| Period End | Type | Status | Affected | % Workforce | Announced | Expected Completion | Geography | Segment / Function | Charge | Source | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 2025-12-31 | voluntary_separation | completed | 2025-11-30 | United States — Michigan | Electric Utility — J.H. Campbell coal-fueled generating units | USD 48 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Retention incentive program to ensure staffing through planned retirement; aggregate cost $48M deferred as regulatory asset with MPSC-approved recovery over three years. Final payments made November 2025. Separate ongoing retention measures (up to $4M per 90-day emergency order period) continue due to DOE emergency orders extending plant operation. | |||
| 2025-12-31 | other | in_progress | 2025-09-30 | United States — Michigan | Electric Utility — 13 hydroelectric dams | Item_1_Business f5-10k / MiMo-V2.6-Flash-fp8-HTML | Retention incentive program for hydroelectric facility employees contingent on MPSC and FERC approval of the sale. Buyer will offer employment to current employees for at least one year post-sale. Headcount not disclosed. | ||||
| 2025-09-30 | other | completed | 2025-05 | United States (Michigan) | Electric utility — operating, maintenance, and construction bargaining unit | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | Consumers and the Utility Workers Union of America (UWUA) ratified a new five-year collective bargaining contract in May 2025. | ||||
| 2025-09-30 | other | completed | 2025-07 | United States (Michigan) | Customer contact center | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | Consumers and the UWUA ratified a new five-year contract covering customer contact center employees in July 2025. | ||||
| 2025-09-30 | other | completed | 2025-09 | United States (Michigan) | Zeeland plant bargaining unit | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | Consumers and the United Steelworkers ratified a new five-year contract for the Zeeland plant bargaining unit in September 2025. | ||||
| 2025-09-30 | other | in_progress | 2025-11-30 | Michigan | Electric Utility | USD 48 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Retention incentive program for J.H. Campbell plant staff to ensure staffing through planned retirement. Aggregate cost estimated at $48 million; $47 million deferred as regulatory asset as of Sept 30, 2025. Final payments due in Nov 2025. | |||
| 2025-09-30 | other | announced | 2025-09-30 | Michigan | Electric Utility | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Retention incentive program for hydroelectric facility employees pending sale of 13 river dams. Benefits contingent on MPSC and FERC approval. Buyer to offer employment for at least one year post-sale. | ||||
| 2025-06-30 | plant_closure | in_progress | Michigan, United States | Electric utility — J.H. Campbell generating station (1,407 MW) | USD 50 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Planned 2025 retirement of J.H. Campbell; retention incentive program keeps staff through retirement, aggregate cost estimated under $50 million (upper bound), $46 million deferred as regulatory asset at 2025-06-30. Retirement timing disrupted by DOE 202(c) emergency order extending operation through 2025-08-20, with possible further orders. No employee count disclosed. | ||||
| 2025-06-30 | other | in_progress | 2025-12-31 | Michigan | Electric Utility | USD 46 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Retention incentive program for J.H. Campbell plant staff to ensure staffing through 2025 retirement. Cumulative cost incurred and deferred as regulatory asset was $46 million as of June 30, 2025. Total estimated cost less than $50 million. | |||
| 2025-03-31 | other | in_progress | 2025-12-31 | Michigan | Generation / J.H. Campbell Plant | USD 45 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Retention incentive program for J.H. Campbell coal-fueled generating units to ensure staffing through retirement in 2025. Cumulative cost incurred and deferred as regulatory asset was $45 million as of March 31, 2025. Aggregate cost estimated less than $50 million. | |||
| 2025-03-31 | other | completed | Michigan | Workforce Development | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Created a Clean Energy Workforce Development Program for people employed in building trades to receive training and certifications in advanced energy efficiency, lead abatement, and other work. | |||||
| 2024-12-31 | voluntary_separation | in_progress | 2025-12-31 | United States — Michigan | Electric Utility — J.H. Campbell coal-fueled generating units | USD 43 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Cumulative cost deferred as a regulatory asset through 2024-12-31. Aggregate program cost through 2025 estimated under $50 million. Supports staffing through planned 2025 retirement of J.H. Campbell coal units. | |||
| 2024-12-31 | divestiture_reduction | completed | 2024-04-01 | 2024-04-30 | United States — Michigan | Gas Utility — ASP (unregulated) business | discontinued_operations_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Consumers sold its unregulated ASP business for $124 million proceeds with a $110 million gain. Headcount impact not disclosed. Consumers retained a long-term services agreement for billing, collection, and call center services. | |||
| 2024-12-31 | other | announced | 2025-12-31 | United States — Michigan | Electric and Gas Utility — union workforce | Item_1_Business f5-10k / MiMo-V2.6-Flash-fp8-HTML | UWUA and USW collective bargaining agreements expire in 2025. Unions represented 44% of CMS Energy and 46% of Consumers employees. Risk factor notes potential strike or work stoppage could disrupt operations. | ||||
| 2024-12-31 | voluntary_separation | completed | USD 33 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | Absence of 2023 voluntary separation program expenses contributed to $33 million increase in net income in 2024. Implies the program occurred in 2023, but is mentioned in 2024 comparative analysis. No specific headcount provided. | ||||||
| 2024-09-30 | voluntary_separation | completed | Michigan | Corporate / Utility Operations | USD 33 (millions) | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Filing notes 'Absence of 2023 voluntary separation program expenses' of $33 million for the nine months ended Sept 30, 2024, implying the program occurred in the prior year. No employee count disclosed. | ||||
| 2024-09-30 | restructuring | in_progress | 2025-12-31 | Michigan | Electric Utility - J.H. Campbell Generating Station | USD 50 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Retention incentive program to ensure staffing through retirement of J.H. Campbell units in 2025. Aggregate cost estimated at $50 million. Cumulative cost incurred and deferred as of Sept 30, 2024 was $41 million. Employee count not disclosed. | |||
| 2024-06-30 | plant_closure | in_progress | 2025-12-31 | Michigan, United States | Electric utility — J.H. Campbell coal-fueled generating units | USD 50 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Aggregate program cost through 2025 estimated at $50M; $38M deferred as regulatory asset at 2024-06-30; $10M expected in 2024. No employee count disclosed. MPSC approved deferred accounting. | |||
| 2024-06-30 | divestiture_reduction | completed | 2024-04-30 | Michigan, United States | Gas utility — ASP (unregulated) business | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Consumers sold its unregulated ASP business in April 2024 for $124M proceeds with a $110M gain. No headcount associated with the divestiture is disclosed. | ||||
| 2024-06-30 | voluntary_separation | completed | USD 28 (millions) | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Filing notes 'Absence of 2023 voluntary separation program expenses' of $28 million for the six months ended June 30, 2024, compared to 2023. This indicates the program occurred in the prior year and is not an active action in the current period, but is disclosed as a variance driver. | ||||||
| 2024-06-30 | other | in_progress | Clean Energy Workforce Development | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Created a Clean Energy Workforce Development Program for people employed in the building trades to receive training and certifications in advanced energy efficiency, lead abatement, and other work. | ||||||
| 2024-03-31 | other | in_progress | 2025-12-31 | Michigan | Electric Utility | USD 50 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Retention incentive program for J.H. Campbell coal-fueled generating units to ensure staffing through retirement in 2025. Aggregate cost estimated at $50 million; $38 million incurred and deferred as of March 31, 2024. | |||
| 2023-12-31 | voluntary_separation | completed | 400 | 2023-04-01 | 2023-12-31 | United States | Non-union employees across CMS Energy and Consumers | USD 33 (millions) | MD&A f5-10k / MiMo-V2.6-Flash-fp8-HTML | More than 400 employees approved for and accepted early separation; pre-tax charge of $33 million recorded for year ended December 31, 2023 | |
| 2023-12-31 | voluntary_separation | completed | 400 | 2023-04-01 | United States | Non-union employees | USD 33 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | Voluntary separation program for non-union employees announced in April 2023; more than 400 employees approved for and accepted early separation. Pre-tax charge of $33 million recorded. | ||
| 2023-09-30 | voluntary_separation | in_progress | 400 | 2023-04 | United States | Non-union employees across CMS Energy and Consumers | USD 33 (millions) | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | More than 400 employees approved for and accepted early separation; $33M pre-tax charge recorded for the nine months ended September 30, 2023. Filing states 'more than 400' — count is a floor, not exact. | ||
| 2023-09-30 | voluntary_separation | in_progress | 400 | 2023-04-01 | United States | Non-union employees | USD 33 (millions) | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Voluntary separation program for non-union employees announced in April 2023. More than 400 employees approved for and accepted early separation. Pre-tax charge of $33 million recorded for the nine months ended Sept 30, 2023. | ||
| 2023-09-30 | restructuring | in_progress | Retention Benefits [Member] / D.E. Karn Generating Complex [Member] | USD 16,000,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2023-06-30 | voluntary_separation | in_progress | 400 | 2023-04-01 | United States | Non-union employees across CMS Energy and Consumers | USD 28 (millions) | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | More than 400 employees approved for and accepted early separation; $28M pre-tax charge recorded in Q2 2023; additional $6M pre-tax charge expected in Q3 2023. | ||
