced in 2012; both closures completed by end of 2013. Cumulative restructuring charges of $200 million; $102 million paid to terminated employees for severance and benefits as of September 30, 2014.
2014-09-30restructuringin_progress1,1002014-012015-06-30WorldwideEmbedded Processing; JapanUSD 74 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Filer describes elimination of about 1,100 jobs worldwide; $74M is cumulative charges recognized since January 2014 through 2014-09-30 (of which $25M in the nine months then ended), not a quarterly charge. $36M paid to terminated employees as of 2014-09-30; no further material charges expected.
2014-09-30restructuringcompleted2012WirelessUSD 383 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Action described as now complete; cumulative charge includes a $90M goodwill impairment. $241M paid to terminated employees as of 2014-09-30. Related Nice, France site sale completed in Q1 2014 with a $30M gain. No employee count disclosed.
2014-09-30plant_closurecompleted20122013-12-31United States and JapanManufacturingUSD 200 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Closure of older semiconductor manufacturing facilities in Houston, Texas and Hiji, Japan, both completed by end of 2013; $102M paid to terminated employees as of 2014-09-30. No employee count disclosed.
2014-09-30restructuringin_progress1,1002014-01-012015-06-30WorldwideEmbedded Processing; JapanUSD 74 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Announced January 2014. Cost reductions include elimination of about 1,100 jobs. Cumulative charges recognized through Sept 30, 2014 were $74 million. No further material charges expected.
2014-09-30restructuringcompleted2012-01-01WorldwideWirelessUSD 383 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Announced 2012. Action is now complete. Cumulative restructuring charges recognized were $383 million, including $90 million goodwill impairment.
2014-09-30plant_closurecompleted2012-01-012013-12-31Houston, Texas; Hiji, JapanManufacturingUSD 200 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Closure of two older semiconductor manufacturing facilities. Completed by end of 2013. Cumulative restructuring charges recognized were $200 million.
2014-09-30restructuringin_progressEmployee Severance And Benefits Charges Reserves Member / 2012 Action [Member]USD -6,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2014-09-30restructuringin_progressEmployee Severance And Benefits Charges Reserves Member / Prior Actions [Member]USD 0 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2014-09-30restructuringin_progressBusiness Restructuring Impairments And Other Charges Reserves Member / 2013 Action [Member]USD 7,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2014-09-30restructuringin_progressUSD 19,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2014-09-30restructuringin_progressBusiness Restructuring Impairments And Other Charges Reserves Member / Prior Actions [Member]USD 0 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2014-09-30restructuringin_progressEmployee Severance And Benefits Charges Reserves Member / 2013 Action [Member]USD 18,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2014-09-30restructuringin_progress1,1002013 Action [Member]USD 74,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
Expected positions to be eliminated
2014-09-30restructuringin_progress2012 Action [Member]USD 383,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2014-09-30restructuringin_progressPrior Actions [Member]USD 0 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2014-06-30restructuringin_progress1,1002014-01-012015-06-30Worldwide, including JapanEmbedded Processing and Japan operationsUSD 77 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Cost-saving actions announced January 2014 to focus investments on higher-growth markets; cumulative charges through June 30, 2014 comprise $70 million severance and benefits and $7 million other exit costs, with no further charges expected. Expected annualized savings of about $130 million by end of 2014. As of June 30, 2014, $6 million paid to terminated employees.
2014-06-30restructuringcompleted2012-01-01Wireless businessUSD 383 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Restructuring of the Wireless business to reduce expenses and refocus investments; cumulative charges of $383 million include a $90 million goodwill impairment. As of June 30, 2014, $216 million paid to terminated employees for severance and benefits. Action is now complete.
2014-06-30plant_closurecompleted2012-01-012013-12-31Houston, Texas and Hiji, JapanSemiconductor manufacturing facilitiesUSD 200 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Closure of two older semiconductor manufacturing facilities announced in 2012; cumulative restructuring charges of $200 million, with both closures completed by end of 2013. As of June 30, 2014, $101 million paid to terminated employees for severance and benefits.
2014-06-30restructuringin_progress1,1002014-012015-06-30Worldwide (including Japan)Embedded Processing; Japan operationsUSD 77 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Cost-saving actions announced January 2014; elimination of about 1,100 jobs worldwide. Cumulative charges through June 30, 2014 of $77M ($70M severance and benefits, $7M other exit costs), with $6M paid to terminated employees. MD&A states expected annualized savings of about $130M by end of 2014. Also disclosed in MD&A Restructuring actions section; sourced here from the footnote.
2014-06-30restructuringcompleted2012GlobalWirelessUSD 383 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
2012 Wireless restructuring action, now complete (completed in 2013). Cumulative charges of $383M including a $90M goodwill impairment; $216M paid to terminated employees for severance and benefits as of June 30, 2014. Employee headcount affected not disclosed. A $6M credit from a change in estimate was recognized in the six months ended June 30, 2014.
2014-06-30plant_closurecompleted20122013-12-31Houston, Texas, USA and Hiji, JapanSemiconductor manufacturingUSD 200 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Closure of two older semiconductor manufacturing facilities announced in 2012 and completed by end of 2013. Cumulative restructuring charges of $200M; $101M paid to terminated employees for severance and benefits as of June 30, 2014. Employee headcount affected not disclosed.
2014-06-30restructuringin_progress1,1002014-01-012015-06-30WorldwideEmbedded Processing; JapanUSD 77 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Announced Jan 2014. Cost reductions include elimination of about 1,100 jobs. Cumulative charges recognized through June 30, 2014 were $77 million ($70M severance, $7M other exit costs). No further charges expected.
2014-06-30restructuringcompleted2012-01-012013-12-31WorldwideWirelessUSD 383 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Announced 2012. Action now complete. Cumulative restructuring charges recognized were $383 million, including $90 million goodwill impairment.
2014-06-30plant_closurecompleted2012-01-012013-12-31Houston, Texas; Hiji, JapanManufacturingUSD 200 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Closure of two older semiconductor manufacturing facilities. Completed by end of 2013. Cumulative restructuring charges recognized were $200 million.
2014-06-30restructuringin_progress1,1002013 Action [Member]USD 77,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
Expected positions to be eliminated
2014-06-30restructuringin_progress2012 Action [Member]USD 383,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2014-06-30restructuringin_progressEmployee Severance And Benefits Charges Reserves Member / 2013 Action [Member]USD 21,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2014-06-30restructuringin_progressUSD 22,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2014-06-30restructuringin_progressEmployee Severance And Benefits Charges Reserves Member / Prior Actions [Member]USD 0 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2014-06-30restructuringin_progressBusiness Restructuring Impairments And Other Charges Reserves Member / Prior Actions [Member]USD 0 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2014-06-30restructuringin_progressEmployee Severance And Benefits Charges Reserves Member / 2012 Action [Member]USD -6,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2014-06-30restructuringin_progressBusiness Restructuring Impairments And Other Charges Reserves Member / 2013 Action [Member]USD 7,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2014-06-30restructuringin_progressPrior Actions [Member]USD 200,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2014-03-31restructuringin_progress1,1002014-01-012015-06-30Worldwide (Embedded Processing and Japan)Embedded Processing; Japan operationsUSD 85 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Announced January 2014; about 1,100 jobs eliminated worldwide with expected annualized savings of about $130 million by end of 2014. Total expected charges about $85 million, of which $81 million recognized through March 31, 2014 ($76 million severance and benefits, $5 million other exit costs). $49 million recorded in Q4 2013 for Embedded Processing; $32 million for Japan recognized in Q1 2014 for voluntary benefits accepted. Only $1 million paid to terminated employees as of March 31, 2014.
2014-03-31restructuringcompleted2012-01-012013-12-31Wireless businessUSD 383 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Wireless business restructuring now complete; cumulative charges of $383 million including a $90 million goodwill impairment. $198 million paid to terminated employees for severance and benefits as of March 31, 2014. Included sale of Nice, France site in Q1 2014 generating a $30 million gain.
2014-03-31plant_closurecompleted2012-01-012013-12-31Houston, Texas and Hiji, JapanSemiconductor manufacturing facilitiesUSD 200 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Closure of two older semiconductor manufacturing facilities completed by end of 2013; cumulative charges of $200 million. $101 million paid to terminated employees for severance and benefits as of March 31, 2014.
2014-03-31restructuringin_progress1,1002014-012015-06-30Worldwide (Embedded Processing and Japan)Embedded Processing; Japan operationsUSD 85 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
About 1,100 jobs to be eliminated; $81M of the ~$85M expected total recognized through March 31, 2014 ($76M severance/benefits, $5M other exit costs). Includes $32M of Japan voluntary benefits accepted in Q1 2014. Expected annualized savings of about $130M by end of 2014; $1M paid to terminated employees as of March 31, 2014. Filer presents the program as a single consolidated total, not split by geography.
2014-03-31restructuringcompleted20122013-12-31Global (Wireless business)WirelessUSD 383 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Cumulative charges include a $90M goodwill impairment; $198M paid to terminated employees as of March 31, 2014. No employee headcount disclosed. Sale of the Nice, France site (part of this action) completed in Q1 2014 with a $30M gain.
2014-03-31plant_closurecompleted20122013-12-31Houston, Texas, USA and Hiji, JapanSemiconductor manufacturing facilitiesUSD 200 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Closure of two older manufacturing facilities completed by end of 2013; $101M paid to terminated employees as of March 31, 2014. No employee headcount disclosed. Q1 2014 included $7M of gains tied to sales of other assets associated with these sites.
2014-03-31restructuringin_progress1,1002014-01-012015-06-30WorldwideEmbedded Processing; JapanUSD 85 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Announced January 2014. Cost reductions include elimination of about 1,100 jobs. Total expected charges ~$85 million. $81 million recognized through March 31, 2014.
2014-03-31restructuringin_progressEmployee Severance And Benefits Charges Reserves Member / 2012 Action [Member]USD -6,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2014-03-31restructuringin_progressUSD 26,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2014-03-31restructuringin_progressBusiness Restructuring Impairments And Other Charges Reserves Member / 2013 Action [Member]USD 5,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2014-03-31restructuringin_progressEmployee Severance And Benefits Charges Reserves Member / Prior Actions [Member]USD 0 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2014-03-31restructuringin_progressEmployee Severance And Benefits Charges Reserves Member / 2013 Action [Member]USD 27,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2014-03-31restructuringin_progressBusiness Restructuring Impairments And Other Charges Reserves Member / Prior Actions [Member]USD 0 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2014-03-31restructuringin_progress2013 Action [Member] / JAPANUSD 32,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2014-03-31restructuringin_progressOther Restructuring [Member] / 2013 Action [Member]USD 5,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2014-03-31restructuringin_progress2012 Action [Member]USD 383,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2014-03-31restructuringin_progressImpairment, Goodwill [Member] / 2012 Action [Member]USD 90,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2014-03-31restructuringin_progress1,1002013 Action [Member]USD 81,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
Expected positions to be eliminated
2014-03-31restructuringin_progressPrior Actions [Member] / Semiconductor manufacturing facilities in Hiji, Japan, and Houston, Texas [Member]USD 200,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2014-03-31restructuringin_progressOther Restructuring [Member] / Prior Actions [Member]USD -1,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2014-03-31restructuringin_progressAccelerated Depreciation of Facility Assets [Member] / Prior Actions [Member]USD 1,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2014-03-31restructuringin_progressOther Restructuring [Member] / 2012 Action [Member]USD 0 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2014-03-31restructuringin_progressPrior Actions [Member]USD 0 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2014-03-31restructuringin_progressAccelerated Depreciation of Facility Assets [Member] / 2012 Action [Member]USD 0 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-12-31restructuringannounced1,1002014-012015-06WorldwideEmbedded Processing; Japan operationsUSD 80 (millions)subsequent_events
f5-10k / GLM-5.3-flash-HTML
Announced January 2014, after fiscal year-end; disclosed within Note 3 and MD&A rather than a dedicated subsequent-events footnote. About 1,100 job eliminations worldwide; expected charges of about $80 million, all severance and related benefit costs. $49 million was recorded in Q4 2013 for the Embedded Processing component, with the remainder (Japan) expected in Q1 2014; no payments made as of December 31, 2013. MD&A cites expected annualized savings of about $130 million by end of 2014. Expected completion disclosed as 'substantially complete by mid-2015'.
2013-12-31restructuringcompleted1,70020122013-12-31WorldwideWireless (former segment); legacy wireless productsUSD 389 (millions)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Multi-year program announced in 2012; complete by end of 2013. Figures are cumulative through fiscal year-end 2013: about 1,700 jobs eliminated worldwide; $389 million cumulative restructuring charges including a $90 million non-tax-deductible goodwill impairment (recognized 2012) and $275 million cumulative severance and benefits. Fiscal 2013 charges were $38 million ($30 million severance, $6 million accelerated depreciation, $2 million other exit costs); $180 million paid to terminated employees as of December 31, 2013.
2013-12-31plant_closurecompleted50020122013-12-31Houston, Texas, United StatesWafer fabrication (semiconductor manufacturing)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
One of two older wafer fabrication facilities closed under a 2012 announcement; the filing states each facility employed about 500 people. Combined cumulative restructuring charges for the two closures were $200 million through 2013 ($39 million recognized in 2013); $97 million paid to terminated employees as of December 31, 2013. Both closures complete by end of 2013; charge figures not broken out per facility.
2013-12-31plant_closurecompleted50020122013-12-31Hiji, JapanWafer fabrication (semiconductor manufacturing)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
One of two older wafer fabrication facilities closed under a 2012 announcement; the filing states each facility employed about 500 people. Combined cumulative restructuring charges for the two closures were $200 million through 2013 ($39 million recognized in 2013); $97 million paid to terminated employees as of December 31, 2013. Both closures complete by end of 2013; charge figures not broken out per facility.
2013-12-31restructuringannounced1,1002014-012015-06-30Worldwide (including Japan)Embedded Processing and Japan operationsUSD 80 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Announced January 2014, after fiscal year-end; elimination of about 1,100 jobs worldwide with expected annualized savings of about $130 million by end of 2014. $49 million of severance recorded in Q4 2013 for the Embedded Processing component; the Japan component is expected to be recognized in Q1 2014. Filer does not split the 1,100 headcount between the two components.
2013-12-31restructuringcompleted1,70020122013-12-31WorldwideWireless (legacy wireless products)USD 38 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Headcount of about 1,700 jobs eliminated is cumulative for the program, which the filer states is now complete as of fiscal year-end 2013. Charge shown is the 2013 activity ($38 million); cumulative charges since January 1, 2011 were $389 million, including a $90 million goodwill impairment. $180 million of severance paid through December 31, 2013.
2013-12-31plant_closurecompleted50020122013-12-31United States (Houston, Texas)Embedded Processing wafer fabricationrestructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Older wafer fabrication facility closed during 2013; filer states each of the two facilities employed about 500 people. Closure complete by end of 2013. Prior-actions charges were $39 million in 2013 ($200 million cumulative since January 1, 2011, $97 million of severance paid through December 31, 2013); the filer does not allocate the charge between the two sites.
2013-12-31plant_closurecompleted50020122013-12-31Japan (Hiji)Wafer fabricationrestructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Older wafer fabrication facility closed during 2013; filer states each of the two facilities employed about 500 people. Closure complete by end of 2013. Prior-actions charges were $39 million in 2013 ($200 million cumulative since January 1, 2011); the filer does not allocate the charge between the two sites.
2013-12-31restructuringin_progress1,1002014-01-012015-06-30WorldwideEmbedded Processing and Japan operationsUSD 80 (millions)subsequent_events
f5-10k / Qwen3.6-27B-Q8_0
Announced in January 2014 (subsequent event). Cost reductions include elimination of about 1,100 jobs. Total expected charges about $80 million, all severance and related benefit costs. Substantially complete by mid-2015.
2013-12-31restructuringcompleted1,7002012-01-012013-12-31WorldwideWireless businessUSD 389 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Announced in 2012. Action is now complete, eliminating about 1,700 jobs. Cumulative restructuring charges of $389 million, including $90 million goodwill impairment.
2013-12-31plant_closurecompleted1,0002012-01-012013-12-31Houston, Texas and Hiji, JapanManufacturingUSD 200 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Announced in 2012 closure of two older semiconductor manufacturing facilities. Each employed about 500 people (total 1,000). Both complete by end of 2013. Cumulative charges $200 million.
2013-12-31restructuringin_progressEmployee Severance And Benefits Charges Reserves Member / 2013 Action [Member]USD 49,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2013-12-31restructuringin_progress2012 Action [Member]USD 38,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2013-12-31restructuringin_progressAccelerated Depreciation of Facility Assets [Member] / Prior Actions [Member]USD 28,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2013-12-31restructuringin_progressOther Restructuring [Member] / 2012 Action [Member]USD 105,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2013-12-31restructuringin_progressPrior Actions [Member]USD 39,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2013-12-31restructuringin_progressAccelerated Depreciation of Facility Assets [Member] / 2012 Action [Member]USD 6,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2013-12-31restructuringin_progressUSD 638,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2013-12-31restructuringin_progressEmployee Severance And Benefits Charges Reserves Member / 2012 Action [Member]USD 30,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2013-12-31restructuringin_progressEmployee Severance And Benefits Charges Reserves Member / Prior Actions [Member]USD 119,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2013-12-31restructuringin_progressOther Restructuring [Member] / Prior Actions [Member]USD 53,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2013-12-31restructuringin_progress2013 Action [Member]USD 49,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2013-12-31restructuringin_progressImpairment, Goodwill [Member] / 2012 Action [Member]USD 90,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2013-12-31restructuringin_progressPrior Actions [Member] / Semiconductor manufacturing facilities in Hiji, Japan, and Houston, Texas [Member]USD 200,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2013-12-31restructuringin_progressBusiness Restructuring Impairments And Other Charges Reserves Member / Prior Actions [Member]USD 33,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2013-12-31restructuringin_progressBusiness Restructuring Impairments And Other Charges Reserves Member / 2012 Action [Member]USD 8,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2013-09-30restructuringin_progress1,7002012-11-012013-12-31WorldwideFormer Wireless segment (legacy wireless products)USD 275 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Announced November 2012; expected to reduce annualized expenses by about $450 million. Cumulative severance and benefits cost of $275 million since initiation; $124 million paid to terminated employees as of September 30, 2013. Remaining severance accrual of $152 million at quarter-end.
2013-09-30plant_closurein_progress2011-10-012013-12-31Houston, Texas, USA and Hiji, JapanSemiconductor manufacturing facilitiesUSD 116 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Closure of two older wafer fabrication facilities announced beginning Q4 2011. Cumulative severance and benefits cost of $116 million; about $90 million paid to terminated employees as of September 30, 2013. Remaining severance accrual of $17 million at quarter-end.
2013-09-30reduction_in_forcecompleted3502011-09-012012-12-31Former National Semiconductor operationsUSD 17 (millions)other
f5-10q / GLM-5.3-flash-fp4-HTML
About 350 jobs eliminated by end of 2012 as a result of redundancies and cost efficiency measures following the National Semiconductor acquisition; severance and other benefits costs of $17 million recognized in 2012.
2013-09-30restructuringin_progress1,7002012-112013-12-31WorldwideWireless (legacy)USD 389 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
2012 Wireless action; expected to cut annualized expenses by about $450 million. Cumulative charge since initiation includes $275M severance, $9M accelerated depreciation, $105M other exit costs. $124M severance paid as of 2013-09-30; remaining accrual $152M.
2013-09-30plant_closurein_progress20112013-12-31Houston, Texas, USA and Hiji, JapanManufacturing (wafer fabrication)USD 187 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
2011 actions: closure of two older semiconductor manufacturing facilities. Cumulative charge includes $116M severance, $28M accelerated depreciation, $43M other exit costs; about $90M severance paid as of 2013-09-30. No employee count disclosed.
2013-09-30restructuringcompleted3502012-12-31Not specifiedNational Semiconductor integration (redundancies and cost efficiency)other
f5-10q / MiMo-V2.6-Flash-fp8-HTML
About 350 jobs eliminated by end of 2012 from National Semiconductor acquisition redundancies; cumulative severance and benefits charges of $86M, of which $82M paid as of 2013-09-30. Historical action, disclosed as context in this filing.
2013-09-30restructuringin_progress1,7002012-11-012013-12-31WorldwideFormer Wireless segmentUSD 389 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Action announced Nov 2012 to reduce annualized expenses by ~$450M. Cumulative charges of $389M recognized since initiation. $124M paid for severance/benefits as of Sept 30, 2013.
2013-09-30plant_closurein_progress2011-10-012013-12-31Houston, Texas and Hiji, JapanManufacturingUSD 187 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Closure of two older semiconductor manufacturing facilities. Cumulative charges of $187M recognized since initiation. $90M paid for severance/benefits as of Sept 30, 2013. Specific headcount not disclosed.
2013-09-30restructuringin_progress2011 Action [Member]USD 26,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-09-30restructuringin_progressUSD 16,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-09-30restructuringin_progress2012 Action [Member]USD 0 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-09-30restructuringin_progressAccelerated Depreciation of Facility Assets [Member] / 2011 Action [Member]USD 0 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-09-30restructuringin_progressAccelerated Depreciation of Facility Assets [Member] / 2012 Action [Member]USD 0 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-09-30restructuringin_progressEmployee Severance And Benefits Charges Reserves Member / 2011 Action [Member]USD 3,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-09-30restructuringin_progressOther Restructuring [Member] / 2012 Action [Member]USD 105,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-09-30restructuringin_progressEmployee Severance And Benefits Charges Reserves Member / 2012 Action [Member]USD 0 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-09-30restructuringin_progressOther Restructuring [Member] / 2011 Action [Member]USD 43,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-09-30restructuringin_progressEmployee Severance And Benefits Charges Reserves Member / Prior Actions [Member]USD 0 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-09-30restructuringin_progressBusiness Restructuring Impairments And Other Charges Reserves Member / 2012 Action [Member]USD 8,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-09-30restructuringin_progressBusiness Restructuring Impairments And Other Charges Reserves Member / Prior Actions [Member]USD 0 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-09-30restructuringin_progressBusiness Restructuring Impairments And Other Charges Reserves Member / 2011 Action [Member]USD 23,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-09-30restructuringin_progress1,7002012 Action [Member] / Scenario, Forecast [Member]restructuring_footnote
f5-10q / no-ai-xblr
2013-06-30restructuringin_progress1,7002012-11-012013-12-31WorldwideFormer Wireless segment (legacy wireless products)USD 275 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Announced November 2012; expected to reduce annualized expenses by about $450 million. About 1,700 jobs worldwide expected to be eliminated. Cumulative severance and benefits charges of $275 million since action initiated; $48 million paid to terminated employees as of June 30, 2013. Q2 2013 charges: $26 million severance, $3 million accelerated depreciation. Remaining severance accrual of $227 million at June 30, 2013.
2013-06-30plant_closurein_progress2011-10-012013-12-31Houston, Texas, USA and Hiji, JapanSemiconductor manufacturing facilitiesUSD 114 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Beginning Q4 2011, charges recognized for plans to close two older wafer fabrication facilities in Houston, Texas and Hiji, Japan in 2013. Cumulative severance and benefits charges of $114 million; about $52 million paid to terminated employees as of June 30, 2013. Q2 2013 charges: $1 million severance, $3 million other exit costs. Remaining severance accrual of $54 million at June 30, 2013.
2013-06-30reduction_in_forcecompleted3502011-09-012012-12-31National Semiconductor (acquired September 2011)USD 15 (millions)business_combinations_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
About 350 jobs eliminated by end of 2012 as a result of redundancies and cost efficiency measures following the National Semiconductor acquisition. Cumulative severance and other benefits charges of $15 million recognized in the six months ended June 30, 2012; no severance charges in 2013.
2013-06-30restructuringin_progress1,7002012-11-012013-12-31WorldwideWireless (former segment); legacy wireless productsUSD 29 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
About 1,700 jobs worldwide expected to be eliminated; action announced November 2012, expected to reduce annualized expenses by about $450 million. Q2 2013 charges of $29M comprise $26M severance/benefits and $3M accelerated depreciation; severance accrual remaining at 2013-06-30 was $227M. Announcement month stated, day not specified.
2013-06-30plant_closurein_progress2011-10-012013-12-31Houston, Texas, USA and Hiji, JapanSemiconductor manufacturing (wafer fabrication facilities)USD 4 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Planned closure of two older manufacturing facilities; charges began Q4 2011 (announcement quarter stated, exact date not specified). Q2 2013 charges of $4M comprise $1M severance/benefits and $3M other exit costs; about $52M paid to terminated employees cumulatively. Headcount affected not disclosed.
2013-06-30restructuringin_progress1,7002012-11-012013-12-31WorldwideFormer Wireless segmentUSD 389 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Announced Nov 2012. Expected to reduce annualized expenses by ~$450M. Cumulative charges of $389M recognized since initiation. $48M paid to terminated employees as of June 30, 2013.
2013-06-30plant_closurein_progress2011-10-012013-12-31Houston, Texas and Hiji, JapanManufacturingUSD 171 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Plans to close two older semiconductor manufacturing facilities. Cumulative charges of $171M recognized since initiation. $52M paid to terminated employees as of June 30, 2013. Specific headcount not disclosed in this filing.
2013-06-30restructuringin_progressOther Restructuring [Member] / 2011 Action [Member]USD 29,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-06-30restructuringin_progressUSD 48,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-06-30restructuringin_progressAccelerated Depreciation of Facility Assets [Member] / 2011 Action [Member]USD 0 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-06-30restructuringin_progressEmployee Severance And Benefits Charges Reserves Member / 2011 Action [Member]USD 114,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-06-30restructuringin_progressOther Restructuring [Member] / 2012 Action [Member]USD 105,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-06-30restructuringin_progressEmployee Severance And Benefits Charges Reserves Member / 2012 Action [Member]USD 26,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-06-30restructuringin_progressAccelerated Depreciation of Facility Assets [Member] / 2012 Action [Member]USD 6,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-06-30restructuringin_progress2012 Action [Member]USD 38,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-06-30restructuringin_progress2011 Action [Member]USD 4,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-06-30restructuringin_progressBusiness Restructuring Impairments And Other Charges Reserves Member / Prior Actions [Member]USD 0 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-06-30restructuringin_progressBusiness Restructuring Impairments And Other Charges Reserves Member / 2011 Action [Member]USD 9,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-06-30restructuringin_progressEmployee Severance And Benefits Charges Reserves Member / Prior Actions [Member]USD 0 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-06-30restructuringin_progressBusiness Restructuring Impairments And Other Charges Reserves Member / 2012 Action [Member]USD 8,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-03-31restructuringin_progress1,7002012-11-012013-12-31WorldwideWireless (legacy wireless products, reported in Other)USD 360 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Expected to reduce annualized expenses by about $450 million. Cumulative charges of $360 million recognized through March 31, 2013, comprising $249 million severance and benefits, $6 million accelerated depreciation, $15 million other exit costs and $90 million non-tax-deductible goodwill impairment. Q1 2013 charges of $9 million. About $33 million paid to terminated employees as of quarter-end.
2013-03-31plant_closurein_progress2011-10-012013-06-30Houston, Texas and Hiji, JapanSemiconductor manufacturing facilitiesUSD 167 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Closure of two older wafer fabrication facilities announced beginning Q4 2011; total estimated charge $215 million (about $135 million severance, $30 million accelerated depreciation, $50 million other exit costs). $167 million recognized through March 31, 2013; Q1 2013 charges of $6 million. About $30 million paid to terminated employees as of quarter-end.
2013-03-31restructuringcompleted3502011-09-012012-12-31National Semiconductor integrationUSD 86 (millions)business_combinations_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
About 350 jobs eliminated by end of 2012 as a result of redundancies and cost efficiency measures following the National Semiconductor acquisition. Cumulative charges of $86 million recognized, of which $81 million paid as of March 31, 2013.
2013-03-31restructuringin_progress1,7002012-112013-12-31WorldwideWirelessUSD 360 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
About 1,700 jobs worldwide expected to be eliminated; action expected to reduce annualized expenses by about $450 million. Cumulative charges of $360 million recognized as of March 31, 2013 (including $90 million non-tax-deductible goodwill impairment), of which $9 million recognized in Q1 2013; $33 million paid to terminated employees. Announcement month stated as November 2012; day not disclosed.