| 2023-06-30 | voluntary_separation | in_progress | 400 | 2023-04-01 | Michigan | Non-union employees | USD 28 (millions) | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Announced in April 2023. More than 400 employees approved for and accepted early separation. Pre-tax charge of $28 million recorded for Q2 2023. Additional pre-tax charge of $6 million expected in Q3 2023. | ||
| 2023-06-30 | restructuring | in_progress | Retention Benefits [Member] / D.E. Karn Generating Complex [Member] | USD 16,000,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2023-03-31 | voluntary_separation | announced | 2023-04 | United States (Michigan) | Non-union employees | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | Announced April 2023; employees elect to request separation and management decides which to accept. Decisions communicated May 2023 with 45-day election window. Additional expense expected in Q2 2023; headcount and charge not quantified. | ||||
| 2023-03-31 | other | in_progress | 2023-05-31 | United States (Michigan) | Electric utility — D.E. Karn coal plant retention program | USD 2 (millions) | other f5-10q / MiMo-V2.6-Flash-fp8-HTML | Retention incentive program tied to May 2023 coal unit retirement; $2M additional retention benefit cost expected in H1 2023. Aggregate program cost through 2022 was $31M. Deferred as regulatory asset; no employee count disclosed. | |||
| 2023-03-31 | other | in_progress | 2025-12-31 | United States (Michigan) | Electric utility — J.H. Campbell coal plant retention program | USD 16 (millions) | other f5-10q / MiMo-V2.6-Flash-fp8-HTML | Retention incentive program through 2025 plant retirement; $16M of retention benefit costs expected in 2023. Aggregate program cost estimated at $50M through 2025. Deferred as regulatory asset; no employee count disclosed. | |||
| 2023-03-31 | voluntary_separation | announced | 2023-04-01 | United States | Non-union employees | subsequent_events f5-10q / Qwen3.6-27B-Q8_0 | Announced voluntary separation program for non-union employees. Management to decide which requests to accept in May 2023. Expected to result in additional expense in Q2 2023. | ||||
| 2023-03-31 | restructuring | in_progress | Retention Benefits [Member] / D.E. Karn Generating Complex [Member] | USD 16,000,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2022-12-31 | voluntary_separation | completed | 170 | 2022-04-01 | United States | Salaried non-union employees | USD 8 (millions) | MD&A f5-10k / MiMo-V2.6-Flash-fp8-HTML | After-tax charge of $8 million for FY2022; more than 170 employees accepted and were approved for early separation. Filer states staffing levels will be better matched to workload demand. | ||
| 2022-12-31 | voluntary_separation | completed | 170 | 2022-04 | United States | Salaried non-union | USD 8 (millions) | Item 7. MD&A - Other Outlook and Uncertainties f5-10k / Qwen3.6-27B-Q8_0 | Voluntary separation program for salaried non-union employees announced in April 2022. After-tax charge of $8 million recorded for year ended Dec 31, 2022. | ||
| 2022-12-31 | restructuring | in_progress | Severance Benefits [Member] / J.H. Campbell Generating Units [Member] | USD 4,000,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | ||||||
| 2022-12-31 | restructuring | in_progress | Retention Benefits [Member] / D.E. Karn Generating Complex [Member] | USD 16,000,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | ||||||
| 2022-09-30 | voluntary_separation | in_progress | 170 | 2022-04 | United States (Michigan) | Salaried non-union employees | USD 8 (millions) | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | Filer states more than 170 employees accepted and were approved for early separation; charge is after-tax for the nine months ended September 30, 2022. Program also triggered remeasurement of DB Pension Plan A lump-sum settlements. | ||
| 2022-09-30 | voluntary_separation | completed | 170 | 2022-04-01 | United States | Salaried non-union employees | USD 8 (millions) | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Voluntary separation program for salaried non-union employees; after-tax charge of $8 million recorded for nine months ended Sept 30, 2022. | ||
| 2022-09-30 | restructuring | in_progress | Severance Benefits [Member] / J.H. Campbell Generating Units [Member] | USD 4,000,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2022-09-30 | restructuring | in_progress | Retention Benefits [Member] / D.E. Karn Generating Complex [Member] | USD 16,000,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2022-06-30 | voluntary_separation | in_progress | 170 | 2022-04 | United States | Salaried non-union employees | USD 8 (millions) | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | After-tax charge of $8M recorded in Q2 2022. More than 170 employees accepted and were approved for early separation. Company expects future cost savings from improved staffing alignment. | ||
| 2022-06-30 | restructuring | in_progress | United States | Gas utility — coal plant retirement transition (D.E. Karn / J.H. Campbell) | USD 4 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Severance benefits recognized during six months ended June 30, 2022, recorded in other liabilities. Related to coal-fueled generating unit retirements under 2021 IRP; deferred as regulatory asset per MPSC-approved treatment. | ||||
| 2022-06-30 | voluntary_separation | in_progress | 170 | 2022-04-01 | United States | Salaried non-union employees | USD 8 (millions) | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Voluntary separation program for salaried non-union employees announced in April 2022. More than 170 employees accepted and were approved for early separation. After-tax charge of $8 million recorded for the three months ended June 30, 2022. | ||
| 2022-06-30 | restructuring | in_progress | Severance Benefits [Member] / J.H. Campbell Generating Units [Member] | USD 4,000,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2022-06-30 | restructuring | in_progress | Retention Benefits [Member] / D.E. Karn Generating Complex [Member] | USD 16,000,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2022-03-31 | voluntary_separation | announced | 2022-04 | United States (Michigan) | Salaried non-union employees | subsequent_events f5-10q / MiMo-V2.6-Flash-fp8-HTML | Announced April 2022; employees elect to request separation, management decides which to accept. Decisions communicated May 2022 with 45-day election window. Additional expense expected in Q2 2022; no headcount or charge quantified. | ||||
| 2022-03-31 | other | in_progress | 2021-02 | United States (Michigan) | Electric utility — lineworkers | other f5-10q / MiMo-V2.6-Flash-fp8-HTML | Union wage reevaluation arbitration; hearings began Oct 2021, resumed Jan 2022, expected to continue through 2022. No loss estimate possible. | ||||
| 2022-03-31 | other | in_progress | 2019 | 2023-12-31 | United States (Michigan) | Electric utility — D.E. Karn generating complex | USD 35 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Retention incentive program through coal unit retirement in 2023; aggregate cost estimated at $35M through 2023. $16M expensed, $4M capitalized, $8M deferred as regulatory asset at 2022-03-31. No employee count disclosed. | ||
| 2022-03-31 | voluntary_separation | announced | 2022-04 | Michigan | Salaried non-union employees | subsequent_events f5-10q / Qwen3.6-27B-Q8_0 | Announced voluntary separation program for salaried non-union employees in April 2022. Management to decide which requests to accept in May 2022. Expected to result in additional expense in Q2 2022. | ||||
| 2022-03-31 | restructuring | in_progress | Retention Benefits [Member] / D.E. Karn Generating Complex [Member] | USD 16,000,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2021-12-31 | divestiture_reduction | completed | 2021-10-01 | United States (Utah) | EnerBank (industrial bank subsidiary) | discontinued_operations_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | EnerBank acquired by Regions Bank on October 1, 2021; headcount removed not disclosed; pre-tax gain of $657 million recognized | ||||
| 2021-12-31 | restructuring | in_progress | Retention Benefits [Member] / D.E. Karn Generating Complex [Member] | USD 16,000,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | ||||||
| 2021-09-30 | divestiture_reduction | completed | 2021-06-07 | 2021-10-01 | United States (Utah) | EnerBank USA (discontinued operations) | other f5-10q / MiMo-V2.6-Flash-fp8-HTML | EnerBank USA merged with Regions Bank on 2021-10-01; CMS Energy received ~$1.0B proceeds and expects ~$660M pre-tax gain in Q4 2021. No employee headcount associated with the divestiture is disclosed. | |||
| 2021-09-30 | voluntary_separation | in_progress | 2019 | 2023 | United States (Michigan) | Electric utility — D.E. Karn generating complex | USD 35 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Retention incentive program to ensure staffing at D.E. Karn through coal unit retirement in 2023. Aggregate cost through 2023 estimated at $35M; $8M expected in 2021, deferred as regulatory asset. Cumulative expense through 2021-09-30 was $16M. No employee count disclosed. | ||
| 2021-09-30 | voluntary_separation | completed | Michigan | Electric Utility | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Filing notes 'Absence of 2020 voluntary separation plan expenses' in 2021 results, indicating the program was active in the prior year. No specific headcount or charge details provided for the current period. | |||||
| 2021-09-30 | other | in_progress | 2019-01-01 | 2023-12-31 | Michigan | Electric Utility | USD 35 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Retention incentive program for D.E. Karn generating complex staffing through anticipated retirement. Aggregate cost estimated at $35 million through 2023. Cumulative cost incurred and charged to expense was $16 million as of Sept 30, 2021. | ||
| 2021-09-30 | restructuring | in_progress | Retention Benefits [Member] / D.E. Karn Generating Complex [Member] | USD 16,000,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2021-06-30 | voluntary_separation | completed | 2020-01-01 | Michigan | Corporate / Utility | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Filing notes 'Absence of 2020 voluntary separation plan expenses' in the variance analysis for Q2 and YTD 2021, indicating the program was active in the prior year. No specific headcount or charge amounts are disclosed for the current period. | ||||
| 2021-06-30 | other | in_progress | 2019-01-01 | 2023-12-31 | Michigan | Electric Utility | USD 35 (millions) | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Retention incentive program for D.E. Karn generating complex staff through anticipated 2023 retirement. Aggregate cost estimated at $35 million through 2023. $8 million expected to be recognized in 2021. | ||
| 2021-06-30 | restructuring | in_progress | Retention Benefits [Member] / D.E. Karn Generating Complex [Member] | USD 0 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2021-03-31 | voluntary_separation | completed | USD 8 (millions) | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Filing notes 'Absence of 2020 voluntary separation plan expenses' of $8 million in the current quarter comparison, indicating the program was active in the prior year but not the current period. | ||||||
| 2021-03-31 | other | in_progress | 2019-01-01 | 2023-12-31 | Michigan | Electric Utility | USD 35 (millions) | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Retention incentive program announced in 2019 to ensure staffing at D.E. Karn generating complex through 2023. Aggregate cost estimated at $35 million. $8 million expected to be recognized in 2021. | ||
| 2021-03-31 | restructuring | in_progress | Retention Benefits [Member] / D.E. Karn Generating Complex [Member] | USD 16,000,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2020-12-31 | voluntary_separation | completed | 140 | 2019-12 | United States (Michigan) | Non-union employees, CMS Energy and Consumers | USD 9 (millions) | MD&A f5-10k / MiMo-V2.6-Flash-fp8-HTML | After-tax charge of $9 million recorded for the year ended December 31, 2020; 140 employees accepted and were approved for early separation. Program announced December 2019; filer expects future cost savings from better-matched staffing levels. | ||
| 2020-12-31 | other | completed | 2020 | 2025 | United States (Michigan) | UWUA: operating, maintenance, construction, customer contact center; USW: Zeeland plant | Item_1_Business f5-10k / MiMo-V2.6-Flash-fp8-HTML | UWUA and USW agreements expired and new agreements were ratified in 2020, providing 3 percent pay increases to operating, maintenance and construction employees (same annual increase through 2024), 3.5 percent to customer contact center employees, and 3 percent to Zeeland plant employees. New agreements expire in 2025. Affected-employee count not disclosed. | |||
| 2020-12-31 | acquisition_addition | completed | 2020-07 | United States (Texas) | Enterprises | other f5-10k / MiMo-V2.6-Flash-fp8-HTML | CMS Enterprises purchased a 51 percent ownership interest in Aviator Wind Equity Holdings in July 2020; the 525-MW wind project became operational in September 2020. Headcount added through the transaction is not disclosed. | ||||
| 2020-12-31 | other | in_progress | 2019-10 | 2023 | United States (Michigan) | Electric utility — D.E. Karn generating complex | USD 35 (millions) | MD&A f5-10k / MiMo-V2.6-Flash-fp8-HTML | Retention incentive program to ensure staffing through retirement of the D.E. Karn coal units in 2023. Aggregate cost through 2023 estimated at $35 million; $16 million cumulative cost incurred and charged to expense through December 31, 2020, with $3 million capitalized. MPSC approved deferred accounting treatment; $8 million expected to be recognized in 2021. Participating-employee count not disclosed. | ||
| 2020-12-31 | voluntary_separation | completed | 140 | 2019-12 | 2020-12-31 | United States | Non-union employees | USD 9 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | Voluntary separation program for non-union employees announced in Dec 2019. 140 employees accepted and were approved for early separation in 2020. After-tax charge of $9 million recorded. | |
| 2020-12-31 | restructuring | in_progress | Retention Benefits [Member] / D.E. Karn Generating Complex [Member] | USD 16,000,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | ||||||
| 2020-09-30 | voluntary_separation | completed | 140 | 2019-12-01 | United States | Non-union employees | USD 8 (millions) | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | After-tax charge of $8M for nine months ended 2020-09-30; 140 employees accepted and were approved for early separation. Program announced December 2019 for non-union employees. | ||
| 2020-09-30 | other | completed | 2020-10-01 | United States | Operating, maintenance, and construction employees (UWUA bargaining unit) | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | UWUA collective bargaining agreement expired June 2020; new agreement ratified October 2020 providing 3% pay increase effective 2020-06-01. Subsequent-event disclosure. | ||||
| 2020-09-30 | other | in_progress | 2019-10-01 | 2023-12-31 | United States | D.E. Karn generating complex | USD 35 (millions) | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | Aggregate cost estimated at $35M through 2023 to retain staffing through coal unit retirements; up to $15M expense expected in 2020. Cumulative cost charged to expense was $14M as of 2020-09-30. Recovery sought in 2020 electric rate case. | ||
| 2020-09-30 | voluntary_separation | in_progress | 140 | 2019-12-01 | United States | Non-union employees | USD 8 (millions) | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Voluntary separation program for non-union employees announced in Dec 2019. 140 employees accepted and approved for early separation in the nine months ended Sept 30, 2020. After-tax charge of $8 million recorded. | ||
| 2020-09-30 | other | completed | 2020-10-01 | United States | Operating, maintenance, and construction employees | MD&A f5-10q / Qwen3.6-27B-Q8_0 | New UWUA agreement ratified in October 2020 providing 3% pay increase effective June 1, 2020. Headcount not specified. | ||||
| 2020-09-30 | restructuring | in_progress | Retention Benefits [Member] / D.E. Karn Generating Complex [Member] | USD 14,000,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2020-06-30 | voluntary_separation | in_progress | 140 | 2019-12 | United States | Non-union employees across CMS Energy and Consumers | USD 8 (millions) | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | After-tax charge of $8 million recorded for six months ended June 30, 2020; 140 employees accepted and were approved for early separation. Program announced December 2019. | ||
| 2020-06-30 | other | in_progress | 2019-10 | 2023-12-31 | United States | Electric utility — D.E. Karn generating complex | USD 35 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Retention incentive program to ensure staffing through 2023 coal unit retirements. Aggregate cost estimated at $35 million through 2023; $11 million cumulative expense charged as of June 30, 2020; up to $15 million expected in 2020. Recovery sought in 2020 electric rate case. | ||
| 2020-06-30 | other | completed | 2020-06-01 | United States | Operating, maintenance, and construction employees (UWUA bargaining unit) | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | UWUA agreement expired June 2020; in-person negotiations suspended due to COVID-19. Three-percent pay increase effective June 1, 2020 under interim agreement; tentative agreement to be reached within two weeks of lifting in-person restrictions, subject to ratification. | ||||
| 2020-06-30 | voluntary_separation | in_progress | 140 | 2019-12-01 | Non-union employees | USD 8 (millions) | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Voluntary separation program for non-union employees announced in Dec 2019. 140 employees accepted and were approved for early separation in the six months ended June 30, 2020. After-tax charge of $8 million recorded. | |||
| 2020-06-30 | other | in_progress | 2020-06-01 | Michigan | Operating, maintenance, and construction employees | MD&A f5-10q / Qwen3.6-27B-Q8_0 | UWUA agreement expired June 2020. Tentative agreement executed providing 3% pay increase effective June 1, 2020. Ratification pending. | ||||
| 2020-06-30 | restructuring | in_progress | Retention Benefits [Member] / D.E. Karn Generating Complex [Member] | USD 11,000,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2020-03-31 | voluntary_separation | in_progress | 140 | 2019-12 | United States | Non-union employees, CMS Energy and Consumers Energy | USD 8 (millions) | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | After-tax charge for the three months ended March 31, 2020; 140 employees accepted and were approved for early separation. Companies expect future cost savings from better staffing alignment. | ||
| 2020-03-31 | voluntary_separation | in_progress | 140 | 2019-12-01 | United States | Non-union employees | USD 8 (millions) | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Voluntary separation program for non-union employees announced in Dec 2019. 140 employees accepted/approved for early separation in Q1 2020. After-tax charge of $8 million recorded. | ||
| 2020-03-31 | other | in_progress | 2019-10-01 | 2023-12-31 | Michigan | Electric Utility - D.E. Karn Generating Complex | USD 35 (millions) | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Retention incentive program to ensure staffing through 2023 retirement of coal units. Aggregate cost estimated at $35 million through 2023. $4 million expense recognized in Q1 2020. | ||
| 2020-03-31 | restructuring | in_progress | Retention Benefits [Member] / D.E. Karn Generating Complex [Member] | USD 4,000,000 (absolute) | restructuring_footnote f5-10q / no-ai-xblr | ||||||
| 2019-12-31 | voluntary_separation | announced | 2019-12 | United States | Non-union employees | USD 10 (millions) | MD&A f5-10k / MiMo-V2.6-Flash-fp8-HTML | Voluntary separation program for non-union employees announced December 2019; management communicated decisions in January 2020 and affected employees have 45 days to elect separation. Estimated after-tax charge of up to $10 million in 2020; headcount not disclosed. | |||
| 2019-12-31 | other | in_progress | 2019-10 | 2023-12-31 | United States — Essexville, Michigan | Electric utility — D.E. Karn generating complex | USD 35 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Retention incentive program to hold staffing at D.E. Karn through the 2023 retirement of coal units 1 & 2; aggregate cost through 2023 estimated at $35 million, with $15 million of expense expected in 2020. $6 million recognized in 2019. Costs to be sought from customers; participating employee count not disclosed. | ||
| 2019-12-31 | voluntary_separation | announced | 2019-12-31 | 2020-02-14 | United States | Non-union employees | USD 10 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | Voluntary separation program for non-union employees announced in December 2019. After-tax charge of up to $10 million expected in 2020. Employees have 45 days to decide whether to separate after management decisions communicated in January 2020. | ||
| 2019-12-31 | restructuring | in_progress | 2019-10-31 | 2023-12-31 | Michigan | Electric Utility | USD 35 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | Retention incentive program for D.E. Karn generating complex staffing through anticipated retirement of coal-fueled units in 2023. Aggregate cost estimated at $35 million through 2023. $6 million recognized in 2019. | ||
| 2019-12-31 | restructuring | in_progress | Retention And Severance Benefits [Member] / D.E. Karn Generating Complex [Member] | USD 6,000,000 (absolute) | restructuring_footnote f5-10k / no-ai-xblr | ||||||
| 2019-09-30 | other | announced | 2019-10 | 2023 | Michigan | Electric Utility — D.E. Karn generating complex | USD 35 (millions) | other f5-10q / MiMo-V2.6-Flash-fp8-HTML | Retention incentive program announced October 2019 to maintain staffing through planned 2023 coal unit retirement; $6M expense expected in late 2019. Employee count not disclosed. | ||