2013-03-31plant_closurein_progress2013-06-30Houston, Texas and Hiji, JapanManufacturingUSD 215 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Closure of two older semiconductor manufacturing facilities; total estimated charge of $215 million, of which about $135 million severance and related benefits, about $30 million accelerated depreciation and about $50 million other exit costs. $167 million recognized as of March 31, 2013 ($6 million in Q1 2013); about $30 million paid to terminated employees. No employee count disclosed. Announced beginning in Q4 2011 (exact date not stated); closures expected complete by mid-2013.
2013-03-31restructuringcompleted3502012-12-31National Semiconductor integrationUSD 86 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
About 350 jobs eliminated by the end of 2012 due to redundancies and cost efficiency measures following the September 2011 National Semiconductor acquisition; cumulative severance and other benefits charges of $86 million, of which $81 million paid as of March 31, 2013. Action completed before the quarter covered by this filing.
2013-03-31restructuringin_progress1,7002012-11-012013-12-31WorldwideFormer Wireless segmentUSD 360 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Announced Nov 2012. Expected to reduce annualized expenses by ~$450M. Cumulative charges recognized as of Mar 31, 2013: $360M ($249M severance/benefits, $6M accelerated depreciation, $15M other exit costs, $90M goodwill impairment). Q1 2013 charges: $9M.
2013-03-31plant_closurein_progress2011-10-012013-06-30Houston, Texas and Hiji, JapanManufacturingUSD 167 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Announced Q4 2011. Closure of two older semiconductor manufacturing facilities. Total estimated charge: $215M ($135M severance/benefits, $30M accelerated depreciation, $50M other exit costs). Cumulative charges recognized as of Mar 31, 2013: $167M. Q1 2013 charges: $6M.
2013-03-31restructuringin_progressEmployee Severance And Benefits Charges Reserves Member / 2012 Action [Member]USD 4,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-03-31restructuringin_progress2011 Action [Member] / Semiconductor manufacturing facilities in Hiji, Japan, and Houston, Texas [Member]USD 6,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-03-31restructuringin_progress2012 Action [Member]USD 9,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-03-31restructuringin_progressFacility Closing [Member] / 2011 Action [Member] / Semiconductor manufacturing facilities in Hiji, Japan, and Houston, Texas [Member]USD 1,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-03-31restructuringin_progressAccelerated Depreciation of Facility Assets [Member] / 2012 Action [Member]USD 3,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-03-31restructuringin_progressAccelerated Depreciation of Facility Assets [Member] / 2011 Action [Member] / Semiconductor manufacturing facilities in Hiji, Japan, and Houston, Texas [Member]USD 5,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-03-31restructuringin_progressFacility Closing [Member] / 2012 Action [Member]USD 2,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-03-31restructuringin_progressImpairment of Goodwill [Member] / 2012 Action [Member]USD 90,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-03-31restructuringin_progressUSD 15,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-03-31restructuringin_progressBusiness Restructuring Impairments And Other Charges Reserves Member / 2012 Action [Member]USD 5,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-03-31restructuringin_progressEmployee Severance And Benefits Charges Reserves Member / Prior Actions [Member]USD 0 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-03-31restructuringin_progressEmployee Severance And Benefits Charges Reserves Member / 2011 Action [Member]USD 0 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-03-31restructuringin_progressBusiness Restructuring Impairments And Other Charges Reserves Member / Prior Actions [Member]USD 0 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2013-03-31restructuringin_progressBusiness Restructuring Impairments And Other Charges Reserves Member / 2011 Action [Member]USD 6,000,000 (absolute)restructuring_footnote
f5-10q / no-ai-xblr
2012-12-31restructuringin_progress1,7002012-112013-12-31WorldwideWirelessUSD 351 (millions)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Refocus of Wireless business away from smartphones/tablets toward embedded markets; about 1,700 job eliminations expected. Of an estimated ~$360 million total program charge, $351 million was recognized in Q4 2012 ($245M severance and benefits, $13M other exit costs, $3M accelerated depreciation, $90M non-deductible goodwill impairment). Only $4 million of severance had been paid by year-end 2012; action expected to be substantially complete in 2013 with about $450 million of annualized expense savings.
2012-12-31plant_closurein_progress1,00020112013Hiji, Japan and Houston, Texas, United StatesSemiconductor manufacturing (wafer fabrication); charges recorded in Other (unallocated)USD 161 (millions)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Multi-year program to close two older wafer fabrication facilities; each facility employed about 500 people (aggregate ~1,000, derived from the per-facility disclosure). Cumulative charges of $161 million recognized through fiscal year-end 2012 of an estimated $215 million total ($135M severance, $30M accelerated depreciation, $50M other exit costs); $49 million of charges recognized in 2012 and $11 million of severance paid in 2012. Item 2 (Properties) footnote references a January 2012 announcement of the closures; charges under the '2011 action' began in Q4 2011.
2012-12-31reduction_in_forcecompleted3502011-092012-12-31Acquisition-related charges (National Semiconductor integration); recorded in Acquisition chargesUSD 16 (millions)business_combinations_footnote
f5-10k / GLM-5.3-flash-HTML
Post-closing employment reductions of roughly 350 former National Semiconductor jobs announced at the September 2011 acquisition closing; all positions eliminated by the end of 2012 due to redundancies and cost-efficiency measures. Approximately $16 million of additional severance expense recognized in 2012; cumulative charges of $86 million through 2012, with $65 million paid in 2012 and $14 million in 2011.
2012-12-31restructuringin_progress1,7002012-112013-12-31WorldwideWirelessUSD 351 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
About 1,700 jobs expected to be eliminated; total expected charges about $360M, of which about $245M severance. $351M recognized in Q4 2012 ($245M severance/benefits, $90M non-tax-deductible goodwill impairment, $13M other exit costs, $3M accelerated depreciation). Expected annualized expense reduction about $450M; action expected substantially complete by end of 2013. Implied 1,700 of 34,151 total employees.
2012-12-31plant_closurein_progress5002012-012013-12-31Japan (Hiji)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Value is facility employment (about 500 people), not a stated elimination count. Program covers two facilities with combined estimated charge of $215M, of which $161M recognized cumulatively through 2012-12-31 ($49M recognized in 2012; $11M paid to terminated employees in 2012). Item 2 states closures announced January 2012; Note 3 indicates charges began in Q4 2011. Cumulative through fiscal year-end.
2012-12-31plant_closurein_progress5002012-012013-12-31United States (Houston, Texas)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Value is facility employment (about 500 people), not a stated elimination count. Program covers two facilities with combined estimated charge of $215M, of which $161M recognized cumulatively through 2012-12-31 ($49M recognized in 2012; $11M paid to terminated employees in 2012). Item 2 states closures announced January 2012; Note 3 indicates charges began in Q4 2011. Cumulative through fiscal year-end.
2012-12-31restructuringcompleted3502011-09-232012-12-31National Semiconductor acquisition integrationUSD 16 (millions)business_combinations_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Employment reductions announced at the September 2011 acquisition closing (about 350 jobs); all positions eliminated by end of 2012 due to redundancies and cost efficiency measures, with about $16M additional expense recognized in 2012. Cumulative charges of $86M through 2012-12-31 ($65M paid in 2012, $14M in 2011). Announcement predates the current fiscal year.
2012-12-31restructuringin_progress1,7002012-112013-12-31WorldwideWirelessUSD 351 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Announced November 2012. Includes $245M severance, $90M goodwill impairment, and other exit costs. Expected to reduce annualized expenses by $450M.
2012-12-31plant_closurein_progress1,0002012-012013-12-31Japan, United StatesManufacturingUSD 49 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Closure of facilities in Hiji, Japan and Houston, Texas. Each facility employed about 500 people. Total estimated charge $215M; $49M recognized in 2012.
2012-12-31restructuringin_progressImpairment of Goodwill [Member] / 2012 Action [Member]USD 90,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2012-12-31restructuringin_progressEmployee Severance And Benefits Charges Reserves Member / 2012 Action [Member]USD 245,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2012-12-31restructuringin_progressEmployee Severance And Benefits Charges Reserves Member / 2011 Action [Member] / Semiconductor manufacturing facilities in Hiji, Japan, and Houston, Texas [Member]USD 113,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2012-12-31restructuringin_progressFacility Closing [Member] / 2012 Action [Member]USD 13,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2012-12-31restructuringin_progressAccelerated Depreciation of Facility Assets [Member] / 2012 Action [Member]USD 3,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2012-12-31restructuringin_progressAccelerated Depreciation of Facility Assets [Member] / 2011 Action [Member] / Semiconductor manufacturing facilities in Hiji, Japan, and Houston, Texas [Member]USD 23,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2012-12-31restructuringin_progress2011 Action [Member] / Semiconductor manufacturing facilities in Hiji, Japan, and Houston, Texas [Member]USD 161,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2012-12-31restructuringin_progress2012 Action [Member]USD 351,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2012-12-31restructuringin_progressFacility Closing [Member] / 2011 Action [Member] / Semiconductor manufacturing facilities in Hiji, Japan, and Houston, Texas [Member]USD 25,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2012-12-31restructuringin_progressBusiness Restructuring Impairments And Other Charges Reserves Member / 2011 Action [Member]USD 43,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2012-12-31restructuringin_progressBusiness Restructuring Impairments And Other Charges Reserves Member / 2008/2009 Actions [Member]USD 0 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2012-12-31restructuringin_progressBusiness Restructuring Impairments And Other Charges Reserves Member / 2012 Action [Member]USD 106,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2012-12-31restructuringin_progressUSD 400,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2012-12-31restructuringin_progressEmployee Severance And Benefits Charges Reserves Member / 2011 Action [Member]USD 6,000,000 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2012-12-31restructuringin_progressEmployee Severance And Benefits Charges Reserves Member / 2008/2009 Actions [Member]USD 0 (absolute)restructuring_footnote
f5-10k / no-ai-xblr
2012-09-30reduction_in_forcein_progress3502011-09-23National Semiconductor integration (Analog segment)USD 45 (millions)business_combinations_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
About 350 jobs eliminated as redundancies and cost-efficiency measures following the National acquisition; $45 million in charges recognized through September 30, 2012, of which $34 million paid and $4 million of the remaining $11 million expected to be paid in Q4 2012.
2012-09-30plant_closurein_progress2011-102013-06-30Houston, Texas, United StatesSemiconductor manufacturingrestructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
One of two older wafer fabrication facilities announced for closure in Q4 2011; program total estimated at $215 million (about $135 million severance and related benefits, $30 million accelerated depreciation, $50 million other exit costs), with $149 million recognized through September 30, 2012. Filers disclose the two facilities as a single consolidated program; no per-site charge split provided.
2012-09-30plant_closurein_progress2011-102013-06-30Hiji, JapanSemiconductor manufacturingrestructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Second of two older wafer fabrication facilities announced for closure in Q4 2011, expected complete by mid-2013; part of the consolidated $215 million estimated program charge.
2012-09-30plant_closurein_progress2012-012013-06-30Houston, Texas, United States; Hiji, JapanManufacturing (semiconductor wafer fabrication)USD 215 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Planned closure of two older fabs by mid-2013; $149M of the $215M total estimated charge recognized through 2012-09-30, including $37M in the first nine months of 2012. About $135M of total charge is severance and related benefits. No employee count disclosed. MD&A states announcement in January 2012; charges began Q4 2011.
2012-09-30restructuringcompleted3502011-09-23National Semiconductor acquisition integration (Silicon Valley Analog, Analog segment)USD 45 (millions)business_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
About 350 jobs eliminated from redundancies and cost efficiency measures following the National acquisition; $45M of charges recognized, $34M paid as of 2012-09-30, with $4M of the remaining $11M expected to be paid in Q4 2012.
2012-09-30restructuringin_progress3502011-09-23GlobalNational Semiconductor Acquisition IntegrationUSD 45 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
About 350 jobs eliminated due to redundancies and cost efficiency measures. Total charges recognized $45 million as of Sept 30, 2012, of which $34 million paid.
2012-09-30plant_closurein_progress2011-10-012013-06-30Houston, Texas and Hiji, JapanManufacturingUSD 215 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Closure of two older semiconductor manufacturing facilities. Total estimated charge $215 million. $149 million recognized through Sept 30, 2012. Includes severance, accelerated depreciation, and other exit costs.
2012-06-30restructuringin_progress3502012-12-31Other (acquisition-related)USD 44 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
About 350 jobs to be eliminated by end of 2012 due to redundancies and cost efficiency measures following the National acquisition. $44 million recognized through June 30, 2012, of which $29 million paid; $15 million remaining to be paid later in 2012; approximately $3 million of similar expense expected in remainder of 2012.
2012-06-30plant_closurein_progress2011-10-012013-06-30Houston, Texas, USASemiconductor manufacturingUSD 215 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Announced in Q4 2011: closure of two older semiconductor manufacturing facilities in Houston, Texas and Hiji, Japan by mid-2013. Total estimated charge $215 million, of which $135 million recognized through June 30, 2012. Composition: ~$135 million severance and related benefits, ~$30 million accelerated depreciation, ~$50 million other exit costs. Consolidated record for both facilities; no per-site employee counts disclosed.
2012-06-30restructuringcompleted3,9002008-01-012009-12-31restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
2008 and 2009 actions eliminated about 3,900 jobs; completed in 2009. Remaining accrual of $14 million at June 30, 2012 ($8 million severance and benefits, $6 million other charges).
2012-06-30plant_closurein_progress2013-06-30Houston, Texas (U.S.) and Hiji, JapanSemiconductor manufacturing (reported in Other segment)USD 215 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Program announced in Q4 2011 to close two older wafer fabs by mid-2013; exact announcement date not stated. Total estimated charge $215M (about $135M severance, $30M accelerated depreciation, $50M other exit costs); $135M recognized through June 30, 2012, $114M accrual remaining. No employee headcount disclosed. H1 2012 charges were $23M.
2012-06-30restructuringin_progress3502012-12-31Not specified (former National Semiconductor workforce)Former National Semiconductor employees; redundancies and cost efficiency measuresUSD 44 (millions)business_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
About 350 jobs to be eliminated by end of 2012 following the Sept 23, 2011 acquisition; announcement date not stated in this filing. $44M in charges recognized as of June 30, 2012 ($29M paid, $15M payable later in 2012), plus about $3M additional expense expected for the remainder of 2012. Related retention bonuses and stock-based comp are reported separately in the same note.
2012-06-30restructuringin_progress2011-10-012013-06-30Houston, Texas and Hiji, JapanManufacturingUSD 215 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Closure of two older semiconductor manufacturing facilities. Total estimated charge $215 million. $135 million recognized through June 30, 2012. Includes severance, accelerated depreciation, and other exit costs.
2012-06-30restructuringin_progress3502011-09-232012-12-31GlobalOther (Acquisition-related)USD 44 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Announced employment reductions related to National Semiconductor acquisition. About 350 jobs to be eliminated by end of 2012 due to redundancies and cost efficiency. $44 million charge recognized as of June 30, 2012.
2012-06-30restructuringin_progress350National Semiconductor [Member]restructuring_footnote
f5-10q / no-ai-xblr
Expected positions to be eliminated
2012-03-31restructuringin_progress2011-10-012013-06-30Houston, Texas, USA and Hiji, JapanSemiconductor manufacturing facilitiesUSD 215 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Announced Q4 2011; two older wafer fabs to close by mid-2013. Cumulative $122M recognized through Q1 2012; remainder over next six quarters. About $135M severance, $30M accelerated depreciation, $50M other exit costs.
2012-03-31restructuringin_progress2011-10-012013-06-30Houston, Texas, USA and Hiji, JapanSemiconductor manufacturing facilitiesUSD 10 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Q1 2012 restructuring charge: $5M accelerated depreciation and $5M other exit costs, reported in Other for segment purposes.
2012-03-31reduction_in_forcein_progress3502011-09-232012-12-31Former National Semiconductor employeesUSD 40 (millions)business_combinations_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Announced employment reductions tied to National acquisition redundancies; ~350 jobs eliminated by end of 2012. $40M recognized through Q1 2012, $18M paid, $22M payable later in year; ~$8M more expected in remainder of 2012.
2012-03-31acquisition_additioncompleted2011-09-23Analog (Silicon Valley Analog)business_combinations_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
National Semiconductor acquisition completed September 23, 2011; headcount added not disclosed in this 10-Q.
2012-03-31restructuringin_progress3502012-12-31Former National Semiconductor employees (Silicon Valley Analog integration)USD 40 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Announced employment reductions tied to National acquisition redundancies and cost efficiency; about 350 jobs to be eliminated by end of 2012. $40M in charges recognized through 2012-03-31 ($18M paid, $22M payable later in 2012); about $8M of similar expense expected in the remainder of 2012. Q1 2012 charge for these reductions was $12M. Exact announcement date not disclosed.
2012-03-31plant_closurein_progress2013Houston, Texas and Hiji, JapanSemiconductor manufacturing (reported in Other segment for segment reporting)USD 215 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Program announced in Q4 2011 to close two older wafer fabs by mid-2013; total estimated charge $215M (about $135M severance and benefits, about $30M accelerated depreciation, about $50M other exit costs). $122M recognized cumulatively through 2012-03-31, including $10M in Q1 2012 ($5M accelerated depreciation, $5M other exit costs). Severance accrual of $100M remained at 2012-03-31. Employees affected not disclosed; charges not split between the two sites.
2012-03-31restructuringin_progress3502011-09-232012-12-31GlobalNational Semiconductor (Silicon Valley Analog)USD 12 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Announced employment reductions for former National employees; 350 jobs to be eliminated by end of 2012 due to redundancies and cost efficiency measures. $12M charge recognized in Q1 2012.
2012-03-31plant_closurein_progress2011-10-012013-06-30Houston, Texas and Hiji, JapanManufacturingUSD 10 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Closure of two older semiconductor manufacturing facilities. Total estimated charge $215M. Q1 2012 charge of $10M consists of accelerated depreciation and other exit costs. Employee count not explicitly disclosed for this specific action in Q1.
2012-03-31restructuringin_progress350National Semiconductor [Member]restructuring_footnote
f5-10q / no-ai-xblr
Expected positions to be eliminated
2011-12-31acquisition_additioncompleted2011-09-232011-09-23Analogbusiness_combinations_footnote
f5-10k / GLM-5.3-flash-HTML
Acquisition of National Semiconductor completed September 23, 2011 for total consideration of about $6.56 billion; National's operations are reported within the Analog segment as Silicon Valley Analog. The number of employees added through the combination is not disclosed in this filing. Related workforce charges recognized in 2011 include $46 million of retention bonuses for former National employees and $50 million of stock-based compensation from accelerated vesting of equity awards upon employee terminations.
2011-12-31otherin_progress2011-09-23Other (charges recorded in Other segment); former National Semiconductor employeesUSD 41 (millions)business_combinations_footnote
f5-10k / GLM-5.3-flash-HTML
Severance and benefits recognized for change-of-control provisions under existing employment agreements of former National employees who have been or will be terminated after the closing date. Part of $70 million of total severance and benefit charges recognized in 2011, of which $14 million was paid in 2011 and $56 million is payable in 2012.
2011-12-31reduction_in_forcein_progress3502012-12-31Other (charges recorded in Other segment); former National Semiconductor employeesUSD 29 (millions)business_combinations_footnote
f5-10k / GLM-5.3-flash-HTML
Announced employment reductions affecting about 350 jobs driven by redundancies and cost-efficiency measures following the National acquisition; all positions to be eliminated by the end of 2012, with roughly $20 million of additional expense expected to be recognized in 2012. The $29 million is the announced-reductions portion of $70 million in total severance and benefit charges recognized in 2011.
2011-12-31plant_closurein_progress5002012-01-23Houston, Texas, United StatesOtherrestructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Older semiconductor fab slated for closure over roughly 18 months; facility employs about 500 people. Part of a combined two-site program (with Hiji, Japan) that supported about 4 percent of TI's 2011 revenue; combined estimated charges of $215 million — about $135 million severance and benefits, $30 million accelerated depreciation and $50 million other exit costs — of which $112 million was recognized in fourth-quarter 2011 and the remainder will be incurred over the next seven quarters. Annual savings of about $100 million expected once complete. Public announcement date of January 23, 2012 per the Item 2 properties footnote. Restructuring charges for the 2011 actions were recorded in the Other segment.
2011-12-31plant_closurein_progress5002012-01-23Hiji, JapanOtherrestructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Older semiconductor fab slated for closure over roughly 18 months; facility employs about 500 people. Part of a combined two-site program (with Houston, Texas) that supported about 4 percent of TI's 2011 revenue; combined estimated charges of $215 million — about $135 million severance and benefits, $30 million accelerated depreciation and $50 million other exit costs — of which $112 million was recognized in fourth-quarter 2011 and the remainder will be incurred over the next seven quarters. Annual savings of about $100 million expected once complete. Public announcement date of January 23, 2012 per the Item 2 properties footnote. Restructuring charges for the 2011 actions were recorded in the Other segment.
2011-12-31acquisition_additioncompleted2011-09-232011-09-23GlobalAnalog (Silicon Valley Analog)business_combinations_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Acquisition of National Semiconductor completed 2011-09-23 for $6.56B total consideration; headcount added not separately disclosed
2011-12-31plant_closureannounced5002012-01-232013-07-31Houston, Texas, United StatesAnalog; Embedded ProcessingItem_1_Business
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Closure announced 2012-01-23 over next 18 months; facility employed about 500 people and supported about 4% of 2011 revenue; part of combined $215M restructuring program with Hiji, Japan
2011-12-31plant_closureannounced5002012-01-232013-07-31Hiji, JapanAnalog; Embedded Processing; WirelessItem_1_Business
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Closure announced 2012-01-23 over next 18 months; facility employed about 500 people and supported about 4% of 2011 revenue; part of combined $215M restructuring program with Houston, Texas
2011-12-31restructuringin_progress2012-01-232013-07-31Houston, Texas, United States; Hiji, JapanOtherUSD 215 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Total estimated charge $215M; $112M recognized in Q4 2011 ($107M severance, $5M accelerated depreciation); remainder over next seven quarters; about $135M severance, $30M accelerated depreciation, $50M other exit costs; annual savings about $100M
2011-12-31reduction_in_forcein_progress3502011-09-232012-12-31GlobalAnalog (Silicon Valley Analog / National Semiconductor)USD 29 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Post-acquisition redundancies and cost efficiency measures at National Semiconductor; all jobs to be eliminated by end of 2012; approximately $20M additional expense expected in 2012
2011-12-31othercompleted2011-09-232011-12-31GlobalAnalog (Silicon Valley Analog / National Semiconductor)USD 41 (millions)business_combinations_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Change-of-control severance provisions under existing National Semiconductor employment agreements; $14M paid in 2011, $56M to be paid in 2012
2011-12-31restructuringin_progress1,0002011-10-012013-06-30Japan, United StatesManufacturingUSD 215 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Announced plans to close two older semiconductor manufacturing facilities in Hiji, Japan, and Houston, Texas, over the next 18 months. Each employs about 500 people. Total charge estimated at $215 million.
2011-12-31restructuringcompleted3502011-09-232012-12-31GlobalSilicon Valley Analog (National Semiconductor)USD 29 (millions)business_combinations_footnote
f5-10k / Qwen3.6-27B-Q8_0
Announced employment reductions affecting about 350 jobs as part of National Semiconductor acquisition integration. All jobs to be eliminated by end of 2012.
2011-12-31restructuringin_progress350National Semiconductor [Member]restructuring_footnote
f5-10k / no-ai-xblr
Expected positions to be eliminated
2011-09-30restructuringin_progress3502011-09-232012-12-31National Semiconductor (Silicon Valley Analog)USD 53 (millions)business_combinations_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Severance and benefit payments for former National employees terminated after closing; about 350 jobs eliminated by end of 2012. Additional restructuring charges of about $30 million expected through Q3 2012. Also $41 million stock-based compensation for accelerated vesting of terminated employees and $6 million retention bonus accrual.
2011-09-30acquisition_additioncompleted2011-09-23United StatesAnalog (Silicon Valley Analog)business_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Acquisition of National Semiconductor closed 2011-09-23; headcount added not disclosed. National operations reported within Analog segment as Silicon Valley Analog.
2011-09-30restructuringin_progress3502012-12-31United StatesNational Semiconductor (Silicon Valley Analog) — acquired operationsUSD 30 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Severance and benefits for former National employees terminated after closing; about 350 jobs to be eliminated by end of 2012, with roughly $30M additional charges running through Q3 2012. Related $41M accelerated stock comp for terminated employees and $6M retention-bonus accrual recorded in Q3 acquisition cost of $147M. Announcement date not stated in filing.
2011-09-30restructuringin_progress3502011-09-232012-12-31GlobalNational Semiconductor (Analog Segment)USD 53 (millions)business_combinations_footnote
f5-10q / Qwen3.6-27B-Q8_0
Severance and other benefit payments for former National employees terminated after closing. About 350 jobs to be eliminated by end of 2012. Additional charges of about $30 million expected through Q3 2012.
2011-09-30restructuringin_progress350National Semiconductor [Member]restructuring_footnote
f5-10q / no-ai-xblr
Expected positions to be eliminated
2011-06-30acquisition_additionannounced2011-04-042011-12-31United StatesAnalogUSD 15 (millions)MD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Pending acquisition of National Semiconductor at $25/share (~$6.5B), expected to close in 2H 2011; National will join the Analog segment. No headcount added disclosed; $15M acquisition-related expense recorded in 1H 2011 ($13M in Q2).
2011-03-31acquisition_additionannounced2011-04-042011-12-31AnalogUSD 2 (millions)MD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Agreement to acquire National Semiconductor for $25 per share (~$6.5 billion), to be funded with cash and new debt; upon close National becomes part of TI's Analog segment. No headcount figures disclosed. $2 million of acquisition-related transaction costs incurred in Q1 2011. A $350 million reverse termination fee applies if the deal fails on regulatory grounds.
2011-03-31acquisition_additionannounced2011-04-042011Analogsubsequent_events
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Post-quarter announcement (after 2011-03-31). $25 cash per National share, approx. $6.5 billion, funded with existing cash and new debt; National to join the Analog segment. No headcount figure disclosed. A $350 million reverse termination fee applies if regulatory approvals fail.
2010-12-31restructuringcompleted3,9002008-102009Company-wide; initial action focused on Wireless segment (baseband operation)USD 33 (millions)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Multi-year program: October 2008 action targeted Wireless baseband expenses; a second action announced January 2009 added broad-based employment reductions. About 3,900 jobs eliminated cumulatively and actions completed in 2009 (cumulative-to-date figure, not fiscal-2010 headcount). Fiscal 2010 activity: $33 million restructuring expense (Analog $13M, Embedded Processing $6M, Wireless $10M, Other $4M), $(33)M non-cash postretirement settlement/curtailment charges, and $64 million payments; cumulative income-statement charges $254M (2008), $212M (2009), $33M (2010); remaining accrual $30 million at December 31, 2010.
2010-12-31acquisition_additioncompleted2010-10-14Chengdu, ChinaAnalog wafer fabricationUSD 140 (millions)business_combinations_footnote
f5-10k / GLM-5.3-flash-HTML
Acquisition of semiconductor manufacturing site with an operational 200mm wafer fab (plus a non-operating fab for future expansion), announced October 14, 2010 and recorded as a business combination in 2010. Employment offered to the majority of existing employees at the site; headcount not disclosed. Net cash used $140 million, with an additional $35 million payable to the seller in October 2011.
2010-12-31acquisition_additioncompleted2010-08-312010-08-31Aizu-Wakamatsu, JapanAnalog wafer fabricationUSD 130 (millions)business_combinations_footnote
f5-10k / GLM-5.3-flash-HTML
Acquisition of two wafer fabrication facilities completed August 31, 2010 for net cash of $130 million (components: $59M business combination, $58M 300mm production tools recorded as capital purchase, $12M contractual settlement). Employment offered to existing employees at the Aizu site; headcount not disclosed.
2010-12-31divestiture_reductioncompleted2010-11-152010-11-15Other segment product lineUSD 144 (millions)other
f5-10k / GLM-5.3-flash-HTML
Product line divested November 15, 2010 for $148 million; value shown is the $144 million gain recognized in operating profit, not a charge. Workforce impact (headcount removed) not disclosed.