| 2019-09-30 | other | announced | 2019-10 | 2023-12-31 | Michigan | Electric Utility - D.E. Karn Generating Complex | USD 35 (millions) | subsequent_events f5-10q / Qwen3.6-27B-Q8_0 | Retention incentive program announced in October 2019 to ensure staffing through 2023 retirement of coal units. Aggregate cost estimated at $35 million. $6 million expense expected in late 2019. Employee count not disclosed. | ||
| 2017-12-31 | voluntary_separation | completed | 2017 | 2017-12-31 | Michigan | Electric Utility | MD&A f5-10k / Qwen3.6-27B-Q8_0 | Absence in 2017 of a $6 million charge associated with a 2016 voluntary separation program implies no similar charge in 2017, but specific headcount or charge for 2017 is not explicitly quantified as a distinct action in the text provided, only referenced by absence of prior year charge. However, looking closely at 'Maintenance and Other Operating Expenses' for 2017 vs 2016, it mentions 'absence in 2017 of a $6 million charge associated with a 2016 voluntary separation program'. It does not explicitly state a 2017 voluntary separation occurred. Therefore, this action is likely null for 2017. I will remove this entry. | |||
| 2017-09-30 | voluntary_separation | completed | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Filing notes the 'absence, in 2017, of a 2016 voluntary separation plan' resulting in cost savings of $6 million (Electric Utility) and $4 million (Gas Utility) compared to the prior year. No specific headcount or charge amount for the current period is disclosed. | |||||||
| 2016-12-31 | voluntary_separation | in_progress | 176 | 2016-06 | 2017-03-31 | United States | Non-union employees, CMS Energy and Consumers | USD 11 (millions) | MD&A f5-10k / MiMo-V2.6-Flash-fp8-HTML | 176 employees accepted and were approved for early separation; after hiring replacements, a net reduction of 126 employees is expected. Separations occur in early 2017. | |
| 2016-12-31 | voluntary_separation | completed | 176 | 2016-06-01 | Michigan | Non-union employees | USD 11 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | Voluntary separation program for non-union employees announced in June 2016. 176 employees accepted and were approved for early separation. Net reduction expected to be 126 employees after hiring replacements. | ||
| 2016-09-30 | voluntary_separation | in_progress | 176 | 2016-06 | United States (Michigan) | Non-union employees across CMS Energy and Consumers | USD 11 (millions) | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | 176 employees accepted and were approved for early separation during Q3 2016. After hiring replacements for certain positions, net reduction of 140 employees expected. Charge recorded in Q3 2016. | ||
| 2016-09-30 | voluntary_separation | completed | 176 | 2016-06-01 | Michigan | Non-union employees | USD 11 (millions) | MD&A f5-10q / Qwen3.6-27B-Q8_0 | 176 employees accepted and were approved for early separation. Net reduction expected to be 140 employees after hiring replacements. | ||
| 2016-06-30 | voluntary_separation | announced | 2016-06-30 | United States (Michigan) | Non-union employees, CMS Energy and Consumers | USD 13 (millions) | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | Program announced June 2016; management decisions communicated July 2016 with 45-day election window. Estimated charge range $10M–$15M in 2016. Number of employees affected not disclosed. | |||
| 2016-06-30 | voluntary_separation | announced | 2016-06 | Michigan | Non-union employees | USD 13 (millions) | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Voluntary separation program for non-union employees announced in June 2016. Estimated charge range of $10 million to $15 million in 2016. Management communicated decisions in July 2016. | |||
| 2015-12-31 | acquisition_addition | completed | 2015-12 | 2015-12-31 | Michigan, United States | Electric utility | USD 155 (millions) | business_combinations_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Purchase of a 540-MW natural gas-fueled generating plant in Jackson, Michigan from AlphaGen Power LLC and DPC Juniper, LLC. No headcount added or assumed was disclosed. | ||
| 2015-12-31 | plant_closure | announced | 2016-04-30 | Michigan, United States | Electric utility | Item_1_Business f5-10k / MiMo-V2.6-Flash-fp8-HTML | Retirement of seven coal units (B.C. Cobb 4&5, J.C. Weadock 7&8, J.R. Whiting 1-3) was authorized for securitization of remaining book value; no associated workforce reduction was quantified. Annual electric rate increase reduced by $39 million upon retirement. | ||||
| 2015-12-31 | plant_closure | completed | 2015-06-30 | Michigan, United States | Electric utility | other f5-10k / MiMo-V2.6-Flash-fp8-HTML | Three smaller natural gas-fueled generating units retired in June 2015; remaining book value securitized. No associated workforce reduction was quantified. | ||||
| 2015-09-30 | other | completed | 2015-05 | Michigan, United States | Operating, maintenance, and construction employees | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | UWUA ratified a new five-year collective bargaining agreement with Consumers in May 2015. | ||||
| 2015-09-30 | other | completed | 2015-07 | Michigan, United States | Call center employees | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | UWUA ratified a new five-year collective bargaining agreement with Consumers in July 2015. | ||||
| 2015-09-30 | other | completed | 2015-09 | Michigan, United States | Zeeland employees | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | USW ratified a new five-year collective bargaining agreement with Consumers in September 2015. | ||||
| 2015-09-30 | other | completed | 2015-05-01 | Michigan | Operating, maintenance, and construction employees | MD&A f5-10q / Qwen3.6-27B-Q8_0 | UWUA ratified new five-year agreements with Consumers for operating, maintenance, and construction employees in May 2015. | ||||
| 2015-09-30 | other | completed | 2015-07-01 | Michigan | Call center employees | MD&A f5-10q / Qwen3.6-27B-Q8_0 | UWUA ratified new five-year agreements with Consumers for call center employees in July 2015. | ||||
| 2015-09-30 | other | completed | 2015-09-01 | Zeeland, Michigan | Zeeland employees | MD&A f5-10q / Qwen3.6-27B-Q8_0 | USW ratified a new five-year agreement with Consumers for Zeeland employees in September 2015. | ||||
| 2015-06-30 | other | completed | 2015-05-01 | United States (Michigan) | Operating, maintenance, and construction employees | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | UWUA ratified a new five-year collective bargaining agreement with Consumers for operating, maintenance, and construction employees in May 2015. | ||||
| 2015-06-30 | other | completed | 2015-07-01 | United States (Michigan) | Call center employees | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | UWUA ratified a new five-year collective bargaining agreement with Consumers for call center employees in July 2015 (subsequent event). | ||||
| 2015-06-30 | other | completed | 2015-05-01 | Michigan | Operating, maintenance, and construction | other f5-10q / Qwen3.6-27B-Q8_0 | UWUA ratified new five-year agreement with Consumers for operating, maintenance, and construction employees. | ||||
| 2015-06-30 | other | completed | 2015-07-01 | Michigan | Call center | other f5-10q / Qwen3.6-27B-Q8_0 | UWUA ratified new five-year agreement with Consumers for call center employees. | ||||
| 2015-03-31 | other | announced | 2015-04 | 2015-05 | Michigan, United States | Operating, maintenance, and construction employees (UWUA bargaining unit) | other f5-10q / MiMo-V2.6-Flash-fp8-HTML | Tentative agreement reached in April 2015 on a new five-year collective bargaining agreement with the UWUA; existing agreement expires June 2015 and ratification was expected in May 2015. No affected-employee count or charge disclosed. | |||
| 2014-12-31 | voluntary_separation | completed | Michigan | Corporate | Item 1. Business - Customer Value f5-10k / Qwen3.6-27B-Q8_0 | Consumers undertook initiatives to reduce costs through voluntary separation plans. | |||||
| 2014-09-30 | voluntary_separation | completed | Michigan | Corporate / Utility Operations | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Filing mentions 'voluntary separation plans' as an initiative to reduce costs and minimize rate increases. No specific headcount or charge amounts are disclosed for the current period. | |||||
| 2013-12-31 | voluntary_separation | completed | Michigan | Corporate / Utility | MD&A f5-10k / Qwen3.6-27B-Q8_0 | Filing mentions 'voluntary separation program expenses' of $8 million in 2012 and initiatives to reduce costs through voluntary separation plans in 2013. No specific headcount affected is disclosed for 2013. | |||||
| 2013-06-30 | voluntary_separation | completed | 2012-01-01 | Michigan | Corporate / Utility | USD 8 (millions) | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Filing notes the 'absence, in 2013, of $8 million of voluntary separation programs expenses' compared to 2012, indicating the program was executed in the prior year. No headcount count is provided. | |||
| 2013-03-31 | voluntary_separation | in_progress | Michigan, United States | Consumers (electric and gas utility) | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | MD&A lists a voluntary separation plan among Consumers' cost-reduction initiatives; no employee counts, dates, or severance amounts are disclosed in this filing. | |||||
| 2013-03-31 | voluntary_separation | completed | Michigan | Corporate / Utility | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Filing states Consumers has undertaken initiatives to reduce costs through a 'voluntary separation plan'. No specific headcount or charge amount is disclosed for the current quarter. | |||||
| 2012-12-31 | voluntary_separation | completed | 232 | 2012-04-01 | 2012-07-01 | United States | Salaried employees | USD 12 (millions) | MD&A f5-10k / MiMo-V2.6-Flash-fp8-HTML | CMS Energy announced a voluntary separation program for salaried employees in April 2012; management approved 232 employees for early separation with a majority separation date of July 1, 2012. Charge recorded for the year ended December 31, 2012. | |
| 2012-12-31 | voluntary_separation | completed | 232 | 2012-04-01 | 2012-07-01 | Michigan | Salaried employees | USD 12 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | Voluntary separation program for salaried employees; majority separation date July 1, 2012. | |
| 2012-09-30 | voluntary_separation | completed | 232 | 2012-04-01 | 2012-07-01 | United States | Salaried employees | USD 12 (millions) | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | CMS Energy announced a voluntary separation program for salaried employees in April 2012; majority separation date was July 1, 2012. Charge of $12 million recorded in Q2 2012 (three months ended June 30, 2012). | |
| 2012-09-30 | voluntary_separation | completed | 232 | 2012-04-01 | 2012-07-01 | United States | Salaried employees | USD 12 (millions) | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Announced in April 2012; separation date for majority was July 1, 2012. Charge recorded in Q2 2012. | |
| 2012-06-30 | voluntary_separation | in_progress | 232 | 2012-04-01 | 2012-07-01 | United States (Michigan) | Salaried employees | USD 12 (millions) | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | Program announced April 2012 for salaried employees; majority separation date July 1, 2012. Charge recorded in Q2 2012; program described as approved for 232 employees. | |
| 2012-06-30 | voluntary_separation | in_progress | 232 | 2012-04-01 | 2012-07-01 | Salaried employees | USD 12 (millions) | MD&A f5-10q / Qwen3.6-27B-Q8_0 | CMS Energy announced a voluntary separation program for salaried employees in April 2012. Management approved 232 employees for early separation with a separation date of July 1, 2012. A charge of $12 million was recorded during the three months ended June 30, 2012. | ||
| 2012-03-31 | voluntary_separation | announced | 2012-04 | 2012-07-01 | United States | Salaried employees | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | CMS Energy announced a voluntary separation program for salaried employees; participation level not yet predictable. Target separation date July 1, 2012. | |||
| 2012-03-31 | voluntary_separation | announced | 2012-04 | 2012-07-01 | Salaried employees | subsequent_events f5-10q / Qwen3.6-27B-Q8_0 | CMS Energy announced a voluntary separation program for salaried employees. Target separation date is July 1, 2012. Participation level cannot be predicted. | ||||
| 2011-12-31 | plant_closure | announced | 2011-12-31 | 2015-01-31 | Michigan | Electric utility — coal generation | Item_1_Business f5-10k / MiMo-V2.6-Flash-fp8-HTML | In December 2011 Consumers announced plans to mothball seven smaller coal-fueled units effective January 2015 (B.C. Cobb 4&5, J.C. Weadock, J.R. Whiting and related units). No employee impact, severance charge, or headcount reduction was quantified; options under evaluation include environmental retrofit, gas conversion, decommissioning, or a combination. | |||
| 2011-12-31 | other | completed | 2011-12-31 | Michigan | Electric utility — generation development | Item_1_Business f5-10k / MiMo-V2.6-Flash-fp8-HTML | Consumers formally canceled its planned 830-MW coal-fueled plant at the Karn/Weadock complex in December 2011, citing market conditions and environmental standards. The related $22 million development-cost write-off was recorded in 2010 when the project was deferred; no workforce impact was disclosed. | ||||
| 2011-06-30 | voluntary_separation | completed | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Filing references '$6 million of voluntary separation plan expenses incurred in 2010' as a comparative item. No new voluntary separation actions or associated headcount/charges are disclosed for the current period. | |||||||
| 2010-12-31 | divestiture_reduction | completed | 2011-01-31 | Connecticut | Enterprises (IPP) | discontinued_operations_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | CMS Energy sold its ownership interest in Exeter (scrap-tire IPP) to ReEnergy in January 2011; no employee count disclosed. Related $6 million impairment recorded in 2010 discontinued operations. | ||||
| 2010-09-30 | voluntary_separation | in_progress | Michigan, United States | Consumers Energy — electric and gas utility operations | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | MD&A cites $6M electric and $4M gas voluntary separation plan expenses for nine months ended 2010-09-30; no employee count or program details disclosed. | |||||
| 2010-09-30 | other | completed | 2010-04-30 | Michigan, United States | Consumers Energy — operating, maintenance, and construction employees | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | Union ratified a new five-year collective bargaining agreement in April 2010; agreement changed postretirement health benefits, triggering OPEB remeasurement at 2010-04-30. | ||||
| 2010-09-30 | other | completed | 2010-07-31 | Michigan, United States | Consumers Energy — virtual call center employees | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | Union ratified a new agreement in July 2010, effective August 2010 upon expiration of the prior agreement. | ||||
| 2010-09-30 | other | announced | 2010-10-31 | 2011-01-31 | Michigan, United States | Consumers Energy — Zeeland employees | other f5-10q / MiMo-V2.6-Flash-fp8-HTML | United Steelworkers ratified a new agreement in October 2010; becomes effective January 2011 upon expiration of the prior agreement. Announcement date approximate (October 2010, day not specified). | |||
| 2010-09-30 | voluntary_separation | completed | Michigan | Consumers Energy Company | USD 7 (millions) | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Costs associated with the voluntary separation plan at Consumers. | ||||
| 2010-09-30 | other | completed | 2010-04-01 | Michigan | Consumers Energy Company | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Union ratified new five-year agreement for operating, maintenance, and construction employees. | ||||
| 2010-09-30 | other | completed | 2010-07-01 | Michigan | Consumers Energy Company | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Union ratified new agreement for virtual call center employees. | ||||
| 2010-09-30 | other | announced | 2010-10-01 | 2011-01-01 | Michigan | Consumers Energy Company | MD&A f5-10q / Qwen3.6-27B-Q8_0 | United Steelworkers ratified new agreement for Zeeland employees, effective January 2011. | |||
| 2010-06-30 | voluntary_separation | in_progress | United States | Electric utility and Gas utility | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | Voluntary separation plan expenses referenced in operating expense discussions ($6M electric, $4M gas for six months); no employee count or completion date disclosed. | |||||
| 2010-06-30 | other | completed | 2010-04-30 | United States | Operations, maintenance, and construction | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | Union ratified a new five-year collective bargaining agreement with Consumers in April 2010 covering operating, maintenance, and construction employees; no headcount disclosed. | ||||
| 2010-06-30 | voluntary_separation | completed | Michigan | Consumers Energy | USD 7 (millions) | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Filing discloses $6 million in voluntary separation plan expenses for the three months ended June 30, 2010, and $7 million for the six months ended June 30, 2010. No employee count is provided. | ||||
| 2010-03-31 | other | announced | 2010-04 | 2010-05 | United States (Michigan) | Consumers Energy — Union-represented employees | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | Tentative five-year collective bargaining agreement reached in April 2010; ratification scheduled for May 2010. Prior agreement expires June 2010. Affected employee count not disclosed. | |||
| 2010-03-31 | voluntary_separation | in_progress | United States (Michigan) | Consumers Energy — Electric and Gas Utility segments | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | Voluntary separation plan expenses increased $6M (electric) and $4M (gas) vs. prior-year quarter; no employee count, program size, or completion date disclosed in this filing. | |||||
| 2010-03-31 | voluntary_separation | in_progress | USD 7 (millions) | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Filing reports $7 million decrease in net income due to costs associated with the voluntary separation plan. Specific employee counts are not disclosed. | ||||||
| 2009-12-31 | voluntary_separation | in_progress | 177 | 2009-11 | United States — Michigan | Salaried employees | USD 11 (millions) | MD&A f5-10k / MiMo-V2.6-Flash-fp8-HTML | Voluntary separation program announced November 2009; decisions communicated January 2010. The $11M charge relates to 2010 and covers the combined voluntary and involuntary components of the program. | ||
| 2009-12-31 | voluntary_separation | in_progress | 120 | 2009-11 | United States — Michigan | Union employees | MD&A f5-10k / MiMo-V2.6-Flash-fp8-HTML | Union component of the same voluntary separation program; charge is disclosed only as a combined $11M for voluntary and involuntary components. | |||
| 2009-12-31 | layoff | announced | 76 | 2010-02 | United States — Michigan | Union employees | subsequent_events f5-10k / MiMo-V2.6-Flash-fp8-HTML | Lay-off of additional union employees announced February 2010, after fiscal year-end; included in the combined $11M charge expected to be recognized in 2010. | |||
| 2009-12-31 | voluntary_separation | announced | 177 | 2009-11 | Michigan | Salaried employees | subsequent_events f5-10k / Qwen3.6-27B-Q8_0 | Voluntary separation program announced in Nov 2009; 177 salaried employees approved for early separation in Jan 2010. Part of $11M total charge expected in 2010. | |||
| 2009-12-31 | layoff | announced | 120 | 2009-11 | Michigan | Union employees | subsequent_events f5-10k / Qwen3.6-27B-Q8_0 | 120 union employees approved for early separation in Jan 2010 under program announced Nov 2009. Part of $11M total charge expected in 2010. | |||
| 2009-12-31 | layoff | announced | 76 | 2010-02 | Michigan | Union employees | subsequent_events f5-10k / Qwen3.6-27B-Q8_0 | Additional 76 union employees laid off in Feb 2010. Part of $11M total charge expected in 2010. | |||
| 2007-12-31 | divestiture_reduction | completed | 2007-03-31 | 2007-08-31 | International (Argentina, Middle East, Africa, India, Brazil) | Enterprises | discontinued_operations_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | CMS Energy completed the sale of substantially all international assets during 2007; no headcount associated with the divestitures was disclosed. | |||
| 2007-12-31 | divestiture_reduction | completed | 2007-04-30 | 2007-04-30 | Michigan, United States | Electric utility (Palisades nuclear plant) | other f5-10k / MiMo-V2.6-Flash-fp8-HTML | Palisades sold to Entergy in April 2007; employees transferred to Entergy ceased participating in CMS Energy retirement plans. Number of transferring employees not disclosed. | |||
| 2007-06-30 | divestiture_reduction | completed | 2007-04-01 | 2007-04-01 | Michigan | Electric Utility / Nuclear | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Employees transferred to Entergy as a result of the sale of Palisades nuclear plant in April 2007. No specific headcount disclosed. | |||
| 2007-06-30 | divestiture_reduction | completed | 2007-05-01 | 2007-05-01 | Middle East, Africa, India | Enterprises | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Sale of ownership interest in businesses in Middle East, Africa, and India to TAQA in May 2007. No specific headcount disclosed. | |||