2010-12-31restructuringcompletedGlobalAnalog; Embedded Processing; Wireless; OtherUSD 33 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
FY2010 expense of $33M relates to the Oct 2008 Wireless/baseband and Jan 2009 broad-based actions (about 3,900 jobs eliminated, completed in 2009); 2010 amounts are remaining severance accrual activity (accrual $30M at year-end 2010). Segment split of 2010 expense: Analog $13M, Embedded Processing $6M, Wireless $10M, Other $4M. No employees affected disclosed for FY2010.
2010-12-31acquisition_additioncompleted2010-10-14China (Chengdu High-tech Zone)Analog (wafer fabrication)business_combinations_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Acquisition of TI's first China semiconductor site (operational 200mm fab plus non-operating fab); employment offered to the majority of existing site employees. Headcount count not disclosed; net cash of $140M plus $35M payable Oct 2011.
2010-12-31acquisition_additioncompleted2010-08-31Japan (Aizu-Wakamatsu)Analog (wafer fabrication)business_combinations_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Acquisition of two wafer fabs and equipment; employment offered to existing site employees. Headcount count not disclosed; transitional supply services through June 2012.
2010-12-31divestiture_reductioncompleted2010-11-15Not disclosedOtherUSD 144 (millions)discontinued_operations_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Divestiture of a product line previously in the Other segment for $148M, with a $144M gain recorded in operating profit. Associated headcount not disclosed.
2010-12-31restructuringcompleted3,9002008-102009-12-31GlobalWireless and Broad-basedUSD 33 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Actions announced in Oct 2008 and Jan 2009 eliminated about 3,900 jobs; completed in 2009. 2010 restructuring expense was $33 million, primarily for remaining severance and benefits.
2010-09-30restructuringcompleted2008-102009-12-31Wireless segment, especially baseband operationrestructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
October 2008 action to reduce Wireless segment expenses; combined with January 2009 action eliminated about 3,900 jobs; both actions completed in 2009. Restructuring expense of $4 million in Q3 2010 and $31 million YTD reflects settlements of U.S. pension plan benefits for employees affected by these actions.
2010-09-30restructuringcompleted2009-012009-12-31Company-widerestructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
January 2009 broad-based employment reductions to align spending with weakened demand; combined with October 2008 action eliminated about 3,900 jobs; completed in 2009. Remaining accrual of $35 million at September 30, 2010.
2010-09-30acquisition_additioncompleted2010-08-31Aizu-Wakamatsu, JapanOther segment (transitional supply services); Analog production processes being installedUSD 130 (millions)business_combinations_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Acquired two wafer fabrication facilities from Spansion Japan Limited under court-approved plan of reorganization for net cash of $130 million; TI offered employment to all SJL employees in Aizu; headcount not disclosed.
2010-09-30acquisition_additioncompleted2010-08-31Aizu-Wakamatsu, JapanOther (transitional supply services); manufacturingbusiness_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Acquired two wafer fabrication facilities from Spansion Japan Limited; TI offered employment to all SJL employees in Aizu. Number of employees hired not disclosed.
2010-09-30acquisition_additionannounced2010-10-142010-12-31Chengdu High-tech Zone, ChinaAnalog (manufacturing)subsequent_events
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Announced acquisition of a 200-millimeter wafer fab from Cension Semiconductor Manufacturing; to be recorded as a business combination in Q4 2010 for net cash of $140 million. No headcount disclosed.
2010-09-30restructuringcompleted3,9002008-10-012009-12-31GlobalWireless, Analog, Embedded Processing, OtherUSD 31 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Actions announced in Oct 2008 and Jan 2009 eliminated about 3,900 jobs; completed in 2009. Q3 2010 charges reflect settlements of U.S. pension plan benefits for affected employees.
2010-09-30acquisition_additioncompleted2010-08-312010-08-31JapanOtherUSD 59 (millions)business_combinations_footnote
f5-10q / Qwen3.6-27B-Q8_0
Acquired two wafer fabrication facilities in Aizu-Wakamatsu, Japan. Offered employment to all SJL employees in Aizu.
2010-06-30restructuringcompleted2008-10-012009-12-31Wireless segment, especially baseband operationrestructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
October 2008 announcement to reduce Wireless segment expenses; part of combined actions eliminating about 3,900 jobs, completed in 2009.
2010-06-30restructuringcompleted2009-01-012009-12-31Company-widerestructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
January 2009 announcement of broad-based employment reductions to align spending with weakened demand; combined 2008-2009 actions eliminated about 3,900 jobs and were completed in 2009.
2010-06-30restructuringin_progress2008-10-01Company-wideUSD 17 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Q2 2010 restructuring expense of $17 million reflects settlements of U.S. pension plan benefits for employees affected by the 2008-2009 actions; remaining accrual of $39 million at June 30, 2010, with $55 million paid in the first half of 2010.
2010-06-30restructuringcompleted3,9002008-10-012009-12-31Wireless segment (especially baseband operation); broad-based employment reductionsUSD 28 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Actions announced October 2008 and January 2009 eliminated about 3,900 jobs and were completed in 2009. Remaining accrual of $39 million at June 30, 2010. Q2 2010 restructuring expense of $17 million reflects settlements of U.S. pension plan benefits for employees affected by these actions; six-month 2010 restructuring expense was $28 million.
2010-06-30restructuringcompleted3,9002008-102009-12-31Not specifiedWireless (baseband) and broad-based company-wide employment reductionsrestructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Combined Oct 2008 Wireless/baseband and Jan 2009 broad-based actions; headcount reduction completed in 2009. Severance accrual rolled from $94M at 2009-12-31 to $39M at 2010-06-30, with $28M restructuring expense and $55M payments in H1 2010; current-period expense includes non-cash pension settlement charges. Second announcement date: 2009-01.
2010-06-30restructuringcompleted3,9002008-102009Wireless segment (baseband operation) and company-wide employment reductionsUSD 28 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Consolidated program: Oct 2008 Wireless/baseband actions plus Jan 2009 broad-based reductions; about 3,900 jobs eliminated, actions completed in 2009. Charge shown is restructuring expense for the six months ended June 30, 2010 (settlements of U.S. pension plan benefits for affected employees), not the original program charge. Remaining accrual at June 30, 2010 was $39M ($31M severance and benefits, $8M impairments and other); YTD 2010 payments were $55M. Counts not broken out by announcement date.
2010-06-30restructuringcompleted3,9002008-102009-12-31GlobalWireless, Analog, Embedded Processing, OtherUSD 28 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Actions announced in Oct 2008 and Jan 2009 eliminated about 3,900 jobs; completed in 2009. Q2 2010 expense of $28M reflects postretirement benefit plan settlement charges.
2010-06-30restructuringcompleted3,9002008-102009-12-31GlobalWireless, Analog, Embedded Processing, OtherUSD 28 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Actions announced in Oct 2008 and Jan 2009 eliminated about 3,900 jobs; completed in 2009. Q2 2010 expense of $28M reflects postretirement benefit plan settlement charges.
2010-03-31restructuringcompleted3,9002008-10-012009-12-31Company-wide, with focus on Wireless segment baseband operationUSD 10 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Actions announced October 2008 (Wireless expense reductions) and January 2009 (broad-based employment reductions) eliminated about 3,900 jobs and were completed in 2009. Q1 2010 restructuring expense of $10 million reflects settlement charges from U.S. pension plan benefits for affected employees; remaining accrual of $54 million at March 31, 2010.
2010-03-31restructuringin_progress3,9002008-102009-12-31Not specifiedWireless (baseband) and broad-based across segmentsUSD 10 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Combined Oct 2008 Wireless/baseband actions and Jan 2009 broad-based employment reductions eliminated about 3,900 jobs; job eliminations completed in 2009. Q1 2010 restructuring expense of $10M reflects postretirement plan settlement charges; remaining accrual at 2010-03-31 was $54M ($44M severance and benefits, $10M impairments/other), with $40M of payments made during the quarter. Segment split of Q1 2010 expense: Analog $4M, Embedded Processing $2M, Wireless $3M, Other $1M.
2010-03-31restructuringcompleted3,9002008-10-012009-12-31GlobalWireless, Analog, Embedded Processing, OtherUSD 10 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Actions announced in Oct 2008 and Jan 2009 eliminated about 3,900 jobs; completed in 2009. Q1 2010 expense of $10M reflects postretirement benefit plan settlement charges for affected employees.
2009-12-31restructuringcompleted2008-102009Wireless (baseband operation)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Expense-reduction actions in the Wireless segment, especially baseband operations. Headcount not separately disclosed; combined with the January 2009 broad-based reductions, the actions eliminated about 3,900 jobs and were completed in 2009. Wireless FY2009 restructuring expense was $59 million.
2009-12-31reduction_in_forcecompleted2009-012009Broad-based, all segmentsrestructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Broad-based employment reductions to align spending with weakened demand (MD&A also refers to an involuntary reduction program). Headcount not separately disclosed; combined with the October 2008 Wireless actions, eliminated about 3,900 jobs, completed in 2009. FY2009 restructuring expense totaled $212 million ($201 million severance and benefits): Analog $87M, Embedded Processing $43M, Wireless $59M, Other $23M.
2009-12-31voluntary_separationcompletedUnited StatesUSD 6 (millions)MD&A
f5-10k / GLM-5.3-flash-HTML
Voluntary retirement program implemented during 2009, referenced in connection with the U.S. defined benefit pension plan; participant count not disclosed. $6 million of special termination benefit charges were recognized in the U.S. defined benefit plan in 2009. Plan assets held elevated cash at year-end 2009 for related benefit payments, the majority expected to be paid in 2010.
2009-12-31acquisition_additioncompleted2009Embedded Processingbusiness_combinations_footnote
f5-10k / GLM-5.3-flash-HTML
Microcontroller portfolio expansion completed in the second quarter of 2009 for net cash of $51 million plus $7 million of other consideration; operations integrated into the Embedded Processing segment. Headcount added not disclosed.
2009-12-31acquisition_additioncompleted2009Analogbusiness_combinations_footnote
f5-10k / GLM-5.3-flash-HTML
Designer of high-frequency, high-efficiency power management semiconductors acquired in the first quarter of 2009 for net cash of $104 million plus $7 million of other consideration; operations integrated into the Analog segment. Headcount added not disclosed.
2009-12-31restructuringcompleted3,9002009-01-012009-12-31WorldwideCompany-wide, with initial wave focused on Wireless/baseband operationsUSD 212 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Combined program of October 2008 Wireless/baseband actions and January 2009 broad-based employment reductions; about 3,900 jobs eliminated, actions completed in 2009. 2009 restructuring expense $212M ($201M severance and benefits, $11M asset impairments); by segment: Analog $87M, Embedded Processing $43M, Wireless $59M, Other $23M. Remaining accrual at year-end 2009 was $95M.
2009-12-31voluntary_separationin_progressUnited StatesCompany-wideother
f5-10k / MiMo-V2.6-Flash-fp8-HTML
2009 Voluntary Retirement Program referenced in pension disclosure; U.S. defined benefit plan held excess cash anticipating future benefit payments, majority expected to be paid out in 2010. Headcount affected, announcement date and charge not disclosed in this filing.
2009-12-31acquisition_additioncompletedUnited StatesEmbedded Processingbusiness_combinations_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Luminary Micro acquired in Q2 2009 for net cash of $51 million plus $7 million other consideration; exact date and headcount added not disclosed.
2009-12-31acquisition_additioncompletedUnited StatesAnalogbusiness_combinations_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
CICLON Semiconductor Device Corporation acquired in Q1 2009 for net cash of $104 million plus $7 million other consideration; exact date and headcount added not disclosed.
2009-12-31restructuringcompleted3,9002008-102009-12-31GlobalWireless, Analog, Embedded Processing, OtherUSD 212 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Combined actions announced in Oct 2008 and Jan 2009 eliminated about 3,900 jobs. Completed in 2009. Includes voluntary retirement program and involuntary reductions.
2009-09-30restructuringin_progress3,9002008-10-012009-12-31Wireless segment, especially baseband operation; company-wide actions announced January 2009USD 450 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Combined October 2008 and January 2009 actions eliminated about 3,900 jobs and are expected to reduce annualized costs by more than $700 million; total charges of about $450 million expected to continue through Q4 2009. Q3 2009 charge was $10 million; nine-month 2009 charges were $200 million.
2009-09-30restructuringin_progress2008-10-012009-12-31AnalogUSD 81 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Nine months ended September 30, 2009 restructuring charges for Analog segment ($4 million in Q3 2009).
2009-09-30restructuringin_progress2008-10-012009-12-31Embedded ProcessingUSD 40 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Nine months ended September 30, 2009 restructuring charges for Embedded Processing segment ($2 million in Q3 2009).
2009-09-30restructuringin_progress2008-10-012009-12-31WirelessUSD 58 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Nine months ended September 30, 2009 restructuring charges for Wireless segment ($3 million in Q3 2009).
2009-09-30restructuringin_progress2008-10-012009-12-31OtherUSD 21 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Nine months ended September 30, 2009 restructuring charges for Other segment ($1 million in Q3 2009).
2009-09-30acquisition_additioncompleted2009-04-01Embedded ProcessingUSD 51 (millions)business_combinations_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Q2 2009 acquisition of Luminary Micro for net cash of $51 million plus $7 million other consideration; headcount added not disclosed. Operations integrated into Embedded Processing segment.
2009-09-30acquisition_additioncompleted2009-01-01AnalogUSD 104 (millions)business_combinations_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Q1 2009 acquisition of CICLON Semiconductor Device Corporation for net cash of $104 million plus $7 million other consideration; headcount added not disclosed. Operations integrated into Analog segment.
2009-09-30restructuringin_progress3,9002008-10-012009-12-31Not specified (global)Primarily Wireless (baseband); second round company-wideUSD 450 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Consolidated program: October 2008 actions targeted over $200M annualized expense reduction in Wireless/baseband; January 2009 actions were employment reductions to align spending with weakened demand. Combined, about 3,900 jobs eliminated as of 2009-09-30 and annualized costs reduced by more than $700M. Total expected charges about $450M, continuing through Q4 2009; $200M recognized in the nine months ended 2009-09-30 ($10M in Q3 2009). Charges by segment for 9M 2009: Analog $81M, Embedded Processing $40M, Wireless $58M, Other $21M. Remaining accrual at 2009-09-30 was $149M. MD&A expects Q4 2009 restructuring charges of about one cent of EPS. Second announcement date (January 2009) not specified to the day.
2009-09-30acquisition_additioncompleted2009-06-30United StatesEmbedded Processingbusiness_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Luminary Micro acquired in Q2 2009 for net cash of $51M plus $7M other consideration; headcount added not disclosed. Exact announcement/acquisition date not specified beyond the quarter.
2009-09-30acquisition_additioncompleted2009-03-31United StatesAnalogbusiness_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
CICLON Semiconductor Device Corporation acquired in Q1 2009 for net cash of $104M plus $7M other consideration; headcount added not disclosed. Exact announcement/acquisition date not specified beyond the quarter.
2009-09-30restructuringin_progress3,9002008-10-012009-12-31GlobalWireless, Analog, Embedded Processing, OtherUSD 450 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Combined actions announced in Oct 2008 and Jan 2009 eliminated about 3,900 jobs. Total charges expected to be about $450 million, continuing through Q4 2009.
2009-06-30restructuringin_progress3,9002008-10-012009-12-31Wireless segment, especially baseband operation; company-wide employment reductionsUSD 460 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Combined October 2008 and January 2009 actions expected to eliminate about 3,900 jobs and reduce annualized costs by more than $700 million; total charges of about $460 million expected to continue through Q4 2009.
2009-06-30restructuringin_progress2008-10-012009-12-31AnalogUSD 35 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Q2 2009 restructuring charge for Analog segment.
2009-06-30restructuringin_progress2008-10-012009-12-31Embedded ProcessingUSD 18 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Q2 2009 restructuring charge for Embedded Processing segment.
2009-06-30restructuringin_progress2008-10-012009-12-31WirelessUSD 23 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Q2 2009 restructuring charge for Wireless segment.
2009-06-30restructuringin_progress2008-10-012009-12-31OtherUSD 9 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Q2 2009 restructuring charge for Other segment.
2009-06-30restructuringin_progress2008-10-012009-12-31AnalogUSD 77 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Year-to-date 2009 restructuring charge for Analog segment.
2009-06-30restructuringin_progress2008-10-012009-12-31Embedded ProcessingUSD 37 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Year-to-date 2009 restructuring charge for Embedded Processing segment.
2009-06-30restructuringin_progress2008-10-012009-12-31WirelessUSD 55 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Year-to-date 2009 restructuring charge for Wireless segment.
2009-06-30restructuringin_progress2008-10-012009-12-31OtherUSD 21 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Year-to-date 2009 restructuring charge for Other segment.
2009-06-30acquisition_additioncompleted2009-04-01Embedded ProcessingUSD 51 (millions)business_combinations_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Acquired Luminary Micro in Q2 2009 for net cash of $51 million plus $7 million other consideration; headcount added not disclosed. Operations integrated into Embedded Processing segment.
2009-06-30acquisition_additioncompleted2009-01-01AnalogUSD 104 (millions)business_combinations_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Acquired CICLON Semiconductor Device Corporation in Q1 2009 for net cash of $104 million plus $7 million other consideration; headcount added not disclosed. Operations integrated into Analog segment.
2009-06-30restructuringin_progress3,9002008-102009-12-31GlobalPrimarily Wireless (baseband); actions announced January 2009 spanned the companyUSD 460 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Consolidated program combining October 2008 Wireless actions and January 2009 employment reductions; counts not split between the two announcements. About 3,800 jobs eliminated as of 2009-06-30. Expected to cut annualized costs by more than $700 million; charges run through Q4 2009. Charges recognized: $230M in Q4 2008, $105M in Q1 2009, $85M in Q2 2009; remaining accrual $225M at 2009-06-30. Q2 2009 charges by segment: Analog $35M, Embedded Processing $18M, Wireless $23M, Other $9M.
2009-06-30acquisition_additioncompletedUnited StatesEmbedded Processingbusiness_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Luminary Micro acquired in Q2 2009 for $51 million net cash plus $7 million other consideration; added more than 140 microcontroller products per MD&A. Headcount added not disclosed.
2009-06-30acquisition_additioncompletedUnited StatesAnalogbusiness_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
CICLON Semiconductor Device Corporation acquired in Q1 2009 for $104 million net cash plus $7 million other consideration. Headcount added not disclosed.
2009-06-30restructuringin_progress2008-10-012009-12-31GlobalWireless, Analog, Embedded Processing, OtherUSD 85 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Part of combined actions announced Oct 2008 and Jan 2009 expected to eliminate ~3,900 jobs total. Q2 2009 charge was $85M. Cumulative jobs eliminated as of June 30, 2009 is ~3,800.
2009-06-30acquisition_additioncompleted2009-04-01GlobalEmbedded ProcessingUSD 58 (millions)business_combinations_footnote
f5-10q / Qwen3.6-27B-Q8_0
Acquisition of Luminary Micro for net cash of $51M and other consideration of $7M. Headcount not explicitly disclosed.
2009-06-30acquisition_additioncompleted2009-01-01GlobalAnalogUSD 111 (millions)business_combinations_footnote
f5-10q / Qwen3.6-27B-Q8_0
Acquisition of CICLON Semiconductor Device Corporation for net cash of $104M and other consideration of $7M. Headcount not explicitly disclosed.
2009-03-31restructuringin_progress6502008-10-01Wireless segment, especially baseband operationUSD 230 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
October 2008 action targeting annualized expense reductions of more than $200 million; $230 million charge recognized in Q4 2008 ($218 million severance and benefits, $12 million asset impairments).
2009-03-31restructuringin_progress12%2009-01-012009-12-31Company-wideUSD 105 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
January 2009 announced employment reductions of about 12 percent via layoffs and voluntary retirements/departures; combined with October 2008 actions, annualized cost reductions exceed $700 million and total charges expected to exceed $400 million through Q4 2009. Q1 2009 charge of $105 million ($98 million severance and benefits, $7 million impairments); about $100 million of charges expected in Q2 2009.
2009-03-31reduction_in_forcein_progress3,2002008-10-01Company-wideMD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Cumulative total of about 3,200 jobs eliminated since the first action was announced in October 2008, as of March 31, 2009; restructuring actions still underway in non-U.S. subsidiaries.
2009-03-31restructuringin_progress6502008-102009-12-31Not specifiedWireless (especially baseband operation)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Announced October 2008; eliminates about 650 jobs and reduces annualized expenses by more than $200 million. Part of a combined program expected to generate over $700 million in annualized cost reduction with total charges in excess of $400 million running through Q4 2009.
2009-03-31restructuringin_progress12%2009-012009-12-31Not specified; actions include non-U.S. subsidiariesCompany-widerestructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Announced January 2009 to align spending with weakened demand; employment to be reduced about 12 percent via layoffs and voluntary retirements/departures. Filer does not state an absolute headcount for this action. Cumulatively, about 3,200 jobs had been eliminated since October 2008 as of March 31, 2009; Q1 2009 restructuring charge was $105 million ($98M severance and benefits, $7M asset impairments), with about $100 million of additional charges expected in Q2 2009.
2009-03-31restructuringin_progress12%2009-01-012009-12-31GlobalAll SegmentsUSD 105 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
January 2009 actions to align spending with weakened demand; combined with Oct 2008 actions, total employment reduced about 12% via layoffs and voluntary retirements. Q1 2009 charges of $105M ($98M severance, $7M impairments). Total program charges expected >$400M.
2009-03-31acquisition_additioncompleted2009-03-312009-03-31GlobalAnalogUSD 111 (millions)business_combinations_footnote
f5-10q / Qwen3.6-27B-Q8_0
Acquisition of CICLON Semiconductor Device Corporation for $111M. Headcount not explicitly disclosed.
2008-12-31restructuringin_progress6502008-102009-06Wireless segment (cellular baseband operation)USD 110 (millions)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Re-focusing of Wireless on applications processors and connectivity; expected to reduce annualized expenses by more than $200 million. Approximately 650 jobs to be eliminated; $109 million of the charge was recognized in the fourth quarter of 2008.
2008-12-31restructuringannounced3,40012%2009-012009-09USD 300 (millions)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Employment reduction to align spending with weakening demand, comprising 1,800 layoffs and 1,600 voluntary retirements and departures. Announced after fiscal year-end; $121 million of the charge was recognized in the fourth quarter of 2008. Combined annualized savings with the October 2008 Wireless action: about $700 million.
2008-12-31restructuringin_progress6502008-102009-06-30Not specifiedWireless (cellular baseband operation)USD 110 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Program expected to cut annualized expenses by more than $200 million in Wireless; $109 million of the charge was recognized in Q4 2008. Filer states 'About 650 jobs are expected to be eliminated.'
2008-12-31layoffannounced1,8002009-012009-09-30Not specified (company-wide)Company-wideUSD 300 (millions)subsequent_events
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Announced January 2009 (after fiscal year-end) to align spending with weakened demand; part of a 12 percent employment reduction combining 1,800 layoffs with 1,600 voluntary retirements/departures. Total charge for the action about $300 million, of which $121 million was recognized in Q4 2008; completion expected through Q3 2009. Combined with the Wireless actions, annualized costs to be reduced by more than $700 million.
2008-12-31voluntary_separationannounced1,6002009-012009-09-30Not specified (company-wide)Company-widesubsequent_events
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Voluntary retirements and departures forming the second component of the January 2009 program (12 percent total employment reduction with the 1,800 layoffs); charge not separately allocated between components. Implied program total of 3,400 positions is broadly consistent with 12 percent of the 29,537 year-end headcount.
2008-12-31acquisition_additioncompleted2008Not specifiedAnalogUSD 19 (millions)business_combinations_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Two acquisitions completed in Q2 2008 for net cash of $19 million to obtain design expertise and technology; no headcount acquired was disclosed.
2008-12-31restructuringin_progress6502008-102009-06GlobalWirelessUSD 110 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Actions announced in October 2008 to reduce annualized expenses in Wireless segment, especially cellular baseband operation. About 650 jobs expected to be eliminated. Total charges approx $110 million.
2008-12-31restructuringannounced3,40012%2009-012009-09GlobalCorporateUSD 300 (millions)subsequent_events
f5-10k / Qwen3.6-27B-Q8_0
Actions announced in January 2009 (subsequent event). Employment reduced 12% through 1,800 layoffs and 1,600 voluntary retirements/departures. Total charges about $300 million. Combined with Wireless actions, annualized costs reduced by more than $700 million.
2008-09-30restructuringin_progressmultiple locationsSemiconductorUSD 44 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Charges of $44 million in Q3 2008 for impairments of long-lived assets held for sale at several facilities ($36 million) and voluntary termination benefits of $8 million tied to site consolidations; allocated $17 million to cost of revenue, $23 million to R&D, $4 million to SG&A. No employee count disclosed.
2008-09-30restructuringannounced2008-10-202009-06-30Wireless (cellular baseband operation)USD 110 (millions)subsequent_events
f5-10q / GLM-5.3-flash-fp4-HTML
Actions expected to cut expenses by more than $200 million annualized, about 85% in R&D; reductions begin immediately and complete by June 2009; restructuring charges of approximately $110 million across the next three quarters. Also pursuing sale of merchant baseband product line (2008 revenue expected $350-400 million). No employee count disclosed.
2008-09-30restructuringin_progressMultiple locationsSemiconductorUSD 44 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Q3 2008 charges of $44M: $36M impairment of long-lived assets held for sale at several sites plus $8M voluntary termination benefits tied to site consolidations; split $17M COR, $23M R&D, $4M SG&A. No employee counts disclosed.
2008-09-30restructuringannounced2008-10-202009-06-30Not specifiedWireless — cellular baseband operationUSD 110 (millions)subsequent_events
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Post-quarter announcement of actions expected to cut more than $200M annualized expenses (about 85% R&D, 10% COR, 5% SG&A); ~$110M restructuring charges over the next three quarters. TI also pursuing sale of merchant baseband line (2008 revenue ~$350-400M). No employee counts disclosed.
2008-09-30restructuringannounced2008-10-202009-06-30Wireless operations, especially cellular baseband operationUSD 110 (millions)subsequent_events
f5-10q / Qwen3.6-27B-Q8_0
Actions expected to reduce expenses by more than $200 million annualized. Restructuring charges of approximately $110 million expected across the next three quarters.
2008-09-30restructuringcompleted2008-09-302008-09-30Semiconductor segmentUSD 44 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Charges of $44 million associated with impairments of long-lived assets and site consolidations. Includes $8 million for voluntary termination benefits.
2007-12-31restructuringcompleted3002007-01-22Semiconductor (advanced digital manufacturing process technology); charges reflected in CorporateUSD 52 (millions)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Shift to collaborative digital process development with foundries plus halted production at an older digital factory. FY2007 charge of $52M comprises $31M severance/benefits and $21M accelerated depreciation; about 300 jobs eliminated by year-end 2007 and actions substantially complete. $10M of severance paid through 2007-12-31. Expected annual savings of ~$150M in R&D and ~$50M in cost of revenue.
2007-12-31restructuringcompleted3002007-01-222007-12-31Not specifiedSemiconductor (digital manufacturing process technology development; Corporate)USD 52 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Program shifted digital process technology development to foundry partners and stopped production at an older digital factory; actions substantially complete by year-end 2007. Charge comprises $31M severance/benefits and $21M accelerated depreciation; expected to reduce R&D by ~$150M and cost of revenue by ~$50M annually.
2007-12-31restructuringcompleted3002007-01-222007-12-31GlobalCorporateUSD 52 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Announced Jan 22, 2007. Actions substantially complete by year-end. Charge includes $31M severance/benefits and $21M accelerated depreciation.
2007-09-30restructuringin_progress5002007-01-222007-12-31CorporateUSD 55 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Plan to change advanced digital process development, work with foundry partners, and stop production at an older digital factory, moving equipment to analog factories; expected to reduce annualized costs by about $200 million. About 500 jobs expected to be eliminated by year end; total restructuring charges of approximately $55 million.
2007-09-30restructuringin_progress2007-01-222007-12-31CorporateUSD 15 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Third-quarter 2007 charge of $15 million: $7 million severance and benefit costs and $8 million acceleration of depreciation on facilities' assets over remaining service lives.