| 2007-06-30 | divestiture_reduction | completed | 2007-06-01 | 2007-06-01 | Brazil | Enterprises | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Sale of CMS Energy Brasil S.A. to CPFL Energia S.A. in June 2007. No specific headcount disclosed. | |||
| 2007-06-30 | divestiture_reduction | completed | 2007-03-01 | 2007-03-01 | Argentina, Michigan | Enterprises / Gas Utility | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Sale of portfolio of businesses in Argentina and northern Michigan non-utility natural gas assets to Lucid Energy in March 2007. No specific headcount disclosed. | |||
| 2007-03-31 | divestiture_reduction | completed | 2007-04-11 | 2007-04-11 | United States (Michigan) | Electric Utility — Palisades nuclear plant | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Employees transferred to Entergy upon Palisades sale; no headcount disclosed. Transferred employees no longer participate in CMS retirement benefit plans. | |||
| 2007-03-31 | voluntary_separation | in_progress | United States (Michigan) | Electric Utility and Gas Utility | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | Voluntary separation program referenced as a driver of increased overhead expense; no employee count, charge, or timeline disclosed. | |||||
| 2007-03-31 | restructuring | in_progress | United States (Michigan) | Utility business (electric and gas) | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | Utility reorganization announced in 2006; charges incurred in Q1 2007 referenced but no employee count or charge amount disclosed. | |||||
| 2007-03-31 | voluntary_separation | in_progress | Michigan | Utility Operations | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Overhead expense increased primarily due to costs related to our voluntary separation program and costs associated with our utility reorganization. | |||||
| 2006-12-31 | restructuring | announced | 2006-11-01 | Michigan, United States | Utility business | Item_1_Business f5-10k / MiMo-V2.6-Flash-fp8-HTML | Reorganization of utility business announced November 2006 to improve operating efficiency, reliability, and customer service. Filing states charges may be incurred in 2007 but does not quantify employees affected or charges. No specific headcount reduction disclosed. | ||||
| 2006-06-30 | divestiture_reduction | announced | 2006-07-11 | 2007-03-31 | United States (Michigan) | Electric Utility — Nuclear Operations (Palisades plant and Big Rock ISFSI) | subsequent_events f5-10q / MiMo-V2.6-Flash-fp8-HTML | Agreement to sell Palisades nuclear plant and Big Rock ISFSI to Entergy for $380M. Asset Sale Agreement provides for offers of employment to all Palisades and Big Rock ISFSI employees at closing; specific employee count not disclosed. Targeted close Q1 2007. | |||
| 2006-06-30 | divestiture_reduction | announced | 2006-07-24 | 2006-12-31 | United States (Michigan) | Enterprises — MCV Partnership and FMLP interests | subsequent_events f5-10q / MiMo-V2.6-Flash-fp8-HTML | Agreement to sell 100% of stock of CMS Midland, Inc. and CMS Midland Holdings Company to GSO Capital Partners/Rockland Capital Energy Investments for $60.5M. Employee headcount impact not disclosed. | |||
| 2005-09-30 | other | completed | United States | Consumers Energy Company — operating, maintenance, construction, and call center employees | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | New 5-year collective bargaining agreements reached and ratified with the Utility Workers Union of America. Operating/maintenance/construction agreement expired 2005-06-01; call center agreement expired 2005-08-01. Approximately 46% of Consumers' employees are union-represented. No employee count or charge disclosed. | |||||
| 2005-03-31 | other | completed | 2005-04-30 | United States (Michigan) | Operating, maintenance, and construction employees | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | New tentative Operating, Maintenance, and Construction Agreement reached with Utility Workers Union of America in April 2005; union membership voted to ratify. Prior agreement expired June 1, 2005. Approximately 46% of employees are union-represented. | ||||
| 2005-03-31 | other | announced | 2005-08-01 | United States (Michigan) | Call center employees | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | Collective bargaining agreement with Utility Workers Union of America for call center employees set to expire August 1, 2005. No negotiation outcome disclosed as of filing date. | ||||
| 2004-12-31 | restructuring | in_progress | 2002-06-01 | United States | Corporate | USD 0 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Multi-year cost reduction program announced June 2002; no restructuring expense recorded in FY2004. Accrual balance decreased from $9M to $5M during FY2004 via $4M in payments. Employee counts not disclosed. | |||
| 2004-12-31 | divestiture_reduction | completed | 2003-06-30 | 2003-06-30 | United States | Natural Gas Transmission | discontinued_operations_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Sale of Panhandle to Southern Union closed June 2003; employee headcount impact not disclosed. Prior-year action retained for context of multi-year divestiture program. | |||
| 2004-12-31 | restructuring | completed | 2002-06-01 | 2004-12-31 | United States | Corporate / CMS ERM | USD 0 (millions) | restructuring_footnote f5-10k / Qwen3.6-27B-Q8_0 | Initiated in June 2002 to reduce annual operating costs. Accrual balance was $5 million at Dec 31, 2004. No new expense recorded in 2004; payments of $4 million made. CMS ERM closed Houston office in 2003 and moved headquarters to Jackson, MI. | ||
| 2004-12-31 | restructuring | in_progress | 2002-06-01 | United States | Corporate / Multiple | USD 0 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Multi-year cost reduction program announced June 2002; FY2004 expense was $0 with $4M in payments; $5M accrual balance remaining at year-end ($2M involuntary termination, $3M lease termination). No employee count disclosed for FY2004 activity. | |||
| 2004-12-31 | divestiture_reduction | completed | Australia | Enterprises — Natural Gas Transmission | discontinued_operations_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Sale of Goldfields and Parmelia business to APT completed August 2004; no headcount impact disclosed | |||||
| 2004-12-31 | divestiture_reduction | completed | Australia | Enterprises — Independent Power Production | discontinued_operations_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Sale of Loy Yang power plant completed April 2004; no headcount impact disclosed | |||||
| 2004-09-30 | restructuring | in_progress | 2002-06-01 | USD 0 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Initiatives announced June 2002 to reduce annual operating costs. No new expense recorded in Q3 2004; payments of $4 million made against prior accruals. | |||||
| 2004-06-30 | restructuring | in_progress | 2002-06-01 | Michigan | Corporate | USD 0 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Initiated in June 2002 to reduce annual operating costs by estimated $50 million. Includes headquarters relocation and employee terminations. No new expense charged in Q2 2004; $3 million paid from accrual. | |||
| 2004-06-30 | restructuring | completed | Michigan | Corporate | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Completed termination of numerous employees, including five officers, as part of the 2002 cost reduction initiatives. | |||||
| 2004-03-31 | restructuring | in_progress | 2002-06-01 | Michigan | Corporate | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Initiated in June 2002 to reduce annual operating costs by estimated $50 million. Actions included relocating headquarters to Jackson, MI, changes to 401(k) and health plans, and termination of numerous employees including five officers. No specific headcount affected disclosed for Q1 2004; accrual balance was $7 million at March 31, 2004. | ||||
| 2003-12-31 | restructuring | completed | 187 | 2002-06-01 | 2003-12-31 | United States | Corporate | USD 3 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Multi-year program announced June 2002 targeting $50M annual cost reduction via HQ relocation, 401(k) and health care changes, and workforce reductions. 187 total officers/employees affected (65 terminated by YE2002, remainder completed in 2003). 2003 expense of $3M for involuntary termination benefits; ending accrual balance $9M. Includes 64 employees terminated plus 123 electing severance. | |
| 2003-12-31 | divestiture_reduction | completed | 2003-06-30 | 2003-07-01 | United States | Natural Gas Transmission (Panhandle Eastern Pipe Line) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Sale of Panhandle to Southern Union closed June 2003. Significant number of Panhandle employees elected to retire effective July 1, 2003. Exact headcount not disclosed. Pension plan retained payment obligations for vested Panhandle employees. | |||
| 2003-12-31 | plant_closure | completed | 2003-07-31 | United States | Corporate Headquarters | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Relocated CMS Energy corporate headquarters from Dearborn, Michigan to Jackson, Michigan in July 2003 as part of the June 2002 restructuring program. Headcount impact not separately disclosed. | ||||
| 2003-12-31 | restructuring | completed | 64 | 2002-06-01 | 2003-12-31 | United States | Corporate | USD 3 (millions) | restructuring_footnote f5-10k / Qwen3.6-27B-Q8_0 | Involuntary termination of 64 employees, including five officers. All remaining terminations completed in 2003. Expense of $3 million recorded in 2003. | |
| 2003-12-31 | voluntary_separation | completed | 123 | 2002-06-01 | 2002-12-31 | United States | Corporate | restructuring_footnote f5-10k / Qwen3.6-27B-Q8_0 | 123 employees elected severance arrangements prior to December 31, 2002. | ||
| 2003-12-31 | divestiture_reduction | completed | 2003-06-01 | 2003-06-01 | United States | Natural Gas Transmission | discontinued_operations_footnote f5-10k / Qwen3.6-27B-Q8_0 | Sale of Panhandle to Southern Union. Pension plan remeasurement and settlement/curtailment losses recorded. Specific headcount not disclosed. | |||
| 2003-12-31 | divestiture_reduction | completed | 2003-07-01 | 2003-07-01 | United States | Natural Gas Transmission | discontinued_operations_footnote f5-10k / Qwen3.6-27B-Q8_0 | Sale of CMS Field Services to Cantera Natural Gas. Specific headcount not disclosed. | |||
| 2003-12-31 | divestiture_reduction | completed | 2003-06-01 | 2003-06-01 | United States | Energy Resource Management | discontinued_operations_footnote f5-10k / Qwen3.6-27B-Q8_0 | Sale of CMS Viron. Specific headcount not disclosed. | |||
| 2003-12-31 | restructuring | completed | 122 | 2002-06-01 | 2003-12-31 | United States | Corporate / Enterprise-wide | USD 3 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Program announced June 2002; 187 total officers/employees affected (64 terminated, 123 elected severance). 65 terminated by end of 2002; remaining 122 completed in 2003. FY2003 charge of $3M for involuntary termination benefits. | |