2007-09-30restructuringin_progress2007-01-222007-12-31CorporateUSD 46 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Nine-months 2007 charge of $46 million: $27 million severance and benefit costs and $19 million acceleration of depreciation. As of September 30, 2007, $6 million settled and paid to terminated employees for severance and benefits.
2007-09-30restructuringin_progress5002007-01-222007-12-31Not specifiedSemiconductor (digital manufacturing); CorporateUSD 55 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Program shifts advanced digital process development to foundry partners and stops production at an older digital factory, moving equipment to analog fabs; expected to cut annualized costs by about $200 million. Charges were $15 million in Q3 2007 and $46 million YTD (severance/benefits and accelerated depreciation); $6 million paid to terminated employees as of 2007-09-30. Job reduction figure is approximate ('about 500').
2007-09-30restructuringin_progress5002007-01-222007-12-31GlobalCorporateUSD 55 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Plan to change advanced digital manufacturing process technology development and stop production at an older digital factory. Expected to reduce annualized costs by about $200 million. Total expected charges of approximately $55 million. About 500 jobs expected to be eliminated by year end.
2007-06-30restructuringin_progress5002007-01-222007-12-31Semiconductor (advanced digital process technology development and older digital factory)USD 17 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Plan announced January 22, 2007 to collaborate with foundry partners on advanced digital process technology and stop production at an older digital factory, moving equipment to analog factories. Expected to reduce annualized costs by about $200 million; total expected charges approximately $55 million. Q2 2007 charge of $17 million comprised $11 million severance/benefits and $6 million accelerated depreciation; $3 million of severance paid as of June 30, 2007.
2007-06-30restructuringin_progress5002007-01-222007-12-31Semiconductor (digital manufacturing; Corporate-reflected charges)USD 55 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Program shifts advanced digital process development to foundry partners and stops production at an older digital factory, moving equipment to analog fabs; expected to cut annualized costs about $200 million. Charges: $17M in Q2 2007 (severance/benefits $11M, accelerated depreciation $6M) and $31M YTD (severance/benefits $21M, accelerated depreciation $10M); $11M of Q2 charge ($20M YTD) in cost of revenue and $6M ($11M YTD) in R&D, reflected in Corporate. $3M paid to terminated employees as of 2007-06-30. No total headcount disclosed, so percent-of-workforce cannot be computed.
2007-06-30restructuringin_progress5002007-01-222007-12-31GlobalCorporate / ManufacturingUSD 55 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Plan to change advanced digital manufacturing process technology development and stop production at an older digital factory. Expected to reduce annualized costs by $200 million. Total expected charges $55 million; $31 million incurred YTD.
2007-03-31restructuringin_progress5002007-01-222007-12-31SemiconductorUSD 55 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Plan to shift advanced digital process development to foundry partners and stop production at an older digital factory, moving equipment to analog factories; about 500 job reductions expected by year end; total charges of about $55 million, including about $40 million termination benefits and about $15 million accelerated depreciation; expected to reduce annualized costs by about $200 million. Q1 2007 charge was $14 million ($10 million termination benefits, $4 million accelerated depreciation); no severance payments made from reserve as of March 31, 2007.
2007-03-31restructuringin_progress5002007-01-222007-12-31Not specifiedSemiconductor (digital manufacturing; Corporate)USD 55 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Program shifts advanced digital process development to foundry collaboration and stops production at an older digital factory, moving equipment to analog fabs. About 500 jobs expected reduced by year end; total charge ~$55M (~$40M termination benefits, ~$15M accelerated depreciation). Q1 2007 charge was $14M ($10M termination benefits, $4M accelerated depreciation; $9M in COR, $5M in R&D, reflected in Corporate). No severance/benefit payments made as of 2007-03-31. Expected to reduce annualized costs by ~$200M when complete.
2007-03-31acquisition_additioncompletedNot specifiedSemiconductorUSD 27 (millions)business_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
An asset acquisition was made in Q1 2007 and integrated into the Semiconductor segment; filing states it was not material. Headcount added not disclosed. $27M shown as acquisitions, net of cash acquired in the Q1 2007 cash flow statement.
2007-03-31restructuringin_progress5002007-01-222007-12-31CorporateUSD 14 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Plan to change advanced digital manufacturing process technology development and stop production at an older digital factory. Q1 charge of $14M includes $10M termination benefits and $4M accelerated depreciation. Total expected charges ~$55M.
2006-12-31divestiture_reductioncompleted2006-012006-04-27Sensors & Controls segment (excluding RFID operations)discontinued_operations_footnote
f5-10k / GLM-5.3-flash-HTML
Sale to Bain Capital affiliate for $3 billion cash closed April 27, 2006; business renamed Sensata Technologies. Pre-tax gain $2,554 million ($1,674 million net of tax). Transferred employee headcount not disclosed.
2006-12-31restructuringannounced5002007-01-222007-12-31Semiconductor — advanced digital process technology development and digital factoryUSD 55 (millions)subsequent_events
f5-10k / GLM-5.3-flash-HTML
Plan to develop digital process technology with foundry partners and stop production at an older digital factory, moving equipment to analog factories. Expected annualized cost reduction about $200 million; charges spread across 2007 quarters.
2006-12-31acquisition_additioncompleted2006-012006-01NorwaySemiconductorbusiness_combinations_footnote
f5-10k / GLM-5.3-flash-HTML
Chipcon Group ASA (Oslo, Norway) acquired for $183 million cash in January 2006; integrated into Semiconductor segment from acquisition date. Employee headcount added not disclosed.
2006-12-31acquisition_additioncompleted2006-012006-01NorwaySemiconductorbusiness_combinations_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Headcount added through the acquisition is not disclosed; a $5 million in-process R&D charge was recorded.
2006-12-31divestiture_reductioncompleted2006-012006-04-27GlobalSensors & Controls (discontinued operations)discontinued_operations_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Sale completed April 27, 2006 for $3 billion cash; employees transferred with the business are not quantified in the filing.
2006-12-31restructuringannounced5002007-01-222007-12-31Semiconductor — digital manufacturing; equipment redeployed to analog factoriesUSD 55 (millions)subsequent_events
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Announced after fiscal year-end; about 500 jobs expected reduced by year-end 2007, with roughly $200 million of expected annual cost savings. Charges of about $55 million to be spread across the four quarters of 2007.
2006-12-31restructuringannounced5002007-01-222007-12-31GlobalSemiconductorUSD 55 (millions)subsequent_events
f5-10k / Qwen3.6-27B-Q8_0
Announced Jan 22, 2007. Plan to change advanced digital manufacturing process technology development and stop production at an older digital factory. About 500 jobs expected to be reduced by year end. Total restructuring charges approx $55 million.
2006-09-30divestiture_reductioncompleted2006-01-092006-04-27Sensors & Controls (excluding RFID operations)other
f5-10q / GLM-5.3-flash-fp4-HTML
Sale of substantially all of the former Sensors & Controls segment to an affiliate of Bain Capital for $3 billion cash; completed April 27, 2006; business renamed Sensata Technologies. No employee headcount figures disclosed.
2006-09-30acquisition_additioncompleted2006-012006-01Oslo, NorwaySemiconductorUSD 5 (millions)business_combinations_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Acquired 100% of Chipcon Group ASA for $183 million cash; includes $5 million in-process R&D charge, $115 million goodwill, $86 million other intangibles. No employee headcount figures disclosed.
2006-09-30divestiture_reductioncompleted2006-01-092006-04-27GlobalSensors & Controls segment (excluding retained RFID operations)other
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Sale of the Sensors & Controls business to a Bain Capital affiliate for $3 billion, closed 2006-04-27; no employee count disclosed. Filing notes a transition services agreement expected to run six to twelve months from closing, with some IT services up to two years.
2006-09-30acquisition_additioncompleted2006-01-012006-01-31NorwaySemiconductor segmentUSD 5 (millions)business_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Acquisition of Chipcon Group ASA for $183 million cash; no headcount added disclosed. Charge shown is the in-process R&D expense recorded in Corporate, not a severance charge. Announcement month only is stated in the filing.
2006-06-30divestiture_reductioncompleted2006-01-092006-04-27Sensors & Controls (renamed Sensata Technologies)USD 1,651 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Sale of substantially all of the Sensors & Controls segment, excluding RFID operations, to an affiliate of Bain Capital, LLC for $3 billion cash; gain on sale of $2,550 million before $899 million tax. No employee headcount affected was disclosed.
2006-06-30acquisition_additioncompleted2006-01Oslo, NorwaySemiconductorUSD 5 (millions)business_combinations_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Acquired 100 percent of Chipcon Group ASA for $183 million cash; recorded $5 million in-process R&D charge, $115 million goodwill, $86 million other intangibles. No employee headcount added was disclosed.
2006-06-30acquisition_additioncompleted2006-012006-01NorwaySemiconductorbusiness_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Acquired 100% of Chipcon Group ASA of Oslo for $183 million cash in January 2006; no employee count disclosed. Recorded $115M goodwill, $86M intangibles, and a $5M in-process R&D charge.
2006-06-30divestiture_reductioncompleted2006-01-092006-04-27GlobalSensors & Controls (former segment; RFID operations retained in Semiconductor)other
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Sale of substantially all of the Sensors & Controls segment to an affiliate of Bain Capital for $3 billion cash, completed April 27, 2006; renamed Sensata Technologies. No headcount transferred disclosed. TI provides transition services for roughly six to twelve months.
2006-03-31acquisition_additioncompleted2006-01-01NorwaySemiconductorUSD 5 (millions)business_combinations_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
TI acquired 100 percent of Chipcon Group ASA for $183 million in cash; no headcount figures disclosed. Includes a $5 million in-process R&D charge.
2006-03-31divestiture_reductionannounced2006-01-092006-04-27Sensors & Controls (excluding RFID operations)USD 3,000 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Definitive agreement to sell substantially all of the Sensors & Controls segment to an affiliate of Bain Capital, LLC for $3 billion in cash; sale completed April 27, 2006. No employee counts disclosed.
2006-03-31acquisition_additioncompleted2006-01-01NorwaySemiconductorUSD 5 (millions)business_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Chipcon Group ASA acquired for $183M cash; $5M in-process R&D charge. No employee count disclosed.
2006-03-31divestiture_reductioncompleted2006-01-092006-04-27Sensors & Controls (excluding RFID)other
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Sale to Bain Capital affiliate for $3B; completed April 27, 2006 (subsequent event). No employee count disclosed.
2005-12-31restructuringin_progress91120032006-12-31United States (production lines moving from Attleboro, Massachusetts to other TI sites)Sensors & Controls, primarily manufacturing operationsUSD 72 (millions)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Multi-year program announced 2003; figures are cumulative through fiscal year-end. 911 employees terminated of about 930 jobs expected to be affected; $70 million of the ~$72 million total net pretax charges recorded. FY2005 severance charges were $17 million. Remaining payments expected by end of 2006; MD&A cites estimated annualized savings of $40 million when complete.
2005-12-31restructuringcompleted89720032006-12-31U.S. and international locationsSemiconductor, manufacturing operationsUSD 82 (millions)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Multi-year program announced 2003; cumulative-to-date figures. All affected employees terminated as of December 31, 2005 and full $82 million charge recorded; $4 million of severance/benefit payments remain due through 2006. MD&A cites estimated annualized savings of $67 million. A residual $10 million from pre-2003 prior actions is payable through 2008 (no employee counts disclosed for that legacy pool).
2005-12-31divestiture_reductionannounced2006-01-092006-06-30Sensors & Controls segment (RFID operations excluded; RFID to move into Semiconductor segment)subsequent_events
f5-10k / GLM-5.3-flash-HTML
Subsequent event: definitive agreement to sell substantially all of the Sensors & Controls segment to an affiliate of Bain Capital, LLC for $3 billion in cash; completion expected in first half of 2006. No employee headcount affected disclosed. Business to be presented as discontinued operations from Q1 2006; a related $31 million capital lease obligation transfers to the buyer.
2005-12-31acquisition_additioncompleted2005-122006-01-31Norway (target headquartered in Oslo)Semiconductor (short-range, low-power wireless RF transceiver devices)USD 200 (millions)Item_1_Business
f5-10k / GLM-5.3-flash-HTML
Agreement to acquire Chipcon Group ASA announced December 2005 for approximately $200 million cash; transaction closed January 2006, subsequent to fiscal year-end. No employee headcount acquired was disclosed. Charge value is purchase consideration, not a restructuring charge.
2005-12-31restructuringin_progress91120032006-12-31United States (Attleboro, Massachusetts)Sensors & ControlsUSD 17 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Cumulative through fiscal year-end: 911 of approximately 930 jobs terminated under a program announced in 2003 to move production lines from Attleboro to other TI sites; total program cost expected about $72 million. 2005 severance charges were $17 million ($14M cost of revenue, $3M SG&A); remaining payments expected to complete by end of 2006.
2005-12-31restructuringcompleted89720032005-12-31United States and internationalSemiconductorUSD 0 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Cumulative through fiscal year-end: all 897 affected employees terminated as of December 31, 2005; total program cost $82 million recorded in prior years, with no severance charges in 2005. A $4 million severance and benefit balance remains to be paid through 2006.
2005-12-31acquisition_additionannounced2005-122006-01Norway (Oslo)SemiconductorUSD 200 (millions)subsequent_events
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Agreement to acquire Chipcon Group ASA for approximately $200 million in cash; transaction closed January 2006, so results are not in the 2005 financial statements. Headcount added not disclosed.
2005-12-31divestiture_reductionannounced2006-01-092006-06-30GlobalSensors & ControlsUSD 3,000 (millions)subsequent_events
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Definitive agreement to sell substantially all of the Sensors & Controls segment (excluding RFID) to an affiliate of Bain Capital, LLC for $3 billion in cash; expected to complete in first half of 2006. Assets to be sold totaled $476 million and liabilities $134 million at December 31, 2005. Headcount affected not disclosed.
2005-12-31restructuringin_progress93020032006-12-31Attleboro, Massachusetts and other TI sitesSensors & ControlsUSD 72 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Announced in 2003 to move production lines. Expected to affect about 930 jobs through 2006. As of Dec 31, 2005, 911 employees terminated. Total cost expected to be about $72 million.
2005-12-31restructuringcompleted89720032006-12-31U.S. and international locationsSemiconductorUSD 82 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Announced in 2003 affecting 897 jobs. As of Dec 31, 2005, all employees affected had been terminated. Total cost was $82 million.
2005-09-30restructuringin_progress9302003-042006-12-31United States (Attleboro, Massachusetts and other TI sites)Sensors & ControlsUSD 71 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Announced Q2 2003 to move production lines closer to customers and cut manufacturing costs; affects about 930 jobs via voluntary retirement and involuntary termination. As of 2005-09-30, 785 employees terminated and $63 million net pretax charges recorded; remaining charges expected through 2006. Accrual balance $10 million at quarter-end.
2005-09-30restructuringcompleted8972003-042005-03-31United States, Japan, Germany (primarily)SemiconductorUSD 82 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Announced Q2 2003 for semiconductor manufacturing operations; 897 employees terminated through Q1 2005 with total net pretax cost of $82 million. Completed in Q1 2005; $7 million of severance and benefit costs remains to be paid through 2011.
2005-09-30restructuringcompleted2008-12-31Prior years' restructuring programsrestructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
All employees from earlier-period restructuring actions terminated; $12 million of severance and benefit costs remains to be paid through 2008, reflecting non-U.S. government benefit-payment regulations.
2005-09-30restructuringin_progress78520032006United States — Attleboro, Massachusetts (production lines moving to other TI sites)Sensors & ControlsUSD 63 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Plan announced Q2 2003 to relocate production lines; about 930 jobs affected via voluntary retirement and involuntary termination through 2006. 785 employees terminated and $63 million net pretax charges recorded as of 2005-09-30; total expected cost about $71 million. Q3 2005 severance charge was $1 million; nine-month 2005 charges were $10 million.
2005-09-30restructuringcompleted89720032005-03-31United States, Japan, Germany and other international locationsSemiconductor manufacturing operationsUSD 82 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Announced Q2 2003; completed in Q1 2005 with 897 employees terminated and $82 million net pretax cost. $7 million of severance and benefit costs remains to be paid through 2011.
2005-09-30restructuringcompletedPrimarily non-U.S. locationsOtherUSD 12 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
All employees from earlier-period restructuring actions terminated as of 2005-09-30; $12 million severance and benefit balance remains payable through 2008. Employee count not disclosed.
2005-09-30restructuringcompleted8972003-04-012005-03-31U.S. and international locationsSemiconductorUSD 82 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Semiconductor Restructuring Action announced in Q2 2003. Completed in Q1 2005 with 897 terminated employees. Total net pretax cost $82 million. Balance of $7 million remains to be paid through 2011.
2005-09-30restructuringin_progress7852003-04-012006-12-31Attleboro, MassachusettsSensors & ControlsUSD 63 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Sensors & Controls Restructuring Action announced in Q2 2003. Expected to affect about 930 jobs. As of Sept 30, 2005, 785 employees terminated. Total net pretax charges recorded $63 million. Charges expected to be completed in 2006.
2005-06-30restructuringin_progress9202003-04-012006-12-31United States (Attleboro, Massachusetts and other TI sites)Sensors & ControlsUSD 70 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Announced Q2 2003 to move production lines closer to customers and cut manufacturing costs; affects about 920 jobs via voluntary retirement and involuntary termination. As of June 30, 2005, 738 employees terminated and $62 million net pretax charges recorded; remaining charges expected through 2006. Q2 2005 charge of $4 million in cost of revenue, primarily severance.
2005-06-30restructuringcompleted8972003-04-012005-03-31United States, Japan, GermanySemiconductorUSD 82 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Announced Q2 2003 for manufacturing operations as productivity increased with fewer people; 875 employees terminated during 2003-2004, action completed in Q1 2005 with 897 total terminated employees and $82 million total net pretax cost. $7 million of severance and benefit costs remains to be paid through 2011.
2005-06-30restructuringcompleted2008-12-31Prior years' restructuring programsUSD 14 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
All employees from earlier-period restructuring actions have been terminated; $14 million of severance and benefit costs remains to be paid through 2008, with extended payment dates reflecting non-U.S. government benefit regulations.
2005-06-30restructuringin_progress9202003-06-302006-12-31Attleboro, Massachusetts, United StatesSensors & ControlsUSD 70 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Program to relocate production lines from Attleboro to other TI sites; 738 employees terminated and $62M of the ~$70M expected total cost recorded as of 2005-06-30. Q2 2005 charge was $4M severance in cost of revenue.
2005-06-30restructuringcompleted8972003-06-302005-03-31United States, Japan, GermanySemiconductorUSD 82 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Completed in Q1 2005 with 897 total employees terminated and $82M net pretax cost. $7M severance balance remains payable through 2011.
2005-06-30restructuringcompleted8972003-Q22005-03-31U.S., Japan, GermanySemiconductor manufacturingUSD 82 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Semiconductor Restructuring Action announced in Q2 2003. Completed in Q1 2005. Total net pretax cost $82 million. Balance of $7 million severance/benefits remains to be paid through 2011.
2005-06-30restructuringcompleted2008-12-31Various non-U.S. locationsVariousUSD 14 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Prior years' restructuring programs. All employees terminated. Balance of $14 million severance/benefits remains to be paid through 2008.
2005-03-31restructuringin_progress9202003-04-012006-12-31Attleboro, Massachusetts, with moves to other TI sitesSensors & ControlsUSD 70 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Announced Q2 2003 to relocate production lines closer to customers and cut manufacturing costs. As of 2005-03-31, 656 employees terminated and $58 million net pretax charges recorded; Q1 2005 charge of $5 million, mostly severance. Remaining charges expected through 2006; projected annualized savings about $40 million.
2005-03-31restructuringcompleted8972003-04-012005-03-31United States and international locationsSemiconductor manufacturingUSD 82 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Announced Q2 2003 to improve productivity with fewer people. Completed in Q1 2005; all affected employees terminated, with $8 million of severance and benefit costs remaining to be paid through 2011. Projected annualized savings about $67 million.
2005-03-31restructuringin_progress9202003-06-302006-12-31United States (Attleboro, Massachusetts)Sensors & ControlsUSD 5 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Program announced Q2 2003 to move production lines from Attleboro to other TI sites; affects about 920 jobs. As of 2005-03-31, 656 employees terminated and $58M cumulative net pretax charges recorded; $5M charged in Q1 2005 ($4M in cost of revenue, $1M in SG&A). Total expected cost about $70M; remaining charges expected through 2006. Announcement date is approximate (quarter only).
2005-03-31restructuringcompleted8972003-06-302005-03-31United States and internationalSemiconductorUSD 82 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Program announced Q2 2003 for Semiconductor manufacturing operations; completed in Q1 2005 with 897 terminated employees and total net pretax cost of $82M. $8M of severance and benefit costs remains to be paid through 2011. No charge recorded in Q1 2005. Announcement date is approximate (quarter only).
2005-03-31restructuringin_progress2003-04-012006-12-31Attleboro, MassachusettsSensors & ControlsUSD 5 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Sensors & Controls restructuring action announced in Q2 2003. Total expected cost $70 million. As of March 31, 2005, 656 employees terminated. Q1 2005 charge of $5 million primarily for severance costs.
2005-03-31restructuringcompleted8972003-04-012005-03-31U.S. and international locationsSemiconductorUSD 0 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Semiconductor restructuring action announced in Q2 2003. Completed in Q1 2005 with total of 897 terminated employees. Total net pretax cost $82 million. No specific charge recorded in Q1 2005; balance of $8 million remains to be paid.
2004-12-31restructuringin_progress9152003-042006-12-31United States (Attleboro, Massachusetts) and JapanSensors & Controls — manufacturing operationsUSD 63 (millions)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Announced Q2 2003 to move production lines from Attleboro to other TI sites; expanded Q3 2004 by ~145 additional jobs (included in the 915 total). 627 employees terminated cumulatively through 2004-12-31, primarily at Attleboro and Japan. FY2004 net pretax charge $13M (cumulative ~$54M); expected annualized savings ~$40M when completed end of 2006.
2004-12-31restructuringin_progress9002003-042005-12-31United States and international locationsSemiconductor — manufacturing operationsUSD 82 (millions)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Announced Q2 2003 as manufacturing operations become more productive with fewer people. 875 employees terminated cumulatively through 2004-12-31, primarily U.S., Japan and Germany. FY2004 net pretax charge $4M (cumulative $81M); remaining charges expected completed in 2005; annualized savings ~$67M when completed.
2004-12-31reduction_in_forcecompleted5002002Primarily United States; remainder internationalSemiconductor — manufacturing operationsUSD 17 (millions)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Late-2002 plan to involuntarily terminate ~500 employees to align resources with market demand. All affected employees terminated as of 2004-12-31 (488 per reconciliation table); $1M of severance/benefit costs remains payable through 2005.
2004-12-31reduction_in_forcecompleted2,3672001United States — 329 Massachusetts; 2,038 other U.S. locations, primarily TexasSemiconductorUSD 153 (millions)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
U.S. component of 2001 worldwide cost-reduction plan, combining a voluntary retirement program with involuntary terminations. Cumulative-to-date figures; all affected employees terminated as of 2004-12-31.
2004-12-31plant_closurecompleted1,1592001United States — Santa Cruz and Tustin, California; Merrimack, New HampshireSemiconductor — manufacturing consolidationUSD 88 (millions)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Closing of three Semiconductor facilities (1,159 employees in California and New Hampshire). Charges: $31M severance, $46M accelerated depreciation, $11M other. Facilities sold in 2001, 2003, and Q3 2004; all affected employees terminated as of 2004-12-31.
2004-12-31reduction_in_forcecompleted2,19820012008-12-31Europe (471), Asia (1,075), Japan (652)SemiconductorUSD 116 (millions)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
International voluntary retirement program plus involuntary terminations. All employees terminated as of 2004-12-31; remaining $17M of severance payable through 2008 ($7M 2005, $5M 2006, $3M 2007, $2M 2008), reflecting foreign-government benefit-payment regulations.
2004-12-31restructuringcompleted2005-12-31Primarily Europe; Texas, United StatesLegacy actions (Semiconductor and divested software business)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Legacy pre-2001 terminations (primarily European locations), a Texas facility closing (sold 2002), and a software-business warranty reserve (expired 2002); in 2002, $8M and $20M reserves were reversed and $6M severance paid. $1M of severance remained at 2004-12-31, with payments expected completed in 2005. No employee count disclosed for this component.
2004-12-31restructuringin_progress6272003-06-302006-12-31United States (primarily Attleboro, Massachusetts) and JapanSensors & ControlsUSD 13 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Program announced in Q2 2003 to relocate production lines from Attleboro; total program cost about $63M affecting about 915 jobs. Employees terminated figure (627) is cumulative through 2004-12-31; charge of $13M is the amount recorded during fiscal year 2004. Remaining charges expected to be completed by end of 2006.
2004-12-31restructuringin_progress8752003-06-302005-12-31United States, Japan and GermanySemiconductor manufacturingUSD 4 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Program announced in Q2 2003 affecting about 900 jobs; total program cost about $82M. Employees terminated figure (875) is cumulative through 2004-12-31; charge of $4M is the amount recorded during fiscal year 2004. Remaining charges expected to be completed in 2005.
2004-12-31restructuringcompleted4882002-12-312005-12-31United States and international locationsSemiconductor manufacturingrestructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Program announced in late 2002 to involuntarily terminate about 500 employees; $17M of severance and benefit costs recorded in 2002. All employees terminated as of 2004-12-31 (488 cumulative terminations); $1M balance remains to be paid through 2005. No charge recorded in fiscal year 2004.
2004-12-31restructuringin_progress5,7242001-12-312008-12-31United States (California, New Hampshire, Texas, Massachusetts), Europe, Asia and JapanSemiconductor manufacturingrestructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Multi-year cost-reduction plan including voluntary retirement, involuntary terminations and closure of three Semiconductor facilities (Santa Cruz CA, Merrimack NH, Tustin CA). $357M of net pretax charges recorded beginning 2001; all 5,724 employees terminated as of 2004-12-31. A $17M severance balance remains payable through 2008 ($7M in 2005, $5M in 2006, $3M in 2007, $2M in 2008). No new charge recorded in fiscal year 2004.
2004-12-31restructuringin_progress2005-12-31Europe and United StatesPrior-year actions (European facility closures, Texas facility closure, software business warranty)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Residual balance of $1M in severance and benefit costs remained at 2004-12-31, expected to be paid in 2005. No new charge recorded in fiscal year 2004.
2004-12-31restructuringin_progress6272003-04-012006-12-31United States, JapanSensors & ControlsUSD 13 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
2003 Sensors & Controls Restructuring Action. Announced Q2 2003. Total expected cost $63 million. 627 employees terminated as of Dec 31, 2004. Net pretax charges of $13 million recorded in 2004.
2004-12-31restructuringin_progress8752003-04-012005-12-31United States, Japan, GermanySemiconductorUSD 4 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
2003 Semiconductor Restructuring Action. Announced Q2 2003. Total expected cost $82 million. 875 employees terminated as of Dec 31, 2004. Net pretax charges of $4 million recorded in 2004.
2004-12-31restructuringcompleted4882002-10-012005-12-31United States, InternationalSemiconductorUSD 0 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
2002 Semiconductor Action. Announced late 2002. All employees terminated as of Dec 31, 2004. Balance of $1 million severance remains to be paid through 2005. No charges recorded in 2004.
2004-12-31restructuringcompleted5,7242001-01-012008-12-31United States, Europe, Asia, JapanSemiconductorUSD 0 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
2001 Semiconductor Action. Began in 2001. All employees affected have been terminated as of Dec 31, 2004. Balance of $17 million severance remains to be paid through 2008. No charges recorded in 2004.
2004-12-31restructuringcompleted2000-01-012005-12-31Europe, United StatesOtherUSD 0 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Prior Actions. Primarily European locations and Texas facility. As of Dec 31, 2004, balance of $1 million in severance remains to be paid. Payments expected to be completed in 2005. No charges recorded in 2004.
2004-09-30restructuringin_progress9152003-042005-12-31Primarily Attleboro, Massachusetts, with relocation to other TI sitesSensors & ControlsUSD 63 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Production-line relocation announced Q2 2003; includes Q3 2004 decision to move additional lines affecting about 145 more jobs. 510 employees terminated and $50 million of net pretax charges recorded through Sept. 30, 2004; payments expected to be completed in 2006. Q3 2004 charge of $4 million for 56 employees.
2004-09-30restructuringin_progress8902003-042005-12-31U.S. and international locationsSemiconductor manufacturingUSD 82 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Announced Q2 2003 to make manufacturing operations more productive with fewer people. 868 employees terminated and $82 million of net pretax charges recorded through Sept. 30, 2004; payments expected to be completed in 2005. Q3 2004 charge of $1 million for 5 employees.
2004-09-30reduction_in_forcecompleted50020022004-12-31450 in U.S. locations; remainder internationalSemiconductor manufacturingUSD 17 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Plan to involuntarily terminate about 500 employees to align resources with market demand; 488 terminated in Q3-Q4 2002. All employees terminated as of Sept. 30, 2004; $1 million of severance remains to be paid, with payments expected to be completed in 2004.
2004-09-30restructuringin_progress2001-012008-12-31Worldwide, with remaining payments for international actionsCompany-wide cost-reduction plan including Semiconductor facility closuresrestructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Worldwide cost-reduction plan with voluntary retirement, involuntary terminations and closure of three Semiconductor facilities (one sold 2001, one 2003, one in Q3 2004). $17 million of severance for international actions remains to be paid; payments of $2 million in 2004, $6 million in 2005, $4 million in 2006, $3 million in 2007 and $2 million in 2008.
2004-09-30restructuringin_progress2004-12-31Primarily European locationsPre-2001 actionsrestructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Actions taken prior to 2001 to terminate employees primarily in European locations; $1 million in severance and benefit costs remains to be paid, with payments expected to be completed in 2004.
2004-09-30restructuringin_progress562003-06-302005-12-31United States — Attleboro, Massachusetts (with some Japan locations in prior periods)Sensors & Controls (primarily manufacturing)USD 4 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Program announced in Q2 2003 (exact date not disclosed) to relocate production lines from Attleboro; about 915 jobs affected in total, total expected cost about $63M. Q3 2004 charge of $5M for the program is reported in MD&A; the footnote attributes $4M of Q3 charges to this action. Cumulative: 510 employees terminated and $50M net pretax charges through 2004-09-30. Relocation extended one year through end of 2005; severance payments expected to complete in 2006.
2004-09-30restructuringannounced1452004-09-302005-12-31United States — Attleboro, MassachusettsSensors & Controls (manufacturing)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Third-quarter 2004 decision to move additional production lines from Attleboro, affecting about 145 additional jobs; included in the total expected cost of the Sensors & Controls action. Exact announcement date not disclosed.
2004-09-30restructuringin_progress52003-06-302005-12-31United States and international locationsSemiconductor manufacturingUSD 1 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Program announced in Q2 2003 (exact date not disclosed) affecting about 890 jobs; total expected cost about $82M. Cumulative: 868 employees terminated and $82M net pretax charges through 2004-09-30. Severance payments expected to complete in 2005.
2004-09-30plant_closurecompleted2001-03-312004-09-30United StatesSemiconductor (manufacturing facility consolidation)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Worldwide cost-reduction plan begun in Q1 2001 included closing three Semiconductor facilities; one was sold in 2001, one in 2003, and the remaining facility was sold in the third quarter of 2004. A $17M severance and benefit balance for the associated international actions remains, with payments through 2008.
2004-09-30restructuringin_progress562003-06-302006-12-31Attleboro, MassachusettsSensors & ControlsUSD 4 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Q3 2004 charges for Sensors & Controls restructuring initiated in Q2 2003. Total program expected to affect ~915 jobs; 510 terminated as of Sept 30, 2004.
2004-09-30restructuringin_progress52003-06-302005-12-31U.S. and international locationsSemiconductorUSD 1 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Q3 2004 charges for Semiconductor restructuring initiated in Q2 2003. Total program expected to affect ~890 jobs; 868 terminated as of Sept 30, 2004.
2004-06-30restructuringin_progress7702003-04-012004-12-31United States (Attleboro, Massachusetts and other TI sites)Sensors & ControlsUSD 60 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Moving certain production lines from Attleboro to other TI sites; primarily severance and benefit costs via voluntary retirement and involuntary termination programs. As of 2004-06-30, 466 employees terminated and $46 million net pretax charges recorded; payments expected to be completed in 2005. Q2 2004 charge of $3 million (144 employees affected); Q1 2004 charge of $3 million (6 employees). Projected annualized savings of about $40 million when completed at end of 2004.
2004-06-30restructuringin_progress9002003-04-012004-12-31United States and international locationsSemiconductor manufacturingUSD 85 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Manufacturing operations becoming more productive with fewer people; primarily severance and benefit costs. As of 2004-06-30, 863 employees terminated and $81 million net pretax charges recorded; payments expected to be completed in 2005. Q2 2004 charge of $1 million (4 employees affected); Q1 2004 charge of $2 million (91 employees, primarily U.S.). Projected annualized savings of about $70 million when completed at end of 2004.
2004-06-30reduction_in_forcecompleted5002002-10-012004-12-31Primarily United States; remainder internationalSemiconductor manufacturingUSD 17 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Plan announced in late 2002 to involuntarily terminate about 500 employees, primarily in manufacturing, to align resources with market demand. 488 employees terminated in 2002 (54 in Q3, 434 in Q4); 450 in U.S. locations. All employees terminated as of 2004-06-30; $1 million of severance and benefit costs remains to be paid, with payments expected to be completed in 2004.
2004-06-30restructuringcompleted2001-01-012008-12-31Worldwide; international actions remainCompany-wide cost reduction including Semiconductor facility closuresrestructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Worldwide cost-reduction plan with voluntary retirement program, involuntary terminations, and consolidation of manufacturing operations including closing three Semiconductor facilities (one sold 2001, one sold 2003, one being marketed for sale). All employees terminated as of 2004-06-30; $19 million of severance and benefit costs for international actions remains to be paid through 2008 ($4M in 2004, $6M in 2005, $4M in 2006, $3M in 2007, $2M in 2008).
2004-06-30restructuringcompleted2004-12-31Primarily European locationsrestructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Actions taken in years prior to 2001 to terminate employees primarily in European locations. As of 2004-06-30, $2 million in severance and benefit costs remains to be paid; payments expected to be completed in 2004.
2004-06-30restructuringin_progress14420032004-12-31Attleboro, Massachusetts, United StatesSensors & ControlsUSD 3 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Announced in second quarter of 2003; program moves production lines out of Attleboro, affecting about 770 jobs, total cost about $60M. Q2 2004 charge of $3M (severance/benefits) in cost of revenue, 144 employees affected at Attleboro. Cumulatively 466 employees terminated and $46M of net pretax charges recorded through 2004-06-30. Q1 2004 affected 6 employees ($3M charge). Projected annualized savings about $40M when completed at end of 2004; severance payments expected complete in 2005.
2004-06-30restructuringin_progress420032004-12-31United States and international locationsSemiconductorUSD 1 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Announced in second quarter of 2003; program affects about 900 jobs in Semiconductor manufacturing, total cost about $85M. Q2 2004 charge of $1M (severance/benefits) in cost of revenue, 4 employees affected. Cumulatively 863 employees terminated and $81M of net pretax charges recorded through 2004-06-30. Q1 2004 affected 91 employees ($2M charge). Projected annualized savings about $70M when completed at end of 2004; severance payments expected complete in 2005.
2004-06-30restructuringin_progress144AttleboroSensors & ControlsUSD 3 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Q2 2004 charges for severance and benefit costs.
2004-06-30restructuringin_progress6Sensors & ControlsUSD 3 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Q1 2004 charges for severance and benefit costs.
2004-06-30restructuringin_progress4SemiconductorUSD 1 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Q2 2004 charges for severance and benefit costs.
2004-06-30restructuringin_progress91U.S.SemiconductorUSD 2 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Q1 2004 charges for severance and benefit costs.
2004-03-31restructuringin_progress8002003-042005-12-31United States (Attleboro, Massachusetts) and JapanSensors & ControlsUSD 60 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Moving certain production lines from Attleboro to other TI sites; 322 employees terminated through 2004-03-31 with $43 million of net pretax charges recorded to date; Q1 2004 charge of $3 million ($2M cost of revenue, $1M SG&A); projected annualized savings of $40 million.
2004-03-31restructuringin_progress9502003-042005-12-31United States and international locationsSemiconductorUSD 90 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Manufacturing productivity improvement; 859 employees terminated through 2004-03-31 with $80 million of net pretax charges recorded to date; Q1 2004 charge of $2 million in cost of revenue; projected annualized savings of $70 million.
2004-03-31reduction_in_forcecompleted50020022004-12-31United States (450) and international locationsSemiconductorUSD 17 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
488 employees terminated in Q3-Q4 2002; all terminations complete as of 2004-03-31 with $1 million severance balance remaining, payable in 2004; projected annualized savings of $30 million.
2004-03-31restructuringcompleted2001-012008-12-31WorldwideSemiconductor and company-widerestructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Voluntary retirement program, involuntary terminations, and closure of three Semiconductor facilities; all employees terminated as of 2004-03-31 with $21 million severance balance remaining, payable through 2008 ($6M in 2004, $6M in 2005, $4M in 2006, $3M in 2007, $2M in 2008).
2004-03-31reduction_in_forcecompleted2004-12-31EuropeCompany-wide (primarily European locations)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Terminations taken in years prior to 2001; $2 million severance balance remains as of 2004-03-31, expected to be paid in 2004.
2004-03-31restructuringin_progress3222003-06-302005-12-31Massachusetts, United States; JapanSensors & Controls — manufacturingUSD 43 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Program to move production lines from Attleboro to other TI sites; about 800 jobs targeted, total expected cost about $60M. 322 employees terminated and $43M cumulative net pretax charges recorded as of 2004-03-31. Q1 2004 charge was $3M ($2M in cost of revenue, $1M in SG&A); no Q1-specific employee count given. Projected annualized savings about $40M when complete.
2004-03-31restructuringin_progress8592003-06-302005-12-31United States; internationalSemiconductor — manufacturingUSD 80 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Program affecting about 950 jobs in Semiconductor manufacturing; total expected cost about $90M. 859 employees terminated and $80M cumulative net pretax charges as of 2004-03-31. In Q1 2004, 91 employees affected (primarily U.S.) with $2M charge in cost of revenue. Projected annualized savings about $70M when complete.
2004-03-31restructuringcompleted4882002-12-312004-12-31United States; internationalSemiconductor — manufacturingUSD 17 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Late-2002 plan to involuntarily terminate about 500 employees; 488 terminated (450 U.S.). All terminations complete as of 2004-03-31; $1M severance balance remains, payments expected to complete in 2004. Projected annualized savings about $30M.
2004-03-31plant_closurein_progress2001-03-312008-12-31United StatesSemiconductor — manufacturing facilitiesUSD 21 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
2001 worldwide cost-reduction plan including closure of three Semiconductor facilities (one sold 2001, one sold 2003, one still being marketed). All employees terminated; $21M severance balance remains, payable through 2008 ($6M in 2004, $6M 2005, $4M 2006, $3M 2007, $2M 2008). No employee count disclosed.
2004-03-31restructuringin_progress2004-12-31EuropeOther (pre-2001 European actions)USD 2 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Pre-2001 terminations primarily in European locations; $2M severance balance remains, payments expected to complete in 2004. No employee count or announcement date disclosed.
2004-03-31restructuringin_progress2003-04-012005-12-31Attleboro, Massachusetts; JapanSensors & ControlsUSD 3 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Q1 2004 charges of $3M recorded. Total program expected to affect ~800 jobs with total cost ~$60M. 322 employees terminated as of Mar 31, 2004.
2004-03-31restructuringin_progress912003-04-012005-12-31United States; InternationalSemiconductorUSD 2 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Q1 2004 charges of $2M recorded for 91 employees affected in Q1. Total program expected to affect ~950 jobs with total cost ~$90M. 859 employees terminated as of Mar 31, 2004.
2004-03-31restructuringcompleted2002-10-012004-12-31United States; InternationalSemiconductorrestructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Late 2002 plan to terminate ~500 employees. All employees terminated as of Mar 31, 2004. Balance of $1M severance remains to be paid.
2004-03-31restructuringcompleted2001-01-012008-12-31WorldwideSemiconductorrestructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Q1 2001 cost-reduction plan. All employees terminated as of Mar 31, 2004. Balance of $21M severance remains to be paid through 2008.
2004-03-31restructuringcompleted2000-01-012004-12-31EuropeOtherrestructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Prior actions in European locations. Balance of $2M severance remains to be paid in 2004.
2003-12-31restructuringin_progress3162003-042004-12-31United States (Attleboro, Massachusetts) and JapanSensors & Controls — manufacturingUSD 40 (millions)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Announced Q2 2003 (April-June; exact date not disclosed) to move certain production lines from Attleboro, MA to other TI sites to be closer to customers and reduce manufacturing costs. Program expected to affect about 800 jobs via voluntary retirement and involuntary termination at a total expected cost of about $60 million. FY2003 figures are cumulative through December 31, 2003: 316 terminated (183 in Q2, 90 in Q3, 43 in Q4) and $40 million net pretax charges recorded ($26M Q2, $8M Q3, $6M Q4), primarily severance and benefit costs. Projected annualized savings of about $40 million upon completion at end of 2004; payments expected to be completed in 2005.
2003-12-31restructuringin_progress7682003-042004-12-31United States and international (Germany, Japan)Semiconductor — manufacturingUSD 78 (millions)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Announced Q2 2003 (April-June; exact date not disclosed) to make manufacturing operations more productive with fewer employees. Program expected to affect about 950 jobs in U.S. and international Semiconductor manufacturing at a total expected cost of about $90 million. FY2003 figures are cumulative through December 31, 2003: 768 terminated (109 in Q2 at U.S./Germany, 553 in Q3 at U.S./Japan, 106 in Q4 at U.S.) and $78 million net pretax charges recorded, including $65 million severance and benefit costs, $8 million non-cash fixed-asset write-downs and $5 million accelerated depreciation. Projected annualized savings of about $70 million upon completion at end of 2004; payments expected to be completed in 2004.
2003-12-31restructuringin_progress8002003-06-302005-12-31United States (primarily Attleboro, Massachusetts) and JapanSensors & ControlsUSD 40 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Announced in Q2 2003 (quarter only disclosed); program to move production lines from Attleboro to other TI sites, affecting about 800 jobs over two years. $40M net pretax charges recorded cumulative through 2003-12-31 (severance $37M plus non-cash items $3M); total expected program cost about $60M. 316 employees terminated as of 2003-12-31. Payments expected complete in 2005.
2003-12-31restructuringin_progress9502003-06-302004-12-31United States and international locationsSemiconductorUSD 78 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Announced in Q2 2003 (quarter only disclosed); manufacturing productivity program expected to affect about 950 jobs. $78M net pretax charges recorded cumulative through 2003-12-31 (severance $65M plus non-cash depreciation acceleration/write-downs $13M); total expected program cost about $90M. 768 employees terminated as of 2003-12-31. Payments expected complete in 2004.
2003-12-31acquisition_additioncompleted2003-07-01United StatesSemiconductorbusiness_combinations_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
TI acquired 100% of Radia Communications in July 2003 for approximately $133M; only month of acquisition disclosed. Headcount added through the acquisition is not disclosed. $23M in-process R&D charge recorded.
2003-12-31restructuringin_progress8002003-04-012005-12-31Attleboro, Massachusetts and JapanSensors & ControlsUSD 60 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Plan to move production lines from Attleboro to other TI sites. Expected to affect about 800 jobs through voluntary retirement and involuntary termination over two years. Total cost expected to be about $60 million. As of Dec 31, 2003, 316 employees terminated and $40 million recorded.
2003-12-31restructuringin_progress9502003-04-012004-12-31U.S. and international locationsSemiconductorUSD 90 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Restructuring action to improve productivity in Semiconductor manufacturing. Expected to affect about 950 jobs. Total cost expected to be about $90 million. As of Dec 31, 2003, 768 employees terminated and $78 million recorded.
2003-12-31restructuringcompleted5002002-10-012004-12-31U.S. and international locationsSemiconductorUSD 17 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Plan announced in late 2002 to involuntarily terminate about 500 employees. 488 employees terminated in 2002. Net pretax charges of $17 million recorded. As of Dec 31, 2003, all employees terminated and $1 million balance remains to be paid.
2003-09-30restructuringin_progress8002003-04-012005-12-31Primarily Attleboro, Massachusetts, with moves to other TI sites including JapanSensors & ControlsUSD 60 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Moving certain production lines from Attleboro to other TI sites; expected annualized savings about $40 million. Q3 2003 net pretax charge of $8 million ($7M cost of revenue, $1M SG&A) affecting 90 employees; Q2 2003 charge of $26 million affecting 183 employees; cumulative charges of $34 million and 273 employees terminated as of September 30, 2003. Payments expected to be completed in 2005.
2003-09-30restructuringin_progress9502003-04-012004-12-31United States and international locations, primarily U.S. and JapanSemiconductor manufacturingUSD 90 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Operations becoming more productive with fewer people; expected annualized savings about $70 million. Q3 2003 net pretax charge of $48 million ($41M cost of revenue, $6M SG&A, $1M R&D) affecting 553 employees; Q2 2003 charge of $23 million affecting 109 employees primarily at U.S. and Germany locations; cumulative charges of $71 million and 662 employees terminated as of September 30, 2003. Payments expected to be completed in 2004.
2003-09-30layoffcompleted4882002-10-012003-12-31450 in U.S. locations; remainder in international locationsSemiconductor manufacturingUSD 17 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Plan announced in late 2002 to involuntarily terminate about 500 employees to align resources with market demand; 54 terminated in Q3 2002 and 434 in Q4 2002. Charges of $11M cost of revenue, $4M SG&A, $2M R&D. All employees terminated as of September 30, 2003; $1 million of severance and benefit costs remains to be paid, with payments expected to be completed in 2003. Estimated annualized savings about $30 million.
2003-09-30restructuringcompleted5,7242001-01-012003-06-30Worldwide: U.S. (Massachusetts, Texas, California, New Hampshire), Europe, Asia, JapanPrimarily Semiconductor manufacturingUSD 357 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Worldwide cost-reduction plan combining voluntary retirement program, involuntary terminations, and consolidation of manufacturing operations including closure of three Semiconductor facilities (Santa Cruz CA, Merrimack NH, Tustin CA). Component charges: U.S. voluntary/involuntary programs $153 million; U.S. site closings $88 million; international actions $116 million severance and benefit costs. Estimated annualized savings about $600 million. U.S. site-closing program complete at June 30, 2003; all affected employees have terminated. As of September 30, 2003, $25 million of international severance costs remain to be paid through 2007.
2003-09-30restructuringin_progress2001-01-012007-12-31Europe, Asia, JapanSemiconductorUSD 116 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Affected 471 employees in Europe, 1075 in Asia, and 652 in Japan. All employees terminated as of September 30, 2003; $25 million of severance and benefit costs remains to be paid, with $9 million in 2003, $5 million in 2004, $5 million in 2005, and $3 million in each of 2006 and 2007. Estimated annualized savings about $140 million.
2003-09-30restructuringin_progress2001-01-012004-12-31Primarily European locationsPrior actionsUSD 3 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Actions taken in years prior to 2001 to terminate employees primarily in European locations. $3 million in severance and benefit costs remains to be paid as of September 30, 2003; $1 million payable in 2003 and $2 million in 2004.
2003-09-30restructuringin_progress8002003-062005United States (primarily Attleboro, Massachusetts; also Japan)Sensors & ControlsUSD 60 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Program announced in Q2 2003 to move production lines from Attleboro to other TI sites; total expected cost about $60M. In Q3 2003, 90 employees affected with $8M net pretax charge; 273 employees terminated and $34M cumulative charges as of 2003-09-30. Payments expected to be completed in 2005. Announcement date given only as second quarter of 2003.
2003-09-30restructuringin_progress9502003-062004United States and international locations (primarily U.S. and Japan)SemiconductorUSD 90 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Program announced in Q2 2003 affecting about 950 jobs in Semiconductor manufacturing; total expected cost about $90M. In Q3 2003, 553 employees affected with $48M net pretax charge; 662 employees terminated and $71M cumulative charges as of 2003-09-30. Payments expected to be completed in 2004. Announcement date given only as second quarter of 2003.
2003-09-30restructuringcompleted4882002-122003United States and international locations (450 in U.S.)Semiconductor manufacturingUSD 17 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Plan announced in late 2002 to involuntarily terminate about 500 employees; 488 terminated in Q3/Q4 2002. All employees terminated as of 2003-09-30 with $1M severance balance remaining; payments expected to be completed in 2003. Announcement date given only as late 2002.
2003-09-30acquisition_additioncompleted2003-07United StatesSemiconductor (RF WLAN / 802.11 wireless LAN technologies)USD 23 (millions)business_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
TI acquired 100% of Radia Communications in July 2003 for approximately $133M; $23M in-process R&D charge recorded. No headcount added through the acquisition is disclosed.
2003-09-30restructuringin_progress902003-04-012005-12-31Attleboro, Massachusetts and JapanSensors & ControlsUSD 8 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Q3 2003 charges for moving production lines from Attleboro to other TI sites. Total program expected to affect ~800 jobs.
2003-09-30restructuringin_progress5532003-04-012004-12-31U.S. and JapanSemiconductorUSD 48 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Q3 2003 charges for manufacturing efficiencies. Total program expected to affect ~950 jobs.
2003-09-30acquisition_additioncompleted2003-07-01SemiconductorUSD 133 (millions)business_combinations_footnote
f5-10q / Qwen3.6-27B-Q8_0
Acquisition of 100% equity of Radia Communications, Inc. Headcount not explicitly disclosed.
2003-06-30restructuringin_progress8502003-04-012005-06-30Primarily Attleboro, Massachusetts, USSensors & ControlsUSD 70 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Moving certain production lines from Attleboro to other TI sites; voluntary retirement and involuntary termination programs over two years. Q2 2003 net pretax charge of $26 million ($22M cost of revenue, $4M SG&A), primarily severance; 183 employees affected in the quarter.
2003-06-30restructuringin_progress8602003-04-01United States and international locationsSemiconductor manufacturingUSD 80 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Manufacturing productivity improvement; Q2 2003 net pretax charge of $23 million ($21M cost of revenue, $2M SG&A), primarily severance; 105 employees affected in the quarter at US and Germany locations.
2003-06-30reduction_in_forcecompleted5002002-10-012003-12-31Primarily US; remainder internationalSemiconductor manufacturingUSD 17 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
488 employees terminated in Q3/Q4 2002 (450 US); all terminations complete as of June 30, 2003 with $2 million severance balance remaining, payable in 2003.
2003-06-30restructuringcompleted5,7242001-01-012003-06-30Worldwide (US, Europe, Asia, Japan)Primarily Semiconductor manufacturingUSD 357 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Voluntary retirement, involuntary terminations, and closure of three Semiconductor facilities (Santa Cruz CA, Merrimack NH, Tustin CA). Charges: $153M US voluntary/involuntary programs, $88M US site closings, $116M international actions. Program complete as of June 30, 2003; $27M international severance balance payable through 2007.
2003-06-30reduction_in_forcecompleted2004-12-31Primarily Europerestructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Pre-2001 terminations primarily in European locations; $4 million severance balance remains, with $2 million payable in 2003 and $2 million in 2004.
2003-06-30restructuringin_progress8502003-06-302005-06-30United States (primarily Attleboro, Massachusetts)Sensors & ControlsUSD 70 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Program announced in Q2 2003 to move production lines from Attleboro to other TI sites; about 850 jobs over two years via voluntary retirement and involuntary termination. 183 employees affected and $26M net pretax charge recorded in Q2 2003 ($22M in cost of revenue, $4M in SG&A); total expected program cost about $70M. Expected annualized savings $40M. Completion date inferred from 'over the next two years'.
2003-06-30restructuringin_progress8602003-06-30United States and international locationsSemiconductorUSD 80 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Program announced in Q2 2003 affecting about 860 jobs in Semiconductor manufacturing as operations become more productive with fewer people. 105 employees affected (U.S. and Germany) and $23M net pretax charge recorded in Q2 2003 ($21M in cost of revenue, $2M in SG&A); total expected program cost about $80M. Expected annualized savings $65M. Company expects about $100M additional restructuring charges by end of 2004.
2003-06-30reduction_in_forcecompleted48820022003-12-31United States (450) and international locationsSemiconductor manufacturingUSD 17 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Announced in late 2002 to involuntarily terminate about 500 employees; 54 terminated in Q3 2002 and 434 in Q4 2002 (488 total). All terminations complete as of 2003-06-30 with $2M severance balance remaining; payments expected to complete in 2003. Expected annualized savings $30M. Included for completeness as the filing reports it as completed at quarter end.
2003-06-30restructuringin_progress8502003-04-012005-06-30Attleboro, MassachusettsSensors & ControlsUSD 70 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Plan to move production lines; affects ~850 jobs over next two years via voluntary retirement and involuntary termination. Q2 charge was $26M.
2003-06-30restructuringin_progress8602003-04-01U.S. and international locationsSemiconductorUSD 80 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Affects ~860 jobs in manufacturing operations to improve productivity. Q2 charge was $23M.
2003-06-30reduction_in_forcecompleted5002002-10-012003-12-31U.S. and international locationsSemiconductorUSD 17 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Announced late 2002 to align resources with market demand. 488 employees terminated by Q4 2002. All terminated as of June 30, 2003.
2003-03-31restructuringannounced8002003-04-252004-12-31Primarily Attleboro, Massachusetts, United StatesSensors & Controls, primarily manufacturingUSD 30 (millions)MD&A
f5-10q / GLM-5.3-flash-fp4-HTML
First phase of actions; total plan cost about $55 million with charges spread over quarters as jobs are eliminated; voluntary retirement and involuntary terminations; production lines relocating from Attleboro to other TI sites; annualized savings estimated at $35 million.
2003-03-31restructuringannounced4502003-04-252004-06-30United States and international locationsSemiconductor manufacturing operationsUSD 10 (millions)MD&A
f5-10q / GLM-5.3-flash-fp4-HTML
First phase of actions; total plan cost about $45 million with charges spread over quarters as jobs are eliminated; annualized savings estimated at $45 million.
2003-03-31reduction_in_forcecompleted4882002-10-012003-12-31450 in U.S. locations; remainder internationalSemiconductor, primarily manufacturing operationsUSD 17 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Announced late 2002 to align resources with market demand; all employees terminated as of March 31, 2003; $6 million of severance and benefit costs remains to be paid, expected to be completed in remainder of 2003; annualized savings estimated at $30 million.
2003-03-31voluntary_separationcompleted2,3672001-01-012002-12-31United States (329 in Massachusetts; 2038 primarily in Texas)Primarily manufacturing operationsUSD 153 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Part of 2001 worldwide cost-reduction plan affecting 5,724 employees total; voluntary retirement program plus involuntary terminations; program complete at year-end 2002; annualized savings estimated at $290 million.
2003-03-31plant_closurecompleted1,1592001-01-012003-12-31California and New Hampshire, United StatesSemiconductor manufacturingUSD 88 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Closure of three facilities (Santa Cruz and Tustin, California; Merrimack, New Hampshire); charges include $31 million severance, $46 million accelerated depreciation, $11 million other; all facilities closed and employees terminated as of March 31, 2003; $3 million severance remains; annualized savings estimated at $170 million.
2003-03-31restructuringin_progress2,1982001-01-012007-12-31Europe (471), Asia (1075), Japan (652)SemiconductorUSD 116 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Voluntary retirement program and involuntary terminations; all employees terminated as of March 31, 2003; $27 million of severance and benefit costs remains to be paid through 2007; annualized savings estimated at $140 million.
2003-03-31plant_closurecompleted4802000-01-012002-12-31Versailles, Kentucky, United StatesSensors & Controls manufacturingUSD 13 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Facility closing with severance for elimination of 480 jobs; program complete at year-end 2002; annualized savings estimated at $10 million.
2003-03-31reduction_in_forcein_progress4322000-07-012003-12-31United States, Japan, and EuropeSemiconductor and Sensors & ControlsUSD 19 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Several severance actions; $18 million of severance costs paid as of March 31, 2003; payments expected to be completed in remainder of 2003; annualized savings estimated at $31 million.