| 2003-12-31 | divestiture_reduction | completed | 2003-06-30 | 2003-07-01 | United States | Natural Gas Transmission (Panhandle) | discontinued_operations_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Panhandle sold June 2003; significant number of Panhandle employees elected to retire effective July 1, 2003. No specific headcount disclosed. Pension settlement loss of $25M ($16M after-tax) and curtailment gain of $10M ($7M after-tax) recorded in discontinued operations. | |||
| 2003-12-31 | restructuring | completed | 187 | 2002-06 | 2003-12-31 | United States | Corporate | USD 3 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Cumulative program total of 187 officers and employees; 65 terminated by end of 2002, remainder completed in 2003. FY2003 involuntary termination expense was $3M. Program included headquarters relocation, 401(k) and health care plan changes. | |
| 2003-12-31 | voluntary_separation | completed | 2003-07-01 | United States | Natural Gas Transmission (Panhandle) | USD 25 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Significant number of Panhandle employees elected to retire as of July 1, 2003 following sale of Panhandle. Pension settlement loss of $25M ($16M after-tax) plus $10M curtailment gain ($7M after-tax). Headcount not disclosed. | |||
| 2003-09-30 | restructuring | completed | 187 | 2002-06-01 | 2003-12-31 | United States | Corporate | USD 4 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Program announced June 2002 to reduce operating costs ~$50M annually. 64 employees terminated plus 5 officers; 123 elected severance before Dec 31, 2002. All remaining terminations completed in 2003. Nine-month 2003 involuntary termination expense was $4M; ending accrual balance $12M ($5M involuntary termination, $7M lease termination). | |
| 2003-09-30 | other | completed | 2002-06-01 | 2003-07-31 | United States | Corporate | USD 2 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Corporate headquarters relocation from Dearborn to Jackson, Michigan completed July 2003; ~$2M in relocation and headquarters expenses expensed as incurred. Part of broader restructuring program. | ||
| 2003-09-30 | restructuring | completed | 64 | 2002-06-01 | 2003-09-30 | United States | Corporate | USD 1 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Initiated June 2002. 64 employees terminated. All remaining terminations completed in 2003. $1M involuntary termination benefits expensed in Q3 2003. | |
| 2003-09-30 | restructuring | completed | 123 | 2002-06-01 | 2003-09-30 | United States | Corporate | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | 123 employees elected severance arrangements under the June 2002 restructuring initiative. No specific charge disclosed for this voluntary component in Q3. | ||
| 2003-06-30 | restructuring | completed | 187 | 2002-06 | 2003-12-31 | United States (Dearborn, Houston, Michigan) | Corporate, CMS Field Services, CMS MST | USD 3 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Program announced June 2002 to reduce operating costs ~$50M annually. 187 total affected (5 officers, 18 CMS Field Services, 41 CMS MST trading, 31 Dearborn severance electors, 92 Houston severance electors). 65 terminated by Dec 31 2002; remaining completed in 2003. $3M involuntary termination expense recorded in six months ended June 30, 2003. | |
| 2003-06-30 | divestiture_reduction | completed | 2003-06-11 | 2003-06-11 | United States | Natural Gas Transmission (Panhandle) | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | Sale of Panhandle to Southern Union completed June 11, 2003 for ~$1.8B total proceeds. No employee headcount associated with the divestiture disclosed. | |||
| 2003-06-30 | divestiture_reduction | completed | 2003-06 | 2003-06 | United States | Energy Management Services (CMS Viron) | USD 14 (millions) | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | Sale of CMS Viron majority assets to Chevron Energy Solutions closed June 2003. Total loss on sale was $14M ($9M net of tax). No employee headcount disclosed. | ||
| 2003-06-30 | divestiture_reduction | completed | 2003-06 | 2003-06 | United States | Natural Gas Transmission (Guardian Pipeline) | USD 4 (millions) | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | Sale of one-third membership interest in Guardian Pipeline to WPS Resources subsidiary completed June 2003 for $26M. Loss of $4M ($3M after-tax). No employee headcount disclosed. | ||
| 2003-06-30 | divestiture_reduction | completed | 2003-07 | 2003-07 | United States | Natural Gas Transmission (CMS Field Services) | subsequent_events f5-10q / MiMo-V2.6-Flash-fp8-HTML | Sale of CMS Field Services to Cantera Resources completed July 2003 for ~$113M cash plus $50M face value note. Net proceeds ~$100M used to reduce debt. No employee headcount disclosed. | |||
| 2003-06-30 | restructuring | completed | 187 | 2002-06-01 | 2003-12-31 | United States | Corporate, CMS Field Services, CMS MST | USD 3 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Initiated June 2002. Includes termination of 5 officers, 18 CMS Field Services employees, and 41 CMS MST trading group employees. 31 Dearborn-based and 92 Houston employees elected severance. All remaining terminations completed in 2003. $3M expense recorded in first half of 2003. | |
| 2003-06-30 | restructuring | completed | 2002-06-01 | 2003-07-01 | Michigan | Corporate | USD 2 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Relocation of corporate headquarters from Dearborn to Jackson, MI. Relocation completed July 2003. $2M in relocation and other headquarters expenses incurred in 2003. | ||
| 2003-06-30 | voluntary_separation | completed | 2003-06-11 | 2003-07-01 | United States | Panhandle (Discontinued Operations) | USD 13 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Significant number of Panhandle employees elected to retire as of July 1, 2003 following the sale of Panhandle. $13 million after-tax settlement loss recorded pursuant to SFAS No. 88. | ||
| 2003-03-31 | restructuring | in_progress | 64 | 2002-06-30 | 2003-12-31 | United States | CMS Field Services and CMS Marketing, Services and Trading | USD 1 (millions) | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | Program announced June 2002; includes 5 officers, 18 CMS Field Services employees, and 41 CMS MST trading group employees. Remaining terminations to be completed in 2003. | |
| 2003-03-31 | voluntary_separation | in_progress | 123 | 2002-06-30 | 2003-12-31 | United States (Dearborn, Michigan and Houston, Texas) | Corporate headquarters relocation and corporate functions | restructuring_footnote f5-10q / MiMo-V2.6-Flash-fp8-HTML | 31 Dearborn-based and 92 Houston employees elected severance arrangements before December 31, 2002; 65 had been terminated as of that date. Part of broader restructuring including HQ relocation to Jackson, Michigan. | ||
| 2003-03-31 | restructuring | in_progress | 187 | 2002-06-01 | 2003-12-31 | United States | Corporate, Field Services, Marketing Services and Trading | USD 1 (millions) | restructuring_footnote f5-10q / Qwen3.6-27B-Q8_0 | Initiated June 2002. 187 officers/employees terminated or elected severance prior to Dec 31, 2002. Remaining terminations to be completed in 2003. Q1 2003 expense of $1M for involuntary termination benefits. | |
| 2003-03-31 | other | completed | 300 | 2003-03-26 | 2003-04-01 | Michigan | Call Center | other f5-10q / Qwen3.6-27B-Q8_0 | Tentative collective bargaining agreement reached for Call Center employees, effective April 1, 2003. | ||
| 2002-12-31 | restructuring | in_progress | 187 | 2002 | 2003 | United States | Corporate, CMS Field Services, CMS MST trading group | USD 22 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Program includes 5 officers, 18 CMS Field Services employees, 41 CMS MST trading employees, 31 Dearborn-based and 92 Houston employees electing severance; 65 terminated by year-end, remainder in 2003. Additional $11M charge for non-cancelable lease obligations from headquarters relocation to Jackson, MI. | |
| 2002-12-31 | divestiture_reduction | announced | 2002-12-21 | United States | Natural gas transmission (Panhandle) | discontinued_operations_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Definitive agreement to sell Panhandle companies to Southern Union Panhandle Corp. for $662M cash plus $1.166B debt assumption; pending FTC approval under Hart-Scott-Rodino Act. Panhandle had 1,155 FTE employees at year-end. | ||||
| 2002-12-31 | divestiture_reduction | completed | 2002-10-31 | United States, Venezuela, Colombia | Oil and gas exploration and production | discontinued_operations_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | CMS Energy completed exit from oil and gas E&P business through sales of CMS Oil and Gas stock and properties in Venezuela and Colombia; combined after-tax loss of approximately $82M. | ||||
| 2002-12-31 | restructuring | in_progress | 187 | 2002 | 2003 | United States | Corporate, CMS Field Services, CMS MST | USD 33 (millions) | MD&A f5-10k / Qwen3.6-27B-Q8_0 | Termination of 5 officers, 18 CMS Field Services employees, and 41 CMS MST trading group employees. 65 terminated as of Dec 31, 2002; remaining to be completed in 2003. Includes $22M involuntary termination benefits and $11M non-cancelable lease obligations. | |
| 2002-12-31 | restructuring | in_progress | 187 | 2002-01-01 | 2003-12-31 | United States | Corporate / CMS Field Services / CMS MST | USD 22 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Program terminated 5 officers, 18 CMS Field Services employees, 41 CMS MST trading group employees; 31 Dearborn and 92 Houston employees elected severance. 65 of 187 separated by 2002-12-31; remainder expected in 2003. Charge covers involuntary termination benefits only. | |
| 2002-12-31 | restructuring | in_progress | 2002-01-01 | 2003-06-30 | United States | Corporate headquarters relocation | USD 11 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Present value of future non-cancelable lease obligations for relocation of corporate headquarters from Dearborn to Jackson, Michigan; no headcount reduction attributed to this component | ||
| 2002-12-31 | divestiture_reduction | completed | 2002-09-30 | 2002-10-31 | United States / Venezuela / Colombia | Oil and Gas Exploration and Production | discontinued_operations_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Sale of CMS Oil and Gas stock and Venezuelan subsidiary completed September 2002; Colombian properties closed October 2002, completing exit from oil and gas E&P business; headcount not disclosed | |||
| 2002-12-31 | divestiture_reduction | announced | 2002-12-21 | 2003-06-11 | United States | Natural Gas Transmission (Panhandle) | discontinued_operations_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Definitive agreement to sell Panhandle companies signed 2002-12-21; sale completed 2003-06-11 as subsequent event; headcount not disclosed | |||