2003-03-31reduction_in_forcein_progress2004-12-31Primarily European locations; also a Texas facilityPrior actions — severance, facility closing, and software business unit warrantyrestructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Reserve balance of $37 million at beginning of 2002; Texas facility reserve ($8 million) and warranty reserve ($20 million) reversed in 2002; $3 million severance remains at March 31, 2003, payable $2 million in remainder of 2003 and $1 million in 2004.
2003-03-31restructuringannounced8002003-04-252004-12-31Primarily United States (Attleboro, Massachusetts headquarters)Sensors & ControlsUSD 30 (millions)MD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
First phase of a plan totaling about $55M in cost; production lines moving from Attleboro to other TI sites. Projected annualized savings about $35M. Part of a combined ~$40M Q2 2003 charge.
2003-03-31restructuringannounced4502003-04-252004-06-30United States and international locationsSemiconductor manufacturingUSD 10 (millions)MD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
First phase of a plan totaling about $45M in cost; reductions through mid-2004 as operations become more productive. Projected annualized savings about $45M. Part of a combined ~$40M Q2 2003 charge.
2003-03-31reduction_in_forcecompleted4882002-09-302003-03-31450 in U.S. locations; remainder internationalSemiconductor manufacturing operationsUSD 17 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Announced late 2002 to align resources with market demand; 54 terminated in Q3 2002 and 434 in Q4 2002. All employees terminated as of 2003-03-31; $6M severance accrual remains payable during remainder of 2003. Charge split: $11M cost of revenue, $4M SG&A, $2M R&D.
2003-03-31plant_closurecompleted1,1592001-03-312003-03-31California (Santa Cruz, Tustin) and New Hampshire (Merrimack)Semiconductor manufacturingUSD 88 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Three Semiconductor facilities closed; all employees terminated as of 2003-03-31 with $3M severance accrual remaining. One facility sold in Q4 2001; two still being marketed for sale. Additional 2002 charges: $15M accelerated depreciation (Merrimack) and $5M severance.
2003-03-31voluntary_separationcompleted5,7242001-03-312002-12-31United States, Europe, Asia, JapanPrimarily manufacturing operations (Semiconductor)USD 357 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Consolidated 2001 cost-reduction plan combining voluntary retirement, involuntary terminations and site consolidations: $153M U.S. severance, $116M international severance, $88M site-closing charges. Program complete; $30M severance accrual remains at 2003-03-31 ($27M international payable through 2007, $3M prior actions). Projected annualized savings about $600M.
2003-03-31restructuringin_progress8002003-03-312004-12-31United StatesSensors & ControlsUSD 30 (millions)MD&A
f5-10q / Qwen3.6-27B-Q8_0
First phase of restructuring affecting about 800 jobs primarily in manufacturing at Attleboro, MA headquarters. Total plan cost expected to be $55 million.
2003-03-31restructuringin_progress4502003-03-312004-06-30United States and InternationalSemiconductorUSD 10 (millions)MD&A
f5-10q / Qwen3.6-27B-Q8_0
First phase of restructuring affecting about 450 jobs in manufacturing operations. Total plan cost expected to be $45 million.
2002-12-31reduction_in_forcecompleted48820022003United States (450 employees) and international locations (remainder of total)Semiconductor; primarily manufacturing operationsUSD 17 (millions)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Plan announced late 2002 to involuntarily terminate about 500 employees to align resources with market demand; 54 terminated in Q3 2002 and 434 in Q4 2002 (488 total). Net pretax charge of $17M in severance and benefit costs ($11M cost of revenue, $4M SG&A, $2M R&D). All terminations completed by December 31, 2002; $9M of severance payable in 2003. MD&A estimates annualized savings of about $30 million.
2002-12-31plant_closurecompleted20012002-12-31United States (California and New Hampshire sites)Semiconductor; primarily manufacturing operationsUSD 5 (millions)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Fiscal 2002 tail of a program announced in Q1–Q2 2001 covering three facility closures (prior-year activity affected 1,159 employees — reported in the prior 10-K, not attributed to FY2002). FY2002 activity: $5M additional severance and benefit costs recorded in cost of revenue, plus $15M non-cash acceleration of depreciation on the New Hampshire facility. Payments complete and no balance remains at December 31, 2002.
2002-12-31reduction_in_forcecompleted48820022002-12-31United States (450 of 488) and international locationsSemiconductor (primarily manufacturing operations)USD 17 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Plan announced in late 2002 to involuntarily terminate about 500 employees; 54 terminated in Q3 and 434 in Q4 2002. All terminations complete at year-end; $9 million severance balance remains payable during 2003. Charge split: $11M cost of revenue, $4M SG&A, $2M R&D. Projected annualized savings estimated at $30 million.
2002-12-31plant_closurecompleted20012002-12-31United States (Merrimack, New Hampshire; two closed facilities being marketed for sale)SemiconductorUSD 20 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Multi-year program originally announced 2001 (1,159 employees affected then). Only FY2002 activity captured: $15 million additional accelerated depreciation plus $5 million additional severance, both in cost of revenue. No new headcount reduction disclosed for 2002; all employees already terminated and payments complete at year-end.
2002-12-31acquisition_additioncompleted2002-062002-06-30Germany (Berlin)business_combinations_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Acquisition of Condat AG, developer of wireless communication software and platforms, completed in Q2 2002 for approximately $87 million purchase price with approximately $69 million goodwill recognized. Headcount added through the acquisition is not disclosed.
2002-12-31restructuringcompleted4882002-Q42003-12-31United States and InternationalSemiconductorUSD 17 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Announced late 2002 to align resources with market demand. 450 employees in U.S., remainder international. All terminated by year-end; $9M balance remains to be paid in 2003.
2002-12-31restructuringcompleted2002-Q12003-12-31United StatesSemiconductorUSD 20 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Continuation of 2001 program closing three facilities. 2002 charges include $15M depreciation acceleration and $5M severance. $3M severance balance remains to be paid in 2003.
2002-12-31restructuringin_progress2001-Q12007-12-31InternationalSemiconductorrestructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Part of 2001 worldwide cost-reduction plan affecting 2,198 international employees. No new 2002 charges disclosed. $29M severance balance remains, payable through 2007.
2002-12-31restructuringin_progressPrior Years2004-12-31United States and InternationalOtherrestructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Reserves from prior years. In 2002, $8M facility reserve and $20M warranty reserve reversed; $6M severance paid. $3M balance remains, payable through 2004.
2002-09-30voluntary_separationcompleted3292001-01Massachusetts, United StatesPrimarily manufacturing operationsrestructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Part of Q1 2001 worldwide cost-reduction plan; portion of the 5724 affected employees in the Massachusetts location. All employees terminated as of Q3 2002; $2 million severance balance remains, payable by 2003.
2002-09-30reduction_in_forcecompleted2,0382001-01Other U.S. locations, primarily TexasPrimarily manufacturing operationsrestructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Involuntary terminations under the Q1 2001 cost-reduction plan; all employees terminated as of Q3 2002.
2002-09-30plant_closurecompleted1,1592001-01California and New Hampshire, United StatesSemiconductorUSD 88 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Closing of three Semiconductor facilities (Santa Cruz and Tustin, CA; Merrimack, NH). Charge includes $31M severance, $46M accelerated depreciation, $11M other. All facilities closed and employees terminated as of Q3 2002; $4M severance balance payable by 2003. In 2002 an additional $15M accelerated depreciation and $5M severance were recorded.
2002-09-30voluntary_separationcompleted4712001-012007-12-31EuropeSemiconductorrestructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Portion of international restructuring under Q1 2001 plan; $30M severance balance remains at Q3 2002, paid through 2007.
2002-09-30reduction_in_forcecompleted1,0752001-012007-12-31AsiaSemiconductorrestructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Portion of international restructuring under Q1 2001 plan; all employees terminated, severance payments continue through 2007.
2002-09-30reduction_in_forcecompleted6522001-012007-12-31JapanSemiconductorrestructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Portion of international restructuring under Q1 2001 plan; all employees terminated, severance payments continue through 2007.
2002-09-30reduction_in_forceannounced5002002-092002-12-31United StatesPrimarily manufacturing and support functionsMD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Expense-control action aligning resources with market demand; most reductions expected to occur in the fourth quarter of 2002.
2002-09-30voluntary_separationcompleted3292001-01-012003-12-31Massachusetts, United StatesSemiconductorrestructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Sub-component of the U.S. voluntary/involuntary program announced in Q1 2001 (announcement month only disclosed). Program-wide net pretax charge was $153M, not allocated by location. All employees terminated as of Q3 2002; $2M severance balance remains, payable through 2003.
2002-09-30voluntary_separationcompleted2,0382001-01-012003-12-31Texas and other U.S. locations, United StatesSemiconductorrestructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Sub-component of the U.S. voluntary/involuntary program announced in Q1 2001. Program-wide net pretax charge was $153M, not allocated by location. All employees terminated as of Q3 2002; $2M severance balance remains, payable through 2003.
2002-09-30plant_closurecompleted1,1592001-01-012002-09-30California and New Hampshire, United StatesSemiconductorUSD 88 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Closure of three Semiconductor facilities (Santa Cruz CA, Merrimack NH, Tustin CA) announced across Q1-Q2 2001; charge includes $31M severance, $46M accelerated depreciation and $11M other. All facilities closed and employees terminated by Q3 2002. In 2002 TI recorded an additional $15M accelerated depreciation and $5M severance on these sites; one facility sold in Q4 2001, two being marketed for sale.
2002-09-30restructuringcompleted4712001-01-012007-12-31EuropeSemiconductorrestructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Sub-component of international restructuring announced Q1 2001; international program charge of $116M severance not allocated by region. All employees terminated as of Q3 2002; $30M severance balance remains, payable through 2007.
2002-09-30restructuringcompleted1,0752001-01-012007-12-31AsiaSemiconductorrestructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Sub-component of international restructuring announced Q1 2001; international program charge of $116M severance not allocated by region. All employees terminated as of Q3 2002; $30M severance balance remains, payable through 2007.
2002-09-30restructuringcompleted6522001-01-012007-12-31JapanSemiconductorrestructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Sub-component of international restructuring announced Q1 2001; international program charge of $116M severance not allocated by region. All employees terminated as of Q3 2002; $30M severance balance remains, payable through 2007.
2002-09-30restructuringin_progress2000-12-312004-12-31Primarily Europe; United StatesCorporate / otherrestructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Pre-2001 restructuring reserves (European terminations, Texas facility closure, software-business warranty). Reserve was $40M at 2002-01-01; in 2002 $8M and $20M reserves were reversed and $7M severance paid. $5M balance remains, payable through 2004. Employee counts not disclosed.
2002-09-30reduction_in_forceannounced5002002-11-082002-12-31United StatesManufacturing and support functionsMD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Filer states it is reducing about 500 jobs, primarily in U.S. manufacturing and support, with most expected in Q4 2002; described as 'about 500'. Announcement date taken as filing date (2002-11-08); no separate charge disclosed. Total headcount not disclosed, so percentage cannot be computed.
2002-09-30acquisition_additioncompleted2002-06-302002-06-30Semiconductorother
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Condat acquired during Q2 2002; acquired intangibles disclosed (developed technology $26M, customer relationships $2M, non-compete $2M) but no headcount added through the acquisition is disclosed. Announcement date approximated to quarter end.
2002-09-30restructuringin_progress5002002-09-302002-12-31United StatesManufacturing and support functionsMD&A
f5-10q / Qwen3.6-27B-Q8_0
Reduction of about 500 jobs primarily impacting manufacturing and support functions in the US, expected to occur in Q4 2002.
2002-09-30restructuringin_progress2001-03-312003-12-31United StatesManufacturingUSD 2 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Balance of $2 million severance remains to be paid; payments expected completed by 2003.
2002-09-30plant_closurein_progress2001-03-312003-12-31United StatesSemiconductorUSD 4 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Balance of $4 million severance remains to be paid; payments expected completed by 2003.
2002-09-30restructuringin_progress2001-03-312007-12-31International (Europe, Asia, Japan)SemiconductorUSD 30 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Balance of $30 million severance remains to be paid; payments expected to continue through 2007.
2002-09-30restructuringin_progress2000-12-312004-12-31International (primarily Europe)OtherUSD 5 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Balance of $5 million severance remains to be paid; payments expected to continue through 2004.
2002-06-30restructuringin_progress5,7242001-01-01WorldwideCompany-wide cost reduction and restructuringUSD 293 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
2001 worldwide cost-reduction and restructuring program; as of June 30, 2002, $260 million of the $293 million aggregate severance obligations had been paid. Remaining accrual balance $52 million at quarter-end.
2002-06-30plant_closurein_progress2002-04-01United StatesSemiconductorUSD 5 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Second-quarter 2002 severance charges of $5 million for Semiconductor site closings in the U.S.; $15 million of severance payments made during the quarter against these accruals. Headcount for this component not separately disclosed.
2002-06-30acquisition_additioncompleted2002-06-302002-06-30Germany (Berlin)SemiconductorUSD 85 (millions)business_combinations_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
TI completed acquisition of Condat AG, Berlin for approximately $85 million; goodwill of approximately $58 million recognized. Employee headcount added via the acquisition was not disclosed.
2002-06-30restructuringin_progress5,7242001WorldwideCompany-wide, including Semiconductor facility closingsUSD 293 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
2001 worldwide cost-reduction and restructuring program; $260M of the $293M aggregate severance paid as of 2002-06-30, leaving $33M outstanding. Program remains in progress with severance payments in both quarters of 2002. Filer also discloses quarterly sub-counts from 2001 (3,778 and 559 employees in Q2 2001; 502 and 600 in Q1 2001) that do not sum to the 5,724 consolidated total.
2002-06-30plant_closurein_progress2002Merrimack, New Hampshire, United StatesSemiconductorUSD 14 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Closure of the Semiconductor manufacturing facility in Merrimack, NH, part of $17M net special charges in Q1 2002; $9M was accelerated depreciation and $4M fixed-asset write-downs. No employee count disclosed. Severance payments against related accruals continued through 2002-06-30 per Note 14.
2002-06-30acquisition_additioncompleted2002-06-30Berlin, GermanyNot specifiedbusiness_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Acquisition of Condat AG completed during Q2 2002; exact completion date not disclosed (date shown is quarter end). Purchase price approximately $85M with approximately $58M of goodwill recognized; no headcount added disclosed.
2002-06-30restructuringin_progress52002-04-01United StatesSemiconductorUSD 5 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Severance charges incurred in Q2 2002 related to ongoing restructuring actions.
2002-06-30plant_closurein_progress2002-01-01New Hampshire, United StatesSemiconductorUSD 14 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Restructuring charges primarily related to the closing of the Semiconductor manufacturing facility in Merrimack, New Hampshire. Includes $9M depreciation acceleration and $4M fixed asset write-downs. Employee count for this specific Q1 action not explicitly broken out in Q2 filing, though total 2001 program affected 5,724 employees.
2002-03-31plant_closurein_progress2001-10-01Merrimack, New Hampshire, United StatesSemiconductorUSD 14 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Q1 2002 charge of $14 million for closing the Semiconductor manufacturing facility in Merrimack, NH: $9 million acceleration of depreciation over remaining service life and $4 million fixed asset write-downs for assets held for sale. Facility closure originally announced/charged in Q4 2001. No employee count disclosed for this site.
2002-03-31restructuringin_progress5,7242001-01-01WorldwideCompany-wide cost reduction and restructuringUSD 293 (millions)MD&A
f5-10q / GLM-5.3-flash-fp4-HTML
2001 worldwide cost-reduction and restructuring actions affecting 5,724 employees with aggregate severance obligations of $293 million; $251 million paid as of March 31, 2002. Expected annualized savings of approximately $600 million, with benefit beginning in Q2 2001. Action originated in 2001; status updated in this Q1 2002 filing.
2002-03-31plant_closurein_progressMerrimack, New Hampshire, United StatesSemiconductorUSD 14 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Q1 2002 charge: $9M accelerated depreciation plus $4M write-downs of assets held for sale. Announcement date not stated in filing; closure first charged in Q4 2001. No employee count disclosed; affected workers may be included in the 5,724 total of the 2001 program.
2002-03-31restructuringin_progress5,724WorldwideUSD 293 (millions)MD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Program announced in 2001 (exact date not disclosed in this filing); $251M of the $293M aggregate severance obligations paid as of 2002-03-31, with $26M of severance payments during Q1 2002 per Note 11. Expected annualized savings of approximately $600M beginning Q2 2001.
2002-03-31restructuringin_progress2002-01-01Merrimack, New HampshireSemiconductorUSD 14 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Closing of Semiconductor manufacturing facility; $9M depreciation acceleration, $4M fixed asset write-downs.
2002-03-31restructuringin_progress2002-01-01United StatesSemiconductorUSD 11 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Severance payments for voluntary/involuntary program related to business divestiture.
2002-03-31restructuringin_progress2002-01-01United StatesSemiconductorUSD 8 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Severance payments for site closings.
2002-03-31restructuringin_progress2002-01-01InternationalSemiconductorUSD 7 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Severance payments for international restructuring.
2002-03-31restructuringin_progress2002-01-01United StatesSemiconductorUSD 7 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Severance payments for site closings.
2001-12-31acquisition_additioncompletedUnited StatesSemiconductorItem_1_Business
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Graychip acquired in Q3 2001; developer of digital up/down-converters. No headcount disclosed.
2001-09-30voluntary_separationcompleted2412001-01-01United StatesUSD 11 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
U.S. voluntary retirement program acceptances in Q1 2001
2001-09-30restructuringin_progress2612001-01-01InternationalSemiconductorUSD 16 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Restructuring actions at international Semiconductor locations
2001-09-30plant_closurein_progress6002001-01-01Santa Cruz, CaliforniaSemiconductorUSD 25 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Closure of Semiconductor manufacturing facility; $16M severance for 600 employees and $5M accelerated depreciation
2001-09-30reduction_in_forcein_progress3,7782001-04-01WorldwideUSD 214 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Worldwide cost-reduction program announced in Q2 2001
2001-09-30plant_closurein_progress5592001-04-01Merrimack, New Hampshire; Tustin, California; Santa Cruz, CaliforniaSemiconductorUSD 35 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Closure of three Semiconductor facilities; $14M severance and $16M accelerated depreciation
2001-09-30reduction_in_forcein_progress2852001-07-01WorldwideUSD 19 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Worldwide cost-reduction program in Q3 2001
2001-09-30plant_closurein_progress2001-07-01Santa Cruz, California; Merrimack, New Hampshire; Tustin, CaliforniaSemiconductorUSD 16 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Q3 restructuring charges for closing three Semiconductor facilities; $15M is accelerated depreciation
2001-09-30restructuringin_progress5,7242001-01-01WorldwideUSD 290 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Aggregate Q1-Q3 2001 cost reduction and restructuring actions; $184M of $290M severance paid as of 2001-09-30; expected annualized savings about $400 million
2001-09-30restructuringcompleted4322000-07-01United States, Japan, EuropeSemiconductor and Sensors & ControlsUSD 10 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Net $10M charge for restructuring and other actions; estimated annual benefit of $31M in reduced personnel costs; $13M of $19M severance obligation paid as of 2001-09-30
2001-09-30plant_closurecompleted4802000-01-01Versailles, KentuckySensors & ControlsUSD 12 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Manufacturing facility closure; estimated annual benefit of $10M in reduced personnel costs; $9M of severance obligation paid as of 2001-09-30
2001-09-30restructuringin_progress285WorldwideCompany-wideUSD 19 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Part of TI's 2001 worldwide cost reduction and restructuring actions; $184M of $290M aggregate severance paid as of 2001-09-30; annualized savings estimated at ~$400M across all 2001 actions affecting 5,724 employees.
2001-09-30plant_closurein_progressUnited States (Santa Cruz, CA; Merrimack, NH; Tustin, CA)SemiconductorUSD 16 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Restructuring charges for closing three Semiconductor facilities; $15M of the $16M is accelerated depreciation over remaining service life. Employee count for Q3 portion not separately disclosed.
2001-09-30restructuringin_progress3,778WorldwideCompany-wideUSD 214 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Severance cost for worldwide cost-reduction program disclosed in Q2 2001; included in YTD 2001 restructuring roll-forward.
2001-09-30plant_closurein_progress559United States (Merrimack, NH; Tustin, CA; Santa Cruz, CA)SemiconductorUSD 35 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Closing of three Semiconductor facilities affecting an additional 559 employees; $14M severance and $16M accelerated depreciation within the $35M charge.
2001-09-30voluntary_separationcompleted241United StatesCompany-wideUSD 11 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
First-quarter employee acceptances under the U.S. voluntary retirement program.
2001-09-30restructuringcompleted261InternationalSemiconductorUSD 16 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Severance cost for restructuring actions affecting employees in international Semiconductor locations.
2001-09-30plant_closurecompleted600United States (Santa Cruz, CA)SemiconductorUSD 16 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Closing of Santa Cruz Semiconductor manufacturing facility; $16M severance for 600 employees plus $5M accelerated depreciation within the $25M facility-related charge.
2001-09-30restructuringin_progress2852001-07-01WorldwideCost reduction programUSD 19 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Q3 2001 worldwide cost reduction program.
2001-09-30plant_closurein_progress2001-07-01Santa Cruz, CA; Merrimack, NH; Tustin, CASemiconductorUSD 16 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Closing of three Semiconductor facilities. Charge includes $15M acceleration of depreciation.
2001-09-30restructuringin_progress3,7782001-04-01WorldwideCost reduction programUSD 214 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Q2 2001 worldwide cost-reduction program.
2001-09-30plant_closurein_progress5592001-04-01Merrimack, NH; Tustin, CA; Santa Cruz, CASemiconductorUSD 35 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Closing of three Semiconductor facilities. Charge includes $14M severance and $16M depreciation acceleration.
2001-09-30voluntary_separationin_progress2412001-01-01United StatesVoluntary retirement programUSD 11 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Q1 2001 employee acceptances under U.S. voluntary retirement program.
2001-09-30restructuringin_progress2612001-01-01InternationalSemiconductorUSD 16 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Q1 2001 restructuring actions in international Semiconductor locations.
2001-09-30plant_closurein_progress6002001-01-01Santa Cruz, CASemiconductorUSD 25 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Closing of Semiconductor manufacturing facility. Charge includes $16M severance and $5M depreciation acceleration.
2001-06-30restructuringin_progress3,778WorldwideCompany-wide cost-reduction programUSD 214 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Second-quarter 2001 worldwide cost-reduction program; part of combined H1 2001 actions affecting 5439 employees with expected annualized savings of about $400 million.
2001-06-30plant_closurein_progress559United StatesSemiconductorUSD 35 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Closing of three Semiconductor facilities: Merrimack, New Hampshire; Tustin, California; and Santa Cruz, California. Of the $35 million, $14 million is severance and $16 million is accelerated depreciation over remaining service life.
2001-06-30voluntary_separationcompleted241United StatesU.S. voluntary retirement programUSD 11 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
First-quarter 2001 employee acceptances under the U.S. voluntary retirement program.
2001-06-30restructuringin_progress261InternationalSemiconductorUSD 16 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
First-quarter 2001 severance for restructuring actions at international Semiconductor locations.
2001-06-30plant_closurein_progress600Santa Cruz, CaliforniaSemiconductorUSD 25 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Closing of a Semiconductor manufacturing facility in Santa Cruz, California; $16 million severance for 600 employees and $5 million accelerated depreciation.
2001-06-30restructuringin_progress3,778WorldwideCompany-wide cost reductionUSD 214 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Second-quarter 2001 worldwide cost-reduction program; part of $271M aggregate severance obligations for Q1-Q2 2001 actions, of which $118M paid at 2001-06-30. Expected annualized savings of approximately $400M.
2001-06-30plant_closurein_progress559United States (Merrimack, New Hampshire; Tustin, California; Santa Cruz, California)SemiconductorUSD 35 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Closure of three Semiconductor facilities; of the $35M charge, $14M is severance and $16M is accelerated depreciation over remaining service life.
2001-06-30voluntary_separationcompleted241United StatesCompany-wideUSD 11 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
First-quarter 2001 employee acceptances under the U.S. voluntary retirement program.
2001-06-30restructuringcompleted261InternationalSemiconductorUSD 16 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
First-quarter 2001 restructuring actions in international Semiconductor locations.
2001-06-30plant_closurecompleted600United States (Santa Cruz, California)SemiconductorUSD 25 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Closure of a Semiconductor manufacturing facility; of the $25M charge, $16M is severance and $5M is accelerated depreciation. Santa Cruz also appears in the second-quarter three-facility closure record.
2001-06-30restructuringin_progress3,7782001-06-30WorldwideManufacturing and support functionsUSD 214 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Worldwide cost-reduction program. $214 million severance charge.
2001-06-30plant_closurein_progress5592001-06-30United States (Merrimack, NH; Tustin, CA; Santa Cruz, CA)SemiconductorUSD 35 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Closing of three Semiconductor facilities. $14 million severance, $16 million accelerated depreciation.
2001-06-30voluntary_separationcompleted2412001-03-31United StatesCorporateUSD 11 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
First-quarter employee acceptances under U.S. voluntary retirement program.
2001-06-30restructuringcompleted2612001-03-31InternationalSemiconductorUSD 16 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Restructuring actions in international Semiconductor locations.
2001-06-30plant_closurecompleted6002001-03-31United States (Santa Cruz, CA)SemiconductorUSD 25 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Closing of Semiconductor manufacturing facility. $16 million severance, $5 million accelerated depreciation.
2001-03-31voluntary_separationcompleted241United StatesCorporate, Semiconductor, and Sensors & ControlsUSD 11 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
U.S. voluntary retirement program covering corporate, semiconductor and sensors & controls activities; program expired April 16, 2001.
2001-03-31restructuringin_progress261International, mostly GermanySemiconductorUSD 16 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Restructuring actions affecting 261 employees in international semiconductor locations, mostly in Germany.
2001-03-31plant_closureannounced6002001-12-31Santa Cruz, California, United StatesSemiconductorUSD 25 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Closing of semiconductor manufacturing facility; $16M severance for 600 employees and $5M acceleration of depreciation over remaining service life.
2001-03-31layoffannounced2,5006%WorldwideSupport functions and manufacturingMD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Layoffs to begin in second quarter with associated special charges taken at that time; part of cost-reduction plan expected to yield about $400 million in annualized savings when completed.
2001-03-31voluntary_separationcompleted2412001-04-16United StatesCorporate, Semiconductor, and Sensors & ControlsUSD 11 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
U.S. voluntary retirement program; 241 acceptances in Q1 2001. Program expired April 16, 2001.
2001-03-31restructuringin_progress261International (mostly Germany)SemiconductorUSD 16 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Severance for restructuring actions affecting 261 employees in international semiconductor locations.
2001-03-31plant_closurein_progress600Santa Cruz, California, United StatesSemiconductorUSD 25 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Closing of semiconductor manufacturing facility; $16M severance for 600 employees plus $5M accelerated depreciation; filing states 'fourth-quarter 2001 closing' though charge taken in Q1 2001.
2001-03-31layoffannounced2,5006%WorldwideSupport functions and manufacturingMD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
TI announced plans to lay off about 2,500 employees (6% of workforce) beginning Q2 2001; associated special charges to be taken in Q2. Expected annualized savings of approximately $400 million.
2001-03-31voluntary_separationcompleted2412001-04-16United StatesCorporate, Semiconductor, Sensors & ControlsUSD 11 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
U.S. voluntary retirement program expired April 16, 2001.
2001-03-31restructuringin_progress261International (mostly Germany)SemiconductorUSD 16 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Restructuring actions affecting international semiconductor locations.
2001-03-31plant_closurecompleted600Santa Cruz, CaliforniaSemiconductor ManufacturingUSD 21 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Closing of semiconductor manufacturing facility. Charge includes $16M severance and $5M accelerated depreciation.
2001-03-31layoffannounced2,5006%WorldwideSupport functions and manufacturingMD&A
f5-10q / Qwen3.6-27B-Q8_0
Reductions to begin in second quarter; associated special charges to be taken at that time.
2000-12-31acquisition_additioncompletedSemiconductorItem_1_Business
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Acquisition of Toccata Technology ApS (digital-audio amplifier technology) completed in Q1 2000; headcount added not disclosed.
2000-12-31acquisition_additioncompleted2000-06-21Semiconductorbusiness_combinations_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Burr-Brown Corporation acquired in Q3 2000 (analog semiconductors, data converters and amplifiers), accounted for as a pooling of interests with prior periods restated; headcount added not disclosed.
2000-12-31acquisition_additioncompletedSemiconductorItem_1_Business
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Q3 2000 acquisitions of Dot Wireless, Inc. (CDMA 3G system software) and Alantro Communications, Inc. (wireless LAN technology); headcount added not disclosed.
2000-12-31divestiture_reductioncompletedSensors & ControlsItem_1_Business
f5-10k / MiMo-V2.6-Flash-fp8-HTML
In Q4 2000 Sensors & Controls divested its specialty-clad metals and electrical contacts activity; headcount removed not disclosed.
2000-09-30restructuringin_progress4322000-09-30U.S., Japan and EuropeSemiconductor and Materials & ControlsUSD 19 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Net pretax charges of $10 million for several actions; components included $17 million asset abandonment charges, $9 million gains from asset sales, $17 million escrow pricing refunds, and $19 million severance affecting 432 jobs. No severance costs paid as of September 30, 2000. Estimated annual personnel cost savings of $31 million expected to begin in Q4 2000.
2000-09-30divestiture_reductionannounced2000-09-302000-10-31Materials & Controls — specialty-clad metals and electrical contacts (materials) operationMD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Agreement to sell materials operation to an independent company financed by Blue Point Capital Partners; sale expected to close by October 31, 2000 and result in a gain. The materials operation contributed about $95 million in trade revenue in 1999. No employee count disclosed.
2000-09-30restructuringin_progress432United States, Japan, EuropeSemiconductor; Materials & ControlsUSD 19 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Severance portion of a $10 million net pretax charge; none of the severance paid as of 2000-09-30. Program also included $17M asset abandonment, $9M asset sale gains, $17M escrow refunds.
2000-09-30plant_closurein_progress4802000-01-012001-03-31Versailles, Kentucky, United StatesMaterials & ControlsUSD 12 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Closing of M&C manufacturing facility plus Toccata Technology ApS acquisition costs totaled $29M pretax; severance pay-out had not begun as of 2000-09-30. Announcement date shown as quarter start; exact date not disclosed.
2000-09-30acquisition_additioncompleted2000-07-062000-08-31Tucson, Arizona, United StatesSemiconductorUSD 41 (millions)business_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Burr-Brown Corporation acquired in pooling of interests for ~88 million TI shares; $41M acquisition costs recognized in the quarter. Headcount added not disclosed.
2000-09-30acquisition_additioncompleted2000-08-31United StatesSemiconductorUSD 60 (millions)business_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Dot Wireless, Inc. acquired for ~6.8 million TI shares; $60M in-process R&D charge. Headcount added not disclosed.
2000-09-30acquisition_additioncompleted2000-09-08United StatesSemiconductorUSD 52 (millions)business_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Alantro Communications, Inc. acquired for ~4.2 million TI shares; $52M in-process R&D charge. Headcount added not disclosed.
2000-09-30divestiture_reductionannounced2000-10-31United StatesMaterials & Controls — specialty-clad metals and electrical contacts (materials) operationMD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Sale to a company financed by Blue Point Capital Partners expected to close by 2000-10-31 and result in a gain; headcount removed not disclosed. Operation contributed about $95 million trade revenue in 1999.
2000-09-30othercompletedUnited StatesSemiconductor — hard-disk drive read channel productsMD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Development activity in read channel products discontinued; more than 100 analog design engineers redeployed to telecommunications and data networking markets (redeployment, not a headcount reduction).
2000-09-30restructuringin_progress4322000-09-30U.S., Japan, and EuropeSemiconductor and Materials & ControlsUSD 19 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Net pretax charge of $10 million recorded in Q3 2000. Severance portion is $19 million. None paid as of Sept 30, 2000.
2000-09-30plant_closurein_progress4802000-03-312001-03-31Kentucky, U.S.Materials & ControlsUSD 12 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Closing of Versailles manufacturing facility. Pretax charge of $29 million in Q1 2000, of which $12 million was severance. Elimination of jobs expected by first quarter 2001.
2000-09-30restructuringcompleted2061999-09-301999-12-31U.S.SemiconductorUSD 9 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Response to hard disk drive market downturn. Pretax charge of $12 million in Q3 1999, of which $9 million was severance. Program complete at Sept 30, 2000.
2000-09-30restructuringcompleted1051999-09-301999-12-31Hatogaya, JapanSemiconductorrestructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Additional severance for Japan manufacturing efficiency program. Pretax charge of $7 million in Q3 1999. Program complete at Sept 30, 2000.
2000-09-30restructuringcompleted1531999-03-311999-12-31Hatogaya, JapanSemiconductorUSD 13 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Consolidation of semiconductor manufacturing operations in Japan. Pretax charge of $14 million in Q1 1999, of which $13 million was severance. Program complete at year-end 1999.
2000-09-30restructuringcompleted1999-09-301999-12-31U.S.Unitrode Corporationrestructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Pretax operating charge of $4 million for severance action. Employee count not disclosed.
2000-06-30plant_closurein_progress4802000-01-012001-03-31Versailles, Kentucky, United StatesMaterials and ControlsUSD 29 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Pretax charge of $29 million includes $12 million severance for 480 jobs; also covers Toccata Technology ApS acquisition. Severance unpaid as of June 30, 2000; estimated $10 million annual personnel cost savings beginning Q3 2000.
2000-06-30restructuringcompleted1531999-01-011999-12-31Hatagoya, JapanSemiconductorUSD 14 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Consolidation of semiconductor manufacturing operations in Japan; $13 million severance for 153 jobs plus $1 million other costs. Program complete at year-end 1999; estimated $11 million annual savings began Q4 1999.
2000-06-30plant_closureannounced2000-04-01Dresden, GermanyMaterials and ControlsMD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Closure of Dresden facility, acquired in the Integrated Sensor Solutions acquisition, to improve manufacturing efficiencies; no headcount or charge quantified.
2000-06-30acquisition_additionannounced2000-06-21Semiconductor (analog)business_combinations_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Stock-for-stock agreement for approximately 88 million TI shares including options and convertible notes; headcount not disclosed.
2000-06-30acquisition_additionannounced2000-06-23Semiconductor (wireless LAN)USD 300 (millions)business_combinations_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Stock-for-stock transaction; aggregate value including stock options and warrants approximately $300 million; headcount not disclosed.
2000-06-30acquisition_additionannounced2000-06-29Semiconductor (CDMA/3G)USD 475 (millions)business_combinations_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Stock-for-stock transaction; aggregate value including stock options approximately $475 million; headcount not disclosed.
2000-06-30plant_closurein_progress4802000-01-012001-03-31Versailles, Kentucky, United StatesMaterials & ControlsUSD 12 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Severance for eliminating 480 jobs; pay-out had not begun as of June 30, 2000. Part of a $29M total charge also covering Toccata Technology ApS acquisition.
2000-06-30plant_closureannounced2000-04-01Dresden, GermanyMaterials & Controls — Integrated Sensor SolutionsMD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
M&C announced closure of Dresden facility acquired via Integrated Sensor Solutions; no headcount or charge disclosed.
2000-06-30acquisition_additionannounced2000-06-21United StatesSemiconductor — Analogbusiness_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Agreement to purchase Burr-Brown Corporation for approximately 88 million TI shares; no headcount disclosed.
2000-06-30acquisition_additionannounced2000-06-23United StatesSemiconductor — Wireless LANbusiness_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Agreement to purchase Alantro Communications, Inc. for approximately $300 million; no headcount disclosed.
2000-06-30acquisition_additionannounced2000-06-29United StatesSemiconductor — Wireless (CDMA/3G)business_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Agreement to purchase Dot Wireless, Inc. for approximately $475 million; no headcount disclosed.
2000-06-30plant_closurein_progress4802000-03-312001-03-31Versailles, Kentucky, United StatesMaterials and ControlsUSD 12 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Closing of Materials and Controls manufacturing facility. $12 million severance charge for elimination of 480 jobs. Primary benefit is reduced personnel costs estimated at $10 million annually.
2000-06-30plant_closurecompleted1531999-03-311999-12-31Hatagoya, JapanSemiconductorUSD 13 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Consolidation of semiconductor manufacturing operations. Program completed at year-end 1999.
2000-06-30plant_closureannounced2000-06-30Dresden, GermanyMaterials and ControlsMD&A
f5-10q / Qwen3.6-27B-Q8_0
Announced closure of Dresden facility to improve manufacturing efficiencies. No headcount or charge details provided in this filing.
2000-03-31plant_closurein_progress4802000-02-012001-03-31Versailles, Kentucky, United StatesMaterials & ControlsUSD 12 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Closure of Versailles, Kentucky manufacturing facility announced February 2000; severance pay-out had not begun at March 31, 2000; estimated annual people-cost benefit of $10 million beginning Q3 2000; total Q1 2000 special charge of $29 million includes this action and Toccata acquisition.
2000-03-31restructuringcompleted1531999-01-011999-12-31Hatagoya, JapanSemiconductorUSD 13 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Consolidation of semiconductor manufacturing operations in Japan; program complete at year-end 1999; total Q1 1999 pretax charge was $14 million; estimated annual people-cost benefit of $11 million.
2000-03-31plant_closurein_progress4802000-022001-03-31Versailles, Kentucky, United StatesMaterials & ControlsUSD 12 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Part of $29 million pretax charges in Q1 2000 ($20M in cost of revenues, $6M in MG&A, $3M in R&D); $12M severance for 480 jobs to be eliminated by Q1 2001, with no severance payout begun at 2000-03-31. Estimated annual people-cost savings of $10M expected to begin Q3 2000.
2000-03-31acquisition_additioncompleted2000-03-15Denmarkother
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Acquired all outstanding shares of Toccata Technology ApS in exchange for 136,362 TI common shares; acquisition-related costs included in the $29M Q1 2000 pretax charges. Headcount added not disclosed.
2000-03-31plant_closurein_progress4802000-02-012001-03-31Versailles, Kentucky, USAMaterials & ControlsUSD 12 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Closing of Materials & Control manufacturing facility. $12M severance for 480 jobs. Total pretax charge $29M including acquisition costs.
2000-03-31acquisition_additioncompleted2000-03-152000-03-15DenmarkOtherbusiness_combinations_footnote
f5-10q / Qwen3.6-27B-Q8_0
Acquisition of Toccata Technology ApS. Headcount not disclosed. Included in $29M pretax charge.
1999-12-31acquisition_additioncompleted1999SemiconductorItem_1_Business
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Butterfly VLSI, Ltd., short-distance wireless chipsets; acquired in first quarter 1999; headcount not disclosed
1999-12-31acquisition_additioncompleted1999SemiconductorItem_1_Business
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Libit Signal Processing Ltd., cable modem chipsets; acquired in second quarter 1999; headcount not disclosed
1999-12-31acquisition_additioncompleted1999SemiconductorItem_1_Business
f5-10k / MiMo-V2.6-Flash-fp8-HTML
ATL Research A/S, radio frequency engineering for cellular phones; acquired in third quarter 1999; headcount not disclosed
1999-12-31acquisition_additioncompleted1999SemiconductorItem_1_Business
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Telogy Networks, Inc., VoIP software; acquired in third quarter 1999, accounted for as pooling of interests; headcount not disclosed
1999-12-31acquisition_additioncompleted1999SemiconductorItem_1_Business
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Unitrode Corporation, power supply control and battery management components; acquired in fourth quarter 1999, pooling of interests with prior periods restated; headcount not disclosed
1999-12-31acquisition_additioncompleted1999SemiconductorItem_1_Business
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Power Trends, Inc., point-of-use power solutions; acquired in fourth quarter 1999, pooling of interests; headcount not disclosed
1999-12-31acquisition_additioncompleted1999Materials & ControlsItem_1_Business
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Integrated Sensor Solutions, Inc., automotive sensors; acquired by Materials & Controls in third quarter 1999; headcount not disclosed
1999-12-31acquisition_additioncompleted1999-09-301999-09-30Educational & Productivity SolutionsItem_1_Business
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Soft Warehouse, Inc. (maker of mathematical software); merger into TI effective 1999-09-30 per Exhibit 3(l); headcount not disclosed
1999-09-30reduction_in_forcein_progress2061999-09-301999-12-31United StatesSemiconductorUSD 12 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Response to hard disk drive market downturn; $9M severance, $2M fixed asset write-downs, $1M vendor obligations; severance payout had not begun at quarter-end; employees expected to leave by year-end; estimated annual people-cost benefit of $22 million beginning Q4 1999.
1999-09-30restructuringin_progress1051999-09-30Hatogaya, JapanSemiconductorUSD 7 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Additional job eliminations under the Japan manufacturing efficiency program announced in Q1 1999; charge included in cost of revenues; severance payout had not begun at quarter-end.
1999-09-30restructuringin_progress1531999-01-31Hatogaya, JapanSemiconductorUSD 14 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Consolidation of semiconductor manufacturing operations in Japan; $13M severance for 153 jobs plus $1M other costs; estimated annual people-cost benefit of $11 million expected to begin Q4 1999; severance payout had not begun at September 30, 1999.
1999-09-30restructuringcompleted3,4411998-04-302000-12-31WorldwideCorporate activities and SemiconductorUSD 219 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Program essentially complete at September 30, 1999; 3,401 of 3,441 jobs eliminated, remaining 40 to be eliminated in 2000; $20 million of severance costs primarily to be paid by end of 1999. Charge comprised $161M severance, $41M asset write-downs, $17M vendor cancellation and lease charges; estimated annual benefits of $270 million.
1999-09-30acquisition_additioncompleted1999-08-311999-08-31SemiconductorUSD 15 (millions)business_combinations_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Stock-for-stock pooling transaction; approximately 6.3 million shares issued plus 1.9 million substitute employee stock options; headcount added not disclosed; $15 million transaction costs expensed.
1999-09-30acquisition_additioncompleted1999-08-161999-08-16Materials & ControlsUSD 16 (millions)business_combinations_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Acquired for approximately $67 million; $16 million charge for purchased in-process R&D; headcount added not disclosed.
1999-09-30acquisition_additioncompleted1999-04-301999-04-30SemiconductorUSD 52 (millions)business_combinations_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Acquired for approximately $365 million in Q2 1999; $52 million purchased in-process R&D charge; headcount added not disclosed.
1999-09-30acquisition_additioncompleted1999-01-311999-01-31SemiconductorUSD 10 (millions)business_combinations_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Q1 1999 acquisition; $10 million purchased in-process R&D charge; headcount added not disclosed.
1999-09-30acquisition_additioncompleted1999-10-151999-10-15Semiconductorsubsequent_events
f5-10q / GLM-5.3-flash-fp4-HTML
Stock-for-stock transaction completed October 15, 1999; approximately 16.7 million shares issued; headcount added not disclosed; special charge expected in Q4 1999.
1999-09-30acquisition_additionannounced1999-09-291999-12-31Semiconductorsubsequent_events
f5-10q / GLM-5.3-flash-fp4-HTML
Stock-for-stock agreement; approximately 1.68 million shares to be issued; expected to close by end of 1999; headcount added not disclosed; special charge expected in Q4 1999.
1999-09-30restructuringin_progress2061999-12-31United StatesSemiconductorUSD 12 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Taken in response to the hard disk drive market downturn; charge comprises $9M severance, $2M fixed-asset write-downs and $1M vendor obligations ($10M in cost of revenues, $2M in MG&A). Severance payout had not begun at 1999-09-30; essentially all employees expected to leave by year-end. Estimated annual people-cost savings of $22M beginning Q4 1999. Exact announcement date not disclosed.
1999-09-30restructuringin_progress105Japan (Hatogaya)Semiconductor manufacturingUSD 7 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Additional headcount actions under the Japan manufacturing efficiency program announced in Q1 1999; charge included in cost of revenues. Severance payout had not begun at 1999-09-30. Exact announcement and completion dates not disclosed.
1999-09-30restructuringin_progress153Japan (Hatogaya)Semiconductor manufacturingUSD 14 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Consolidation of semiconductor manufacturing operations in Japan announced in Q1 1999; charge comprises $13M severance and $1M other costs ($11M in cost of revenues, $3M in MG&A). Severance payout had not begun at 1999-09-30; estimated annual people-cost savings of $11M beginning Q4 1999. Exact announcement date not disclosed.
1999-09-30restructuringin_progress3,4412000-12-31WorldwideCorporate activities and semiconductor businessesUSD 219 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Program announced in Q2 1998 (exact date not disclosed in this filing); status update here shows 3,401 of 3,441 positions eliminated as of 1999-09-30, with 40 remaining to be eliminated during 2000 and $20M of severance unpaid. Charge comprised $161M severance, $41M asset write-downs and $17M vendor/lease charges; program included facility closures. Estimated annual benefits of $270M people costs plus ~$9M manufacturing savings.
1999-09-30acquisition_additioncompleted1999-08-311999-08-31Semiconductorbusiness_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Stock-for-stock pooling acquisition completed 1999-08-31; approximately 6.3M shares and 1.9M substitute employee stock options issued; $15M transaction costs expensed in MG&A. Headcount added not disclosed.
1999-09-30acquisition_additioncompleted1999-08-161999-08-16Materials & Controlsbusiness_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Purchase for approximately $67M; $16M in-process R&D charge recorded at acquisition date (non-workforce charge). Strengthens M&C pressure-sensor position. Headcount added not disclosed.
1999-09-30acquisition_additionannounced1999-09-291999-12-31Semiconductorbusiness_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Stock-for-stock agreement entered 1999-09-29; approximately 1.68M shares to be issued; MD&A indicates completion expected by end of 1999. Extends analog catalog leadership. Headcount added not disclosed.
1999-09-30acquisition_additioncompleted1999-10-15Semiconductorsubsequent_events
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Previously announced acquisition completed 1999-10-15, after quarter end; approximately 16.7M shares issued. Extends analog catalog leadership. Announcement date and headcount added not disclosed.
1999-09-30acquisition_additioncompletedSemiconductorbusiness_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Purchase for approximately $365M completed in Q2 1999 (exact date not disclosed); $52M in-process R&D charge recorded (non-workforce charge). Headcount added not disclosed.
1999-09-30acquisition_additioncompletedSemiconductorbusiness_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Acquisition completed in Q1 1999 (exact date and purchase price not disclosed); $10M in-process R&D charge recorded (non-workforce charge). Headcount added not disclosed.
1999-09-30restructuringin_progress2061999-09-301999-12-31United StatesSemiconductorUSD 12 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Severance actions in response to hard disk drive market downturn; charge includes severance, asset write-downs, and vendor obligations.
1999-09-30restructuringin_progress1051999-09-30JapanSemiconductorUSD 7 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Additional severance for Japan manufacturing efficiency program in Hatogaya.
1999-09-30restructuringin_progress1531999-03-31JapanSemiconductorUSD 14 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Consolidation of semiconductor manufacturing operations in Japan to improve efficiencies; charge includes severance and other costs.
1999-09-30restructuringcompleted3,4411998-06-302000-12-31WorldwideCorporate and SemiconductorUSD 219 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Severance/manufacturing efficiency program; 3,401 jobs eliminated by Sept 30, 1999, with 40 remaining to be eliminated in 2000.
1999-06-30restructuringin_progress1531999-01-012000-12-31Hatogaya, JapanSemiconductorUSD 14 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Pretax charge of $14 million in Q1 1999: $13 million severance for elimination of 153 jobs, $1 million other costs. Consolidation expected to be completed by end of 2000; severance pay-out had not begun at June 30, 1999. Estimated annual benefit of $11 million in reduced people costs beginning Q4 1999.
1999-06-30restructuringcompleted3,4411998-04-011999-12-31WorldwideCorporate activities and semiconductor businessesUSD 219 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Q2 1998 pretax charge of $219 million ($161M severance, $41M asset write-downs, $17M vendor cancellation/lease charges). Program essentially complete at June 30, 1999: 3,381 of 3,441 jobs eliminated, remaining 60 by end of 1999; $22 million severance unpaid, primarily to be paid by end of 1999. Estimated annual benefits of $270 million.
1999-06-30restructuringin_progress1531999-03-312000-12-31JapanSemiconductor manufacturingUSD 14 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Consolidation announced in Q1 1999; $13M severance for 153 jobs at Hatogaya plus $1M other. Severance pay-out had not begun at June 30, 1999. Expected annual savings of $11M beginning Q4 1999.
1999-06-30restructuringin_progress3,4411998-06-301999-12-31WorldwideCorporate activities and semiconductor businessesUSD 219 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Program announced Q2 1998. At June 30, 1999, 3,381 of 3,441 jobs eliminated; remaining 60 to be eliminated by end of 1999. $22M severance still unpaid. Charge comprised $161M severance, $41M asset write-downs, $17M vendor/lease charges.
1999-06-30acquisition_additioncompleted1999-06-30Broadband communications — cable modem chipsetsUSD 52 (millions)business_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Acquired for approximately $365M in Q2 1999. $52M charge for purchased in-process R&D. Headcount added not disclosed.
1999-06-30acquisition_additionannounced1999-05-29Broadband communications — VoIP softwarebusiness_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Stock-for-stock transaction; approximately 4.1M TI shares valued at ~$435M as of June 1, 1999. Headcount added not disclosed.
1999-06-30acquisition_additionannounced1999-07-25Power management componentssubsequent_events
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Stock-for-stock transaction; approximately 8.9M TI shares valued at ~$1.2B as of July 23, 1999. Headcount added not disclosed.
1999-06-30acquisition_additioncompleted1999-03-31Short-distance wireless semiconductorsUSD 10 (millions)business_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Acquired in Q1 1999. $10M charge for purchased in-process R&D. Headcount added not disclosed.
1999-06-30acquisition_additionannounced1999-06-30Automotive sensors (Materials & Controls)MD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Integrated Sensor Solutions, Inc. acquisition announced during Q2 1999; expected to close in Q3 1999. Headcount added not disclosed.
1999-06-30restructuringin_progress1531999-03-311999-12-31JapanSemiconductor ManufacturingUSD 14 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Consolidation of semiconductor manufacturing operations in Hatogaya, Japan. Charge includes $13M severance and $1M other costs.
1999-06-30restructuringcompleted3,4411998-06-301999-12-31WorldwideCorporate and SemiconductorUSD 219 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Severance/manufacturing efficiency program announced in Q2 1998. 3,381 jobs eliminated by June 30, 1999; 60 remaining to be eliminated by end of 1999.
1999-03-31restructuringcompleted1531999-03-31JapanSemiconductor manufacturingUSD 31 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Consolidation of semiconductor manufacturing operations in Japan; charge includes $17M asset write-downs, $13M severance for 153 eliminated jobs, and $1M other costs; $28M in cost of revenues, $3M in MG&A.
1999-03-31acquisition_additioncompleted1999-03-31SemiconductorUSD 50 (millions)business_combinations_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Acquired Butterfly VLSI, Ltd., developer of short-distance wireless products, for $50 million cash; includes $10M acquired in-process R&D charge. No headcount disclosed.
1999-03-31restructuringin_progress1531999-01-01JapanSemiconductor manufacturingUSD 31 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Pretax charge of $31M: $17M asset write-downs, $13M severance for 153 jobs, $1M other. $28M in cost of revenues, $3M in SG&A.
1999-03-31acquisition_additioncompleted1999-01-01Short-distance wireless productsUSD 50 (millions)business_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Acquired for $50M cash; $10M in-process R&D charge. Headcount added not disclosed.
1999-03-31restructuringcompleted1531999-03-31JapanSemiconductor manufacturingUSD 13 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Consolidation of semiconductor manufacturing operations in Japan. Total pretax charge was $31 million, including $17 million for asset write-downs and $1 million for other costs.
1998-12-31restructuringin_progress3,4411998-04-011999-12-31WorldwideCorporate activities and SemiconductorUSD 233 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Announced Q2 1998. Eliminated 3,441 jobs via voluntary programs, attrition, outsourcing, layoffs, and facility closures. At year-end 1998, 3,260 jobs eliminated; 181 remaining for 1999. Charge: $161M severance, $55M asset write-downs, $17M vendor/lease.
1998-12-31plant_closurein_progress7401998-10-011999-12-31Europe (Portugal and Italy)Semiconductor assembly/test and Materials & ControlsUSD 72 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Q4 1998: closing of Samsung Electronica assembly/test JV in Portugal (740 employees) and sale of Aversa, Italy M&C plant (completed 1998-12-31). Charge: $35M severance, $35M other cash-related, $2M asset write-downs.
1998-12-31divestiture_reductioncompleted1998-06-181998-09-30Worldwide (Italy, United States, Japan, Singapore)Memory (DRAM) semiconductor operationsdiscontinued_operations_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Completed 1998-09-30. Included Avezzano Italy and Richardson Texas facilities, JV interests in Japan and Singapore, and Singapore assembly/test. Employee headcount transferred not disclosed.
1998-12-31restructuringcompleted1998-01-011998-03-31WorldwideSemiconductor (DRAM joint venture with Hitachi)USD 219 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Q1 1998 pretax charge of $219M in cost of revenues for discontinuing DRAM manufacturing JV with Hitachi. Employee impact not separately disclosed.
1998-12-31restructuringcompleted3,4411998-04-011999-12-31WorldwideCorporate activities and SemiconductorUSD 233 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Second quarter 1998 severance/manufacturing efficiency program. Included elimination of jobs through voluntary programs, attrition, outsourcing and layoffs. Program essentially completed at year-end with most severance costs paid except $49 million to be paid in 1999. 3,260 jobs eliminated, 181 to be eliminated in 1999.
1998-12-31plant_closurein_progress7401998-10-01EuropeSemiconductorUSD 72 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Fourth quarter 1998 closing of semiconductor assembly operation in Europe. Part of broader $72 million charge which also included sale of materials & controls operation. Assembly closing ongoing.
1998-12-31plant_closurecompleted1998-10-011998-12-31EuropeMaterials & Controlsrestructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Fourth quarter 1998 sale of materials & controls manufacturing operation in Europe. Sale completed December 31, 1998. Employee count not explicitly disclosed for this specific closure, included in broader $72 million charge.
1998-12-31restructuringcompleted1,0451997-01-011997-03-31WorldwideMobile computing and Digital ImagingUSD 56 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
First quarter 1997 charge related to sale of mobile computing business and termination of digital imaging printing development program. Severance actions essentially completed by end of quarter.
1998-12-31restructuringin_progress2601997-10-011999-03-31Materials & ControlsUSD 42 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Fourth quarter 1997 cost-reduction actions in Materials & Controls business. Expected to be completed in first-quarter 1999.
1998-09-30restructuringin_progress3,5001998-04-011998-12-31WorldwideSupport functions and manufacturing operationsUSD 233 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Announced in Q2 1998; eliminates approximately 3,500 jobs over the following few months via voluntary programs, attrition, outsourcing and layoffs, plus several facility closings. Charge split: $161M severance, $55M asset writeoffs, $17M vendor cancellation and lease charges. Implementation reported on schedule and expected to be substantially complete by year end; annualized cost savings estimated at $270 million.
1998-09-30restructuringin_progress3,5001998-04-011998-12-31WorldwideSupport functions and manufacturing operationsUSD 233 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Announced in Q2 1998; charge comprises $161M severance, $55M asset writeoffs, $17M vendor cancellation and lease charges. MD&A states implementation is on schedule and substantially complete by year end, with annualized cost savings estimated at $270 million.
1998-09-30divestiture_reductioncompleted1998-09-301998-09-30WorldwideMemory business (DRAM)other
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Memory business, including DRAM manufacturing JV interests, sold to Micron on 1998-09-30. Headcount transferred not disclosed. TI deferred a pre-tax gain of $127 million until repayment of TI-provided financing.
1998-09-30divestiture_reductioncompleted1998-04-011998-06-30TaiwanDRAM joint venture (TI-Acer)other
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Shares sold to Acer Corporation for $120 million cash in Q2 1998, producing a pretax gain of $83 million. Headcount impact not disclosed.