| 2002-12-31 | divestiture_reduction | announced | 2003-05-01 | 2003-09-30 | United States | CMS Field Services | subsequent_events f5-10k / MiMo-V2.6-Flash-fp8-HTML | Definitive agreement to sell CMS Field Services to Cantera Resources Inc. for $115.5M cash plus $50M note; expected to close Q3 2003; headcount not disclosed | |||
| 2002-12-31 | restructuring | in_progress | 187 | 2002-01-01 | 2003-12-31 | United States | Corporate, CMS Field Services, CMS MST trading group | USD 22 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Program terminated 5 officers, 18 CMS Field Services employees, 41 CMS MST trading group employees; 31 Dearborn and 92 Houston employees elected severance arrangements. Of 187 total, 65 terminated as of 2002-12-31; remainder to be completed in 2003. Announcement date approximate (initiatives announced during 2002). | |
| 2002-12-31 | restructuring | in_progress | 2002-01-01 | 2003-06-30 | United States | Corporate headquarters relocation (Dearborn to Jackson, Michigan) | USD 11 (millions) | restructuring_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Charge represents present value of future non-cancelable lease obligations for new Jackson headquarters; building opened March 2003 and will house approximately 1,450 employees. No headcount reduction attributed to this component. | ||
| 2002-12-31 | divestiture_reduction | completed | 2002-01-01 | 2002-10-31 | United States, Venezuela, Colombia, Equatorial Guinea | Oil and gas exploration and production (CMS Oil and Gas) | discontinued_operations_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | CMS Energy completed exit from oil and gas E&P business through sales of Equatorial Guinea interests (January 2002), Powder River Basin holdings (May 2002), stock of CMS Oil and Gas and Venezuela subsidiary (September 2002), and Colombia properties (October 2002). Headcount not disclosed. | |||
| 2002-12-31 | divestiture_reduction | announced | 2002-12-21 | 2003-06-11 | United States | Natural gas transmission (Panhandle) | discontinued_operations_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Definitive agreement signed 2002-12-21 to sell Panhandle companies to Southern Union Panhandle Corp.; sale completed 2003-06-11. Panhandle had 1,155 FTE at 2002-12-31. Headcount removed not separately disclosed. | |||
| 2002-12-31 | divestiture_reduction | announced | 2003-05-01 | 2003-09-30 | United States | Field Services (CMS Gas Transmission subsidiary) | subsequent_events f5-10k / MiMo-V2.6-Flash-fp8-HTML | Definitive agreement signed May 2003 to sell CMS Field Services to Cantera Resources Inc. for $115.5 million cash plus $50 million note; expected to close Q3 2003. 18 CMS Field Services employees were included in the 2002 restructuring program. | |||
| 2002-12-31 | divestiture_reduction | in_progress | 2002-06-01 | 2003-06-30 | United States | Marketing, Services and Trading (CMS MST wholesale business, CMS Viron) | MD&A f5-10k / MiMo-V2.6-Flash-fp8-HTML | CMS Energy decided to phase out CMS MST wholesale energy trading; sale of wholesale gas book to Sempra closed January 2003 ($17M), agreement to sell wholesale power business to Constellation signed February 2003, agreements to sell CMS Viron businesses signed February 2003. 41 CMS MST trading group employees terminated under 2002 restructuring. | |||
| 2002-09-30 | restructuring | in_progress | 60 | 2002-07-01 | United States | Corporate / CMS Field Services / CMS MST | USD 17 (millions) | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | Terminations of 5 officers, 18 CMS Field Services employees, and 37 CMS MST trading group employees as part of restructuring initiatives begun July 2002. Severance charge of $17M for involuntary termination benefits YTD. | ||
| 2002-09-30 | restructuring | announced | 30 | 2002-09-30 | 2002-12-31 | United States | Corporate / headquarters relocation | USD 5 (millions) | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | Approximately 30 employees expected to be terminated in Q4 2002 as part of headquarters relocation to Jackson, Michigan and additional legal expenses. Total expected Q4 restructuring costs approximately $5M. | |
| 2002-09-30 | restructuring | completed | 25% | 2002-06-30 | United States | CMS MST (Marketing, Services and Trading) | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | CMS MST eliminated its speculative trading business and reduced its workforce by approximately 25 percent. Absolute headcount not disclosed. | |||
| 2002-09-30 | restructuring | in_progress | 5 | 2002-09-30 | Corporate | Executive | USD 17 (millions) | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Involuntary termination benefits for five officers. | ||
| 2002-09-30 | restructuring | in_progress | 18 | 2002-09-30 | United States | CMS Field Services | USD 17 (millions) | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Involuntary termination benefits for 18 CMS Field Services employees. Charge aggregated with officer terminations. | ||
| 2002-09-30 | restructuring | in_progress | 37 | 2002-09-30 | United States | CMS MST Trading | USD 17 (millions) | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Involuntary termination benefits for 37 CMS MST trading group employees. Charge aggregated with officer and Field Services terminations. | ||
| 2002-09-30 | restructuring | announced | 30 | 2002-09-30 | 2002-12-31 | United States | Corporate | USD 5 (millions) | MD&A f5-10q / Qwen3.6-27B-Q8_0 | Expected additional restructuring costs in Q4 2002 related to terminating approximately 30 employees, relocating headquarters, and legal expenses. | |
| 2002-06-30 | reduction_in_force | announced | 50 | 25% | 2002-06 | United States | Marketing, Services and Trading (CMS MST) | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | CMS MST to reduce workforce by approximately 25 percent or 50 people as part of eliminating its speculative trading business; announced June 2002. | ||
| 2002-06-30 | divestiture_reduction | announced | 2002-05 | United States and international | Oil and Gas Exploration and Production (CMS Oil and Gas) | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | CMS Energy discontinued CMS Oil and Gas operations in May 2002; definitive sale agreements signed July/August 2002 for approximately $232 million. No employee count disclosed. | ||||
| 2002-06-30 | divestiture_reduction | announced | 2002-06 | 2003-06-30 | United States | Marketing, Services and Trading — CMS Viron (energy performance contracting) | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | CMS Energy announced plan to sell CMS Viron in June 2002; results reclassified to discontinued operations with a $15 million loss. Management expects sale within one year. No employee count disclosed. | |||
| 2002-06-30 | restructuring | announced | 50 | 2002-06-30 | North America | Marketing, Services and Trading | MD&A f5-10q / Qwen3.6-27B-Q8_0 | CMS MST will reduce its workforce by approximately 25 percent or 50 people. | |||
| 2001-06-30 | other | announced | 2001-04 | 2001-07-01 | Michigan, United States | Consumers — Palisades nuclear plant operations | other f5-10q / MiMo-V2.6-Flash-fp8-HTML | NRC-approved transfer of Palisades plant operating authority to Nuclear Management Company (NMC); salaried Palisades employees became NMC employees on 2001-07-01, union employees remain Consumers employees under NMC supervision. No employee count disclosed. | |||
| 2000-09-30 | other | announced | 2000-10-31 | 2001-06-30 | United States (Michigan) | Electric utility — Palisades nuclear plant operations | subsequent_events f5-10q / MiMo-V2.6-Flash-fp8-HTML | Consumers signed an agreement to become a full partner in Nuclear Management Company (NMC) and transfer responsibility for operating its Palisades plant to NMC. Salaried Palisades employees will become NMC employees in approximately mid-2001; union employees will remain Consumers employees working under NMC supervision. No employee count disclosed. | |||
| 2000-09-30 | other | completed | 2000-06-01 | United States (Michigan) | Consumers — operating, maintenance and construction (union and non-union) | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | New collective bargaining agreement with Utility Workers of America effective June 1, 2000 through June 1, 2005. Change in paid personal absence plan reduced operating expenses by $16 million; no headcount impact disclosed. | ||||
| 2000-06-30 | other | completed | 2000-06-01 | Michigan, United States | Consumers Energy — operating, maintenance and construction | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | New collective bargaining agreement with the Union became effective June 1, 2000, running through June 1, 2005. Consumers was evaluating the financial effect of changes in the agreement. No affected-employee count disclosed. | ||||
| 2000-03-31 | other | announced | 2000-06-01 | Michigan, United States | Consumers Energy — operating, maintenance and construction employees | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | New collective bargaining agreement reached with the Union, subject to ratification by members, expected effective June 1, 2000. Michigan State Utility Workers Council recommends ratification. No employee count disclosed. | ||||
| 1999-12-31 | acquisition_addition | completed | 1999-03-29 | 1999-03-29 | United States | Natural Gas Transmission, Storage and Processing | business_combinations_footnote f5-10k / MiMo-V2.6-Flash-fp8-HTML | Panhandle Eastern Pipe Line Company acquired from Duke Energy for $1.9B cash plus $300M assumed debt; employee headcount added not disclosed | |||
| 1997-09-30 | plant_closure | completed | 1997-08-29 | Michigan, United States | Consumers electric operations — Big Rock Point nuclear power plant | MD&A f5-10q / MiMo-V2.6-Flash-fp8-HTML | Plant closed permanently 1997-08-29 as uneconomical in a competitive environment; decommissioning began September 1997 and is expected to take five to ten years. No employee headcount impact disclosed; decommissioning fund expected adequate to cover costs. | ||||
| 1997-06-30 | plant_closure | announced | 1997-08-29 | Michigan, United States | Consumers electric operations — Big Rock Point nuclear power plant | other f5-10q / MiMo-V2.6-Flash-fp8-HTML | Permanent closure of the Big Rock Point nuclear plant set for August 29, 1997, ahead of the plant's original May 31, 2000 license-end date, because management judged it uneconomical in a more competitive environment. Decommissioning begins September 1997 and is expected to take five to ten years. No affected-employee count, severance charge, or workforce reduction figure is disclosed; the filing states the existing decommissioning fund plus future customer collections and fund earnings are expected to cover decommissioning costs. | ||||
| 1996-03-31 | other | in_progress | Michigan | Industrial (Automotive) | MD&A f5-10q / Qwen3.6-27B-Q8_0 | General Motors strike adversely impacted industrial sales; resolved in late March 1996. |