1998-09-30plant_closurecompleted1998-01-011998-03-31JapanDRAM manufacturing joint venture with Hitachi, Ltd.USD 219 (millions)other
f5-10q / MiMo-V2.6-Flash-fp8-HTML
JV discontinued in Q1 1998 with a $219 million pretax charge in cost of revenues; TI acquired the JV's operating assets. Headcount affected not disclosed.
1998-09-30restructuringin_progress3,5001998-06-301998-12-31WorldwideSupport functions and manufacturingUSD 233 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Announced in Q2 1998. Includes voluntary programs, attrition, outsourcing, and layoffs. Charge includes $161M severance, $55M asset writeoffs, $17M vendor/lease charges. Implementation on schedule.
1998-09-30restructuringcompleted1,0451997-01-011997-03-31WorldwideMobile computing and digital imagingUSD 27 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Involuntary employment reductions associated with sale of mobile computing business and termination of digital imaging printing development program in Q1 1997. Essentially completed by end of Q1 1997.
1998-06-30restructuringin_progress3,5001998-06-181998-12-31WorldwideSupport functions and manufacturing operationsUSD 233 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Pretax charge of $233M in Q2 1998: $161M severance, $55M asset writeoffs, $17M vendor cancellation and lease charges. Eliminations via voluntary programs, attrition, outsourcing and layoffs, plus facility closures, over the next few months. Expected annualized savings of $270M when fully implemented by year end. Charge split: $126M in MG&A, $107M in cost of revenues.
1998-06-30restructuringin_progress3,5001998-06-181998-12-31WorldwideSupport functions and manufacturing operationsUSD 233 (millions)restructuring_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Charge comprises $161M severance, $55M asset write-offs, $17M vendor cancellation and lease charges; $126M in MG&A and $107M in cost of revenues. Reductions via voluntary programs, attrition, outsourcing and layoffs, plus closure of several facilities. Estimated annualized cost savings of $270M when fully implemented by year end.
1998-06-30divestiture_reductionin_progress1998-06-181998-12-31WorldwideSemiconductor memory businessother
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Definitive agreement for sale of substantially all memory business assets and two DRAM joint venture stakes to Micron; TI could recognize a material loss at closing. No employee count disclosed.
1998-06-30plant_closurecompleted1998-03-311998-03-31JapanSemiconductor memory (DRAM joint venture with Hitachi)USD 219 (millions)other
f5-10q / MiMo-V2.6-Flash-fp8-HTML
First quarter 1998 pretax charge included in cost of revenues; joint venture discontinued. No employee count disclosed.
1998-06-30divestiture_reductioncompleted1998-06-301998-06-30TaiwanTI-Acer DRAM joint ventureother
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Shares sold to Acer Corporation for $120 million cash, generating an $83 million pretax gain. No employee count disclosed.
1998-06-30restructuringin_progress3,5001998-06-181998-12-31WorldwideSupport functions and manufacturingUSD 233 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Pretax charge of $233 million ($161M severance, $55M asset writeoffs, $17M vendor/lease). Includes voluntary programs, attrition, outsourcing, and layoffs. Expected annualized savings of $270 million.
1998-06-30restructuringcompleted1,0451997-03-311997-03-31WorldwideMobile computing and digital imagingUSD 27 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Historical reference: Q1 1997 severance for involuntary reductions related to mobile computing sale and digital imaging termination. Actions essentially completed by end of Q1 1997.
1998-03-31restructuringcompleted1,0451998-03-311998-03-31worldwideUSD 27 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Severance for involuntary employment reductions related to discontinuance of U.S. DRAM manufacturing joint venture with Hitachi, Ltd. Actions essentially completed by end of quarter.
1997-12-31reduction_in_forcecompleted1,0451997-03-31WorldwideMobile computing business; digital imaging printing development programUSD 27 (millions)other
f5-10k / GLM-5.3-flash-HTML
Q1 1997 pretax charge of $56 million tied to the mobile computing divestiture and termination of the digital imaging printing development program; $27 million was severance for involuntary reductions affecting roughly 1,045 employees, essentially completed by the end of Q1 1997 (quarter-end shown as completion date). The remaining $29 million covered other sale and program-termination costs such as vendor cancellation and lease charges.
1997-12-31reduction_in_forcein_progress2601998Materials & ControlsUSD 42 (millions)other
f5-10k / GLM-5.3-flash-HTML
Q4 1997 pretax charge of $42 million, primarily severance, for cost-reduction actions in the materials & controls business; approximately 260 employees affected, with completion expected during 1998.
1997-12-31divestiture_reductioncompleted1997-01-061997-07-11Defense Systems and Electronics (DSE) — discontinued operationsdiscontinued_operations_footnote
f5-10k / GLM-5.3-flash-HTML
Defense Systems and Electronics business sold to Raytheon Company for $2.95 billion in cash; definitive agreement announced January 6, 1997 and transaction closed July 11, 1997. Financial statements restated to present DSE as discontinued operations. Employees transferred to the buyer are not quantified in the filing. Reported net after-tax gain on sale was $1,473 million (after $876 million of income taxes).
1997-12-31divestiture_reductioncompleted1997-03-31Mobile computing businessItem_1_Business
f5-10k / GLM-5.3-flash-HTML
Mobile computing business sold to The Acer Group in the first quarter of 1997 (quarter-end shown as approximate completion date). Headcount transferred to the buyer is not disclosed; a related Q1 1997 charge included $27 million of severance affecting about 1,045 employees, captured as a separate reduction-in-force record.
1997-12-31divestiture_reductioncompleted1997-06-30Software businessItem_1_Business
f5-10k / GLM-5.3-flash-HTML
Software business sold to Sterling Software, Inc. in the second quarter of 1997 (quarter-end shown as approximate completion date). Headcount not disclosed. The filing separately reports a $66 million pretax gain on the Q2 1997 sale of three divested activities, principally software; the other two businesses sold are not named.
1997-12-31acquisition_additioncompleted1997-03-31Semiconductors — mass storageItem_1_Business
f5-10k / GLM-5.3-flash-HTML
Acquired Intersect Technologies, Inc., a developer and designer of hardware, software and firmware for the mass storage market, in the first quarter of 1997 (quarter-end shown as approximate completion date). No employee count disclosed.
1997-12-31acquisition_additionin_progress1997-11-251998-03-31Semiconductors — high-speed Internet access technologyother
f5-10k / GLM-5.3-flash-HTML
All-cash tender offer for Amati Communications Corporation commenced November 25, 1997 and expired December 23, 1997, with about 78% of shares acquired for $306 million ($20 per share); the balance is being acquired via a second-step merger for $89 million expected in Q1 1998. Includes a $461 million charge for acquired in-process R&D and roughly $121 million of additional acquisition costs, including $73 million of TI stock options issued to replace Amati employee stock options. Headcount not disclosed.
1997-12-31acquisition_additioncompleted1998-03-31Semiconductors — DSP softwareItem_1_Business
f5-10k / GLM-5.3-flash-HTML
Acquired GO DSP Corporation, a developer of software for digital signal processors, in the first quarter of 1998 — after the December 31, 1997 fiscal year-end (quarter-end shown as approximate completion date). No employee count disclosed.
1997-12-31restructuringcompleted1,0451997-03-311997-03-31WorldwideMobile computing and digital imaging printingUSD 56 (millions)other
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Pretax charge of $56M of which $27M was severance for involuntary reductions affecting approximately 1,045 employees; balance of $29M for vendor cancellation and lease charges. Actions completed by end of Q1 1997.
1997-12-31restructuringin_progress2601997-12-311998-12-31WorldwideMaterials & ControlsUSD 42 (millions)other
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Pretax charge of $42M primarily for severance related to cost reduction actions by the materials & controls business, affecting approximately 260 employees; expected completion in 1998.
1997-12-31divestiture_reductioncompleted1997-01-041997-07-11United StatesDefense Systems and Electronics (DSE)discontinued_operations_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
DSE sold to Raytheon for $2.95 billion cash; net gain after $876M taxes was $1,473M. Employee headcount transferred not disclosed.
1997-12-31acquisition_additioncompleted1997-11-251997-12-23United StatesSemiconductor — high-speed Internet / ADSLUSD 461 (millions)other
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Tender offer for ~78% of Amati shares at $20/share ($306M); $461M in-process R&D charge. Employee headcount added not disclosed.
1997-12-31acquisition_additioncompleted1997-03-311997-03-31United StatesSemiconductor — mass storageItem_1_Business
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Intersect Technologies acquired in Q1 1997; headcount not disclosed.
1997-12-31restructuringcompleted1997-06-301997-06-30ThailandSemiconductor — proposed joint venturesUSD 44 (millions)other
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Pretax charge of $44M for termination of agreements related to proposed Thailand joint ventures; employee impact not disclosed.
1997-12-31divestiture_reductioncompleted1997-06-301997-06-30WorldwideSoftware businessItem_1_Business
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Software business sold to Sterling Software in Q2 1997; headcount not disclosed.
1997-12-31restructuringcompleted1,0451997-01-011997-03-31WorldwideMobile computing and digital imaging printingUSD 27 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
First quarter 1997 charge for severance related to sale of mobile computing business and termination of digital imaging printing development program.
1997-12-31restructuringin_progress2601997-10-011998-12-31WorldwideMaterials & ControlsUSD 42 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Fourth quarter 1997 charge primarily for severance costs related to cost reduction actions; expected to be completed in 1998.
1997-09-30reduction_in_forcecompleted1,0451997-03-31WorldwideMobile computing business and digital imaging printing development programUSD 27 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Severance for involuntary employment reductions tied to sale of mobile computing business and termination of digital imaging printing development; actions essentially completed by end of Q1 1997. Part of a $56 million pretax charge, of which $29 million covered other costs such as vendor cancellation and lease charges.
1997-09-30restructuringcompletedThailandJoint-venture agreementsUSD 44 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Pretax operating charge for termination of joint-venture agreements in Thailand; no employee count disclosed.
1997-09-30divestiture_reductioncompleted1997-07-111997-07-11Defense businessUSD 1,473 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Defense business sold to Raytheon Company for $2.95 billion cash; net gain after $876 million income taxes was $1,473 million, reported in discontinued operations. No headcount transferred disclosed.
1997-09-30restructuringcompleted1,0451997-01-011997-03-31WorldwideMobile computing and digital imaging printingUSD 27 (millions)MD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Severance portion of a $56M pretax charge tied to sale of mobile computing business and termination of digital imaging printing program; actions essentially completed by end of Q1 1997.
1997-09-30restructuringcompleted1997-04-011997-06-30ThailandJoint venturesUSD 44 (millions)MD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Pretax operating charge for termination of joint-venture agreements in Thailand; no employee count disclosed.
1997-09-30divestiture_reductioncompleted1997-07-111997-07-11United StatesDefense businessMD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Defense business sold to Raytheon Company for $2.95 billion in cash; no headcount associated with the divestiture disclosed.
1997-09-30divestiture_reductioncompleted1997-04-011997-06-30Software and other businessesMD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Sale of three TI businesses, principally software, generated $177 million of cash; no headcount disclosed.
1997-09-30restructuringcompleted1,0451997-03-311997-03-31worldwideUSD 27 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Severance for involuntary employment reductions associated with mobile computing business sale and digital imaging printing program termination. Actions essentially completed by end of Q1.
1997-09-30restructuringcompleted1997-06-301997-06-30ThailandUSD 44 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Pretax operating charge for termination of joint-venture agreements in Thailand.
1997-06-30reduction_in_forcecompleted1,0451997-03-31WorldwideCompany-wideUSD 27 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Severance for involuntary employment reductions worldwide tied to sale of mobile computing business and termination of digital imaging printing development program; actions essentially completed by end of Q1 1997.
1997-06-30restructuringcompletedMobile computing business; digital imaging printing development programUSD 29 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Balance of a $56 million pretax Q1 charge for other costs of the business sale and program termination, including vendor cancellation and lease charges; no headcount disclosed for this component.
1997-06-30restructuringcompletedThailandJoint-venture agreementsUSD 44 (millions)MD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Pretax operating charge for termination of joint-venture agreements in Thailand; no employee count disclosed.
1997-06-30divestiture_reductioncompleted1997-04-21Software, telecommunications systems, and multipoint systems businessesUSD 66 (millions)MD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Pretax gain from sale of three TI businesses, principally software; headcount removed not disclosed.
1997-06-30divestiture_reductioncompleted1997-01-041997-07-11Defense businessUSD 2,950 (millions)subsequent_events
f5-10q / GLM-5.3-flash-fp4-HTML
Sale of defense business to Raytheon Company closed July 11, 1997 for $2.95 billion cash; expected net gain approximately $1.5 billion to be reported in discontinued operations in Q3 1997. Headcount transferred not disclosed.
1997-06-30reduction_in_forcecompleted1,0451997-011997-03-31WorldwideMobile computing and digital imaging printing development programUSD 27 (millions)other
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Severance portion of a $56 million pretax charge taken on the sale of the mobile computing business and termination of the digital imaging printing program; actions essentially completed by end of Q1 1997. Balance of $27 million covered vendor cancellation and lease costs.
1997-06-30restructuringcompleted1997-04-011997-06-30ThailandJoint venturesUSD 44 (millions)other
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Pretax operating charge for termination of joint-venture agreements in Thailand; no employee count disclosed.
1997-06-30divestiture_reductioncompleted1997-04-211997-06-30Software, telecommunications systems, and multipoint systems businessesMD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Divestiture of three businesses generating a $66 million pretax gain; no headcount removed disclosed.
1997-06-30divestiture_reductioncompleted1997-01-041997-07-11Defense businesssubsequent_events
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Sale of TI's defense business to Raytheon Company for $2.95 billion cash, closed July 11, 1997 (after quarter end); net gain of approximately $1.5 billion to be reported in Q3 1997 discontinued operations. No employee count disclosed.
1997-06-30restructuringcompleted1,0451997-03-311997-03-31WorldwideUSD 27 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Severance for involuntary employment reductions related to mobile computing business sale and digital imaging program termination. Actions essentially completed by end of Q1 1997.
1997-06-30divestiture_reductioncompleted1997-07-111997-07-11Defensesubsequent_events
f5-10q / Qwen3.6-27B-Q8_0
Sale of defense business to Raytheon Company closed July 11, 1997. Headcount not explicitly disclosed in this filing.
1997-03-31reduction_in_forcecompleted1,0451997-03-31WorldwideCompany-wideUSD 27 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Severance for involuntary employment reductions worldwide; actions essentially completed by end of Q1 1997.
1997-03-31divestiture_reductioncompleted1997-02-281997-03-31Mobile computing business (Personal Productivity Products)USD 29 (millions)restructuring_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Sale of mobile computing business to The Acer Group and termination of digital imaging printing development program; $29 million for vendor cancellation and lease charges within a $56 million pretax charge.
1997-03-31divestiture_reductionannounced1997-01-061997-06-30Defense operations (discontinued business)MD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Raytheon to purchase assets of TI's defense operations for $2.95 billion in cash; expected to close in Q2 1997, subject to Hart-Scott-Rodino review. Headcount impact not quantified.
1997-03-31restructuringcompleted1,0451997-03-31WorldwideMobile computing and digital imaging printing development programUSD 27 (millions)other
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Involuntary employment reductions tied to the mobile computing sale and digital imaging printing program termination; severance actions essentially completed by quarter end. Total pretax charge was $56M, of which $29M covered vendor cancellation, lease and other costs.
1997-03-31divestiture_reductioncompleted1997-02-281997-03-31Mobile computing businessMD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Mobile computing business sold to The Acer Group during the quarter; headcount transferred not disclosed.
1997-03-31divestiture_reductionin_progress1997-01-061997-06-30Defense operationsMD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Definitive agreement for Raytheon to purchase TI's defense operations for $2.95 billion cash; expected to close in Q2 1997 subject to antitrust review. Headcount affected not disclosed.
1997-03-31restructuringcompleted1,0451997-03-311997-03-31worldwideUSD 27 (millions)restructuring_footnote
f5-10q / Qwen3.6-27B-Q8_0
Severance for involuntary employment reductions related to sale of mobile computing business and termination of digital imaging printing development program. Actions essentially completed by end of quarter.
1996-12-31restructuringcompleted2,60019961996-12-31United States and worldwideComponents and Digital Products segments (primarily)USD 208 (millions)restructuring_footnote
f5-10k / GLM-5.3-flash-HTML
Fourth-quarter 1996 pretax charge: $91 million severance (US voluntary retirement program plus worldwide involuntary reductions) and $117 million asset write-downs, mainly mobile computing. MD&A discloses segment-level charges of $61 million (Components) and $125 million (Digital Products). Roughly 2,600 employees affected; essentially completed by year-end 1996.
1996-12-31restructuringcompleted70019961996-12-31United StatesDefense Systems and Electronics (discontinued operations)USD 32 (millions)discontinued_operations_footnote
f5-10k / GLM-5.3-flash-HTML
Fourth-quarter 1996 pretax charge for voluntary and involuntary severance; affected approximately 700 DSE employees and was essentially completed by year-end 1996.
1996-12-31divestiture_reductionannounced1997-01-041997-06United StatesDefense Systems and Electronicssubsequent_events
f5-10k / GLM-5.3-flash-HTML
Definitive agreement dated January 4, 1997 (announced January 6) for Raytheon to purchase DSE for $2.95 billion cash; subject to Hart-Scott-Rodino review, expected close second quarter 1997. Disclosed total headcount (59,927) includes DSE employees; standalone DSE headcount not disclosed.
1996-12-31divestiture_reductioncompleted1996Digital Products — Custom Manufacturing Services (CMS)Item_1_Business
f5-10k / GLM-5.3-flash-HTML
Substantially all of the custom manufacturing services business sold in the first quarter of 1996; no employee counts disclosed.
1996-12-31divestiture_reductioncompleted1996Digital Products — printer businessItem_1_Business
f5-10k / GLM-5.3-flash-HTML
Printer business sold in the third quarter of 1996; no employee counts disclosed.
1996-12-31divestiture_reductionannounced1997Digital Products — mobile computingsubsequent_events
f5-10k / GLM-5.3-flash-HTML
Agreement reached subsequent to year-end 1996 to sell the mobile computing business to The Acer Group; TI expects a first-quarter 1997 charge for severance and other costs (amount not disclosed) and will not reflect the unit's operating results after 1996.
1996-12-31acquisition_additioncompleted1996-071996-07Components (semiconductors)other
f5-10k / GLM-5.3-flash-HTML
Acquired Silicon Systems, Inc., a semiconductor enterprise, in July 1996 for $340 million cash plus assumption of $235 million long-term notes to TDK Corp.; included a $192 million acquired in-process R&D charge. Headcount added through the acquisition not disclosed.
1996-12-31restructuringcompleted2,6001996-10-011996-12-31United States and worldwideComponents and Digital Products segmentsUSD 91 (millions)restructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Fourth-quarter 1996 pretax charge of $208 million total, of which $91 million was severance for a U.S. voluntary retirement program and selected involuntary reductions worldwide; actions essentially completed by year-end 1996. The remaining $117 million of the charge was asset write-downs, principally mobile computing.
1996-12-31voluntary_separationcompleted1996-10-011996-12-31United StatesComponents and Digital Products segmentsrestructuring_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
U.S. voluntary retirement program component of the fourth-quarter 1996 cost-reduction actions; headcount not separately disclosed from the combined 2,600 affected employees.
1996-12-31restructuringcompleted7001996-10-011996-12-31United StatesDefense Systems and Electronics (discontinued operations)USD 32 (millions)discontinued_operations_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Fourth-quarter 1996 pretax charge for voluntary and involuntary severance actions affecting approximately 700 DSE employees; essentially completed by year-end 1996.
1996-12-31acquisition_additioncompleted1996-07-011996-07-31United StatesComponents (semiconductor)USD 192 (millions)business_combinations_footnote
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Acquisition of Silicon Systems, Inc. via stock purchase for $340 million cash plus assumption of $235 million 4.0% notes to TDK Corp.; $192 million one-time charge for acquired in-process R&D. Headcount added not disclosed.
1996-12-31divestiture_reductioncompleted1996-01-011996-09-30Not disclosedDigital Products (Custom Manufacturing Services and printer businesses)Item_1_Business
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Substantially all of the custom manufacturing services business sold in the first quarter of 1996 and the printer business sold in the third quarter of 1996; CMS sale generated $132 million of cash. Headcount removed not disclosed.
1996-12-31divestiture_reductionannounced1997-01-041997-06-30United StatesDefense Systems and Electronicssubsequent_events
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Definitive agreement dated January 4, 1997 for Raytheon Company to purchase DSE for $2.95 billion cash; subject to Hart-Scott-Rodino antitrust review, expected to close in second quarter 1997. DSE net assets of $529 million at year-end 1996; headcount not disclosed for the transaction.
1996-12-31divestiture_reductionannounced1997-01-01Not disclosedDigital Products (mobile computing)subsequent_events
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Agreement reached subsequent to year-end 1996 to sell the mobile computing business to The Acer Group; TI will not reflect its operating results after 1996. A first-quarter 1997 charge for severance and other costs was expected. Headcount not disclosed.
1996-12-31restructuringcompleted2,6001996-Q41996-12-31WorldwideComponents and Digital ProductsUSD 208 (millions)restructuring_footnote
f5-10k / Qwen3.6-27B-Q8_0
Pretax charge of $208 million including $91 million for severance (voluntary retirement and involuntary reductions) and $117 million for asset write-downs. Actions essentially completed by year-end 1996.
1996-12-31restructuringcompleted7001996-Q41996-12-31United StatesDefense Systems and Electronics (Discontinued Operations)USD 32 (millions)discontinued_operations_footnote
f5-10k / Qwen3.6-27B-Q8_0
Pretax charge of $32 million for voluntary and involuntary severance actions in DSE. Essentially completed by year-end 1996.
1996-09-30voluntary_separationannounced1996-10-171996-12-31United StatesMost U.S. TI businesses and support areasMD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Enhanced voluntary retirement program offered to about 5,300 eligible U.S.-based employees; charge expected in Q4 1996 depending on participation; count is eligible employees, not actual participants.
1996-09-30acquisition_additioncompleted1996-07-261996-09-30Semiconductors — mixed-signal/analogUSD 192 (millions)business_combinations_footnote
f5-10q / GLM-5.3-flash-fp4-HTML
Acquired Silicon Systems Inc. for $340 million cash plus $235 million note to TDK; $192 million one-time charge for acquired in-process R&D; headcount added not disclosed.
1996-09-30divestiture_reductioncompleted1996-09-30WorldwidePrinter and related supplies businessMD&A
f5-10q / GLM-5.3-flash-fp4-HTML
Sale of certain assets of worldwide printer and related supplies business to Genicom Corporation; business contributed about $28 million of Q3 1996 revenues; headcount removed not disclosed.
1996-09-30voluntary_separationannounced5,3001996-09-301996-12-31United StatesMost U.S. TI businesses and support areasMD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Enhanced voluntary retirement program offered to about 5,300 eligible U.S.-based employees; a Q4 1996 charge expected, sized by participation. 5,300 is the eligible population, not confirmed participants.
1996-09-30acquisition_additioncompletedSilicon Systems, Inc. — mixed-signal/analogUSD 192 (millions)business_combinations_footnote
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Acquired via stock purchase for $340M cash plus assumption of a $235M TDK note; $192M one-time in-process R&D charge. No headcount added disclosed.
1996-09-30divestiture_reductioncompletedWorldwidePrinter and related supplies businessMD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Sale of certain assets of the worldwide printer and supplies business to Genicom Corporation; contributed about $28M in Q3 1996 revenues. No headcount reduction disclosed.
1996-09-30voluntary_separationannounced5,3001996-09-301996-12-31United StatesMost U.S. TI businesses and support areasMD&A
f5-10q / Qwen3.6-27B-Q8_0
Enhanced voluntary retirement program offered to about 5300 eligible U.S.-based employees. Expected to result in a fourth quarter 1996 charge based on participation.
1996-06-30acquisition_additioncompleted1996-06-30Semiconductors (digital signal processing solutions)USD 180 (millions)MD&A
f5-10q / GLM-5.3-flash-fp4-HTML
SSi acquired in July 1996 for $340 million cash plus assumption of a $235 million long-term note to TDK Corp. Headcount added not disclosed. One-time charge for acquired in-process R&D estimated at approximately $180 million ($0.95 per share), no tax offset, to be taken in Q3 1996.
1996-06-30acquisition_additionannounced1996-061996-07United StatesSemiconductors (mixed signal/analog, mass storage components)USD 180 (millions)subsequent_events
f5-10q / MiMo-V2.6-Flash-fp8-HTML
Stock purchase of Silicon Systems Inc. for $340M cash plus assumption of a $235M TDK note; closed July 1996. Planned one-time in-process R&D charge of ~$180M ($0.95/share), no tax offset. Headcount added not disclosed.
1996-06-30divestiture_reductioncompletedCustom Manufacturing unit (CMS)MD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
CMS sold in the first quarter of 1996, generating $132 million of cash; headcount removed not disclosed.
1995-12-31divestiture_reductionannouncedDigital Products — custom manufacturing services businesssubsequent_events
f5-10k / GLM-5.3-flash-HTML
Disclosed in Item 1 (Digital Products) as a post-year-end event: after fiscal year-end 1995 the company reached an agreement to sell substantially all of its custom manufacturing services business. No affected headcount, percentage, or transaction value is disclosed.
1995-12-31divestiture_reductioncompleted1995-05Components — silicon materials operationItem_1_Business
f5-10k / GLM-5.3-flash-HTML
Silicon materials operation was contributed to a joint venture with MEMC Electronic Materials, Inc. in May 1995, with Texas Instruments retaining a minority ownership interest. Disclosed in the raw materials context; no employee counts or charges are disclosed.
1995-12-31divestiture_reductionannounced1996-01-01Digital Products — custom manufacturing servicessubsequent_events
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Agreement reached after fiscal year-end 1995 to sell substantially all of the custom manufacturing services business; no headcount, charge, or completion date disclosed. Announcement date approximate (stated only as subsequent to year-end 1995, before the February 1996 filing).
1995-12-31othercompleted1995-05-01Metallurgical/materials — silicon materials operationItem_1_Business
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Silicon materials operation became part of a joint venture with MEMC Electronic Materials in May 1995, with TI retaining a minority interest; no workforce impact disclosed. Announcement date approximate (month only).
1995-12-31restructuringcompleted1,00019941995-12-31EuropePrimarily semiconductor operations; also nonstrategic digital products linesUSD 132 (millions)other
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Multi-year program announced in Q1 1994 ($83M European restructuring plus $49M divestiture charges); approximately 1,000 employees affected cumulatively, 383 separated in 1994 and most of the remainder separated in 1995 — no precise 1995-only headcount disclosed. Completion delayed by European works councils negotiations, essentially complete by end of 1995.
1995-12-31divestiture_reductionannounced1996Not disclosedDigital Products (custom manufacturing services business)subsequent_events
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Agreement reached subsequent to year-end 1995 to sell substantially all of the custom manufacturing services business; headcount affected not disclosed. Announcement date known only as after 1995-12-31 and before the 1996-02-22 filing date.
1995-12-31acquisition_additioncompleted19951995-12-31United StatesDefense Systems & Electronics (mission planning, logistics management, digital battlefield technologies)MD&A
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Three small defense acquisitions completed during 1995; headcount added not disclosed.
1995-12-31othercompleted1995-051995-05Not disclosedSilicon materials operation (Components/raw materials)Item_1_Business
f5-10k / MiMo-V2.6-Flash-fp8-HTML
Silicon materials operation contributed to a joint venture with MEMC Electronic Materials in May 1995 with TI retaining a minority interest; workforce impact not disclosed.
1995-09-30restructuringcompletedCustom manufacturing services; Personal productivity productsMD&A
f5-10q / MiMo-V2.6-Flash-fp8-HTML
MD&A notes first-quarter 1995 cost-reduction actions including consolidations in these two businesses; no employee counts, dates, or charge amounts disclosed. Filing states these costs were more than offset by favorable royalty accrual adjustments.
1995-09-30restructuringcompleted1995-01-011995-03-31GlobalCustom manufacturing services and personal productivity productsMD&A
f5-10q / Qwen3.6-27B-Q8_0
First quarter 1995 results included cost-reduction actions, including consolidations in custom manufacturing services and personal productivity products. Specific employee counts were not disclosed.